    PT BASUKI PRATAMA ENGINEERINGproposes to offer,the equipment and

    services contained in this proposalOne Fluid bed Boiler

    Boiler Model : BHF-08-13

    Nominal Rating (MCR) : 8,000 kg/hrHeat output : 5,873 kW

    Design Pressure : 13 bar g

    Design Code : Depnaker RI

    Fuel Specification : Bituminous coal - Indonesia

    Gross Calorific Value : 3500 - 6200 kcal/kg

    Electrical power : 380 V 50 Hz 3 phase

    SALIENT FEATURES

    HIGH EFFICIENCY

    FLUID BED COMBUSTION FOR BURNING COAL

    WELDED MEMBRANE WALL CONSTRUCTION FORFURNACE WALLS

    IN BED TUBE BUNDLE

    RELIABLE FIRE TUBE STEAM GENERATOR WITH LARGEWATER VOLUME

    PACKAGED BOILER WITH LITTLE SITE WORK

    NATURAL CIRCULATION DESIGN

    ELECTRIC VARIABLE SPEEED DRIVE FOR FUEL FEEDCONTROL

    FULL BOILER CAPACITY WITH ANY KIND OF COAL

  • 8/9/2019 BHF 08-13_08R0.pdf

    2/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 2 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    SCOPE OF SUPPLY

    - Fluid bed furnace with casing, refractory lining and air distributor with nozzles

    - Water wall assembly with headers

    - Fire tube boiler shell with two gas passes and necessary nozzles, manhole, head holes etc.

    - In-bed tube bundle with headers.

    - Riser and down comers for natural circulation.

    - Access ladder and platform for boiler shell

    - Insulation and galvanized iron cladding

    - Two number screw feeders with variable frequency drives.

    - Valves and mountings as shown in the P&I diagram

    - Modulating water level control including three way control valve

    - Independent extra low level safety

    - Two feed water pumps

    - Control panel including all panel mounted instruments and starters for all drives.

    - Cyclone separator complete with rotary lock valve.

    - Floor mounted induced draft fan & forced draft fan

    - Operating and maintenance manuals

  • 8/9/2019 BHF 08-13_08R0.pdf

    3/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 3 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    DETAILED EQUIPMENT SPECIFICATIONS

    1 Fluid bed Boiler

    Boiler Model : BHF-08-13

    Type : Horizontal combined

    water and fire tube three pass

    Fire tube size : 76.1 x 3.2 mm thk

    Stay tube size : 76.1 x 5 mm thick

    Diameter of shell : 2200 mm

    Length of shell : 5400 mm

    Total hating area of boiler : 223 m2

    Material of construction

    Shell : SA 515/516 Gr. 60/70

    Tubes : BS 3059 Gr. 320 ERWReversing chamber : Mild steel

    Water wall assembly

    Tube material : BS 3059 Gr 320 ERW

    Tube size : 50.8 x 3.2 mm thk.

    Header material : A 106 Gr. B

    Total heating surface : 21.4 m2

    Construction : Membrane wall

    In bed tube bundle

    Tubes material : DIN 17175 St 35.8

    Seamless tubes

    Tube size : 50.8 x 5 mm thk.

    2 Fluid bed combustor

    Type of combustor : atmospheric fluid bed

    Type of distributor : Steel plate with nozzles

    Material of nozzle : Stainless steel

    Fuel Specification : Bituminous Coal - Indonesia

    Gross Calorific Value : 3500 - 6200 kcal/kg

    Coal size required : 100 % below 15 mm with max

    15% below 2 mm sieve.

    Maximum water content : 20 %

    Type of sand : Silica sandSize : 0.8 1.2 mm

  • 8/9/2019 BHF 08-13_08R0.pdf

    4/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 4 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    3 Forced draft fan

    Quantity : One

    Type : Centrifugal fan

    Type of fluid : Fresh air

    Service temperature : 40 deg. C

    Type of drive : Direct

    Material : Mild steel

    Make : Basuki

    Motor protection : IP 55

    Paint protection : Industrial paint

    Power : 37 kW

    4 Induced draft fan

    Quantity : One

    Type : Centrifugal fan

    Type of fluid : Flue gas

    Max. Service temperature : 300 deg. C

    Type of drive : Indirect drive

    Material : Mild steel

    Make : Basuki

    Motor protection : IP 55

    Paint protection : Heat Resistant paint

    Power : 40 kW

    5 Boiler feed water pump

    Quantity : Two

    Type : Multi stage centrifugal pump

    Orientation : vertical in line

    Capacity : 9.6 m3/hr

    Head : 155 MLC

    Max. Ambient temperature : 40 deg. C

    Max. Fluid working temperature : 120 deg. C

    Rotation : 2900 Rpm

    Connection : Flange

    Power : 7.5 kWMake : Grundfos/KSB

    6 Dust collector

    a. Multicyclone

    Quantity : One

    Type : Multy cyclone with Rotary

    Lock Valve

    Gas temperature : 240 C

    Gas side pressure drop : 100 mm Wg

    Material of construction : Mild steel

  • 8/9/2019 BHF 08-13_08R0.pdf

    5/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 5 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    Attachments to cyclone : Motorized rotary air lock

    Power : 0.37 kW

    b. Wet Scrubber

    Quantity : One

    Type : Ventury scrubber

    Gas side pressure drop : 100 mm Wg

    Material of construction : Stainless steel

    Attachments to scrubber : Droplet separator,

    Water pump

    Water pump

    Type : Single stage centrifugal

    Orientation : Horizontal

    Capacity : 9.6 m3/hr

    Service : Fresh water

    Connection : Flange PN16

    Rotation : 1450 Rpm

    Power : 2.2 kW 6

    7 Safety valves

    Type : Fully lift safety valve with closed

    lifting device closed bonnet

    Nominal pressure : PN 16

    Connection : Flange DIN STD 2533

    Body material : GG-25

    Range temperature : -1 Deg. C up to 300 deg. CQuantity : Two

    Capacity : 8,000 Kg/hr

    Set pressure : 13 barg and 12.5 barg

    Make : ARI, Germany

    8 Thermal insulation

    Material : Mineral wool slabs, lightly resin

    Bonded

    Thickness : 100 mm

    Density : 80 kg/m3

    Cladding material : Galvanized iron sheetThickness : 0.6 mm

    9 Control panel

    Type : Self standing

    Incomer rating : 380 V 50 Hz, 3 phase, 4 wire

    Doors : 1 door front opening type

    The panel includes all panel mounted instruments and drives for all connected motors.

  • 8/9/2019 BHF 08-13_08R0.pdf

    6/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 6 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    10 Ducting for air and flue gas (Optional price)

    Material of construction : Mild steel

    Velocity in ducts : 12 m/s maximum

    Finish coat : Heat resistant paint

    Color : Silver

    11 Coal handling system (Optional price)

    We can offer a complete coal handling plant for the boiler. The coal storage and feeding

    system includes the following components

    a) Coal bunker near boiler

    Capacity : 4 m3

    Height approx. : 8 meters

    Location : Mounted above the screw feeders

    Material of construction : Mild steel bunker on mild steel

    structure

    Finish coal : Industrial paint

    b) Belt Conveyor

    Capacity : 3,000 kg/hr

    Drive power : 2.2 kW

    Accessories :

    Coal receiving hopperCapacity : 2 m3

    Material of construction : Mild steel

    Location : Below ground level

    Finish coal : Industrial paint

    12 Chimney (Optional p rice)

    Type : Self standing chimney

    Diameter : 850 mm at the top

    Height : 20 meters

    Material construction : Carbon steel

    Finish coat : Heat resistant paintAccessories : Ash door

    13 Ladder for chimney (Optional price)

    Type : ladder with cage

    Material : mild steel

    Accessories : service platform

    Finish coat : Industrial paint

  • 8/9/2019 BHF 08-13_08R0.pdf

    7/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 7 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    14 Water Tank (Optional price)

    Type : Horizontal thorispherical disc end

    Water contents : 8 m3

    Material construction : Carbon steel

    Accessories : Discharge Valve and drain valve

    Height of the feed water tank at least 2.5 m depending on feed water temperature

    15 Instrumentation and control including the following

    - Modulating water level control including level transmitter, controller and

    motorized three way control valve

    - Minimum water safety by independent conductivity type level electrodes

    - Boiler pressure safety including two number full lift safety valves, two number

    pressure switches

    - Flue gas temperature control including temperature switch and alarm

    - Water flow meter

    - Two bed temperature indicators with control

    16. Valves and fittings

    The boiler system includes the following valves and fittings. Some of these are installed

    on the pressure part. Others have to be installed by the erection contractor in the water

    piping.

    Globe valve DIN PN 16

    DN 20 - 2 No

    DN 25 - 1 No

    DN 40 - 10 No

    DN 65 - 2 No

    DN 150 - 1 No

    BSP - 5 No

    Needle valves PN 40

    BSP - 6 No

    Blow down valves, Germany PN 40

    DN 20 - 3 No

    DN 40 - 1 No

    Safety valve ARI Germany PN 16

    DN 50/80 - 2 No

    Non return valve Disco checkDN 40 - 3 No

    Three way control valve Regeltechnik Germany, electric motor actuator

    DN 40 - 1 No

    Y strainer DIN PN 16

    DN 65 - 2 No

    Butterfly valve PN 6

    DN 50 - 4 No

    Gauge glass assembly, PN 40

    DN 20 - 2 No

    Pressure Indicator

    Dia. 160 mm - 1 No

  • 8/9/2019 BHF 08-13_08R0.pdf

    8/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 8 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    Dia. 63 mm - 3 No

    17. Manufacturi ng certif icate from Depnaker RI

  • 8/9/2019 BHF 08-13_08R0.pdf

    9/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 9 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    EXCLUSIONS

    1) All civil works including foundations etc.

    2) Piping in between the boiler w/o insulation

    3) Air and flue gas ducting

    4) Electrica l cabling in between the boiler

    5) Chimney, platform & ladder for chimney

    6) Coal bunker

    7) Water tank

    8) Coal belt conveyor

    9) Transportation, Erec tion & commissioning

    10) Boiler house structure with roof and side panels. Control room with airtight

    arrangement

    11) Boiler operation certificate

    12) All spares for operation and commissioning

  • 8/9/2019 BHF 08-13_08R0.pdf

    10/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 10 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    FEED WATER & BOILER WATER QUALITY

    In order to ensure smooth and trouble free operation of the boiler, following

    recommendations are specified for combined water tube and fire tube

    boilers.

    Drum operating pressure 1 to 22 kg/cm g

    1. Feed Water

    Hardness Ppm < 2

    pH at 25 C > 9

    Oxygen, mg/l < 0.02

    Total iron mg/l < 0.05

    Total copper mg/l < 0.01

    Oil/ Grease mg/l < 1

    KMnO4 consumption mg/l < 10

    Conductivity at 25C

    measured after cation

    exch.in H+ form and after

    CO2removal.

    s/cm < 500

    2. Boiler Water

    pH at 25 C 10.5 12

    Phosphate residual (PO4) mg/l 10 - 20

    Total Hardness Mmol/l < 0.2

    Specific electrical

    conductivity at 25Cs/cm 30 7500

    Silica. mg/l < 150

    KMnO4 consumption mg/l < 150

    Sodium sulfite as Na2SO3 mg/l 10 - 30

  • 8/9/2019 BHF 08-13_08R0.pdf

    11/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 11 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    TERMINAL POINTSSteam: At outlet flanges of steam stop valve.

    Outlet of steam vent lines

    Feed water: Inlet of water pump

    Inlet of the steam boiler

    (The connecting piping is excluded.)

    Blowdown/Drain: At the outlet of blow down valves

    Flue gas: Outlet of ID Fan

    Fuel: Inlet of the coal screw feeder

    Electricals: Inlet of instrument control panel.

    Instrument air At one point in the boiler house

    Ash: Outlet of ash drain ports

    combustion air: At the FD fan inlet

  • 8/9/2019 BHF 08-13_08R0.pdf

    12/12

    COAL fired fluid bed boi ler

    PT Basuki Pratama Engineering Page 12 of 12

    D:/Adat/Penawar/Std/BHF-New/BHF22013.doc

    SUPERVISION OF ERECTION AND COMMISSIONING

    We can depute our engineer for supervising the following at additionalcost.

    1 ERECTION:

    Erection of all units at site.

    Installation of control panel and instruments.

    Instrument cable lying.

    Erection of steel chimney, coal bunker, ducting for flue gas, structures for

    accessories, bunker etc.

    Erection of boiler feed water pumps and inter-connecting piping.

    Erection of steam and water piping

    Insulation.

    Refractory lining.

    All power and instrumentation cabling

    All impulse piping

    Dust collector

    2 COMMISSIONING:

    Hydrostatic test

    Feed water system flushing.

    Chemical cleaning of boiler.

    Starting up and initial operation of feed water system, dosing system and

    other units.

    Commissioning of the units.