1
Bi Diameter ring Tinggi ring Berat tanah total KA sub Cawan Cawan+BB sub Cawan+BK sub 8,8 cm 7,92 790,36 22,6 13 2,6 Ka = MA MP = ( 22,6 13) ( 132,6 ) =0,9 Vt = 1 4 X 3,14X 8,8 2 X 7,92 = 481,2 BI = mp vt = berat total 1+ KA VT = 790,36 1 +0,9 481,2 = 0,86 BJ Berat labu (a) Labu+tanah oven (b) Labu+tanah oven+ air 100ml (c) 60,3 71,0 165,0 BJ = mp vp = ba 100−( cb) = 71 60,3 100−( 16571 ) = 1,78 Porositas = 1- ( BI BJ ) X 100% = = 1- ( 0,86 1,78 ) X 100% = 50%

DocumentBi

Embed Size (px)

DESCRIPTION

Laporan Praktikum Manajemen Agroekosistem All1Aji Septian Handoko Putra

Citation preview

Page 1: DocumentBi

Bi

Diameter ring Tinggi ring Berat tanah total

KA sub Cawan Cawan+BB sub Cawan+BK sub

8,8 cm 7,92 790,36 22,6 13 2,6

Ka = MAMP

= (22,6−13)(13−2,6)

=0,9

Vt = 14

X 3,14X 8,82 X 7,92 = 481,2

BI = mpvt

= berat total1+KAVT

= 790,361+0,9481,2

= 0,86

BJ

Berat labu (a) Labu+tanah oven (b) Labu+tanah oven+ air 100ml (c)60,3 71,0 165,0

BJ = mpvp

= b−a

100−(c−b) =

71−60,3100−(165−71)

= 1,78

Porositas = 1- (BIBJ

) X 100% = = 1- (0,861,78

) X 100% = 50%