SA MAINTENANCE & SERVICES (M) SDN BHD (718754 U) BIDANG KEPAKARAN KAMI: PERKHIDMATAN PENYELENGGARAAN MEKANIKAL PENYELENGGARAAN LOJI KERJA-KERJA FABRIKASI KEJUTERAAN AWAM & BINAAN PERKHIDMATAN MEMBEKAL TENAGA KERJA PERKHIDMATAN PEMBEKALAN ALAT GANTI IBU PEJABAT: No. PT 22893, Kg Tok Arun, Off Jalan Santong, 23100 Dungun, Terengganu Darul Iman. Tel : 609-8208141 Fax : 609-8208142 Email :[email protected] Website: www.samase.com.my

BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

Embed Size (px)

Citation preview

Page 1: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

1

SA MAINTENANCE & SERVICES (M) SDN BHD

(718754 U)

BIDANG KEPAKARAN KAMI: • PERKHIDMATAN PENYELENGGARAAN MEKANIKAL • PENYELENGGARAAN LOJI • KERJA-KERJA FABRIKASI • KEJUTERAAN AWAM & BINAAN • PERKHIDMATAN MEMBEKAL TENAGA KERJA • PERKHIDMATAN PEMBEKALAN ALAT GANTI

IBU PEJABAT:

No. PT 22893, Kg Tok Arun,

Off Jalan Santong, 23100 Dungun,

Terengganu Darul Iman.

Tel : 609-8208141

Fax : 609-8208142

Email :[email protected]

Website: www.samase.com.my

Page 2: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

2

1. MAKLUMAT

KORPORAT

Pengenalan

Objektif

Syarikat

Latar Belakang Syarikat

Carta Organisasi

Biodata Pengarah Urusan

2. POLISI SYARIKAT

3. KEUPAYAAN SYARIKAT

Aktiviti Syarikat

Pengalaman Syarikat

4. ASET SYARIKAT

Peralatan dan Kelengkapan

Pengangkutan

5. PENDAFTARAN & LESEN

6. LAMPIRAN

ISI KANDUNGAN

Page 3: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

3

PENGENALAN

SA MAINTENANCE & SERVICES (M) SDN BHD

adalah sebuah syarikat perniagaan bumiputera 100%

yang ditubuhkan dan diperbadankan dibawah Akta

Syarikat 1965 pada 20hb Disember 2005. SA

MAINTENANCE & SERVICES (M) SDN BHD telah mula

bergiat aktif dalam bidang industri minyak and gas pada

11hb April 2007. Syarikat ini menjalankan perniagaan

dengan menyediakan pelbagai perkhidmatan kepada

pelanggan seterusnya membuka peluang pekerjaan

kepada anak-anak muda serta masyarakat bumiputera

dalam bidang sektor minyak dan gas terutamanya di

Kawasan Perindustrian Kerteh, Terengganu.

Kami juga menawarkan perkhidmatan khususnya

Membaikpulih Dandang Stim (Boiler Overhaul) &

Pengandung Tekanan Tak Berapi (UPV), Kejuruteraan

Awam dan Binaan, Penyelenggaraan & Kejuruteraan Loji,

Kerja-Kerja Paip dan Fabrikasi Struktur Logam, Kerja-

Kerja Pemesinan, Perkhidmatan Kebersihan & Rawatan,

Perkhidmatan Membekal Tenaga Kerja dan

Perkhidmatan Pembekalan.

Pelan pertumbuhan kami adalah untuk sentiasa

berusaha ke arah prestasi yang cemerlang, memenuhi

permintaan pelbagai industri dengan menetapkan

penanda aras operasi yang lebih tinggi dan langkah-

langkah kawalan kualiti yang ketat untuk mengekalkan

tahap tinggi profesionalisma dan mengambil pendekatan

yang dinamik, progresif dan inovatif bagi perniagaan

kami.

Page 4: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

4

LATAR BELAKANG SYARIKAT

TARIKH :

DITUBUHKAN

20 DISEMBER 2005

NAMA SYARIKAT : SA MAINTENANCE & SERVICES (M)

SDN BHD

NO. PENDAFTARAN :

SYARIKAT

718754-U

ALAMAT :

MODAL BERBAYAR :

STRUKTUR EKUITI :

NO. PT 22893, KG TOK ARUN,

OFF JALAN SANTONG,

23100 PAKA, DUNGUN,

TERENGGANU DARUL IMAN.

RM 1,000,000.00

MALAYSIAN (BUMIPUTERA 100%)

SETIAUSAHA :

SYARIKAT

(MIA35990)

FADHILATUL ASMA BINTI SAIDI

1107 M, TINGKAT 1

JALAN PEJABAT

20200 KUALA TERENGGANU,

TERENGGANU.

AKAUN BANK :

1. CAWANGAN PAKA,

TERENGGANU

2. CAWANGAN DUNGUN,

TERENGGANU

3.

JURUAUDIT : KUZAIMI & CO

Page 5: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

5

OBJEKTIF SYARIKAT

Mengembangkan dan meningkatkan keupayaan dan

kecekapan kami dalam menyediakan perkhidmatan

berkualiti tinggi dalam bidang Penyelenggaraan dan

Kejuruteraan Loji, Membaikpulih, Servis, Kerja-kerja

“EPCC/TA/SHUTDOWN” terutamanya dalam sektor

minyak & gas serta tenaga.

Menyediakan perkhidmatan yang sangat baik dan harga

yang kompetitif dalam kerja-kerja mekanikal dan

industri perdagangan.

Mencapai kecekapan operasi dengan cara memastikan

penghantaran adalah menepati masa.

Memenuhi keperluan kontrak dan keperluan kualiti

seperti yang dikehendaki oleh pihak pelanggan.

Menyediakan program latihan yang efektif bagi

peningkatan kakitangan yang berterusan.

Mencapai sasaran “0” “Lost Time Injury” dari aspek

Keselamatan, Kesihatan dan Persekitaran.

Page 6: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

6

Page 7: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

7

PROFIL PENGARAH URUSAN

PENGARAH URUSAN

MAT SAID BIN MAMAT

Lebih 30 tahun pengalaman dalam bidang penyelenggaraan mekanikal dan kerja-

kerja servis, projek “EPCC” dan kerja-kerja membaikpulih terutamanya dalam sektor

minyak & gas.

Page 8: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

8

PENGARAH

URUSAN

POLISI SYARIKAT

POLISI SYARIKAT

Page 9: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

9

SA MAINTENANCE & SERVICES (M) SDN BHD

DASAR KUALITI

SA MAINTENANCE & SERVICES (M) SDN BHD (SAMASE) komited untuk menjadi yang terkemuka di

syarikat perkhidmatan penyelenggaraan menyediakan pelanggan dengan kualiti yang tinggi dan

produk nilai tambah. SAMASE komited untuk memenuhi keperluan kualiti pelanggan dan

memastikan kepuasan pelanggan.

Slogan untuk dasar kualiti adalah untuk mendapatkan sumber dan menggunakan ia dalam

perkhidmatan penyelenggaraan yang berkualiti tinggi untuk pengedaran yang cekap kepada

pelanggan tempatan dan asing secara konsisten, seterusnya memenuhi semua spesifikasi standard

dan keperluan melalui pada masa penghantaran dan penyediaan kualiti teknikal dan selepas jualan

perkhidmatan oleh pasukan pakar teknikal yang kompeten.

Dasar Kualiti telah dibangunkan untuk mengendali dan mengekal operasi SAMASE dalam

menghasilkan mutu kerja yang berkualiti melalui perancangan dan organisasi tenaga kerja serta

peralatan bagi mencapai objektif kualiti SAMASE.

Dalam melaksanakan dasar ini kami adalah:

Memastikan 100% penghantaran menepati masa bagi kecekepan operasi.

Memenuhi keperluan kontrak pelanggan dengan keperluan kualiti yang dikehendaki melalui “0”

pemulangan dari pihak pelanggan.

Menyediakan 8 jam program latihan yang efektif bagi peningkatan kakitangan yang berterusan.

Mencapai sasaran “0” Lost Time Injury dari aspek Keselamatan, Kesihatan dan Persekitaran.

MAT SAID BIN MAMAT

Pengarah Urusan 05 September 2018

Page 10: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

10

SA MAINTENANCE & SERVICES (M) SDN BHD

POLISI KESELAMATAN, KESIHATAN & ALAM SEKITAR

SA Maintenance & Services (M) Sdn Bhd (SAMASE) adalah komited untuk melaksanakan segala

aktivitinya termasuk menjalankan kerja-kerja penyelenggaraan & baikpulih dandang, fabrikasi,

perdagangan dan membekalkan tenaga kerja ke arah mewujudkan persekitaran kerja yang

cemerlang dan seterusnya mencapai sasaran kemalangan sifar. SAMASE akan berusaha

mengambil segala langkah-langkah yang munasabah dan praktikal untuk mencegah dan

menghindarkan risiko kecederaan, bahaya kepada kesihatan, kerosakan harta benda dan

pencemaran alam sekitar.

Bagi mencapai matlamat ini, SAMASE akan memastikan bahawa:

Memenuhi segala keperluan undang-undang serta keperluan lain yang berkaitan

dengan aspek kesihatan, keselamatan dan alam sekitar serta piawaian industri dan

amalan-amalan terbaik yang berkaitan;

Pelan kontigensi dan langkah mitigasi disediakan dan dikemaskini bagi memastikan

tindakan yang efektif terhadap situasi kecemasan;

Segala sumber, organisasi, sistem dan latihan disediakan secukupnya;

Hal-hal kesihatan, keselamatan dan alam sekitar yang berkaitan dimaklumkan

kepada kakitangan, kontraktor, pelanggan, pembekal dan masyarakat umum;

Sistem Pengurusan Kesihatan, Keselamatan dan Alam Sekitar (HSE MS) dan

perlaksanaannya diteliti secara berkala bagi memastikan peningkatan yang

berterusan.

SAMASE amat berharap semua pekerja, kontraktor dan sesiapa sahaja yang bekerja

bagi pihak SAMASE untuk mematuhi polisi ini pada setiap masa.

MAT SAID BIN MAMAT Pengarah Urusan

04 Jun 2018

Page 11: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

11

SA MAINTENANCE & SERVICES (M) SDN BHD

POLISI DADAH & ALKOHOL

SA Maintenance & Services (M) Sdn Bhd (SAMASE) komited dalam menyediakan persekitaran

kerja yang selamat, bebas daripada dadah dan alkohol berpandu kepada POLISI DADAH &

ALKOHOL, Akta OSHA 1994 dan meningkatkan keselesaan dan kesihatan pekerja, pelanggan

serta pelawat.

SAMASE telah menyediakan polisi berikut bagi menyatakan komitmen untuk menyedia serta

mengekalkan persekitaran yang selamat, produktif dan bebas dadah.

Polisi ini menyatakan;

Adalah menjadi kesalahan kepada pekerja memiliki, mengedar atau menjual dadah

di tempat kerja merujuk kepada Akta Dadah Berbahaya 1952 dan Akta OSHA 1994.

Adalah menjadi kesalahan kepada pekerja berada bawah pengaruh dadah dan

alkohol semasa menjalankan tugas.

Adalah menjadi tanggungjawab syarikat untuk merancang and menjalankan program

pencegahan yang sesuai untuk pekerja dan keluarganya.

Adalah menjadi penyelesaian syarikat untuk menyediakan perkhidmatan rujukan

dalam membantu pekerja berkaitan masalah dadah dan alkohol.

Adalah menjadi hak syarikat menghantar pekerja untuk menjalani ujian

penyalahgunaan dadah sama ada dalam kawasan atau luar tempat kerja.

Adalah menjadi komitmen syarikat menyediakan sumber yang mencukupi untuk

mencapai serta mengekalkan persekitaran bebas dadah.

Pekerja yang didapati melanggar polisi ini, atau bersalah bawah undang-undang

negara boleh dikenakan tindakan disiplin serta-merta mengikut budi bicara syarikat.

MAT SAID BIN MAMAT Pengarah Urusan

04 Jun 2018

Page 12: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

12

AKTIVITI SYARIKAT

• PERKHIDMATAN PENYELENGGARAAN MEKANIKAL • PENYELENGGARAAN LOJI • KERJA-KERJA FABRIKASI • KEJUTERAAN AWAM & BINAAN • PERKHIDMATAN MEMBEKAL TENAGA KERJA • PERKHIDMATAN PEMBEKALAN ALAT GANTI

Page 13: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

13

PERKHIDMATAN PENYELENGGARAAN MEKANIKAL

Baik Pulih Dandang “(Boiler Overhaul)” & Kerja-kerja Servis Aktiviti utama kami ialah perkhidmatan baikpulih Dandang. Selain itu, kami juga berupaya untuk melakukan penggantian tiub serta memasang dandang baharu.

Pengandung Tekanan Tak Berapi “Unfired Pressure Vessels (UPV)”

Gambar 1: Penggantian Reformer bagi Gas Dandang di Petronas Ammonia.

Gambar 2: Pemeriksaan Ujian Hidrostatik Dandang oleh pihak JKKP di PGB (Utiliti Gebeng)

Gambar 4: Pekerja SAMASE bersama Kakitangan PGB (UK) bagi Pembaharuan CF UPV

Gambar 3: Kerja-kerja bagi Pembahuruan CF UPV di PGB (UG).

AKTIVITI PERNIAGAAN KAMI

Page 14: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

14

Valve Overhaul Services

Penyelenggaraan Loji (Plant Maintenance)

SAMASE bermula daripada sebuah syarikat kontraktor kecil yang menyediakan pembaikan dan perkhidmatan penyelenggaraan loji serta berkembang menjadi salah satu kontraktor yang disegani dalam sektor minyak & gas di Terengganu. Secara tidak lansung berupaya menyediakan perkhidmatan yang lebih kompleks dan bersepadu, termasuk penyelenggaraan loji.

Kerja-kerja utama ialah:

• kerja-kerja Pemulihan • Perlindungan hakisan • Pembaikan Konkrit • Persediaan permukaan “Fireproofing” • “Insulation” • “Waterproofing”

Antara pelanggan SAMASE bagi Syarikat Kumpulan PETRONAS ialah: a) Petronas Penapisan Terengganu Sdn Bhd (PPTSB) b) Petronas Gas Berhad (PGB)

Gas Processing Kerteh - (GPK) Gas Processing Santong - (GPS) Utilities Kerteh - (UK) Utilities Gebeng - (UG) Tanjung Sulong Export Terminal - (TSET)

c) Petronas Chemical Group (PCG)

Petronas Chemical Polyethylene / Ethylene LDPE Petronas Chemical Petronas Chemical Olefin Glycol & Derivative (PCOGD)

Gambar 5: Kerja-kerja “lapping”

Page 15: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

15

• Kerja Paip

Kerja Struktur

Kerja-kerja Fabrikasi Kerja-kerja pra-fabrikasi paip dan struktur besi turut dijalankan di bengkel SAMASE. Kerja fabrikasi adalah berdasarkan spesifikasi daripada pihak pelanggan. Manakala, kualiti pula berdasarkan kepada spesifikasi teknikal pelanggan, piawaian, peraturan dan undang-undang yang berkaitan.

Gambar 6: Aktiviti kimpalan bagi kerja paip yang dilakukan di bengkel.

Gambar 7: Pemasangan struktur jerjak pada kolum.

Page 16: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

16

KEJURUTERAAN AWAM & BINAAN

Kejuruteraan & Kerja-kerja Pemesinan

• Penebat Haba (Panas & Sejuk) Pasukan kami berpengalaman bekerja di dalam loji petrokimia seperti

Loji Pemprosesan Gas, Vinyl Chloride Malaysia, Petronas Ammnonia

Sdn Bhd dan sebagainya.

Gambar 10: Penyediaan bahan penebat di kawasan bengkel sebelum dipasang dalam kawasan loji.

Gambar 11: Pemilihan penebat adalah berdasarkan ketahanan suhu serta haba.

Gambar 9: Aktiviti kerja-kerja kejuruteraan dan pemesinan

Gambar 8: “Flange”

Page 17: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

17

Perkhidmatan Membekal Tenaga Kerja

SAMASE membekalkan tenaga kerja yang berkelayakan dan berpengalaman sama ada secara langsung atau tidak langsung kepada Syarikat Kumpulan Petronas dan juga Kontraktor utama. SAMASE juga mempunyai keupayaan menyediakan pelbagai keperluan tenaga manusia yang kompeten antaranya:

“Confined Space Entry” (kelayakan daripada NIOSH)

Penjaga Ruang Terkurung

Pekerja Am

“Fire Watcher” (kelayakan daripada BOMBA & CEFS)

“High Pressure WaterJetting” (kelayakan daripada NIOSH)

“Authorised Work Leade” (AWL)

• Kerja Penyelenggaraan Mengecat “(Initial/Maintenance Painting)”

Gambar 12: Penyediaan permukaan bagi kerja mengecat pada pengandung tekanan di dalam loji.

Gambar 13: Permukaan asal pengandung tekanan yang memerlukan kerja penyelenggaraan mengecat.

Page 18: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

18

Perkhidmatan Pembekalan Alat Ganti

Kami juga berpengalaman dalam bidang perkhidmatan pembekalan alat ganti untuk industri minyak dan gas seperti paip dan kelengkapan paip, injap, perangkap stim, mesin dan lain-lain.

Gambar 14: Gate Valve bagi kerja pengubahsuaian tiub di Loji PDH, PCMTBE.

Gambar 15: SAMASE juga berupaya membekal nut dan bolt bagi kerja-kerja mekanikal.

Page 19: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

19

PENDAFTARAN & LESEN

KEMENTERIAN KEWANGAN

PETRONAS

CIDB MALAYSIA

JKKP

Page 20: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

20

KEMENTERIAN KEWANGAN

Page 21: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

21

Page 22: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

22

Page 23: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

23

Page 24: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

24

PETRONAS

Page 25: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

25

Page 26: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

26

Page 27: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

27

Page 28: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

28

Page 29: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

29

Page 30: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

30

CIDB MALAYSIA

Page 31: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

31

Page 32: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

32

Page 33: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

33

Page 34: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

34

DOSH

Page 35: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

35

Page 36: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

36

Page 37: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

37

SENARAI ALAT, PERALATAN & PENGANGKUTAN

Page 38: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

38

SENARAI ALAT, PERALATAN & PENGANGKUTAN No Penerangan Kuantiti 1 Transport

Forklift 3T - 1 ea Lorry 3T - Hicom 1 ea

2 Hydrotest equipment & accessories Chart Recorder c/w paper chart – Rototherm (0 to 6000 psi) 1 ea Chart Recorder c/w paper chart – Rototherm (0 to 1500 psi) 1 ea Chart Recodrder c/w paper chart – Rototherm (0 to 500 psi) 1 ea Pressure Gauge – Tecsis (0 to 580 psi) 2 ea Pressure Gauge – Ashcroft (0 to 1450 psi) 2 ea Pressure Gauge – Tecsis (0 to 3500 psi) 2 ea Pressure Gauge – Ashcroft (0 to 3700 psi) 2 ea Pressure Gauge – Tecsis (0 to 5800 psi) 2 ea Hand Pump 2 ea Airless Pump 1 ea

3 Confine Space equipment & accessories Explosion proof hand lamp 8 ea Transformer 4 ea 12” Ventilator Fan c/w hose 8 ea Air Line Trolley Draeger Pas Air Pack 1 1 ea Gas Detector MSA Altair 4 in 1 3 ea

4 Lifting tools & accessories 1 lot Chain block AKITA Level block Elephant Looper Shackle Lifting belt Webbing sling

5 Welding tools & accessories Welding Inverter 240/415V GM3000 Murex 2 ea Welding Inverter IT2000 AC/DC ARC 1 ea Junction Box, 4 outlet 4 ea TIG set 4 ea Welding Cables 500A, Australia Proflex 10 rolls Extension wire TRS 70/0.193/3C MPCI 40 rolls Cutting Torch MK250/251 1 ea Air Angle Grinder 4” ATS 1402A 8 ea Air Angle Grinder 4”, Bosch GWS-8-100Z 16 ea Air Angle Grinder 7”, Bosch 4 ea Air Angle Sander 4”, Bosch 4 ea Straight Grinder, Bosch GGS-5000L 2 ea Air Die grinder ¼” Puma 2 ea MS Baking Oven Force Arc BM151B 150kg 2 ea Quiver 5 ea

Page 39: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

39

6 Tube Working Tools & Accessories

Sugino Tube Expander BK-526 with DM c/w spare roller 1 ea Sugino Tube Expander BK-503 with DM c/w spare roller 1 ea Sugino Drum Mandrel DM-11 for BK Type Tube Expander 1 ea

7 Communication tools Walkie Talkie, Motorola GP-328 IS 16ch UHF 14 ea

8 Fire Safety Preventor 1 lot Fire Extinguisher Fire Water Hose 2” Signage/Signboard

9 Handtools / Powertools 1 lot Spannar Knock Ring Copper Hammer Impact wrench Jig Saw Impact Drill

10 Air Manifold c/w 6 outlets 2 ea 11 Pallet truck 3ton 1 ea 12 Test bench PSV 1 ea 13 Safety harness, c/w carabina, energy absorber, double lanyard large

hook 1 lot

14 Toolbox 1 lot

Gambar 16: Fan Blower bagi aktiviti di dalam ruang terkurung.

Gambar 17: Abah-abah keselamatan bagi kerja-kerja di tempat tinggi.

Page 40: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

40

PENGALAMAN SYARIKAT

• PROJEK SYARIKAT 5 TAHUN TERKINI

• REKOD KONTRAK PERJANJIAN HARGA

Page 41: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

41

PROJEK SYARIKAT 5 TAHUN TERKINI NO PENERANGAN TARIKH PELANGGAN

1.

MECH MAINT-BOILERS (SM5010200): Perform CF Renewal and Repair Boiler F3-791 at Petronas Gas Processing Kerteh (GPK), PGB. (Order No.: 3620381752) (RFQ No.:DTC-KTH/PGB-GPU/2016/0142)

August 2018

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

2.

MECH MAINT-BOILERS (SM5010200): To Perform CF Renewal HRSG D at Utilities Gebeng, Kuantan. (Order Number: 3620397476) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

July 2018

Petronas Gas Bhd, Utilities Gebeng (UG)

3.

MECH MAINT-BOILERS (SM5010300): Perform Damper Rectification Works at E6 – 1201A, E6 – 1201B & E6- 1202A at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number :3620395356) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

July - August 2018

Petronas Gas Bhd, Gas Processing Santong (GPS)

4.

MECH MAINT-BOILERS (SM5010200): To Install Goose Neck at Utilities Kertih, Terengganu Darul Iman (Order Number: 3620393777) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

June 2018

Petronas Gas Bhd, Utility Kerteh (UK)

5.

MECH MAINT-BOILERS (SM5010200): To Rectify Sample Cooler Sink Leak at Utilities Kertih, Terengganu Darul Iman (Order Number: 3620394107) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

June 2018

Petronas Gas Bhd, Utility Kerteh (UK)

6. PCC For Reactor dP PDT Tubing Modification Mac 2018 PDH-PCMTBE, Gebeng

7.

MECH MAINT-BOILERS (SM5010300): Perform Overhaul at HRSG B at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number :3620386084) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

May 2018

Petronas Gas Bhd, Gas Processing Santong (GPS)

8.

MECH MAINT-BOILERS (SM5010300): Perform Overhaul at WHB E6-1201A & E6–1201 B at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number :3620383597 / 3620383596) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

May 2018

Petronas Gas Bhd, Gas Processing Santong (GPS)

9.

METALLIC STRUCTURE/PIPING (SM5090100): # Perform Major GP1 Piping Replacement Provision of manpower, supervision, tools, equipment, materials and consumables to perform Rectification Works of Piping at GPK1, Gas Processsing Plant Complex A, Kertih, Kemaman, Terengganu Darul Iman.

April 2018

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

10.

MECH MAINT-BOILERS (SM5010300): Perform Overhaul at Aux A5-1203A at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number :3620376225) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

Mac 2018

Petronas Gas Bhd, Gas Processing Santong (GPS)

11. Repair castable / Hotspot Boiler 1 and 2 Feb 2018 MTBE, Gebeng

12.

MECH MAINT-BOILERS (SM5010200): Perform CF Renewal and HT Boiler HRSG A at at Utilities Gebeng, Petronas Gas Bhd. (Order No.: 3620362868) (RFQ No.:DTC-KTH/PGB-GPU/2016/0142)

December 2017 Petronas Gas Bhd Utility

Gebeng (UG)

13.

MECH MAINT-BOILERS (SM5010200): To Perform Overhaul at HRSG G at Utilities Kertih, Terengganu Darul Iman (Order Number:3620339868) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

December 2017 Petronas Gas Bhd, Utility

Kerteh (UK)

Page 42: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

42

14.

MECH MAINT-BOILERS (SM5010300): Perform Overhaul at E5/6-1202 at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number : 3620320900) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

June 2017

Petronas Gas Bhd Gas

Processing Santong (GPS)

15.

MECH MAINT-BOILERS (SM5010300): Perform Overhaul at E5-1201A at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number : 3620320913) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

June 2017

Petronas Gas Bhd

Gas Processing Santong (GPS)

16.

MECH MAINT-BOILERS (SM5010300): Perform Overhaul at A 5/6-1203 at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number : 3620326097) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

May 2017

Petronas Gas Bhd

Gas Processing Santong (GPS)

17.

PROVISION OF MANPOWER CONSUMABLES,TOOLS,& EQUIPMENTS TO PERFORM CLEANING & RECTIFICATION WORK FOR MAIN HP BOILER #1, #2, #3 & U-1403 SPENT CAUSTIC INCENERATOR DURING TA 2017 AT PCMTBE SDN BHD. (Order Number :HRSB/PO(T)/17/03/0085) (Contract Number.:SAQ/HRSB/114/17)

March 2017

Chemicals Petronas MTBE Sdn

Bhd.

18.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): D-4402 Waste Storage Tank at Petronas Chemicals Derivatives Sdn Bhd. (Order Number : 3620310916) (Contract Number.: DTC-KTH/PCDSB/2016/0091)

March 2017

Petronas Chemicals Derivaties Sdn Bhd.

19.

MECH MAINT-BOILERS (SM5010200): Rectify BFW Pump A Check Valve Passing at Utility Gebeng Plant (UG), PGB. (Order No. : 3620308971) (RFQ No.: DTC-KTH/PGB-GPU/2016/0142)

March 2017

Petronas Gas Bhd Utility Gebeng

(UG)

20.

MECH MAINT-BOILERS (SM5010300):

Perform Overhaul at E6-1201A at Gas Processing Plant Santong (GPS), Petronas

Gas Bhd.

(Order Number : 3620307019) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

February

2017

Petronas Gas Bhd

Gas Processing

Santong (GPS)

21.

MECH MAINT-BOILERS (SM5010300): Perform Overhaul at E6-1201B at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number : 3620307020) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

February 2017

Petronas Gas Bhd Gas Processing Santong (GPS)

22.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE & STLE F-106 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.

February 2017

Petronas Chemicals Ethylene Sdn.Bhd.

23.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): E-6104 Suspected Tubing Leak Rectification at Petronas Chemicals Derivatives Sdn Bhd. Perform preliminary leak test to detect leakage (Order Number : 3620305518) (Contract Number.: DTC-KTH/PCDSB/2016/0091)

February 2017

Petronas Chemicals

Derivaties Sdn Bhd

24.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): Furnace #3 Vaccum Cleaning Services at Petronas Chemicals Derivatives Sdn Bhd. (Order Number : 3620304458) (Contract Number.: DTC-KTH/PCDSB/2016/0091)

February 2017

Petronas Chemicals Derivaties Sdn Bhd.

Page 43: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

43

25.

MECH MAINT-BOILERS (SM5010300): Perform Tube Rectification F3-781 at Gas Processing Plant Kertih (GPK), Petronas Gas Bhd. (Order Number : 3620304484) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

February 2017

Petronas Gas Bhd, Gas

Processing Kerteh (GPK)

26.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): Furnace #5 Routine Shutdown Services at Petronas Chemicals Derivatives Sdn Bhd. (Order Number : 3620304458) (Contract Number.: DTC-KTH/PCDSB/2016/0091)

February 2017

Petronas Chemicals

Derivaties Sdn Bhd

27.

MECH MAINT-BOILERS (SM5010300): PR# FGRU Fan Cooler Tube Pluggin g at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number : 4120164625) (Contract No.: 6200172122)

January 2017

Petronas Gas Bhd Gas Processing Santong (GPS)

28.

MECH MAINT-BOILERS (SM5010200): To Perform Defect Rectification at HRSG C at Utilities Kertih, Terengganu Darul Iman. (Order Number: 3620298583) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

January 2017

Petronas Gas Bhd, Utility Kerteh (UK)

29.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): MLM-VG-5104 Overhaul Services & JIT (HTW) a (Order Number: 3620298090) (Contract Number.: DTC-KTH/PCDSB/2016/0091 )

January 2017

Petronas Chemicals Derivaties Sdn Bhd.

30.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE F-105 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number : 3620297685) RFQ Number.: 6200092922)

January 2017

Petronas Chemicals

Ethylene Sdn Bhd

31.

SPECIAL MAINT- HYDROJETTING (SS1130000): STLE F-106 Cleaning for work at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. STLE: Secondary Transfer Line Exchanger

(Order Number : 3620288745) (RFQ Number. : 6200092922)

January 2017

Petronas Chemicals

Ethylene Sdn Bhd

32.

MECH MAINT-BOILERS (SM5010200): To Perform Boiler Overhaul at F3-781 at Gas Processsing Plant Complex A, Kertih, Kemaman, Terengganu Darul Iman. (Order Number : 3620292560) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

December 2016

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

33.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700): PR# Perform CF Renewal for Water Treatment Unit at 0401 at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number : 4120162255) (Contract No. : 6200168571)

December 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

34.

MECH MAINT-BOILERS (SM5010200): To Perform Overhaul at HRSG C at Utilities Kertih, Terengganu Darul Iman (Order Number: 3620291607) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

December 2016

Petronas Gas Bhd, Utility Kerteh (UK)

35.

MECH MAINT-BOILERS (SM5010200): To supply manpower, materials, and equipment to perform hydrostatic test at HRSG B Utility Gebeng Plant (UG), PGB. (Order No.: 3620291608) (RFQ No.:DTC-KTH/PGB-GPU/2016/0142)

December 2016

Petronas Gas Bhd Utility Gebeng (UG)

Page 44: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

44

36.

MECH MAINT-BOILERS (SM5010200): To Perform Tube Rectification HRSG B at Utilities Gebeng Plant (UG), Gebeng, Kuantan, Pahang. (Order Number: 3620291608) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

December 2016

Petronas Gas Bhd Utility Gebeng

(UG)

37.

MECH MAINT-BOILERS (SM5010200): To Perform Overhaul at HRSG B at Utilities Gebeng Plant (UG), Gebeng, Kuantan, Pahang. (Order Number: 3620291607) (Contract No.: DTC-KTH/PGB-GPU/2016/0142)

December 2016

Petronas Gas Bhd Utility

Gebeng (UG)

38.

MECH MAINT-BOILERS (SM5010200): To Perform peephole at HRSG A at Utilities Gebeng Plant (UG), Gebeng, Kuantan, Pahang. Scope of works. (Order Number: 3620286916) (Contract No.: DTC-KTH/PGB-GPU/2016/0142

November 2016

Petronas Gas Bhd Utility Gebeng

(UG)

39.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): F-1304 Routine Shutdown (Manpower) & E-1314 Cleaning (Order Number: 3620289085) (Contract Number.: DTC-KTH/PCDSB/2016/0091 )

November 2016

Petronas Chemicals Derivaties Sdn Bhd.

40.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE & STLE F-105 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. PTLE: Primary Transfer Line Exchanger STLE: Secondary Transfer Line Exchanger

(Order Number: 3620268219) (RFQ Number.: 6200092922)

November 2016

Petronas Chemicals

Ethylene Sdn Bhd

41.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): To Perform E-1324 SQE Cleaning at Petronas Chemicals Derivatives Sdn Bhd. (Order Number: 3620288705) (Contract Number.: DTC-KTH/PCDSB/2016/0091 )

November 2016

Petronas Chemicals Derivaties Sdn Bhd.

42.

MECH MAINT-BOILERS (SM5010200): To Perform HRSG B Expansion Joint Removal & Installation at Utilities Gebeng Plant (UG), Gebeng, Kuantan, Pahang. (Order Number: PO161108-NN-035) (Contract No.: SAQ/IOSV/16/002)

November 2016

Petronas Gas Bhd Utility Gebeng

(UG)

43.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): To perform E-1514 GRD Reboiler Cleaning at Petronas Chemicals Derivatives Sdn Bhd. (Order Number: 3620286563) (Contract Number.: DTC-KTH/PCDSB/2016/0091 )

November 2016

Petronas Chemicals Derivaties Sdn Bhd.

44.

MECH MAINT-BOILERS (SM5010200): To Perform HRSG A Duct Burner Rectification at Utilities Gebeng Plant (UG), Gebeng, Kuantan, Pahang. (Order Number: 3620279584) (Contract No.: SM4Y160505/6200154645)

October 2016

PetronasGas Bhd Utility Gebeng

(UG)

45.

MECH MAINT-BOILERS (SM5010300): PR# Tray In spection & Replacement Services Demen eth anizer C6 -0401 at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number :4120156089) (Contract No.: 6200159793)

September 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

Page 45: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

45

46.

MECH MAINT-BOILERS (SM5010200): PR#To Fabricate, Supply, Delivery, Installation and Commissioning of Four (4) Units of Steam Condenser (Airfin Fan Cooler)at Gas Processing Plant Santong (GPS), Petronas Gas Bhd. (Order Number :) (Contract No.: DTC-KTH/PGB-GPU/2016/0151)

September 2016 Petronas Gas Bhd

Gas Processing Santong (GPS)

47.

MECH MAINT-BOILERS (SM5010200): To Perform HRSG A Main Stack Expansion Joint Replacement at Utilities Gebeng Plant (UG), Gebeng, Kuantan, Pahang. (Order Number: 3620275673) (Contract No.: SM4Y160505/6200154645)

September 2016 Petronas Gas Bhd Utility

Gebeng (UG)

48.

METALLIC STRUCTURE/PIPING (SM5090100): # Perform Major GP1 Piping Replacement Provision of manpower, supervision, tools, equipment, materials and consumables to perform Rectification Works of Piping at GPK1, Gas Processsing Plant omplex A, Kertih, Kemaman, Terengganu Darul Iman. (Order No.: 4120154897) (RFQ No.: 6200160635)

September 2016 Petronas Gas Bhd, Gas

Processing Kerteh (GPK)

49.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): Tube Bundle Replacement EB234 Stripper Reboiler. Supply (1) one unit of Tube Bundles for Heat Exchanger EB 234 Stripper Reboiler. (Order Number: 4120153731) (RFQ Number.: 6200158119)

August 2016

Petronas Chemicals MTBE Sdn Bhd.

50.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700): Perform UPV D Servicing To perform complete Mechanical Work of Unfired Pressure Vessels and associate equipment for DOSH inspection at Utilities Kertih, Terengganu Darul Iman. (Order Number: 4120153274) (RFQ Number.: 6200158213)

August 2016

Petronas Gas Bhd, Utility Kerteh (UK)

51.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE F-105 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.

Primary Transfer Line Exchanger (PTLE) cleaning: (Order Number: 3620268188) (RFQ Number.: 6200092922)

August 2016

Petronas Chemicals Ethylene Sdn Bhd

52.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE & STLE F-103 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620268219) (RFQ Number.: 6200092922)

August 2016

Petronas Chemicals Ethylene Sdn Bhd

53.

MECH ENG & MAINT-WORKSHOP MACHINING (SM5080100): Design & Fabricate Cooling Fan - To Design & Fabricate Cooling Fan KM5-0302A and Terminal Box for Electric Motor at Gas Processing Santong (GPS), Jalan Santong, and Terengganu Darul Iman. (Order No.: 4120151910) (RFQ No.: 6200156336)

August 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

54.

MECH MAINT-BOILERS (SM5010200): To repair HRSG D diverter damper section at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, and Terengganu Darul Iman. (Order Number: 3620262866)

(Contract No.: SM8Y150604 / 620012032)

July 2016

Petronas Gas Bhd,Utility Kerteh

55.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE & STLE F-104 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620261644) (RFQ Number.: 6200092922)

July 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 46: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

46

56.

MECH MAINT-BOILERS (SM5010200): PR# To do SH tube defining activity Provision of manpower, supervision, tools, equipment, materials and consumables to perform defining activity of superheater tube for Waste Heat Boiler (4 unit) at Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu. (Order No.: 4120147112) (RFQ No.: 6200152866)

June 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

57.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE F-106 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620252799) (RFQ Number.: 6200092922)

May 2016

Petronas Chemicals

Ethylene Sdn Bhd

58.

SPECIAL MAINT- HYDROJETTING (SS1130000): STLE & PTLE F-101 Cleaning for CF renewal at Petronas ChemicalsEthylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620252802) (RFQ Number.: 6200092922)

May 2016

Petronas Chemicals

Ethylene Sdn Bhd

59.

MECH MAINT-BOILERS (SM5010200): Mech Package Boiler GPS for CF Renewal Provision of manpower, supervision, equipment, tools, material, and consumables for internal inspection overhaul cleaning of all components of boiler such as Steam Drum, Mud Drum, Fire Box, and ancillary equipment including repair work prior to inspect and certification for the extension of Certificate Of Fitness by Department of Occupational Safety & Health (DOSH)at Gas Processing Plant, Santong (GPS), Petronas Gas Berhad (PGB), Terengganu Darul Iman. (Order Number: 4120144949) (Contract Number.: 6200151933)

May 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

60.

MECH MAINT-BOILERS (SM5010200): PR# Provision of manpower, supervision, tools, equipment, materials and consumables for boiler repair activity at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620251294) (Contract Number.: SM8Y150510 / 620019030)

May 2016

Petronas Gas BhdUtility Gebeng

61.

MECH MAINT-FURNACES (SM5010500): PR# To perform welding & rectification of attemperator & piping works waste heat boiler (WHB). (4 units) at Gas Processing Santong (GPS), Gas Processing & Utilities, Petronas Gas Bhd. (Order No.: 4120144687) (RFQ No.: 6200149677)

May 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

62.

MECH MAINT-BOILERS (SM5010200): PR# Manpower, materials, and equipment to perform boiler overhaul servicing at HRSG Unit F and associated equipment for DOSH inspection at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order No.: 4120144561) (RFQ No.: 6200142993)

May 2016

Petronas Gas Bhd,Utility Kerteh

63.

HEAT EXCHANGERS, CONDENSERS & COOLER (SM5010400): PR#PTLE Chamber Installation at F-101A at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 41201144488) (RFQ Number.: 62000151498 )

May 2016

Petronas Chemicals

Ethylene Sdn Bhd

64.

MECH MAINT-BOILERS (SM5010200): PR# External Contractor – SA MTN Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical work of HRSG A and associated equipment for DOSH inspection at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order No.: 3620249629) (Contract Number.: SM8Y150510 / 620019030)

May 2016

Petronas Gas Bhd Utility Gebeng

Page 47: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

47

65.

MECH MAINT-BOILERS (SM5010200): PR# HRSG A burner vent line modification Provision of manpower, supervision, tools, equipment, materials andconsumables for HRSG A burner vents line modification at Utility Gebeng (UG), Kuantan, Pahang. (Order Number: 3620249628) (Contract Number.: SM8Y150510 / 620019030)

May 2016

Petronas Gas Bhd Utility Gebeng

66.

MECH MAINT-BOILERS (SM5010200): PR# GTB GCV/SRV N2 line purging installation Provision of manpower, supervision, tools, equipment, materials and consumables for GTB GCV/SRV N2 Purging line installation at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 36202451182) (Contract Number.: SM8Y150510 / 620019030)

May 2016

Petronas Gas Bhd Utility Gebeng

67.

MECH MAINT-BOILERS (SM5010200): PR# HRSG B Burner vent line modification Provision of manpower, supervision, tools, equipment, materials and consumables to perform modification of HRSG B burner vent line at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 36202451181) (Contract Number.: SM8Y150510 / 620019030)

May 2016

Petronas Gas Bhd Utility Gebeng

68.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE F-101 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620244294) (RFQ Number.: 6200092922)

April 2016

Petronas Chemicals

Ethylene Sdn Bhd

69.

MECH MAINT-BOILERS (SM5010200): PR# External Contractor – SA MTN Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical work of HRSG D and associated equipment for DOSH inspection at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order No.: 3620243472) (Contract Number.: SM8Y150510 / 620019030)

April 2016

Petronas Gas Bhd Utility Gebeng

70.

MECH MAINT-BOILERS (SM5010200): PR# IP Steam Header RV’s servicing 3 units Provision of manpower, supervision, tools, equipment, materials and consumables to remove, service & install RV’s at IP Steam Header Line at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order No.: 3620243469) (Contract Number.: SM8Y150510 / 620019030)

April 2016

Petronas Gas BhdUtility Gebeng

71.

MECH MAINT-FURNACES (SM5010500): PR# F3-781 Boiler hotspot repair Hotspot repair of F3-781 Auxiliary Boiler, Gas Processing Kerteh (GPK), PGB, Kerteh, Kemaman, Terengganu. (Order No.: 4120140948) (RFQ No.: 6200147409)

April 2016

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

72.

MECH MAINT-BOILERS (SM5010200): PR# To do SH tube defining activity Provision of manpower, supervision, tools, equipment, materials and consumables to perform defining activity of superheater tube for Waste Heat Boiler (1 unit) at Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu. (Order No.: 4120140732) (RFQ No.: 6200147067)

March 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

73.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700): # V-29208 DOSH KR2 MIXED LPG BULLET OVERHAUL – Provision of manpower, supervision, tools, equipment, materials and consumables for overhaul of mixed LPG bullet which inclusive of equipment blinding and de-blinding, ventilation, internal cleaning,

March 2016

Petronas Penapisan (T) Sdn Bhd (PPTSB)

Page 48: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

48

internal scaffolding erection and removal, blasting, power brushing and maintenance painting for internal and external of bullet and hydrostatic testing at Petronas Penapisan (Terengganu) Sdn Bhd (PPTSB)Kerteh, Kemaman, Terengganu. (Order No.: 4120140684) (RFQ No.: 6200144771)

74.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE F-103 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620241785) (RFQ Number.: 6200092922)

March 2016

Petronas Chemicals

Ethylene Sdn Bhd

75.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE STLE F-105 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620241784) (RFQ Number.: 6200092922)

March 2016

Petronas Chemicals

Ethylene Sdn Bhd

76.

MECH MAINT-HOT INSULATION (SM5120100): # To perform AGO Castable replacement Provision of manpower, supervision, tools, equipments, material, and consumables to perform castable & burner repair of Acid Gas Oxidizer 3 (AGO-3) at KCS, Gas Processing Plant, Kerteh (GPK), Petronas Gas Berhad (PGB), Terengganu Darul Iman. (Order Number: 4120140233) (RFQ Number.: 62000147092)

March 2016

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

77.

MECH MAINT-BOILERS (SM5010200): # Mech Package HRSG GPS for CF Renewal Provision of manpower, material, and equipment to perform boiler overhauls servicing at F5/6-2201A & E5/6-2201B at Gas Processing Plant, Santong (GPS), Petronas Gas Berhad (PGB), Terengganu Darul Iman. Heat Recovery Steam Generator HRSG F5/6-2201A (TG PMD 560) Heat Recovery Steam Generator HRSG F5/6-2201B (TG PMD 559)

(Order Number: 4120140142) (RFQ Number.: 62000147132)

March 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

78.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700): # To perform desuperheater servicing To perform desuperheater rectification and servicing works at Gas Processing Plant-4 (GPP-4), Gas Processing Kerteh, Gas Processing & Utilities, Petronas Gas Bhd, Kerteh, Kemaman, Terengganu. (Order Number: 4120139156) (RFQ Number.: 6200145548)

April / March 2016

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

79.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE F-102 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620237385) (RFQ Number.: 6200092922)

March 2016

Petronas Chemicals

Ethylene Sdn Bhd

80.

MECH MAINT-BOILERS (SM5010200): # GPP3TA TA Activities – Boiler/Smallbore To perform welding and rectification of boiler/smallbore at Gas Processing Plant-3 (GPP-3), Gas Processing Kerteh, Gas Processing & Utilities, Petronas Gas Bhd, Kerteh, Kemaman, Terengganu. (Order Number: 3620237266) (Contract No.: SM8Y150815 / 6200128350)

March 2016

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

81.

MECH MAINT-BOILERS (SM5010200): # GPK Package Boiler CF Renewal To supply manpower, materials and equipment to perform boiler overhaul servicing at F4-771, WHRU#1, and WHRU#2 for DOSH inspection at Gas Processing Kerteh (GPK), PGB, Kerteh, Kemaman, Terengganu. (Order Number: 4120137879) (Contract No.: 6200144212)

February 2016

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

Page 49: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

49

82.

MECH MAINT – MECHANICAL VALVE (SM5030100): To Perform DOSH Inspection for UPV B: To perform complete mechanical work of unfired pressure vessel and associated equipment for DOSH inspection at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 4120136800) (RFQ No.: 6200143122)

March 2016

& June 2016

Petronas Gas Bhd, Utility Kerteh

83.

MECH MAINT-BOILERS (SM5010200): To supply manpower, materials, and equipment to perform boiler overhaul servicing at HRSG Unit B and associated equipment for DOSH inspection at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order No.: 4120136316) (RFQ No.: 6200142993)

March 2016

Petronas Gas Bhd,Utility Kerteh (UK)

84.

MECH MAINT-BOILERS (SM5010200): To perform boiler hotspot and leak repair. Tube leak repair and hotspot repair for Auxiliary Boiler F2-791 Gas Processing Plant-2 (GPP-2), Gas Processing Kerteh, Gas Processing & Utilities, Petronas Gas Bhd, Kerteh, Kemaman, Terengganu. (Order Number: 4120136313) (RFQ No.: 6200143188)

Mid Feb – End March

2016

Petronas Gas Bhd, Gas Processing Kerteh (GPK)

85.

MECH MAINT-BOILERS (SM5010200): Package Boiler D for CF Renewal. To supply manpower, materials, and equipment to perform boiler overhaul servicing at Boiler D (F2-211D01) and associated equipment for DOSH inspection at Utility Gebeng Plant (UG), PGB, Kuantan,Pahang. (Order Number: 4120136088) (RFQ No.: 6200142958)

February 2016

Petronas Gas Bhd, Utility Gebeng

(UG)

86.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700): PCC KR2LSD Modification and DOSH Provision of manpower, supervision, tools, equipment, materials and consumables for PCC KR2LSD Modification and DOSH which inclusive of equipment blinding and de-blinding, ventilation, internal cleaning, internal scaffolding erection and removal, lifting, power brushing and maintenance painting for internal and internal vessel modification at Petronas Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu (Order No.: 4120135117) (RFQ No.: 6200140485)

January 2016

Petronas Penapisan (T) Sdn Bhd (PPTSB)

87.

MECH MAINT-BOILERS (SM5010200): Mech Package Boiler GPS for CF Renewal Provision of manpower, supervision, equipment, tools, material, and consumables for internal inspection overhaul cleaning of all components of boiler such as Steam Drum, Mud Drum, Fire Box, and ancillary equipment including repair work prior to inspect and certification for the extension of Certificate Of Fitness by Department of Occupational Safety & Health (DOSH)at Gas Processing Plant, Santong (GPS), Petronas Gas Berhad (PGB), Terengganu Darul Iman. (Order Number: 4120133323) (RFQ No.: 6200140442)

February 2016

& March 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

88.

MECH MAINT-BOILERS (SM5010200): PR: To repair econ tube leak. To perform welding and rectification of Economizer tube for Auxiliary Boiler A6-1203 at Gas Processing Plant, Santong (GPS), Petronas Gas Berhad (PGB), Terengganu Darul Iman. (Order Number: 4120133072) (RFQ No.: 6200140483)

January –February 2016

Petronas Gas Bhd Gas Processing Santong (GPS)

89.

MECH MAINT-BOILERS (SM5010200): To replace LG steam side isolation Gate valve at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620232500) (Contract No.: SM8Y150604 / 620012032)

February 2016

Petronas Gas Bhd,Utility Kerteh (UK

Page 50: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

50

90.

MECH MAINT-BOILERS (SM5010200): To replace Economizer vent 3” Valve, CBD valve at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620232490) (Contract No.: SM8Y150604 / 620012032)

February 2016

Petronas Gas Bhd,Utility Kerteh (UK

91.

MECH MAINT-BOILERS (SM5010200): To perform repair at flange 10” HHP Header Steam Line at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620230312) (Contract No.: SM8Y150604 / 620012032)

February 2016

Petronas Gas Bhd,Utility Kerteh (UK

92.

SPECIAL MAINT- HYDROJETTING (SM5010200): Blinding & PTLE F-104 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu (Order Number: 3620229126) (RFQ Number.: 6200092922)

January 2016

Petronas Chemicals Ethylene Sdn Bhd

93.

MECH MAINT-BOILERS (SM5010200): To perform repair activity at Air Drier Filter at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620229115) (Contract No.: SM8Y150604 / 620012032)

January 2016

Petronas Gas Bhd Utility Kerteh (UK)

94.

MECH MAINT-BOILERS (SM5010200): Valve servicing at Lube Oil cooler GAN Compressor Unit at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620229114) (Contract No.: SM8Y150604 / 620012032)

January 2016

Petronas Gas Bhd Utility Kerteh (UK)

95.

MECH MAINT-BOILERS (SM5010200): Air Fin Cooler F cleaning for CF Renewal at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620228799) (Contract No.: SM8Y150604 / 620012032)

January 2016

Petronas Gas Bhd Utility Kerteh (UK)

96.

SPECIAL MAINT- REFRACTORY (SS1110000): PTLE F-105 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.

Primary Transfer Line Exchanger (PTLE) cleaning (Order Number: 3620225706) (RFQ Number.: 6200092922)

January 2016

Petronas Chemicals

Ethylene Sdn Bhd

97.

MECH MAINT-BOILERS (SM5010200): Rectify IP steam header isolation valve at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620225447) (Contract No.: SM8Y150510 / 620019030)

January 2016

Petronas Gas Bhd Utility Gebeng

(UG)

98.

MECH MAINT-BOILERS (SM5010200): GTC GCV/SRV N2 Purging line installation at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620225446) (Contract No.: SM8Y150510 / 620019030

January 2016

Petronas Gas Bhd Utility Gebeng

(UG)

99.

MECH MAINT-BOILERS (SM5010200): HRSG D Fuel Gas Line Cleaning activity at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620225445) (Contract No.: SM8Y150510 / 620019030)

January 2016

Petronas Gas Bhd Utility Gebeng

(UG)

100.

MECH MAINT-BOILERS (SM5010200): HRSG C Fuel Gas Line Cleaning activity at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620225444) (Contract No.: SM8Y150510 / 620019030)

January 2016

Petronas Gas Bhd Utility Gebeng

(UG)

Page 51: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

51

101.

MECH MAINT-BOILERS (SM5010200): HRSG C Burner Vent Line modification work at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620225443) (Contract No.: SM8Y150510 / 620019030)

January 2016

Petronas Gas Bhd Utility Gebeng

(UG)

102.

MECH MAINT-BOILERS (SM5010200): HRSG C CF activity #December 2015 at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620225442) (Contract No.: SM8Y150510 / 620019030)

January 2016

Petronas Gas Bhd Utility Gebeng

(UG)

103.

MECH MAINT-BOILERS (SM5010200): HRSG B Fuel Gas Line cleaning activity at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620225441) (Contract No.: SM8Y150510 / 620019030)

January 2016

Petronas Gas Bhd Utility Gebeng

(UG)

104.

MECH MAINT-BOILERS (SM5010200): Open IGV bellmouth cover GT B at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620222219) (Contract No.: SM8Y150604 / 620012032

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

105.

MECH MAINT-BOILERS (SM5010200): Repair work rectification during UPV F CF renewal at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620222202) (Contract No.: SM8Y150604 / 620012032)

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

106.

MECH MAINT-BOILERS (SM5010200): To perform loading / unloading for CP F at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620221772) (Contract No.: SM8Y150604 / 620012032)

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

107.

MECH MAINT-BOILERS (SM5010200): To repair diverter damper HRSG G at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620221769) (Contract No.: SM8Y150604 / 620012032)

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

108.

MECH MAINT-BOILERS (SM5010200): To perform repair expansion joint bellow at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620221520) (Contract No.: SM8Y150604 / 620012032)

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

109.

MECH MAINT-BOILERS (SM5010200): To replace gasket at HHP line 10” 2500# at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620221519) (Contract No.: SM8Y150604 / 620012032)

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

110.

MECH MAINT-BOILERS (SM5010200): To replace gasket at 12” 150# at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620221515) (Contract No.: SM8Y150604 / 620012032)

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

Page 52: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

52

111.

MECH MAINT-BOILERS (SM5010200): To replace 3” BFW line to 4A925CV at ASU at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620221513) (Contract No.: SM8Y150604 / 620012032)

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

112.

SPECIAL MAINT- HYDROJETTING (SS1130000): F-102 blinding deblind, top roof repair at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620219021) (RFQ Number.: 6200092922)

December 2015

Petronas Chemicals

Ethylene Sdn Bhd

113.

MECH MAINT-BOILERS (SM5010200): To perform piping leak test at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620218821) (Contract No.: SM8Y150604 / 620012032)

December 2015

Petronas Gas Bhd Utility Kerteh (UK)

114.

MECH MAINT-BOILERS (SM5010200): To perform cut-off pipe support at 3” BFW at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620217033) (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

115.

MECH MAINT-BOILERS (SM5010200): To perform replacement economizer vent e at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620217023) (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

116.

MECH MAINT-BOILERS (SM5010200): To perform replacement CBD valve steam drum at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620217022) (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

117.

MECH MAINT-BOILERS (SM5010200): To perform replacement of spool at CP at Utilities Kertih Plant (UK),PGB, Kertih, Kemaman, Terengganu (Order Number: 3620216886) (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

118.

SPECIAL MAINT- HYDROJETTING (SS1130000): PTLE STLE Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.

Primary Transfer Line Exchanger (PTLE) cleaning Secondary Transfer Line Exchanger (STLE) cleaning

(Order Number: 3620214573) (RFQ Number.: 6200092922)

November 2016

Petronas Chemicals

Ethylene Sdn Bhd

119.

MECH MAINT-BOILERS (SM5010200): To perform repair lamellar seal HRSG G at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620213817) (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

120.

MECH MAINT-BOILERS (SM5010200): To replace HHP vent valve HRSG G at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620213816) (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

Page 53: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

53

121.

MECH MAINT-BOILERS (SM5010200): To repair MRO E PVC pipe leak at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620213815) (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

122.

MECH MAINT-BOILERS (SM5010200): To fabricate ice block eliminator ASU 2 at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order Number: 3620213813) (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

123.

MECH MAINT-BOILERS (SM5010200): To repair Preheater A leak at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Contract No.: SM8Y150604 / 620012032)

November 2015

Petronas Gas Bhd Utility Kerteh (UK)

124.

MECH MAINT-BOILERS (SM5010200): Rectify HRSG B Diverter Damper at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620213200) (Contract No.: SM8Y150510 / 620019030)

November 2015

Petronas Gas Bhd Utility Gebeng

(UG)

125.

MECH MAINT-BOILERS (SM5010200): Demin Water BPC & PDH pipe cleaning at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang. (Order Number: 3620213197) (Contract No.: SM8Y150510 / 620019030)

November 2015

Petronas Gas Bhd Utility Gebeng

(UG)

126.

MECH MAINT-BOILERS (SM5010200): HRSG C Eco Module bypass rectification at Utility Gebeng Plant (UG), PGB, Kuantan Pahang (Order Number: 3620199291) (Contract No.: SM8Y150510 / 620019030)

November 2015

Petronas Gas Bhd Utility Gebeng

(UG)

127.

SPECIAL MAINT- HYDROJETTING (SS1130000): PTLE STLE F-104 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.

Primary Transfer Line Exchanger (PTLE) cleaning

Secondary Transfer Line Exchanger (STLE) cleaning (Order Number: 3620212939) (RFQ Number.: 6200092922)

November 2015

Petronas Chemicals Ethylene Sdn Bhd

128.

SPECIAL MAINT- HYDROJETTING (SS1130000): PTLE STLE Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.

Primary Transfer Line Exchanger (PTLE) cleaning

Secondary Transfer Line Exchanger (STLE) cleaning (Order Number: 3620212452) (RFQ Number.: 6200092922)

November 2015

Petronas Chemicals Ethylene Sdn Bhd

129.

MECH MAINT-FURNACES (SM5010500): PR: soot cleaning & damper service To perform maintenance work at Furnaces F6-0301 & F6-0602 (Soot cleaning and damper service) at GPP-6, Gas Processing Plant ComplexB (Order No.: 4120128781) (RFQ No.: 6200137342)

November 2015

Petronas Gas Bhd Gas Processing Santong (GPS)

130.

MECH MAINT-BOILERS (SM5010200): Provision Of Manpower, Supervision, Tools, Equipment, Material And Consumables For boiler / piping repair works Qtr4, Gas Processing Kerteh, Gas Processing & Utilities, Petronas Gas Bhd, Kerteh, Kemaman, Terengganu. (Order Number: 4120126330) (RFQ No.: SM8Y150815 / 6200128350)

November 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

Page 54: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

54

131.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding F103 at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620206078) (RFQ Number.: 6200092922)

November 2015

Petronas Chemicals Ethylene Sdn Bhd

132.

SPECIAL MAINT- REFRACTORY (SS1110000): Blinding & PTLE F-101 Cleaning at Petronas Chemicals Ethylene SdnBhd, Kertih, Kemaman, Terengganu. (Order Number: 3620206962) (RFQ Number.: 6200092922)

October 2015

Petronas Chemicals

Ethylene Sdn Bhd

133.

MECH MAINT-BOILERS (SM5010200): To replace drain valve HW HP/IP Bat Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order Number: 3620205973) (Contract No.: SM8Y150604 / 620012032)

October 2015

Petronas Gas Bhd Utility Kerteh (UK)

134.

MECH MAINT-BOILERS (SM5010200): Provision Of Manpower, Supervision, Tools, Equipment, Material And Consumables For Boiler F3-791, F4-791, F3-761 & F3-771 Internal Inspection Overhaul And Repair Work (Mechanical Package Boiler GPKfor CF renewal) (Order Number: 4120126330)

October 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

135.

METALLIC STRUCTURE/PIPING (SM5090100): # Mechanical work & rejuvenation Demin Plant Provision of manpower, supervision, tools, equipment, materials and consumables for Demineralization plant rejuvenation 2015 at Petronas Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu. (Order No.: 4120125741) (RFQ No.: 6200132449)

October 2015

Petronas Penapisan (T) Sdn Bhd

136.

MECH MAINT-BOILERS (SM5010200): Provision of manpower, supervision, tools, material, and consumables for internal inspection overhauls and repair work. (Order No.: 4120123811) (RFQ No.: 6200130886)

November 2015

– January

2016

Petronas Gas Bhd Gas Processing Santong (GPS)

137.

UNFIRED PRESSURE VESSEL: To Perform Complete Mechanical Work Of Unfired Pressure Vessel And Associated Equipment For Dosh Inspection At Utilities Kertih, Terengganu Darul Iman

October 2015

Petronas Gas Bhd Utility Gebeng

(UG)

138.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700): UPV F package DOSH inspection To Perform Complete Mechanical Work Of Unfired Pressure Vessel (UPV-F) And Associated Equipment For Dosh Inspection At Utilities Kertih, Terengganu Darul Iman. (Order Number: 4120123405) (RFQ No.: 6200129358)

October 2015

Petronas Gas Bhd Utility Kerteh (UK)

139.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE F-101 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620209809) (RFQ Number.: 6200092922)

October 2015

Petronas Chemicals

Ethylene Sdn Bhd

140.

MANPOWER SUPPLY- LABOUR SUPPLY (SM2010100): Provision Of Manpower, Supervision, Tools, Equipments, Materials And Consumables To Perform Castable& Burner Repair Of Acid Gas Oxidizer 2 (AGO-2) At KCS, Gas Processing Plant Complex A, Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu. (Order No.: 4120123228) (RFQ No.: 6200131365)

October 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

Page 55: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

55

141.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700) & HEAT EXCHANGERS, CONDENSER & COOLER (SM5010400): Provision of manpower, supervision, equipment, tools, materials, and consumables of mechanical shut down works For LP & LLP FGRU (K5/6-1704 & K5/6-1705) At Gas Processing Plant, Santong (GPS), Petronas Gas Berhad (PGB), Terengganu Darul Iman. FGRU SD UPV & AFC Cleaning (Order No.: 4120122006) (RFQ No.: 6200129396)

Sept – Oct 2015

Petronas Gas Bhd Gas Processing Santong (GPS)

142.

MECH MAINT-BOILERS (SM5010200): To Supply Manpower, Supervision, Tools, Equipment, Material And Consumables For Boiler F2-771, F3-781, F2-761 And F4-781 Internal Inspection Overhaul And Repair Work (Order Number: 4120119511) (RFQ No.: 6200126669)

September 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

143.

MECH MAINT – HOT INSULATION (SM5120100): Provision Of Manpower, Supervision, Tools, Equipments, Materials And Consumables To Perform Castable & Burner Repair Of Acid Gas Oxidizer 4 (Ago-4) At Kcs, Gas Processing Plant Complex A, Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu. (Order No.: 4120118147) (RFQ No.: 6200124529)

Sept – Oct 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

144.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & PTLE F-103 Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu

Primary Transfer Line Exchanger (PTLE) cleaning (Order Number: 3620199488) (RFQ Number.: 6200092922)

August 2015

Petronas Chemicals

Ethylene Sdn Bhd

145.

HEAT EXCHANGERS, CONDENSER & COOLER (SM5010400): # To replace tube bundle Provision of manpower, supervision, tools, equipment, materials and consumables for E-21115 tube bundle replacement at Petronas Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu. (Order No.: 4120119495) (RFQ No.: 6200127514)

August 2015

Petronas Penapisan (T) Sdn Bhd (PPTSB)

146.

HEAT EXCHANGERS, CONDENSER & COOLER (SM5010400): # To do online E21102 bank cleaning Provision of manpower, supervision, tools, equipment, materials and consumables of four (4) banks of E-21102 Air Fin coolers (AFC) at Petronas Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu. (Order No.: 4120118485) (RFQ No.: 6200125512

August 2015

Petronas Penapisan (T) Sdn Bhd (PPTSB)

147.

MECH MAINT-FURNACES(SM5010500): PR: Attemperator Rectification To Perform Welding And Rectification Of Attemperator & Its Associated Piping Works For Waste Heat Boiler (WHB E6-1202A) At Gas Processing Santong (GPS), Gas Processing & Utilities, Petronas Gas Bhd. (Order No.: 4120118488) (RFQ No.: 6200124977)

August 2015

Petronas Gas Bhd Gas Processing Santong (GPS)

148.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding & Deblinding at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu (Order Number: 3620191641) (RFQ Number.: 6200092922)

July 2015

Petronas Chemicals Ethylene Sdn Bhd

149.

MECH MAINT-BOILERS (SM5010200): To Perform Water By-Passing Economizer Module M14 at HRSG C (PMD 15303), Utilities Gebeng. Close manhole & boxup (Order No.: 3620199291)

July - August 2015

Petronas Gas Bhd Utility Gebeng

(UG)

Page 56: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

56

150.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding PTLE & STLE Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620187398) (RFQ Number.: 6200092922)

June 2015

Petronas Chemicals

Ethylene Sdn Bhd

151.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding PTLE & STLE Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.

Primary Transfer Line Exchanger (PTLE) cleaning

Secondary Transfer Line Exchanger (STLE) cleaning (Order Number: 3620183902) (RFQ Number.: 6200092922)

June 2015

Petronas Chemicals

Ethylene Sdn Bhd

152.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700): To perform total of 25 UPV CF Mechanical Activity (Stage B & C) (Order No.: 4120107212) (RFQ Number.: 6200114808)

June 2015

Petronas Gas Bhd Utility Gebeng

(UG)

153.

MECH MAINT-BOILERS (SM5010200): Servicing KCSBO HRSG CF Renewal Package at Gas Processing Kerteh (GPK), Gas Processing & Utilities, Petronas Gas Bhd. Kertih Terengganu. (Order No.: 4120107887) (RFQ Number.: 6200115292)

July – August 2015

Petronas Gas Bhd Utility Gebeng

(UG)

154.

PRESSURE & UNPRESSURIZED VESSEL (SM5010700): To perform total of 25 UPV CF Mechanical Activity (Stage A) (Order No.: 4120105893) (RFQ Number.: 6200114153)

May 2015 Petronas Gas Bhd

Utility Gebeng (UG)

155.

MECH MAINT-FURNACES (SM5010500): To perform maintenance work at 3 units of Furnace F-301, F-601 & F-602 GPP-5 SD (Soot Cleaning & Service Damper) at Gas Processing Santong (GPS), Tok Arun, Paka. (Order No.: 4120104518) (RFQ Number.: 6200111329)

May 2015 Petronas Gas Bhd

Gas Processing Santong (GPS)

156.

MAIN MAINT-MECHANICAL VALVE (SM5030100): To Supply Piping Material and Perform Valve and Flange Installation for Main Air Compressor B and Gas Argon Compressor at ASU2 during TA 2015 (Order No.: 4120101862) (RFQ No.: 6200105411)

07.05.2015 – 19.05.2015

Petronas Gas Bhd Utility Kerteh (UK)

157.

METALLIC STRUCTURE/PIPING (SM5090100): To replace 2 Flanges of 20” 600# IP Steam Line and 4 Flanges of 10” 2500# HHP Steam Line during TA 2015 (Order No.: 4120098985) (RFQ No.: 6200104233)

14.05.2015 – 20.05.2015

Petronas Gas Bhd Utility Kerteh (UK)

158.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding PTLE & STLE Cleaning F103 for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620172711) (RFQ Number.: 6200092922)

March 2015

Petronas Chemicals

Ethylene Sdn Bhd

159.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding PTLE & STLE Cleaning E102/112 for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu. (Order Number: 3620172141) (RFQ Number.: 6200092922)

March 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 57: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

57

160.

MECH MAINT-BOILERS (SM5010200): To supply manpower, materials, and equipment to perform hydrostatic test at HRSG B Utility Gebeng Plant (UG), PGB. (Order No.: 4120103285) (RFQ No.: 6200111001)

March 2015

Petronas Gas Bhd Utility Gebeng

(UG)

161.

MECH MAINT-BOILERS (SM5010200): PR# Rectification Attemperator Piping To Perform Welding And Rectification Of Attemperator & Its Associated Piping Works For Waste Heat Boiler (WHB E6-1201A) AtGas Processing Santong (GPS), Gas Processing & Utilities, Petronas Gas Bhd. (Order No.: 4120098922) (RFQ No.: 6200104678)

February 2015

Petronas Gas Bhd Gas Processing Santong (GPS)

162.

MECH MAINT-BOILERS (SM5010200): PR: To Replace Attemperator Piping To Perform Welding And Rectification Of Attemperator & Its Associated Piping Works For Waste Heat Boiler (WHB E5/6-1201) At Gas Processing Santong (GPS), Gas Processing & Utilities, Petronas Gas Bhd. (Order No.: 4120099824) (RFQ No.: 6200106843)

February 2015

Petronas Gas Bhd Gas Processing

Santong

163.

MECH MAINT-BOILERS (SM5010200): To Supply Manpower, Materials, and Equipment to Perform Hydrostatic Test at HRSG Unit D, F, And G and Lube Oil Cooler Cleaning at GT Unit D, F, And G at Utility Kertih Plant (UK). DOSH Inspection (HT). (Order No.: 4120097833) (RFQ No.: 6200104281)

GT/HRSG-D: 09.02.2015 – 03.03.2015 GT/HRSG-G: GT/HRSG-F:

Petronas Gas Bhd Utility Kerteh (UK)

164.

MECH MAINT-BOILERS (SM5010200): Provision of manpower, supervision, tools, material, and consumables for internal inspection overhauls and repair work. (Order Number: 4120099225) (RFQ No.: 6200106712)

February – July 2015

Petronas Gas Bhd Gas Processing Santong (GPS

165.

SPECIAL MAINT- HYDROJETTING (SS1130000): Blinding PTLE & STLE Cleaning for CF renewal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu

Primary Transfer Line Exchanger (PTLE) cleaning

Secondary Transfer Line Exchanger (STLE) cleaning: (Order Number: 3620157218) (RFQ Number.: 6200092922)

January 2015

Petronas Chemicals

Ethylene Sdn Bhd

166.

MECH MAINT-BOILERS (SM5010200): Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler WHRU#2 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Main Mechanical Package WHRU #2) (Order No.: 4120094738) (RFQ No.: 6200101309)

January 2015

Petronas Gas Bhd Gas Processing

Kerteh

167.

MECH MAINT-BOILERS (SM5010200): Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler WHRU#1 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Main Mechanical Package WHRU #1) (Order No.: 4120094739) (RFQ No.: 6200101363/SM4Y141218)

January 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

168.

MECH MAINT-BOILERS (SM5010200): Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler F2-781 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Main Mechanical Package F2-781) (Order No.: 4120094760) (RFQ No.: 6200101364/SM4Y141219)

January 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

Page 58: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

58

169.

MECH MAINT-BOILERS (SM5010200): Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler F4-781 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Main Mechanical Package F4-781) (Order No.: 4120094761) (RFQ No.: 6200101366/SM4Y141220)

January 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

170.

MECH MAINT-BOILERS (SM5010200): Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler F4-761 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Main Mechanical Package F4-761) (Order No.: 4120094762) (RFQ No.: 6200101367/SM4Y141221)

January 2015

Petronas Gas Bhd Gas Processing Kerteh (GPK)

171.

METALLIC STRUCTURE/PIPING (SM5090100): PR# To Fabricate Floater Aerator To fabricate new floater c/w platform, installation and commissioning Aerator (Aeration Basin) at Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu. (Order No.: 4120092301) (RFQ No.: 6200098464)

December 2014

Petronas Gas Bhd Gas Processing Santong (GPS)

172.

MECH MAINT-BOILERS (SM5010200): PR# To perform servicing renew Boiler CF Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler E5-1201A internal inspection overhaul and repair work for Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu. (Order No.: 4120090952) (RFQ No.: 6200098271)

December 2014

Petronas Gas Bhd Gas Processing Santong (GPS)

173.

HEAT EXCHANGER, CONDENSERS & COOLER (SM5010400): PR# To Plugging Leaking Tube S/Condenser Provision of manpower, supervision, tools, equipment, materials and consumables to perform inspection and plugging tube Exchanger Steam Condenser for Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu. (Order No.: 4120093105) (RFQ No.: 6200099531)

December 2014

Petronas Gas Bhd Gas Processing Santong (GPS)

174.

MECH MAINT-LINED PIPE(SM5090300): PR# Rectification Letdown & Piping To perform welding and rectification piping works at Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu. (Order No.: 4120091319) (RFQ No.: 6200098269)

December 2014

Petronas Gas Bhd Gas Processing Santong (GPS)

175.

MECH MAINT-BOILERS (SM5010200): PR# HRSG CF Renewal UG Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical work of HRSG and associated equipment for DOSH inspection at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order No.: 4120084797) (RFQ No.: 6200092118)

December 2014

Petronas Gas Bhd Utility Kerteh (UK)

176.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP C To perform blinding deblinding line HHP/HP C at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620152259) (Contract No.: SM5Y150604)

December 2014

Petronas Gas Bhd Utility Kerteh (UK)

177.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP A To perform blinding deblinding line HHP/HP A at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620152258) (Contract No.: SM5Y150604)

December 2014

Petronas Gas Bhd Utility Kerteh (UK)

Page 59: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

59

178.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP B To perform blinding deblinding line HHP/HP B at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620151999) (Contract No.: SM5Y150604)

December 2014

Petronas Gas Bhd Utility Kerteh (UK)

179.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To supply 6CBD elbow set To supply 6 set of CBD elbow for HRSG at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620151907) (Contract No.: SM5Y150604)

December 2014

Petronas Gas Bhd Utility Kerteh (UK)

180.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To replace 6CBD elbow To replace CBD elbow HRSG C & F at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620152261) (Contract No.: SM5Y150604)

December 2014

Petronas Gas Bhd Utility Kerteh (UK)

181.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To replace 14” vlv HHPstm OPTIMAL To perform defect rectification for HRSG D, B and preheater unit A at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620152260) (Contract No.: SM5Y150604)

December 2014

Petronas Gas Bhd Utility Kerteh (UK)

182.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: Touchup paint fuel gas vent at HRSG B / F To perform defect rectification at HRSG E, Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620143585) (Contract No.: SM5Y150604)

November 2014

Petronas Gas Bhd Utility Kerteh (UK)

183.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To replace 6 valves at HRSG C To perform defect rectification at HRSG C, Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620143584) (Contract No.: SM5Y150604)

November 2014

Petronas Gas Bhd Utility Kerteh (UK)

184.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To rplc vlv to PICA-1F57 To replace isolation valve to PICA57 at HRSG G, Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620143583) (Contract No.: SM5Y150604)

November 2014

Petronas Gas Bhd Utility Kerteh (UK)

185.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To rplc vlv CBD 1st vent vlv HRSG G To replace CBD line vent 1st valve at HRSG G, Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620143582) (Contract No.: SM5Y150604)

November 2014

Petronas Gas Bhd Utility Kerteh (UK)

186.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: To rplc CBD/IBD Elbow HRSG F To perform defect rectification at HRSG F, Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order No.: 3620143581) (Contract No.: SM5Y150604)

November 2014

Petronas Gas Bhd Utility Kerteh (UK)

187.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HP/IPB HTW resurfc flng HP side To perform HTW at HP/IP Letdown B at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

November 2014

Petronas Gas Bhd Utility Kerteh (UK)

Page 60: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

60

(Order No.: 36200135434) (Contract No.: SM5Y150604)

188.

MECH MAINT-BOILERS (SM5010200): PR# Boiler D Tube Rectification Provision of manpower, supervision, tools, equipment, materials and consumables for tube rectification at Boiler D, Utility Gebeng, Pahang Darul Makmur. (Order No.: 4120085737) (RFQ No.: 6200094451)

October 2014

Petronas Gas Bhd Gas Processing Gebeng (UG)

189.

MECH MAINT-BOILERS (SM5010200): PR# Servicing for HRSG CF Renewal (UK) Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical work of HRSG E & HRSG G and associated equipment for DOSH inspection, Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 4120084143) (RFQ No.: 6200091519)

October 2014

Petronas Gas Bhd Gas Processing Gebeng (UG)

190.

MECH MAINT-BOILERS (SM5010200): Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical equipment for DOSH inspection at Boiler D, Utility Gebeng, Pahang Darul Makmur. (Order No.: 4120081922) (RFQ No.: 6200089500)

September 2014

Petronas Gas Bhd Gas Processing Gebeng (UG)

191.

HEAT EXCHANGER, CONDENSERS & COOLER (SM5010400): PR# Rectification job for GPP2 T2-622/T2-701 Provision of manpower, supervision, tools, equipment, materials and consumables for unit T2-622 and T2-701 rectfification at GPP-2, Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Order No.: 4120081227) (RFQ No.: 6200086283)

September 2014

Petronas Gas Bhd Gas Processing Kerteh (GPK)

192.

METALLIC STRUCTURE/PIPING (SM5090100): PR# Supply and replace hydrogen piping To perform piping replacement for ASU2 Hydrogen Line 40-H-24520- ECH20 at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order No.: 4120081092) (RFQ No.: 6200088518)

September 2014

Petronas Gas Bhd Utility Kerteh (UK)

193.

METALLIC STRUCTURE/PIPING (SM5090100): PR# SEDAR External services To perform rectification works for Mix Bed Exchanger Stainless Steel piping at Demin Plant, Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order No.: 4120081091) (RFQ No.: 6200088508)

September 2014

Petronas Gas Bhd Utility Kerteh (UK)

194.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HRSG E: To replace IBD valve#1 PR# SAMtn: To rectify leak at Preheater A PR# SAMtn: Repair damper face detach PR# SAMtn: rplc cbdvlv#1, IBD elbow, IBDvlv1 PR# SAMtn: Resurface flange vlv LP stmhdr rvB PR# SAMtn: To replace MSV bypass manual vlv To perform defect rectification at HRSG’s at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620130597) (Contract No.: SM5Y150604)

September 2014

Petronas Gas Bhd Utility Kerteh (UK)

195.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HRSG G: To replace CBD elbow To replace CBD elbow for HRSG G at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620129293) (Contract No.: SM5Y150604)

September 2014

Petronas Gas Bhd Utility Kerteh (UK)

Page 61: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

61

196.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HRSG E: To replace IBD valve #2 To replace 1-1/2 Y-type Globe Valve for HRSG E at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620129292) (Contract No.: SM5Y150604)

September 2014

Petronas Gas Bhd Utility Kerteh (UK)

197.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HRSG E: To replace CBD elbow To replace CBD elbow for HRSG E at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620129291) (Contract No.: SM5Y150604)

September 2014

Petronas Gas Bhd Utility Kerteh (UK)

198.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HRSG E HT package To perform hydrostatic test for HRSG E during CF renewal at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620129288) (Contract No.: SM5Y150604)

September 2014

Petronas Gas Bhd Utility Kerteh (UK)

199.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: to rectify leak at HRSG C CBD bypass To replace 1” pipe at CBD bypass line HRSG C at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620129289) (Contract No.: SM5Y150604)

September 2014

Petronas Gas Bhd Utility Kerteh (UK)

200.

MECH MAINT-BOILERS (SM5010200): PR# F2-781 Tube Leak Repair Provision of manpower, supervision, tools, equipment, materials and consumables for tube leaks repair of F2-781 Auxiliary Boiler, Gas Processing Plant Kerteh, Petronas Gas Bhd, and Terengganu Darul Iman. (Order No.: 4120077942) (RFQ No.: 6200085498)

August 2014

Petronas Gas Bhd Gas Processing Kerteh (GPK)

201.

MECH MAINT-FURNACES (SM5010500): PR# To perform internal inspection Provision of manpower, supervision, tools, equipment, materials and consumables for S-707 inspection & rectification at GPP-1, Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu Darul Iman. (Order No.: 4120077738) (RFQ No.: 6200086276)

August 2014

Petronas Gas Bhd Gas Processing Kerteh (GPK)

202.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HRSG F LG LHS vlv #1 rplcement To replace LG LHS valve for HRSG F at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620121192) (Contract No.: SM5Y150604)

July 2014

Petronas Gas Bhd Utility Kerteh (UK)

203.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: Fabricate&install autodrain line To fabricate and install autodrain line at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620121191) (Contract No.: SM5Y150604)

July 2014

Petronas Gas Bhd Utility Kerteh (UK)

204.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HRSG D desupvlvBFWinlet chkvlv To replace Desuperheater Valve BFW inlet Check Valve for HRSG D at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620121190) (Contract No.: SM5Y150604)

July 2014

Petronas Gas Bhd Utility Kerteh (UK)

Page 62: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

62

205.

MECH MAINT-BOILERS (SM5010200): PR# SAMtn: HRSG B HT package To perform hydrostatic test for HRSG F during CF renewal at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu (Order No.: 3620121188) (Contract No.: SM5Y150604)

July 2014

Petronas Gas Bhd Utility Kerteh (UK)

206.

MECH MAINT-FURNACES (SM5010500): PR# Wall Rupture Repair To perform repair works at Acid Gas Incinerator A5-0202, Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu Darul Iman. (Order No.: 4120070967) (RFQ No.: 6200074135)

June 2014

Petronas Gas Bhd Gas Processing Santong (GPS)

207.

BUILDING & STRUCTURE CONSTRUCTION REPAIR & MAINTENANCE (SC2030500) : PR# Wall Rupture Repair To perform repair works at Acid Gas Incinerator A5-0202, Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu Darul Iman. (Order No.: 4120070967) (RFQ No.: 6200074135)

June 2014

Petronas Gas Bhd Gas Processing Santong (GPS)

208.

MECH MAINT-BOILERS (SM5010200) : PR# Boiler Overhaul DOSH CF Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical equipment for DOSH inspection for Boiler at Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu. (Order No.: 3620086452)

December 2013

Petronas Gas Bhd Gas Processing Santong (GPS)

209.

MECH MAINT-BOILERS (SM5010200) : PR# Boiler Overhaul DOSH CF Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical equipment for DOSH inspection for Boiler D at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu. (Order No.: 3620042385)

February 2013

Petronas Gas Bhd Utility Kerteh (UK)

210.

MECH MAINT-BOILERS (SM5010200) : PR# Boiler Boiler DOSH overhaul for F4-771 DOSH CF Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical equipment for DOSH inspection for Boiler at Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu (Order No.: 3620082321) (RFQ No.: LQ-PGB(A)-0244/13)

December 2013

Petronas Gas Bhd Gas Processing

Kerteh

211.

RETUBING: To repair leak boiler tube Tube Leak Repair Provision of manpower, supervision, tools, equipment, materials and consumables for tube leaks repair of F2-781 Auxiliary Boiler, Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu Darul Iman. (Order No.: 3620073316) (RFQ No.: LQ-PGB(A)-0162/13)

December 2013

Petronas Gas Bhd Gas Processing

Kerteh

212.

Internal inspect & overhaul WH boiler Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical equipment for DOSH inspection for Boiler at Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu (Order No.: 3620082292)

December 2013

Petronas Gas Bhd Gas Processing

Kerteh

213.

RETUBING: To repair leak boiler tube Tube Leak Repair Provision of manpower, supervision, tools, equipment, materials and consumables for tube leaks repair of F2-781 Auxiliary Boiler, Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu Darul Iman. (Order No.: 3620073316) (RFQ No.: LQ-PGB(A)-0162/13)

December 2013

Petronas Gas Bhd Gas Processing Kerteh

Page 63: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

63

214.

Tube Leak Rectification For F3-791, PGB Tube Leak Repair Provision of manpower, supervision, tools, equipment, materials and consumables for tube leaks repair of F3-791 Auxiliary Boiler, Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu Darul Iman. (Order No.: 3620086329) (RFQ No.: LQ-PGB(A)-210/13)

November 2013

Petronas Gas Bhd Gas Processing

Kerteh

215.

CASTABLE: To Perform Ago2 Castable Repair At GPP-2, PGB Provision Of Manpower, Supervision, Tools, Equipments, Materials And Consumables To Perform Castable& Burner Repair Of Acid Gas Oxidizer 2 (AGO-2) At KCS, Gas Processing Plant Complex A, Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu. (Order No.: 4120033626) (RFQ No.: SM1B130130)

October – November

2013

Petronas Gas Bhd Gas Processing

Kerteh

216.

BOILER OVERHAUL : Boiler Overhaul Works For F3-791, PGB PR# F3-791 Boiler Overhaul of F3-781 Auxiliary Boiler, Gas Processing Kerteh (GPK), PGB, Kerteh, Kemaman, Terengganu. (Order No.: 3620086329) (RFQ No.: LQ-PGB(A)-0210/13)

October 2013 Petronas Gas Bhd

Gas Processing Kerteh

217.

BOILER OVERHAUL:Boiler Overhaul F-4001, PPTSB Provision of manpower, supervision, tools, equipment, materials and consumables for overhaul of mixed LPG bullet which inclusive of equipment blinding and de-blinding, ventilation, internal cleaning, internal scaffolding erection and removal, blasting, power brushing and maintenance painting for internal and external of bullet and hydrostatic testing at Petronas Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu.

September 2013

PPTSB

218.

BUILDING & STRUCTURE CONSTRUCTION REPAIR AND MAINTENANCE (SC2030500): To provide all necessary manpower, materials, tools, equipment, and consumables for replace & install new roofing for HSE Cabin CUFK, Centralised Utility Facilities (CUF) Kerteh, Petronas Gas Bhd, Kerteh, Terengganu Darul Iman. (Order No.: 4120035379) (RFQ No.: 6200037576)

September 2013

Petronas Gas Bhd Gas Centralised Utility Facilities

(CUF) Kerteh

219.

MACHINING & FABRICATION WORKSHOP (SM5080000) : PR# Tagging and labelling at process area To provide all necessary manpower, materials, tools, equipment, and consumables for tagging and labelling work for ZONE 1 area, Gas Processing Plant Complex B, Petronas Gas Bhd, Tok arun, Terengganu, Darul Iman. (Order No.: 4120037027) (RFQ No.: 6200039496)

September 2013

Petronas Gas Bhd Gas Processing

Plant Complex B, Tok arun

220.

OFFICE ADMIN SERVICE - PAINTING (SC1030100): PR# Sampling signage KR2B Design, fabricate, deliver and install operational signage for Petronas Penapisan (Terengganu) Sdn Bhd / Aromatics Malaysia Sdn Bhd at KR- 2B Aromatics complex, Terengganu Darul Iman. (Order No.: 4120036419) (RFQ No.: 6200037761)

September 2013

Petronas Penapisan

(Terengganu) Sdn Bhd

221.

CASTABLE: To perform AGO2 castable repair Provision Of Manpower, Supervision, Tools, Equipments, Materials And Consumables To Perform Castable& Burner Repair Of Acid Gas Oxidizer 2 (AGO-2) At KCS, Gas Processing Plant Complex A, Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu. Perform NDT at joints as per PGB requireme

August 2013

Petronas Gas Bhd Gas Processing

Kerteh

Page 64: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

64

222.

GENERAL STRUCTURE / BUILDING PAINTING PASSO PROGRAM – PUMP BASEMENT PAINTING (SC2130100): To provide all necessary manpower, materials, tools, equipment, and consumables for BT1 PASSO Pump basement project at Petronas Penapisan (Terengganu) Sdn Bhd, Terengganu Darul Iman (Order No.: 4120028564) (RFQ No.: 6200032116)

July 2013

Petronas Penapisan

(Terengganu) Sdn Bhd

223.

BUILDING & STRUCTURE CONSTRUCTION REPAIR AND MAINTENANCE (SC2030500): To provide all necessary manpower, materials, tools, equipment, and consumables for replace & install new roofing for HSE Cabin CUFK, Centralised Utility Facilities (CUF) Kerteh, Petronas Gas Bhd, Kerteh, Terengganu Darul Iman (Order No.: 4120048093) (RFQ No.: 6200045354)

July 2013

Petronas Gas Bhd Gas Centralised Utility Facilities

(CUF) Kerteh

224.

GENERAL STRUCTURE / BUILDING PAINTING (SC2130100): PR# Structure repair at PE-1/2-S-320 To provide all necessary manpower, materials, tools, equipment, and consumables for BT1 PASSO Pump basement project at Petronas Penapisan (Terengganu) Sdn Bhd, Terengganu Darul Iman (Order No.: 4120029587) (RFQ No.: 6200031489)

July 2013

Petronas Chemicals

Polyethylene Sdn Bhd

225.

RETUBING: Repair Boiler D PR# Boiler D Tube Rectification Provision of manpower, supervision, tools, equipment, materials and consumables for tube rectification at Boiler D, Utility Gebeng, Pahang, Darul Makmur. (Order No.: 3620053654)

April 2013

Petronas Gas Bhd Utility Gebeng

226.

To perform boiler overhaul PR# F4-761 Boiler Overhaul of F4-761 Auxiliary Boiler, Gas Processing (GPK), PGB, Kerteh, Kemaman, Terengganu. (Order No.: 3620053654) (RFQ No.: LQ-PGB(A)-0094/13)

May 2013

Petronas Gas Bhd Gas Processing

Kerteh

227.

RETUBING: Repair Boiler D PR# To do SH tube defining activity Provision of manpower, supervision, tools, equipment, materials and consumables to perform defining activity of superheater tube for Waste Heat Boiler (1 unit) at Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu.

April 2013 Petronas Gas BhdUtility

Gebeng

228.

Boiler Overhaul & DOSH Inspection Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu.

March 2013

Petronas Gas Bhd Gas Processing

Kerteh

229. To repair, fabricate and install P6-0201B Lube Oil Cooler Structure

March 2013

Petronas Gas Bhd Gas Processing

Santong

230.

Internal Inspect & overhaul w heat boiler Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler WHRU#1 internal inspection overhaul and repair work for Utility Gebeng, Petronas Gas Bhd.

February 2013

Petronas Gas Bhd Utility Gebeng

231.

F3-781 Boiler overhaul and tube rectify Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler F2-781 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Order No.: 3620073313) (RFQ No.: LQ-PGB(A)-0174/13)

July 2013

Petronas Gas Bhd Gas Processing

Kerteh

Page 65: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

65

232.

Smallbore rectification for GPP 4 SD Provision of Piping Work Services for GPP4 Shutdown 2012.

May – June 2012

Petronas Gas Bhd Gas Processing

Kerteh

233.

F4-761 Boiler overhaul and tube rectify Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler F4-761 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Order No.: 3620067225) (RFQ No.: LQ-PGB(A)-0094/13)

June 2012

Petronas Gas Bhd Gas Processing

Kerteh

234.

To rectify defect parts/welding works PR# Rectification Letdown & Piping To perform welding and rectification piping works at Gas Processing Plant Santong, Petronas Gas Bhd, Terengganu.

July 2012

Petronas Gas Bhd Gas Processing

Santong

235.

Boiler Overhaul & DOSH Inspection Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu.

June 2012

Petronas Gas Bhd Gas Processing

Santong

236.

BOILER OVERHAUL:F2-781 Boiler overhaul and tube rectify Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler F2-781 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Order No.: 3620073313) (RFQ No.: LQ-PGB(A)-0174/13)

July 2012

Petronas Gas Bhd Gas Processing

Kerteh

237.

BOILER OVERHAUL:F2-791 Boiler Overhaul Provision of manpower, supervision, tools, equipment, materials and consumables for Boiler F2-791 internal inspection overhaul and repair work for Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu. (Order No.: 3620073313) (RFQ No.: LQ-PGB(A)-0174/13)

August 2012

Petronas Gas Bhd Gas Processing

Kerteh

238.

Boiler activities during PRR GPP3 Provision of manpower, supervision, equipment, tools, materials, and consumables for boiler activity during shut down works At Gas Processing Plant, Kerteh (GPK), Petronas Gas Berhad (PGB), Terengganu Darul Iman. (Order No.: 3200120663) (RFQ No.: LQ-PGB(A)-0231/12)

October 2012

Petronas Gas Bhd Gas Processing

Kerteh

239.

Additional for F4-791 wall repair To perform repair activity at F4-791 wall at Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu

December 2012

Petronas Gas Bhd Gas Processing

Kerteh

240.

BOILER OVERHAUL:Boiler DOSH overhaul for F4-771 PR# Boiler Boiler DOSH overhaul for F4-771 DOSH CF Provision of manpower, supervision, tools, equipment, materials and consumables to perform complete mechanical equipment for DOSH inspection for Boiler at Gas Processing Plant Kerteh, Petronas Gas Bhd, Terengganu.

December 2012

Petronas Gas Bhd Gas Processing

Kerteh

241.

GENERAL STRUCTURE / BUILDING PAINTING (SC2130100): PR# Provision of TCOT Washroom Refurbishment PR# PR# Provision 10% for optional scope (TCOT & OSC) (Order No.: 3310131161) (RFQ No.:)

June 2011

Petronas CarigaliSdn Bhd

Page 66: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

66

REKOD KONTRAK PERJANJIAN HARGA

PENERANGAN TEMPOH

KONTRAK

PEMILIK LOJI

MECH MAINT-BOILERS (SM5010200): TERM CONTRACT for provision of manpower, material, equipment &necessary facilities for Equipment Cleaning of Heat Exchanger at Petronas Chemicals Olefins Sdn Bhd, Petronas Chemicals Glycols Sdn Bhd and Petronas Derivatives Sdn Bhd, Kerteh, Terengganu. (Contract No.: DTC-KTH/PCDSB/2016/0091) (BID No.: DTC-KTH/PCDSB/2016/0091)

01.10.2016 – 30.09.2018

Petronas Chemical

Derivatives Sdn Bhd. (PCOGD)

MECH MAINT-BOILERS (SM5010200): TERM CONTRACT for provision of manpower, material, equipment & services for GPU Boiler Overhaul and Repair Work for Gas Processing and Utilities (GPU),Petronas Gas Bhd (Contract No.: DTC-KTH/PGBGPU/2016/0142) (BID No.: DTC-KTH/PGB-GPU/2016/0142)

01.10.2016 – 30.09.2018

Petronas Gas Bhd,

Gas Processing Kerteh (GPK)

MECH MAINT-BOILERS (SM5010200): TERM CONTRACT for provision of manpower, material, equipment & services for Boiler Repair Works for Utilities Gebeng (UG), Petronas Gas Bhd. (Contract No.: SM4Y160505/6200154645) (BID No.: 6200154645)

19.07.2016 – 18.07.2017

Petronas Gas Bhd

Utility Gebeng (UG)

MECH MAINT-FURNACES (SM5010500): TERM CONTRACT for E-21102 AFC Tubes Internal Cleaning for Petronas Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu. (Contract No.: RFX 6200138215) (BID No.: 6200138215)

10.02.2016 – 09.02.2018

Petronas Penapisan (T)

Sdn Bhd (PPTSB)

Page 67: BIDANG KEPAKARAN KAMI - samase.com.my Company Profile_BM.pdf · dalam membantu pekerja berkaitan masalah dadah dan alkohol. Adalah menjadi hak syarikat menghantar pekerja untuk menjalani

67

MECH MAINT-BOILERS (SM5010200): TERM CONTRACT for supply of material and manpower for Boiler Repair Works for Gas Processing Plant Kerteh (GPK), Petronas Gas Bhd. (Contract No.: SM8Y150815) (BID No.: 6200128350)

26.10.2015 – 26.10.2016

Petronas Gas Bhd

Gas Processing Kerteh (GPK)

MECH MAINT-FURNACES (SM5010500): TERM CONTRACT for Primary and Secondary Transfer Line Exchanger (PTLE & STLE) Maintenance Cleaning by means of Hydrojetting for Petronas Chemical Ethylene Sdn Bhd (PCESB), Kerteh, Kemaman, Terengganu. (Contract No.: RFX6200092922) (BID No.: 6200092922)

15.12.2014 – 14.12.2016

Petronas Chemical

Ethylene Sdn Bhd (PCESB)

MECH MAINT-BOILERS (SM5010200): TERM CONTRACT for supply of material and manpower for Boiler Repair Works for Utilities Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu, Petronas Gas Bhd. (Contract No.: SM8Y150604) (BID No.: 6200122032)

01.08.2015 – 31.07.2016

Petronas Gas Bhd

Utility Kerteh (UK)

MECH MAINT-BOILERS (SM5010200): TERM CONTRACT for supply of material and manpower for Boiler Repair Works for Utility Gebeng Plant (UG), Petronas Gas Bhd (PGB), Kuantan, Pahang. (Contract No.: SM8Y150510) (BID No.: 6200119030)

01.07.2015 – 30.06.2016

Petronas Gas Bhd

Utility Gebeng (UG)