Bill No.2Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 FINISHES

Item No.DescriptionQtyUnitRateAmount (Dhs.).

FINISHES All the finishing items shall be as per the schedule of finishes. The floor and wall tilesShall be fixed using approved epoxy adhesiveand epoxy grout Colour matching to the tiles, and to approval. All the pattern and finishing level shall be maid as per drawing and specification. All rates includes supply and fix of tile and necessary cement sand screed, grouting, cuttingas per shape and post protection method after fixing. (The material and workmanship shall be to the approval of The engineer.)

INTERNAL

Floor Finishes

APolished marble tile20.25m220.00405.00PMT

BSemi-solid Parquet14.04m220.00280.80SSP

CSupply and fixing of 300x300/400x400x8mm unglazed ceramic tile (heavy Duty) with matching colour epoxy grout. (Allow a PC rate of - Dhs. 40/m2 for supply of Ceramic) - CT-3ERROR:#N/Am220.00ERROR:#N/A

D1300x300mm 'Graniti tiles' ERROR:#N/Am220.00ERROR:#N/APC Supply Rate Dhs.75/m2

D2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

E1300x300mm non-slip ceramic tile finish with cemntsand screed (O/A 50mm thick)ERROR:#N/Am220.00ERROR:#N/APC Supply Rate Dhs.45/m2

E2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

Total Carried To CollectionERROR:#N/A

INTERNAL FINISHES (Cont'd)

Floor Finishes (Cont'd).

ASupply and fix 60mm thick interlock paving tiles oncement bed (Basement); colour to approvalERROR:#N/Am220.00ERROR:#N/A

B1Cut to size polished granite to approved patternERROR:#N/Am220.00ERROR:#N/APC Supply Rate Dhs.500/m2

B2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

B3Main Contractors OHP percentage on B1 & B2ERROR:#REF!%20.00ERROR:#REF!

EXCLUDEDC1300x300 Granite tile ERROR:#N/Am220.00ERROR:#N/APC Supply Rate Dhs.200/m2

C2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

C3Main Contractors OHP percentage on C1 & C2ERROR:#REF!%20.00ERROR:#REF!

Total Carried To CollectionERROR:#N/A

INTERNAL FINISHES (Cont'd)

Floor Finishes (Cont'd).

A1Fully Vitrified porcelain tiles with to approvedERROR:#N/Am220.00ERROR:#N/ApatternPC Supply Rate Dhs.75/m2

A2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

A3Main Contractors OHP percentage on A1 & A2ERROR:#REF!%20.00ERROR:#REF!

B1Non - slip ceramic tilesERROR:#N/Am220.00ERROR:#N/APC Supply Rate Dhs.45/m2

B2Main Contractors rate for fixing with all itemsEXCLUDEDnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

C1Non-slip fully Vitrified porcelain tiles ERROR:#N/Am220.00ERROR:#N/APC Supply Rate Dhs.75/m2

C2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

Total Carried To CollectionERROR:#N/A

INTERNAL FINISHES (Cont'd)

Floor Finishes (Cont'd).

A1Non-slipCeramic floor tile ERROR:#N/Am220.00ERROR:#N/APC Supply Rate Dhs.25/m2

A2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

A3Main Contractors OHP percentage on A1 & A2ERROR:#REF!%20.00ERROR:#REF!

Non-Slip Procelain tiles Tread & riser with, cement sand screed for staircase steps 300mm tread &EXCLUDED180mm rise

B1Main Stair CaseERROR:#N/Am20.00ERROR:#N/APC Supply Rate Dhs.75/m

B2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am20.00ERROR:#N/A

B3Main Contractors OHP percentage on B1 & B2ERROR:#REF!%20.00ERROR:#REF!

C1Service Stair CaseNot ApplicablePC Supply Rate Dhs.65/m

C2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed Not Applicable

C3Main Contractors OHP percentage on C1 & C2ERROR:#REF!Not Applicable

Non-Slip Procelain tiles for stair case landing with,cement sand screed

D1Main StaircaseERROR:#N/Am220.00ERROR:#N/APC Supply Rate Dhs.50/m2

D2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandEXCLUDEDScreed (O/A 50mm thick) - and wastage factorERROR:#N/Am220.00ERROR:#N/A

D3Main Contractors OHP percentage on D1 & D2ERROR:#REF!%20.00ERROR:#REF!

Total Carried To CollectionERROR:#N/A

INTERNAL FINISHES (Cont'd)

A1Service StaircaseNot ApplicablePC Supply Rate Dhs.45/m2

A2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreedNot Applicable

A3Main Contractors OHP percentage on A1 & A2ERROR:#REF!Not Applicable

B1Supply and fixing of high pressurised Laminateflooring with necessary under lay as per drawingand specfication523m220.0010,460.00(PC Supply and Fix rate Dhs.100/m2) - Including wastage

B2Main Contractors OHP percentage on B1 ERROR:#REF!%20.00ERROR:#REF!

Skirting

D100mm high epoxy paint70m20.00EXCLUDED

D1Procelain tile skirting match to the floor314m20.006,280.00(PC Supply Rate Dhs. 15/Rm)

D2Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cementmortar/glue and wastage factor314m20.006,280.00

D3Main Contractors OHP percentage on D1 & D2ERROR:#REF!%20.00ERROR:#REF!

Total Carried To CollectionERROR:#REF!INTERNAL FINISHES (Cont'd)

Skirting (Cont'd)

A1100mm high Granite Skirting399mERROR:#REF!ERROR:#REF!(PC Supply Rate Dhs. 20/Rm)

A2Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cementmortar/glue and wastage factor399mERROR:#REF!ERROR:#REF!

A3Main Contractors OHP percentage on A1 & A2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

B1100mm high Ceramic tile Skirting144mERROR:#REF!ERROR:#REF!(PC Supply Rate Dhs. 10/Rm)

B2Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cementmortar/glue and wastage factor144mERROR:#REF!ERROR:#REF!

B3Main Contractors OHP percentage on B1 & B2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

C1100mm high ceramic tile skirting for Stair case145mERROR:#REF!ERROR:#REF!(Main Staircase - PC Supply Rate Dhs. 15/Rm)

C2Main Contractors rate for fixing with all itemsEXCLUDEDnecessary for fixing, etc Including Cementmortar/glue and wastage factor145mERROR:#REF!ERROR:#REF!

C3Main Contractors OHP percentage on C1 & C2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

D1Ceramic tile skirting to Toilet326mERROR:#REF!ERROR:#REF!(PC Supply Rate Dhs. 15/Rm)

D2Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cementmortar/glue and wastage factor326mERROR:#REF!ERROR:#REF!

D3Main Contractors OHP percentage on D1 & D2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

E1100mm high pressurised laminate skirting to400mERROR:#REF!ERROR:#REF!match floor (PC Supply Rate Dhs. 50/Rm)

E2Main Contractors rate for fixing with all itemsnecessary for fixing, etc. including wastage factor 400mERROR:#REF!ERROR:#REF!

E3Main Contractors OHP percentage on E1 & E2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

Total Carried To CollectionERROR:#REF!

INTERNAL FINISHES (Cont'd)

Threshold

A1350mm wide threshold for doors as per site30mERROR:#REF!ERROR:#REF!measurement (PC Supply rate = Dhs. 150/M)

A2Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cementmortar/glue30mERROR:#REF!ERROR:#REF!

A3Main Contractors OHP percentage on A1 & A2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

B1200mm wide threshold for doors as per site87mERROR:#REF!ERROR:#REF!measurement (PC Supply rate = AED 50/M)

B2Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including CementEXCLUDEDmortar/glue87mERROR:#REF!ERROR:#REF!

B3Main Contractors OHP percentage on B1 & B2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

C1100mm wide threshold for doors as per site3mERROR:#REF!ERROR:#REF!measurement (PC Supply rate = AED 50/M)

C2Main Contractors rate for all items necessary For fixing, etc as described in preambles3mERROR:#REF!ERROR:#REF!

C3Main Contractors OHP percentage on C1 & C2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

Total Carried To CollectionERROR:#REF!

INTERNAL FINISHES (Cont'd)

Wall Finishes

Plastering for the walls shall be including allaccessories as per drawings / specifications The spills shall be cleaned and touch up shall be done wherever required.

A12mm thick Internal wall plastering6440m2ERROR:#REF!ERROR:#REF!

BEmulsion Painting 1 coat Primer only for the plastered surface 4729m2ERROR:#REF!ERROR:#REF!

CEpoxy Coating System275m2ERROR:#REF!ERROR:#REF!

DOil Paint System500m2ERROR:#REF!ERROR:#REF!

E20mm thick render with matt finish sandtec or80m2ERROR:#REF!ERROR:#REF!approved similar

Porcelain tile / Ceramic tiles / Glossy-Ceramic Tiles/ Vitrified Ceramic tile / Marble stone wall finishes laying to pattern as per drawing & specification, including back ground Plaster & adhesives/glue, grouting to approval of the Engineer;

F1300x300-Glazed ceramic tiles977m2ERROR:#REF!ERROR:#REF!PC Suply Rate Dhs 30/m2

F2Main Contractors rate for fixing with all itemsEXCLUDEDnecessary For fixing, etc 977m2ERROR:#REF!ERROR:#REF!Including background plaster

F3Main Contractors OHP percentage on F1 & F2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

Total Carried To CollectionERROR:#REF!

INTERNAL FINISHES (Cont'd)

Ceiling finishes

A12mm thick Ceiling Plaster 556m2ERROR:#REF!EXCLUDED

BComplete false ceiling with bulkhead, CoveRefer Provisional light, Cornice and curtain box detailSum

CEpoxy Paint on Plaster280m2ERROR:#REF!EXCLUDED

DOil Paint on Plaster179m2ERROR:#REF!EXCLUDED

EEmulsion Paint on plaster97m2ERROR:#REF!EXCLUDED

Total Carried To Collection.00

INTERNAL FINISHES (Cont'd)

ACCESSORIES

Sanitary Fittings

Supply & Install the following Sanitarywares &accessories Complete with Fittings , Taps &Mixers, Traps And accessories as per drawing &specification

A1Bathroom Set (Master bathroom & Secondary13SetsERROR:#REF!ERROR:#REF!Bedroom Bathroom) including mirrorsPC Rate.Dhs.7000/Each set

A2Main Contractors rate for all items necessary For fixing, etc as described in preambles13SetERROR:#REF!ERROR:#REF!

A3Main Contractors OHP percentage on A1 & A2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

B1Toilets including mirrors16NoERROR:#REF!ERROR:#REF!PC Rate.Dhs.5000/Each Toilet

B2Main Contractors rate for all items necessary For fixing, etc as described in preambles16NoERROR:#REF!ERROR:#REF!

B3Main Contractors OHP percentage on B1 & B2ERROR:#REF!%ERROR:#REF!ERROR:#REF!EXCLUDEDC1Toilet Maid Room including mirrors5NoERROR:#REF!ERROR:#REF!PC Rate.Dhs.1500/Each Toilet

C2Main Contractors rate for all items necessary For fixing, etc as described in preambles5NoERROR:#REF!ERROR:#REF!

C3Main Contractors OHP percentage on C1 & C2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

D1Jacuzzi with necessary mixer (Master Bathroom3SetERROR:#REF!ERROR:#REF!Villa 1,2&3) PC Rate Dhs.10,000/set

D2Main Contractors rate for all items necessary 3SetERROR:#REF!ERROR:#REF!For fixing, etc as described in preambles

D3Main Contractors OHP percentage on D1 & D2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

Total Carried To CollectionERROR:#REF!

INTERNAL FINISHES (Cont'd)

Accessories (Cont'd)

Sundries

ASupply and fix corner gaurds, wall guard as per DMrequirement to basement parking12NoERROR:#REF!ERROR:#REF!

BFloor marking to basement parking1LSERROR:#REF!ERROR:#REF!

CConcave mirrors as per requirement for basement2NosERROR:#REF!ERROR:#REF!parking

DInternal signage on staircase doors, landing,1LSERROR:#REF!EXCLUDEDcorridor, service room etc., as per civilDefence/DEWA requirement

EGarbage Container as per DM requirement1LSERROR:#REF!ERROR:#REF!

FMR Gypsum board ducts for vertical down take pipe.1LSERROR:#REF!ERROR:#REF!

Total Carried To CollectionERROR:#REF!

FINISHES (Cont'd)

EXTERNAL

External Entrance Finishes

A1Supply and fix of granite bushed hammer finish forexternal entrance Ramps8m2ERROR:#REF!ERROR:#REF!PC Supply Rate Dhs.200/m2

A2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed8m2ERROR:#REF!ERROR:#REF!

A3Main Contractors OHP percentage on A1 & A2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

B1Supply and fix of Polished granite finish forEXCLUDEDexternal steps tread & riser67mERROR:#REF!ERROR:#REF!PC Supply Rate Dhs.300/m

B2Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed67mERROR:#REF!ERROR:#REF!

B3Main Contractors OHP percentage on B1 & B2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

External wall Finishes

C20mm thick cement & sand render with paint finish. 3075m2ERROR:#REF!ERROR:#REF!

D1Natural Stone Cladding to the wall178m2ERROR:#REF!ERROR:#REF!PC Supply Rate.Dhs.200/m2

D2Main Contractors rate for fixing with all itemsnecessary For fixing, etc 178m2ERROR:#REF!ERROR:#REF!

D3Main Contractors OHP percentage on D1 & D2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

E50mm Depth Punch Hole Groove in Plaster wall asIncludedper Drawing & Specification

FHeavy Texture 4 coats solvent based epoxy paint3075m2ERROR:#REF!ERROR:#REF!system for all exposed surface

GExtra over for Grooves in Plaster with 12mm wide x10mm deep aluminium channel1LSERROR:#REF!ERROR:#REF!

Total Carried To CollectionERROR:#REF!

EXTERNAL FINISHES (Cont'd)

EXTERNAL (Cont'd)

ASupply and install 60mm thick inter lock paver withRefer Provisional all necessary base and kerb stone as per theSumdrawings

Pitched Roof

B1Clay roof tiles red colour including Eaves, Ridges 135m2ERROR:#REF!ERROR:#REF!(PC Supply Rate Dhs.55/m2)

B2Main Contractors rate for all items necessary 135m2ERROR:#REF!ERROR:#REF!For fixing, etc

B3Main Contractors OHP percentage on B1 & B2ERROR:#REF!%ERROR:#REF!ERROR:#REF!

GRC WORKS

CSupply & Fixing GRC Elements as per drawing and Refer Provisional specification. Sum

Total Carried To CollectionERROR:#REF!

EXTERNAL FINISHES (Cont'd)

ADDITIONAL ITEMS

The tenderer is to detail below anyadditional items with quantities and rates notpreviously included to complete the buildup of lumpsum tender price for this sectionof the works. Should the tenderer fail toinsert any items here, it will be deemed thathis lumpsum price for the tender includes allitems and no subsequent claim for anyadditional item will be entertained.

Finishes to Ponds / FountainAMosaic tile for ponds/FountainsBy Client

BMosaic skirting for ponds & fountainBy Client

CWC back wall top as per drawings1LSERROR:#REF!ERROR:#REF!

Total Carried To CollectionERROR:#REF!

EXTERNAL FINISHES (Cont'd)

Collection

From Page 8/1ERROR:#N/A

From Page 8/2ERROR:#N/A

From Page 8/3ERROR:#N/A

From Page 8/4ERROR:#N/A

From Page 8/5ERROR:#REF!

From Page 8/6ERROR:#REF!

From Page 8/7ERROR:#REF!

From Page 8/8ERROR:#REF!

From Page 8/9.00

Total Carried To Page 8/15ERROR:#N/A

EXTERNAL FINISHES (Cont'd)

Collection

From Page 8/15 (B/F)ERROR:#N/A

From Page 8/10ERROR:#REF!

From Page 8/11ERROR:#REF!

From Page 8/12ERROR:#REF!

From Page 8/13ERROR:#REF!

From Page 8/14ERROR:#REF!

Total Bill No. 8- Carried To SummaryERROR:#N/A

8/&P

MeasurementMeasurement sheetFloorRoom CodeRoomFF QtyFF codeplaster Hpaint Hdr1dr2dr3dr4dr5PL QtyWF QtyWF codeCF QtyCF codeSF QtySF codeBasement floor1Drying room9.1511.40.93.73.1d36-2.5d0d0d0d043.0135.6311.4Basement floor2cool room5.4PMT8.70.93.73.1d36-2.5d0d0d0d033.0227.268.7Basement floor3Laundry13.7312.871.83.73.1d36-2.5d36-2.5d0d0d049.2840.4812.87Basement floor4Storage10.49SSP15.81.83.73.1d36-2.5d36-2.5d0d0d060.1249.5615.8Basement floor514.7720.454.53.73.1d36-2.5d36-2.5d31-2.61d32-2.25d34-2.2580.2165.2420.45Basement floor6Storage room (Dry items)14.714.80.93.73.1d34-2.25d0d0d0d055.8446.4214.8Basement floor7Maids room11.7PMT12.751.83.73.1d33-2.25d32-2.25w8-1.12d0d048.2239.4912.75Basement floor82.640.93.73.1d33-2.25d0d0d0d015.8812.944Basement floor912.83.1703.73.1d0d0d0d0d011.739.833.17Basement floor103.55SSP4.12.73.73.1d30-2.25d31-2.61d36-2.5d0d017.8013.724.1Basement floor110.93.73.1ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/ABasement floor124.037.150.93.73.1d30-2.25d0d0d0d027.5422.717.15Basement floor133.156.30.93.73.1d29-2.367d0d0d0d024.2719.956.3Basement floor14Foyer 112.6310.952.83.73.1d22-5.51d36-2.5d0d0d042.8734.6210.95Basement floor153.15PMT5.41.83.73.1d28-2.5d29-2.367d0d0d021.7717.455.4Basement floor16Lounge area20.7415.10.93.73.1d28-2.5d0d0d0d056.7047.1015.1Basement floor17Bedroom 823.5614.90.93.73.1d36-2.5w7-1.28w7-1.28w8-1.12d052.2842.8014.9Basement floor1810.718.750.93.73.1d27-5.1585w7-1.28d0d0d066.2754.4818.75Basement floor198.6410.81.83.73.1d27-5.1585d36-2.5d0d0d038.9631.4010.8Basement floor208.52110.93.73.1d24-2.45d0d0d0d041.5834.4411Basement floor218.114.50.93.73.1d25-4.6155w7-1.28d0d0d051.0841.8414.5Basement floor22Foyer 224.3314.755.63.73.1d28-2.5d26-2.9d22-5.51d23-5.51d058.8846.6714.75Basement floor238.3513.6503.73.1d0d0d0d0d050.5142.3213.65Basement floor24Bedroom 729.629.151.83.73.1d24-2.45d25-4.6155w7-1.28d0d0106.1787.6029.15Basement floor25Lounge area37.82403.73.1bw2-12.1992d0d0d0d076.6062.2024Basement floor26Recreation area8139.50.93.73.1d23-5.51ed3-6.004ed4-16.0844d0d0121.8897.6439.5Ground floor157.624.51.953.83.2d2-5.51w1-4.56w1-4.56w1-4.56w1-4.5676.7660.8924.5Ground floor240.222.453.853.83.2d3-5.51d4-3.19d36-2.5w1-4.56w1-4.5679.6263.8422.45Ground floor320.612.76.33.83.2d1-6.6d2-5.51d1-6.6d0d053.4942.0912.7Ground floor441.634.11.83.83.2d10-3d11-2.574w1-4.56w1-4.56d0121.73100.1934.1Ground floor53.55.20.93.83.2d11-2.574w4-1.885d0d0d018.7215.065.2Ground floor60.93.83.2ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AGround floor734.115.356.23.83.2d1-6.6d1-6.6d3-5.51d9-5.434w1-4.5653.1940.2615.35Ground floor871.629.55.93.83.2d9-5.434w1-4.56w3-2.4d5-3.19ERROR:#N/AERROR:#N/AERROR:#N/A29.5Ground floor93.770.93.83.2d6-2.016w4-1.885d0d0d026.1221.387Ground floor107.612.41.83.83.2d5-3.19d6-2.016d0d0d048.7540.2312.4Ground floor1142.7337.80.93.83.2d5-3.19bw1-9.92082w2-3.5815w2-3.5815w2-3.5815123.2099.9837.8Ground floor1250.6003.83.2d0d0d0d0d00.000.007.5Ground floor131.854.903.83.2d0d0d0d0d018.6215.684.9First floor138.320.60.93.93.35d19-2.574w1-4.56w1-4.56d0d072.1660.3320.6First floor220.911.21.93.93.35d18-5.434w6-5.28d0d0d040.3833.1711.2First floor324.118.41.83.93.35d12-2.86d36-2.5w1-4.56d0d068.8657.7518.4First floor43.837.10.93.93.35d36-2.5d36-2.5d0d0d026.2021.807.1First floor510.7100.93.93.35d13-2.304w1-4.56d0d0d035.6529.6510First floor65.29.61.83.93.35d13-2.304d36-2.5w4-1.885d0d037.7731.509.6First floor70.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AFirst floor838.123.86.43.93.35d12-2.86d18-5.434d14-2.86d16-2.86d36-2.5101.2784.6623.8First floor95.16.32.73.93.35d14-2.86d36-2.5d15-2.574d0d027.1722.226.3First floor1046.31.83.93.35d15-2.574d36-2.5d0d0d026.5222.066.3First floor1120.517.30.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A17.3First floor128.211.70.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A11.7First floor132719.40.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A19.4First floor147.511.350.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A11.35First floor155.780.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A8First floor1621.2180.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A18First floor1710.718.40.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A18.4First floor1848.326.70.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A26.7First floor1924.90.93.93.35d36-2.5d36-2.5d0d0d017.6214.434.9First floor201.84.90.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A4.9First floor212.45.70.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A5.7First floor223.87.30.93.93.35ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A7.3

AbstractCodeQtyPMT20.25SSP14.04MT0CT10GMT0CT20CT30PGT0

DATADOORW000.00W11.92.4-4.56W21.91.885-3.58W312.4-2.40W411.885-1.89W50.82.4-1.92W62.22.4-5.28W71.60.8-1.28W81.40.8-1.12ED112.9-2.90ED25.092.9-14.76ED31.93.16-6.00ED45.093.16-16.08*BW1a2.112.765*2BW1b1.4782.765BW13.5882.765-9.92*BW2a2.113.4*2BW2b1.4783.4BW23.5883.4-12.20D000.00D12.23-6.60D21.92.9-5.51D31.92.9-5.51D41.12.9-3.19D51.12.9-3.19D60.92.24-2.02D70.92.6-2.34D80.92.6-2.34D91.92.86-5.43D1013-3.00D110.92.86-2.57D1212.86-2.86D130.92.56-2.30D1412.86-2.86D150.92.86-2.57D1612.86-2.86D170.92.86-2.57D181.92.86-5.43D190.92.86-2.57D2012.86-2.86D210.92.61-2.35D221.92.9-5.51D231.92.9-5.51D2412.45-2.45D251.812.55-4.62D2612.9-2.90D271.812.85-5.16D2812.5-2.50D290.92.63-2.37D300.92.5-2.25D310.92.9-2.61D320.92.5-2.25D330.92.5-2.25D340.92.5-2.25D3512.5-2.50D3612.5-2.50