    From Liquor to Sludge—Conversion of a RecoveryBoiler to a Bubbling Fluid Bed

    BR-1675

    IntroductionWhen a mill no longer needs an existing recovery boiler itis faced with the problem of what to do with the boiler in the

    future. The mill may have a new recovery of a larger size or

    may have changed from Kraft to recycle product. The sludge

    that once was landfilled is now a valuable fuel to generate steam

    and can displace other more expensive fossil fuels. A U.S. mill,

    having semi-retired a vintage 1964 Combustion Engineering

    (C-E) recovery with a larger recovery boiler, wanted to replace

    older power boilers with a power boiler capable of firing

    papermill sludge; tire derived fuel and wood waste. This paper

    discusses the modifications required to convert this recovery

    boiler to a power boiler and the considerations that paper mills

    need to understand when converting equipment to solid fuel

    firing.

    BackgroundThis project converted the recovery boiler to a power boiler

    and increased steam capacity from 34.5 to 56.7 kg/sec (274,000

    to 450,000 lbs/hr) while maintaining steam outlet conditions

    at 58.6 bar and 441C (850 psig/825 F). The converted boiler

    was designed as a bubbling fluid bed (BFB) boiler capable of 

    burning wood waste, sludge and tires. The project was done on

    an EPC basis (Engineering, Procurement and Construction). In

    order to provide our customer with the most technically sound

    and cost-effective proposal for this project, B&W hired an en-gineering construction company who provided balance of plant

    design, procurement, and construction.

    The existing unit is a 1964 vintage C-E 600 TPD two drum

    recovery boiler. The furnace is 7.5 m (24.7 ft) wide by 7.13 m

    (23.4 ft) deep. The wall construction uses 5.08 cm (2 in.) OD

    tubes on 5.16 cm (2 1/32-in.) centers. The 168 cm (66 in.)

    steam drum and 122 cm (48 in.) mud drums are on 7 m (23 ft)

    centers. For about two years prior to it’s conversion, the boiler

    was maintained in a “hot standby” condition, using the steam

    coil air heater to heat air to keep the boiler and precipitator

    warm. This was for a corrosion concern. The boiler was oper-

    ated, at least annually, whenever the newer recovery boiler had

    an outage.

    Economic and environmental issues justified conversion of the chemical recovery unit to a bubbling fluid bed. About 60

    percent of mill sludge was being sent to the mill’s on-site land-

    fill, based on hauling 24 hours a day. The converted boiler can

    burn all mill sludge 450 tonne (500 ton)/day, thereby essen-

    tially eliminating sludge landfill. This will extend the useful

    life of the on-site landfill. The mill was able to retire two older

    bark boilers and reduce coal usage on their remaining power

    boilers. Conversion to a BFB unit allowed existing assets to

    be fully utilized, such as the upper furnace, superheater, boiler

    bank, precipitator, building, etc. Also, the cost to maintain the

    recovery unit in ‘hot standby’ was eliminated.

    Presented to:1999 TAPPI Engineering ConferenceSeptember 12-16, 1999Anaheim, California, U.S.A.

  • 8/17/2019 BR-1675

    2/8

    2 Babcock & Wilcox

    History of B&W BFBB&W has extensive experience with boiler conversions and

    modifications, including almost total replacement of older re-

    covery boilers with newer recovery units while reusing exist-

    ing buildings and ancillary equipment. B&W has designed,

    manufactured, and constructed complete new facilities with

    fluid bed boilers, including circulating fluid bed and bubbling

    fluid bed, and has converted other boilers to BFB.

    B&W uses the original open bottom design as illustrated in

    Fig. 1. This BFB design feature eliminates the problems asso-

    ciated with bed draining, the size of debris a drain can remove,

    and the need for water-cooled conveyors. The furnace hopper

    is cool and does not require insulation. Further, B&W designs

    the hoppers to be bottom-supported while the boiler remains

    top supported. This design concept is similar to the water seals

    used on many solid fuel top-supported power boilers designed

    by most boiler manufacturers. The primary benefit to this de-

    sign is that the weight (load) of the fluidizing air system, bed

    (sand and fuel) and hoppers is not part of the overall boiler

    loading. The loading to top supports, and top steel, is consid-

    erably reduced. The furnace header-to-hopper seal is based on

    similar seals used on water-cooled stokers and similar BFB

    installations.

    Type and quality of fuel will effect the bubbling bed opera-

    tion; temperature, combustion staging and air heater require-

    ments. Historically a tubular air heater has been required. In

    the case of this project, the fuel combination did not require

    heated air to the bubbling bed. This allowed for the elimina-

    tion of any tubular air heater and the addition of more econo-

    mizer surface. Flue gas recirculation into the bubbling bed air

    system is used to control bed temperature while staging com-

    bustion.

    Boiler PerformanceThe boiler maximum continuous rating (MCR) is 56.7 kg.sec

    (450,000 lb/hr) steam at 441C (825F) and 58.6 bar (850 psig)

    using the specified fuels, which include hog fuel (bark, wood

    chips, etc), paper mill sludge, and chipped tires (or tire-de-

    rived fuel, TDF). The bark moisture can vary between 45-55%,

    and sludge moisture can vary between 50-60%. Woodwaste is

    both purchased and self generated. The boiler is designed to

    burn natural gas using the four start-up burners and two loadburners, and produce 34 kg/sec (270,000 lb/hr) steam at rated

    conditions. In operation the boiler will fire a wide range of 

    fuel quality, affected by fuel sourcing and weather conditions.

    This BFB is designed to process both good and poor fuels.

    The predicted boiler performance is summarized in Table

    1. Table 2 provides the fuel specification for each of the four

    fuels. Within Table 1, Case 1 presents boiler performance at

    MCR with bark, TDF and sludge. The sludge rate is equiva-

    lent to 450 tonne (500 ton)/day of sludge, which is the nominal

    mill sludge output at this time. Case 2 shows boiler perfor-

    mance at MCR with bark and sludge only, and the sludge rate

    is equivalent to 725 tonne (800 ton)/day of sludge, which rep-

    resents a future sludge condition. This boiler has been oper-

    ated with 800 ton/day sludge. Finally, Case 3 is the low load

    condition with 25.2 kg/sec (200,000 lb/hr) steam flow while

    firing bark and 450 tonne (500 ton)/day sludge.

    Illustration 1 shows the BFB retrofit boiler side view, with

    only the front half of the economizer is depicted. There is also

    a second bank of economizer not shown.

    Table 3 summarizes the overall scope of supply for this

    project.

    Bubbling Fluidized Bed (BFB) Boiler The new lower furnace utilizes a fully membraned wall con-

    struction to provide a completely welded, gas-tight enclosure,

    stiffened by buckstays, and covered by insulation and externallagging (see Figs. 2 and 3). The previous furnace wall enclo-

    sure was tangent tube.

    Lower Furnace and Fluid Bed BottomThe membrane furnace walls were constructed using 7.62

    cm (3 in.) OD by 4.57 mm (0.180 in.) minimum wall SA178A

    tubes on 10.32 cm (4 1/16 in.) centers. The 10.32 cm (4 1/16-

    in.) side spacing allowed the new 7.62 cm (3 in.) OD tubes to

    be swaged and welded directly to every other existing 5.08 cm

    (2 in.) OD tube. The remaining 5.08 cm (2 in.) OD tubes were

    routed into a new transition header located near the weld line.

    These new headers on all four walls provide the transition be-tween the new 7.62 cm (3 in.) membrane-welded lower furnace

    tubes and the existing 5.08 cm (2 in.) tangent tubes.

    To achieve the desired steaming capacity of 56.7 kg.sec

    (450,000 lb/hr) the lower furnace combustion zone was enlarged

    from the main furnace shaft to provide a deeper combustion

    zone. The bubbling fluid bed plan area requirements were set

    to achieve the desired bed velocity and bed temperature. The

    new lower furnace depth was increased from 7.09 to 10.21 m

    (23 ft 4 in. to 33 ft 6 in.). The furnace width remained the

    same as original design at 7.52 m (24 ft 8 in.). This arrange-

    ment resulted in both adequate furnace liberation rate and ad-Figure 1 B&W’s open bottom bed design.

  • 8/17/2019 BR-1675

    3/8

    Babcock & Wilcox 3

    Table 1

    Predicted Performance Summary

    MCR – bark, MCR – bark, Reduced loadTDF, sludge sludge 450/(500) TPD

     sludge, bark

    Steam Leaving SH, 103 kg/s (lb/hr) 0.06 (450) 0.06 (450) 0.03 (200)Excess air, % 30 30 40

    Blowdown, % 2 2 2

    Bark Rate, 103 kg/s (lb/hr) 0.02 (131.5) 0.02 (135.5) 6.38x10-3 (50.6)

    Sludge Rate, 103 kg/s (lb/hr) 5.25x10-3 (41.7) 8.40x10-3 (66.7) 5.25x10-3 (41.7)

    Tire Rate, 103 kg/s (lb/hr) 5.29x10-4 (4.2) 0.0 0.0

    Heat Available Fuel, W (MBtu/hr) 2.19x108 (748) 2.26x108 (772) 9.87x107 (337)

    Flue Gas Leaving ECN, 103 kg/s (lb/hr) 0.12 (927.5) 0.11 (909.7) 0.06 (478.8)

    Flue Gas Temp. Lvg ECN, C (F) 177 (350) 177 (350) 160 (320)Flue Gas Recirculation, 103 kg/s (lb/hr) 7.06x10-3 (56.0) 0.0 5.67x10-3 (45.0)

    Steam Press, at SH outlet, Bar (psi) 59 (860) 59 (860) 59 (855)Steam Temp. Leaving SH, C (F) 441 (825) 441 (825) 441 (825)

    Air to Furnace, 103 kg/s (lb/hr) 0.09 (691.4) 0.09 (694.7) 0.04 (329.8)Air Temp. Entering WCAH, C (F) 27 (80) 27 (80) 27 (80)Air Temp. Leaving WCAH, C (F) 107 (225) 107 (225) 99 (210)

    Table 2

    Predicted Performance Fuel Specification

    % By Weight Bark Sludge Tire Natural Gas

     C 25.0 14.62 83.87 69.27

     H2 3.0 1.93 7.09 22.65

     Cl 0.0 0.0 0.0

    H2O 50.0 60.00 0.62

     N2 0.1 0.17 0.24 8.08

     O2

    20.2 9.75 2.17

     S 0.0 0.05 1.23 < 1 ppm

     Ash 1.7 10.23 4.78

    Unknown(2)

    3.25

     kJ/kg (Btu/lb) 10,000 (4,300) 6,600 (2,841) 36,000 (15,500) 50,600 (21,800)

    Min. Density, kg/m3 (lb/ft3) 272(17) 400 (25) 609 (38) NA

    Max. Size, cm (in.) 7.62 (3) 7.62 (3) 7.62 (3) NA

    Min. Size, cm (in.) 10% < 0.32 (0.125) 10% < 0.32 (0.125) 10% < 0.63 (0.25) NA

    Wire Content 0 0 10% belt, 1% bead NA

    (2)Required for analysis to add up to 100%, considered as ash.

  • 8/17/2019 BR-1675

    4/8

    4 Babcock & Wilcox

    Table 3

    General Scope of Work

    Convert the boiler from a chemical recovery unit to a BFBpower boiler, and increase capacity

    Boiler modificationsNew gas burners (start-up and load burners)New motor driven fluidizing air fan and motor driven

    secondary air fan

    DuctsNew horizontal economizer Water coil air heater Flues and hoppers, from boiler generating bank outlet to

    economizer to existing precipitator inlet damper Flues from precipitator outlet, including new outlet

    nozzles, to ID fanTurbine driven ID fanFlues to stacks (2 stacks)Sand feed systemBoiler bed drain system and sand reclaim systemPneumatic ash removal from economizer hoppers and

    precipitator silosInsulation, lagging and refractorySolid fuel feed system, including dedicated bark reclaimer,

    dedicated sludge reclaimer, belt, magnet, disk screen,belt to boiler building, belt inside boiler building

    Wood bins on north and south sides (boile r right and leftwalls)

    Wood screw conveyors, to transport material from southside to north wood bin

    Wood chutes and wood spoutsNew DCS system and new instrumentationNew transformer New electrical room for large motor MCCs and DCS

    equipmentReuse electrical room, install new MCCsCable and trayPiping modificationsPlatform modifications, including concrete and gratingCivil and structural

     Asbestos removalDemolitionConstruction

    Commissioning

    equate residence time for complete combustion. The new lower

    furnace is refractory-lined to control bed temperature and pro-

    tect the tube walls from the reducing (oxygen deficient) atmo-

    sphere. The refractory extends up to the overfire air elevation.

    The new construction of the lower furnace enlargement uses

    panels fore and aft of the main side wall panels. Each panel

    contains 15 tubes and connects to upper and lower wall head-

    ers. These panels are directly supplied with water from new

    downcomer sections.

    The fluid bed bottom uses an open hopper design with one

    manual slide gate valve and one pneumatically actuated spherivalve per hopper for the removal of rocks which enter with the

    fuels. There are 12 hoppers (3 wide x 4 deep). To simplify

    fieldwork, the hoppers were factory assembled into four ship

    units (see Fig. 4). Each ship unit consisted of three hoppers,

    fluidizing air pipes and horizontal support steel. The bed de-

    bris removal cycle is typically once every 12 hours, requiring

    only a small portion of sand to be removed. The bed hoppers

    are equipped with internal tables to prevent funneling of ma-

    terial. The hoppers do not require insulation and, therefore,

    were furnished with a high-temperature primer and finish coat

    of paint. Figure 3 Bubbling fluidized bed—3D view.

    Figure 2 Bubbling fluidized bed boiler—side view.

  • 8/17/2019 BR-1675

    5/8

    Babcock & Wilcox 5

    The eight large diameter fluidizing air ducts are an integral

    part of the hoppers and supply air to the bubble caps to fluidize

    the bed. The bubble caps are arranged on a staggered 10.16 by

    10.16 cm (4 in. by 4 in.) matrix. Twelve thermowells are pro-

    vided in the bed and four thermowells are insta lled on the lower

    water walls to monitor bed temperature.

    Solid fuel is introduced through six airswept distributor

    spouts with three located on the north wall and three located

    on the south wall utilizing an interlaced pattern. This arrange-

    ment was engineered to provide the proper fuel distribution

    required to achieve uniform combustion and uniform flue gas

    temperatures leaving the furnace and entering the convection

    pass.

    Bed Support

    The existing furnace and boiler pressure parts are top-sup-ported and allow for downward expansion during heating from

    ambient to operating temperature. The fluid bed combustor is

    operated with all of the lower furnace hoppers and the volume

    of the lower furnace to a point about 76.2 cm (30 in.) above the

    top of the bubble caps completely full of bed material. The

    lower furnace hoppers are bottom-supported on dedicated struc-

    tural steel from grade. A seal system with fabric expansion

     joint provides for downward expansion of the boiler.

    Buckstays/Rear Wall SupportThree new buckstay elevations were supplied for the new

    lower furnace. Constant load hangers support the rear wall and

    attach to a buckstay below water drum; front wall and sidewallsare supported by existing upper furnace tubes and existing top

    support rods.

    Bed Start-Up Burners and Load BurnersFour overbed natural gas start-up burners are provided to

    heat the bed from a cold condition to the temperature where

    solid fuel combustion occurs. Two burners are located on each

    of the front and rear walls. Each burner is rated at 4.22x107 kJ

    (40 MBtu) per hour heat input. Each pair of burners operates as

    a single burner.

    Figure 4 Hoppers are factory assembled to simplify fieldwork.

    Two natural gas load burners are provided on the front wall,

    3.5 m (11.5 ft) above the overfire air nozzles. These load burn-

    ers are B&W’s low-NOx type XCL-S design, each rated for

    1.58x108 kJ (150 MBtu) operation.

    Combustion Air SystemThe combustion air system consists of one motor driven flu-

    idizing fan, one motor driven secondary air fan (which suppliesair to all burners and OFA nozzles), and one water coil air heater

    for the secondary air system. This two-fan arrangement, along

    with the flue gas recirculation, provides the flexibility neces-

    sary for the specified fuel combinations for bark, sludge, and

    tires, as well as the given fuel moisture content ranges. The bed

    fluidizing air system uses high static air supplied to the bubble

    caps to fluidize the bed material. The overfire air system con-

    tains two levels of air nozzles on each of the front and rear walls.

    Flue gas recirculation to the bubbling bed is required with

    the specified fuel combination and moisture ranges listed in the

    project specifications. The recirculated flue gas is taken from

    the ID fan outlet and introduced into the fluidizing air system at

    the FD fan inlet. The introduction of the flue gas into the fluid-

    izing air system will allow complete bed fluidization while stag-

    ing sufficient combustion in the overfire air zone to maintain

    the bed in the desired 760-871C (1400-1600F) temperature range

    throughout the various combinations of fuels and moisture con-

    tents.

    Furnace ScreenA portion of the original recovery furnace screen platens

    were removed to increase gas temperature entering the super-

    heater.

    Superheater ArrangementThe existing superheater was reused as much as possible,but slightly modified, to provide the desired temperature (441C

     / 825F) and pressure (58.6 bar / 850 psig) at the main steam

    header. The modifications required were: install six missing

    platens in the first two banks, completely remove the third bank,

    and provide new jumper tubes to connect the second bank (in

    direction of gas flow) to the existing inlet header of the first

    superheater bank.

    A new, larger interstage attemperator and main steam piping

    was required to reduce the steam side pressure drop at the in-

    creased steaming rate of 56.7 kg/sec (450,000 lb/hr) and to

    maintain 58.6 bar (850 psig) at the main steam header. Spray

    water is supplied from the existing water line.

    Generating Bank and DrumsNo changes were required to the existing generating bank.

    Economizer The existing vertical cross-flow economizer was removed

    and replaced by a horizontal, bare tube design. The new, con-

    tinuous in-line, bare tube economizer is constructed of 5.08 cm

    (2 in.) OD tubes. The modules are arranged in two gas passes,

  • 8/17/2019 BR-1675

    6/8

    6 Babcock & Wilcox

    each pass utilizing a counterflow design. The flue gas path is

    from boiler outlet to the first pass with flue gases flowing vert i-

    cally down, gases flow above economizer hoppers to the sec-

    ond gas pass, then flue gases f low vertically upward. The econo-

    mizer gas outlet connects to the existing precipitator inlet damp-

    ers.

    Water Coil Air Heater A water coil air heater is installed in the overfire air system.Feedwater is routed from the new economizer to the new water

    coil air heater and then to the steam drum. The new water coil

    air heater reduces the temperature of the feedwater entering the

    steam drum to maintain the necessary margin of subcooled

    feedwater to the drum.

    Safety ValvesThe existing steam drum and superheater safety valves had

    sufficient relieving capacity for the 56.7 kg/sec (450,000 lb/hr) of 

    steam rate.

    Fuel Handling SystemThe bark reclaimer is a six-wide drag chain reclaimer rated

    to discharge 91 tonnes (100 tons) per hour of hogged wood

    waste. Material is discharged onto the reclaimer by either a belt

    conveyor from the woodyard or by front-end loader. The dis-

    charge rate can be varied by controlling the speed of the vari-

    able frequency drive unit.

    The second reclaimer is identical to the bark reclaimer in

    design, but is dedicated to sludge. Sludge is presently loaded

    using a front-end loader, but a dedicated sludge conveyor will

    be added in the future.

    Bark and sludge from the above reclaimers discharge to the

    #1 belt conveyor, which is 1.2 m (48 in.) wide by approximately

    58 m (190 ft) long. Tramp iron is removed by a self-cleaning

    electromagnet, suspended above the conveyor.

    A disc screen is provided at the discharge of the #1 belt con-

    veyor. Material less than nominal 7.6 cm (3 in.) will pass through

    the screen and onto the #2 belt conveyor, which is 1.2 m (48

    in.) wide and approximately 106.7 m (350 ft) long, and termi-

    nates inside the boiler house on the seventh floor.

    Material discharged from the #2 belt conveyor drops to the

    #3 belt conveyor. This is a 1.2 m (48 in.) wide by approximately

    18.3 m (60 ft) long horizontal belt conveyor on the sixth floor.

    The material discharged from the #3 belt conveyor is nor-

    mally directed to the #1 screw conveyor and metered to both

    the north and south bark bins. In the event of a failure of the #1

    screw conveyor, a bypass gate can be manually positioned todivert material directly into the south bark bin in the event that

    a problem prevented the operation of the #1 screw conveyor or

    the north bark bin.

    The north and south fuel bins are of identical construction,

    each consisting of nine 45.7 cm (18 in.) diameter variable pitch

    screws to form a continuous live bottom bin. Each bin is made

    up of three separate feed zones, each feeding one of the three

    windswept spouts located on that side of the boiler. Each speed

    zone has a constant torque, variable frequency drive system.

    B&W used dual bark bins to provide better fuel distribution to

    the bed, more uniform bed temperature, more uniform heat dis-

    tribution to the convection pass, and better control of boiler

    emissions.

    Ash Handling and Sand Reclaim SystemsBottom ash is removed from the bubbling bed utilizing five

    heavy-duty, round link type drag chains. Four drag conveyors

    receive ash from the bed drains (or hopper bottom ash outlets)and discharge into the fifth conveyor, which is a collection con-

    veyor. The collection conveyor transports materials into the sand

    reclaim system.

    The sand reclaim system separates the sand from rocks, ag-

    glomerated sand and debris brought in with the fuels and wire

    from the TDF. The sand is returned to the sand storage silo.

    Fly ash collected from the economizer and electrostatic pre-

    cipitator is conveyed by a pneumatic ash system. The pneumatic

    conveying system is designed to convey 9.1 tonnes (10 tons)/ 

    hour of fly ash on a continuous basis. The fly ash is conveyed

    to a filter/receiver which discharges into the ash silo. An ash

    mixer is located at the silo outlet to condition the ash with wa-

    ter before material is dumped into trucks.

    NOx Reduction SystemA Selective Non-Catalytic Reduction (SCNR) system was

    provided to reduce the NOx emissions from the boiler. SNCR

    uses urea or ammonia injected within a temperature zone of the

    furnace to recombine with NOx  to form N

    2  and water vapor.

    There is no catalyst used in an SNCR. The SNCR is a series of 

    pre-engineered modularized component assemblies, which are

    combined to produce a complete urea based chemical delivery

    system. The urea can be injected through 20 injection lances.

    The injection lances are located at three different boiler zones.

    The following are equipment descriptions of the SNCR system:

    1. Storage tank: Designed to store 75,700 L (20,000 gal) of 

    bulk chemical. The storage tank is of fiberglass construction

    and includes a heating package to maintain 27C (80F).

    2. Circulation Module: This module is used in conjunction

    with the storage tank to keep the chemical fluid warm and cir-

    culating. It also assures that a proper supply of chemical is

    delivered to the metering/mixing module.

    3. Metering/Mixing Module: This module provides com-

    plete metering and control systems for the chemical and in-

    cludes an electrically driven, hydraulically actuated diaphragm

    pump with steady-flow output. The module is designed for in-

    dependent level control, which permits a biasing of the chemi-

    cal to each level of injection. The water supply is adjusted, via

    a regulator, to a set pressure that will allow for proper flow toeach distribution module.

    4. Distribution Module: This module provides complete

    flow to individual injection lances. The modules are placed

     just prior to the injectors and are used as a guide and check for

    proper injector performance. Air for atomization and cooling

    is introduced through this module. One distribution module

    controls up to 8 injectors.

    5. Injection Assemblies: Injection lances are used to spray

    the chemical into the boiler furnace. The injectors are 1.9 cm

    (1.14 in.), 316 L stainless steel tubes, with an inner atomiza-

    tion tube. The standard length is 0.76 m (2.5 ft).

  • 8/17/2019 BR-1675

    7/8

    Babcock & Wilcox 7

    Special ConcernsThe project included several unique features and challenges.

    Boiler 1. This is the first B&W “open bottom” bubbling fluid bed

    that has bottom supported hoppers connected to top supported

    pressure parts. B&W’s other domestic open bottom designed

    BFB units are bottom supported.

    2. The seal between furnace (top supported) and hoppers

    (bottom supported) is similar to other designs, but accommo-

    dates 10.8 cm (4.25 in.) of vertical growth down and 2.54 cm (1

    in.) of horizontal growth.

    3. The sand hoppers were pre-assembled (4 ship units, 3

    hoppers each unit). This included fluidizing air pipes (with

    bubble caps) welded to the hoppers.

    4. Rear wall support: The existing recovery boiler used con-

    stant load hangers at the furnace floor to support the floor and

    rearwall. A new constant load hanger system was needed for

    the rearwall when the furnace floor was removed and replaced

    with the fluid bed.

    5. The new membraned lower furnace (with 7.6 cm / 3 in.

    OD tubes on 10.32 cm / 4-1/16 in. centers) was connected to

    the existing tangent tube furnace (with 5.08 cm / 2 in. OD tubes

    on 5.16 cm / 2-1/32 in. centers), and new inlet headers recon-nect every other existing tube (at cut line) to downcomer circuits.

    Auxiliary Equipment and Construction1. The bark and sludge reclaimers are located in the area

    previously used by the mill for bark storage, about 137 m (450

    ft) from the boiler building. The #2 belt conveyor is routed un-

    der an existing conveyor (behind the boiler house) and the #2

    belt conveyor penetrates the building wall on the seventh floor,

    southwest corner, at an obtuse angle to building wall (and steel).

    2. Inside the building, two woodbins were installed, one on

    north wall and one on south wall. Fuel is transferred from south

    side to north via four wood screws.

    3. Finding locations for two FD fans was challenging, but

    solved.

    4. The vertical clearance between concrete at grade and the

    bottom of platform steel established maximum heights for cer-

    tain equipment, such as economizer modules and urea storage

    tank.5. The new economizer was shipped in 6 modules, weigh-

    ing between 43,090 and 65,770 kg (95,000 and 145,000 lb) each.

    6. New foundations for fans, ash silo and other equipment

    had to consider underground conditions (such as piping) and

    unknown subsoil conditions.

    7. The only entry into building was at grade, on north wall,

    adjacent to an alley.

    8. Space had to be found for a new electrical room (MCC

    and DCS cabinets) and new transformer.

    9. Construction work was performed inside a building, which

    had other operating equipment and boilers, without causing ac-cidental trip(s), while maintaining safe working conditions.

    10. Hazardous material, mainly asbestos, was identified and

    removed (customer removed hazardous material).

    11. Safe demolition of existing equipment and material in-

    cluded:

    - Electrical equipment

    - Cables

    - Piping

    - Cascade evaporator

    - Economizers

    - SCAH

    - Platforms, including concrete and steel

    - Dissolving tank, liquor pumps, etc.

    - Old control room (previously abandoned)

    12. After completion of above demolition by the demolition

    contractor, the boiler erector demolished boiler and superheater

    components, and then installed new equipment and material.

    13. Coordination of outages was required, for tie-ins between

    new equipment (electrical and piping) to existing equipment.

    14. Relocation of cables and piping was needed, either for

    access or to create space for new equipment.

    15. Planning and execution of economizer module erection

    included:

    - Transportation to site and to the alley.

    - The modules were floated inside the building (used air pads).

    - The two largest modules, weighing 65,770 kg (145,000

    lb) each, measured 2.9 m (9.5 ft) high x 5.56 m (18.25 ft) wide

    x 9.14 m (30 ft) long.

    - Modules were assembled at grade by first moving in the

    top module, middle module, lower module and support steel,

    and then the assembly (welded together) was raised to eleva-

    tion (two lifts, 159 tonne / 175 ton each).

    OperationThe conversion project has achieved its major goals, and all

    steam and fuel conditions have been achieved. Bark, sludge,

    tire and natural gas have been fired at all required conditions

    between steam flows of 25.2 and 56.7 kg/sec (200,00 and

    450,000 lb/hr). Main steam temperature is about 17 C (30 F)

    low at MCR conditions, but this low temperature will be cor-

    rected later this year by removing additional furnace screen platens.Sustained operation at MCR and 726 tonne (800 ton)/day

    (future condition) has been limited due to a capacity problem in

    the pneumatic ash system. The ash discharge rate from filter/ 

    receiver to ash silo was a constriction point, but modifications

    will be performed to correct this problem.

    During initial operation, we corrected an acoustic standing

    wave in the front economizer by installing two plate baffles.All boiler emission predictions have been achieved. Some

    typical emissions at MCR are:

    Particulate less than 0.045 kg (0.1 lb)/MBtu at stack 

    (with existing precipitator)

    NOx

    less than 50.8 kg (112 lb)/hr over 24 hours

    SO2 less than 50.8 kg (112 lb)/hr over 24 hours

    CO less than 31.75 kg (70 lb)/hr over 24 hours

    VOC less than 1.36 kg (3 lb)/hr over 24 hours

    ConclusionThis paper has been written to give an indication of needed

    modifications to convert an existing recovery boiler to a BFB

    power boiler. This modification continues to gain in popularityas new recovery capacity is developed or considered. The re-

    covery boiler is typically sized conservatively when applied to

    burning solid fuel such as sludge and woodwaste. This retrofit

    resulted in a steam flow increase of 66%.

    The modifications normally entail getting the new fuel to

    the boiler, providing a combustion zone with air system and

    removing the ash and by products. B&W considers resusing as

    much of the existing boiler as is possible. Even the particulate

    removal used by the recovery boiler maybe reused.

    As noted in this paper, a good design results in a well gener-

    ating boiler producing low emissions.

  • 8/17/2019 BR-1675

    8/8

    8 Babcock & Wilcox

    Copyright © 1999 by The Babcock & Wilcox Company,a McDermott company.

     All rights reserved .

     No part of th is work may be publi shed, translated or reproduced in any form or by any means, or incorporated into any informat ion retrieval system,without the written permission of the copyright holder. Permission requests should be addressed to: Market Communications, The Babcock &Wilcox Company, P.O. Box 351, Barberton, Ohio, U.S.A. 44203-0351.

     Disclaimer 

     Although the information presented in this work is be lieved to be reliable , this work is pub lished with the underst anding that The Babcock & WilcoxCompany and the authors are supplying general information and are not attempting to render or provide engineering or professional services.

     Neither The Babcock & Wilcox Company nor any of its employees make any warranty, guarantee, or representat ion, whether expressed or implied,with respect to the accuracy, completeness or usefulness of any information, product, process or apparatus discussed in this work; and neither The

     Babcock & Wilcox Company nor any of i ts employees shall be l iable for any losses or damages with respect to or result ing f rom the use of , or theinability to use, any information, product, process or apparatus discussed in this work.