    Dt.19thFeb 2014

    BRIEF ON ISSUES OF HAL TO H.E.AMBASSADOR

    1. Delay in ee!"ti#n #$ AL%&&I ' En(ine $#) Inte)*e+iate ,et T)aine)- )#/e!t

    Till December 2013, Russian Side has been informing that importantactivities enumerated below will be accomplished on certification of theengine life to 300 Hrs The engine has been certified for 300 Hrs life on 23 rd

    December 2013 However, as on date, the following activities remainunfulfilled

    a Submission of Draft Supplementar! "greement for deliver! of enginesfrom Series production

    b Handing over of Design Documentation and TechnologicalDocumentation for production of engines with 300 Hrs life from the

    Technological #itsc Technological $arts of the $ro%ect&T$$' for establishing manufacturingfacilities at H"(, )oraput

    *n addition, the plan with time lines for e+tension of life to 1200 Hrs b! 201and later to full life of 3-00.-000 Hrs b! 201/ is awaited

    on fulfillment of above activities is adversel! affecting the progress of *T3- $rogramme and casting doubts on the development time frames promisedb! the Russian Side in respect of $rospective pro%ects

    2. Delay in etablihin( Oe)ha"l $a!ilitie #$ S" 30 MI Ai)$)a*e an+ ita(()e(ate.

    The overhaul of Su 30)* facilities were scheduled to be established b! 4eb2012 based on the commitments made b! Russian Side The commitmentsare repeatedl! revised and during tripartite meeting between *"4, H"( andRussian side held between 10 th4eb 5 16th4eb 2016 and 31st*RS" meeting,Russian Side once again revised the date to "ugust 2016

    The non establishment of 7verhaul facilities is holding the aircraft alread!inducted for overhaul at H"( reducing the availabilit! of aircraft to *"4

    4urther, the repairables are waiting for repairs as the commissioning of teste8uipment is not complete as well as spares are also awaited

    *t is re8uested that the Russian Side ma! be perused to e+pedite thedeputation of Russian Specialists for installation and commissioning of Test98uipment and deliver Spare parts at the earliest so that the facilities areestablished b! ar 2016 and first aircraft overhaul is completed b! a! 2016resulting in improved serviceabilit! and availabilit! levels

    $age 1 of 2

  • 8/12/2019 BRIEF-AMB-19022014

    2/2

    3. S5a)e a)t 6atal#('S6- 7ith lea+ ti*e $#) +elie)y 8 5)i!e +ata

    During 30th*RS" meeting held in ul! 2013 at oscow, *ndian Side re8uestedfor submission of :omprehensive :atalog with $rice data and lead times for one

    time negotiation, so that it will facilitate ordering of Spare parts on fast trac#avoiding the time consuming process of;

    a $lacing *ndentb Receiving the 7ffer & generall! the time frames var!ing from 3 months

    to 12 months and more'c Technical clarificationsd $rice negotiations where prices are deviating from (ast purchase price

    escalated to the !ear of deliver!

    Submission of S$: will avoid above time consuming activities and ensure

    availabilit! of spare parts on fast trac# which is #e! to serviceabilit!

    7f late, it is observed that the prices in respect of certain items are increasedb! multiple times stating that the 79 is not willing to deliver the items at lastpurchase price with relevant escalation This approach is violating the rulesof escalation philosoph! :onsidering the fact that 8uotations from Russian

    "gencies is restricted to a single agenc!, such increases are to be absorbedb! approved Russian "genc! as well as control the 79s to maintain pricesas per (ast $urchase $rice with relevant escalation and principles ofescalation are adhered to including offer of discounts as stipulated in theprotocol Russian Side to continue this arrangement for the life time of the

    aircraft

    4. I"e #$ E5#)t an+ I*5#)t Li!en!e bae+ #n the i(ne+ 6#nt)a!t

    7n man! occasions, the reason cited for dela! in deliver! is attributed to nonreceipt of licence from 4ederal "uthorities an! a times the dela!s arebe!ond - months

    *t is suggested that licences ma! be issued for the items covered in the:ontract. Supplements as soon as the! are signed so that the dela!s due tolicense related issues can be avoided

    &. Sin(le 7in+#7 a55)#a!h

    To enhance *ndustr!*ndustr! cooperation and to 8uic#l! resolve all technicalissues, it is suggested that a single agenc! &preferabl!