BTS HOTEL PLAN for UGM-Yogyakarta – Central Java 1/11 BTS Hotel Presentation to UGM, 271212

Bts hotel ugm presentation knet [compatibility mode]

Embed Size (px)

Citation preview

Page 1: Bts hotel ugm presentation knet [compatibility mode]

BTS HOTEL PLAN forUGM-Yogyakarta – Central JavaBTS HOTEL PLAN forUGM-Yogyakarta – Central Java

1/11BTS Hotel Presentation to UGM, 271212

Page 2: Bts hotel ugm presentation knet [compatibility mode]

Agenda• The BTS Hotel for UGM Campus Yogyakarta,

…….Background• The Result of Drive Test,…. The Telkomsel’s signal in

UGM Campus Yogyakarta• The Proposed Quality Improvement Solutions,…….

The BTS Hotel System Solution• The Outdoor & Indoor Solution Candidates and Target

Coverage Solution• The Project Organization & Time line

• The BTS Hotel for UGM Campus Yogyakarta,…….Background

• The Result of Drive Test,…. The Telkomsel’s signal inUGM Campus Yogyakarta

• The Proposed Quality Improvement Solutions,…….The BTS Hotel System Solution

• The Outdoor & Indoor Solution Candidates and TargetCoverage Solution

• The Project Organization & Time line

2/11BTS Hotel Presentation to UGM, 271212

Page 3: Bts hotel ugm presentation knet [compatibility mode]

Background• Looking at the result of drive test, we definitely need

both Indoor and Outdoor Coverage solution for both 2Gand 3G.

• With New Technology of ‘Feeder-less BTS’ and‘Camouflage Antenna’ then we can make good coverageboth Indoor and Outdoor as well as maintain goodesthetic.

• Telkomsel/Mitratel comes up with solution:– Outdoor coverage using Single operator scheme– Indoor coverage using Multi-Operator scheme

with use of carrier combiner technology from Thirdparty

• Looking at the result of drive test, we definitely needboth Indoor and Outdoor Coverage solution for both 2Gand 3G.

• With New Technology of ‘Feeder-less BTS’ and‘Camouflage Antenna’ then we can make good coverageboth Indoor and Outdoor as well as maintain goodesthetic.

• Telkomsel/Mitratel comes up with solution:– Outdoor coverage using Single operator scheme– Indoor coverage using Multi-Operator scheme

with use of carrier combiner technology from Thirdparty

3/11BTS Hotel Presentation to UGM, 271212

Page 4: Bts hotel ugm presentation knet [compatibility mode]

The Proposed Architecture

• Target Battery is for 2 hours back up• 1 BTS power consumption is 825 watt• Antenna is 16 dBi (K80010681) with 80

cm tall• F/O Backhaul is using Telkom Indoor

Antenna

OutdoorAntenna

Resources: HUAWEI TECHNOLOGIES Co, Ltd

RNC/BSC BBU

Fiber optic BackhaulFiber optic Backbone/Access

UGM-PPTIK orSTO Kota BaruTelkomsel Office

Electricity / PLNFeeder cables

PLN

KWH Meter +Rectifier-Battery

OutdoorAntenna

RadioUnit

PLN

KWH Meter +Rectifier-Battery

RadioUnit

4/11BTS Hotel Presentation to UGM, 271212

Page 5: Bts hotel ugm presentation knet [compatibility mode]

Fiber Optic Path &Solution Candidates

Man/Hand holeFiber Access

Fiber Backbone

Note:

Outdoor solution

Indoor solution

Man/Hand hole

Running an UndergroundBackbone Fiber Optic Cables Ring

96 core 2.63 km length

5/11BTS Hotel Presentation to UGM, 271212

Page 6: Bts hotel ugm presentation knet [compatibility mode]

Outdoor SolutionCandidates

Outdoor solution10 sites

Note:

6/11BTS Hotel Presentation to UGM, 271212

Page 7: Bts hotel ugm presentation knet [compatibility mode]

Indoor SolutionCandidates

Indoor solution16 IBS

Note:Indoor solution16 IBS

7/11BTS Hotel Presentation to UGM, 271212

Page 8: Bts hotel ugm presentation knet [compatibility mode]

Solution Topology

KedokteranGigi

UPT Komputer

Bahasa

WM-7 Graha Saba Farmasi WM-6

WM-10

WM-5

SIC WM-9 Rektorat

KedokteranGigi

WM-8

UC

Ekonomi

MasjidUGM

Psikologi Filsafat FisipolWM-4 WM-2 TeknikPertanian

Hukum

WM-3

WM-1

WM-10

Outdoor solution

Indoor solution

Man/Hand hole

Fiber Access

Fiber Backbone

8/11BTS Hotel Presentation to UGM, 271212

Page 9: Bts hotel ugm presentation knet [compatibility mode]

Target CoverageOutdoor Solution

9/11BTS Hotel Presentation to UGM, 271212

Page 10: Bts hotel ugm presentation knet [compatibility mode]

The ProjectOrganization

Agreement

Agreement

UserProject OwnerPelaksanaProyek

The Main Scope of Work:• Preparation• Implementation• Integration and Interconnection• Function Test, ATP and Documentation

10/11BTS Hotel Presentation to UGM, 271212