Transportation Information Center thanks its partners for their support and assistance

ACE Educational Seminar The Winding Roads of Dairy

Built to Work, Built to Last

Steve Pudloski, Director

Wisconsin Transportation Information Center

Page 2: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

“The Basics of a Good Road” 1. Get water away from the road

2. Build on a firm foundation

3. Use the best materials

4. Compact all layers properly

5. Design for traffic loads and volumes

Page 3: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

“The Basics of a Good Road” 6. Design for maintenance

7. Pave only when ready

8. Build from the bottom up

9. Protect your investment

10. Keep good records

Page 4: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Types of pavements & road surfaces

Asphalt

Hot mix – new or resurfaced; 7 < in. or 7 > in.

Cold mix – new or resurfaced; 7 < in or 7 > in.

Warm mix

Portland Cement Concrete

Sealcoat over Gravel – built up surface < 1 in.

Gravel

Earth

Graded and drained or not graded and drained

Brick or Block

Page 5: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Factors affecting pavement life

Subgrade soil

Pavement materials

Traffic loads and traffic volume

Thickness

Construction quality

Age

Maintenance

Water - drainage

Page 6: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Basic distress mechanisms

Moisture related

Load related

Temperature related

Age related

Page 7: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Moisture

Infiltration

Lubricates

Particles

Weakens

materials

1. Get water away from the road

Moisture Related Why is water a big problem under pavements?

In Subgrade Soil

Page 8: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Moisture

Infiltration

Into

Voids

Freezing

Water

Expands

Breaks

Material

Apart

1. Get water away from the road Moisture Related

Why is water a big problem in pavements?

in Subgrade, Aggregate Base and Asphalt Surface

Page 9: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

1. Get water away from the road

Ditch must be below the road base.

Page 10: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

2. Build on a firm foundation Water, Soils, and Pavements

All pavements rely on the soil beneath the pavement for support.

Wet soils provide less support causing pavements to exceed their load carrying capability and/or their range of flexibility.

Variations in soil moisture occur seasonally. Good drainage systems minimize the variation.

Page 11: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

2. Build on a firm foundation

Native Soils and Water Soils loose strength when wet

• Lubrication of the soil particles

• Replace mineral matter with water

• Expansion of water as it freezes

Not all soils loose the same strength when wet, loss depends on

• Class (clays loose the most strength)

• Particle size

• Particle shape

• Mixture or gradation (how many voids)

Page 12: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

2. Build on firm foundation

Subgrade soils are native soils

Mixture of mineral and organic matter with voids that are filled with water and/or air

Soil types and strengths can vary from spot to spot and from layer to layer

Load bearing strength of any given soil will vary with water content

There is an optimum water content at which a soil is most dense and will carry the greatest load. Compact at optimum water content.

Page 13: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Compaction Fundamentals

Page 14: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Typical Specification Block

95-100% of maximum dry density

OMC ± 2% moisture

Page 15: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Improve Poor Foundations

If Native Soils Have Poor Strength Use Chemical stabilization

• Flyash or Lime

• Portland Cement

Over Excavate, Fill with Select Material

Use Geosynthetics • Woven Geotextile

• Non-woven Geotextile

• Geogrid

• Geo Cell

Page 16: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Base sinks into soft subgrade

Separation

Geo-fabric

Page 17: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Separation & Stabilization

Geotextile used to prevent mixing of road base into subgrade soil

In subgrades with a CBR greater than or equal to 3, use Class 2 geotextiles

In subgrades with a CBR between 1 and 3, use Class 1 geotextiles

Both woven and non-woven can be used for separation application

Base the selection of fabric on your state DOT material specification

Page 18: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Woven Geotextile

Page 19: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Geotextile Separation Test Results

Minnesota LRRB tests (slit tape, heavy

woven, non-woven, & none under 4”, 6” and

8” stone) Non-woven 20% more friction than woven

NW + 4” = W + 6” = No �Geo + 8”

Anchoring fabric not necessary

Compaction of stone is important

No punctures in any of the fabrics

Oklahoma test (woven, non-woven, & none

under 4” of stone) After one winter all un-reinforced sections failed

Non-woven recommended because

• higher friction

• More permeable

Page 20: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Picture 1 from Oklahoma Test

Page 21: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Picture 2 from Oklahoma Test

Page 22: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Picture 3 from Oklahoma Test

Page 23: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Picture 4 from Oklahoma Test

Page 24: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Picture 5 from Oklahoma Test

Page 25: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Geogrid for Reinforcement

Page 26: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Mechanical Interlock

Openings in geogrid reinforce rock base by increasing aggregate interlock

Stress Transfer

Page 27: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

MIDOT Highway 69

Page 28: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

MIDOT HWY 69

Page 29: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

MIDOT HWY 69

Page 30: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Logging Road – Twin Lakes, MI

Page 31: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Logging Road – Twin Lakes, MI

Page 32: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 33: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Geogrid with Geosynthetic Fabric

Page 34: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Geocell Confinement Systems

Geocells are 3-dimensional honeycomb-like structures filled with sand, rock or concrete.

The Geocell is made of strips of polymer sheet or geotextile connected at staggered points so that, when the strips are pulled apart, a large honey-comb mat is formed.

The Geocell provides a physical containment for a depth of soil and a transfer of load through the geocell structure.

Page 35: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Geocell Confinement System

Page 36: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Geocell System with Sand Fill

Page 37: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

3. Use the Best Materials – Base

Aggregate Base Size of the particles

Distribution of sizes (called gradation)

Moisture content

Wear -- abrasion resistance

Hardness -- strength in compression

Fracture -- number of faces

Freeze/thaw soundness

Deleterious materials

Page 38: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

gravel and “stone” (crushed stone)

Gravel – usually natural material - from gravel pits -rounded/weathered

Stone – crushed material – from quarry – fractured faces

Page 39: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Classification of Soils by Size Using Common Nomenclature

Larger than 12” – boulders

Between 12” and 3” – cobbles

Between 3” sieve and #4 – gravel

Between #4 and #200 sieves – sand

Smaller than #200 sieve – fines (silt & clay)

For particles smaller than #200 -- use hydrometer test -- “specific gravity”

Page 40: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

How Size & Distribution are Measured

Stack of nesting sieves with the biggest openings at the top and a pan at the bottom

Pour the stone in the top, washed, shake the stack, weigh each sieve, determine percent passing each sieve

Page 41: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Typical Sizes of Sieves

75 mm (3 in)

50 mm ( 2 in”)

37.5 mm (1 1/2 in)

12.5 mm (1/2 in)

25 mm (1 in)

19 mm (3/4in)

12.5 mm (1/2 in)

9.5 mm (3/8 in)

4.75 mm (#4)

0.2 mm (#10)

0.0425 mm (# 40)

0.075 mm (#200)

31.5 mm (1 1/4 in)

Page 42: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Sieve Analysis Used to Determine

Classification of the material

Does sample meet specifications

Gradation – well, poorly, or open graded

Estimate of strength

Specific particle sizes – for filters/drains

D10, D30, D60:

Sieve size in millimeters that 10, 30 and 60%, respectively pass

Page 43: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Typical Grain Size Distribution

Page 44: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Why Use Well Graded Stone

Smaller particles fill up spaces between the larger rock to reduce air voids in the mix, thereby

increasing aggregate interlock and strengthening the structure

Stone Particles

Page 45: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 46: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

3. Use the Best Materials – Surface

WAPA Asphalt Design Guide

Page 47: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Asphalt Binder Grades

Page 48: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 49: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 50: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 51: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 52: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

4. Compact All Layers

95-100% of maximum dry density

OMC ± 2% moisture

Page 53: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Steel Wheeled Roller Gravels, sands, silts

May use in vibratory or static mode

Sheepsfoot Roller –

Clay

Compactor “walks” out of the soil

Page 54: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Pneumatic (Rubber Tired) Roller

Clays, silts, sand

Tire pressure can be adjusted

Grid Roller

Gravel, breaker-run, cobbles

Page 55: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 56: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Paver Screed –Key Component

Provides initial (85%) compaction

Smoothes surface

Provides slope/crown

Governs thickness

Page 57: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Rolling Operations for Asphalt Pavement

Compaction Phases

Breakdown (Initial)

• Provide initial compaction/density

• Use vibratory steel-wheeled roller

Intermediate

• Use vibratory steel-wheeled or pneumatic roller

Finish

• Remove roller marks – smooth surface

• Use static (non-vibratory) steel-wheeled roller

Page 58: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Steel Wheeled Roller

Vibratory mode for

breakdown rolling

Static mode (vibrator

off) for finish rolling

Page 59: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Pneumatic Roller

Often used for

Intermediate rolling

Tire pressure must be

uniform

Wheels are staggered

to provide full-width

compaction

Page 60: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Combination of Breakdown and Intermediate Rolling

Page 61: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Wheel Load

Hot-mix asphalt

Base

Subbase

Natural soil called subgrade

5. Design for Traffic Loads & Volumes

Page 62: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Different Pavement Types

Subbase

Subgrade

Base

Asphalt Layer

Subbase

Subgrade

Concrete Section Asphalt Section

Page 63: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

How Pavements Carry Loads

6500 lbs 6500 lbs

pressure < 0.3 psi

pressure

3 psi

Portland Cement Concrete

Hot Mix Asphalt Concrete

Page 64: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Pavement Thickness Design

Adequate pavement thickness design is the result of a thorough soil survey coupled with a mathematical evaluation of such factors as vehicle volume and composition, subgrade soil support, and the strengths of materials used in the pavement structure.

Evolving Design Methodology

Empirical - - - Combination - - -Mechanistic

(Road Test) (MEPDG)

Page 65: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Empirical Method of Thickness Design

Design period of the pavement. In the USA 20 years is typical, although recent approach is called “perpetual” pavement, or “ long lasting” pavement

Design traffic load is estimated for 1/2 the design period. For a 20 year design period the projected ADT in year 10 is the basis of the design.

Page 66: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Empirical Method of Thickness Design

Calculate traffic factor for design year

Project the number and mix of vehicles

One 80,000# truck equals the loading (damage) of 7,000 to 10,000 cars

AASHTO : 18,000# per axle or 18kips Equivalent Single Axle Loads (ESALS)

Empirical formula to calculate traffic factor which will be used with soil and pavement strengths to set thickness

Page 67: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 68: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Soil Strength by Soil Type

Excellent to Good Soils (High Support)

Retains substantial amount of support capacity when wet.

Clean and sharp sand and gravel that are well graded, i.e., good distribution of particle sizes and low voids. Minimally affected by frost.

Medium Soils (Medium Support)

Retains moderate amount of firmness when wet. Loams, silty

sands and sand & gravel with some clay and fine silt. Some frost heaving.

Poor Soils (Poor Support)

Becomes soft and plastic when wet. High clay and silt content.

Organic soils are also poor.

Page 69: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Soil Capacity to Bear Loads

Field sample that is tested in the lab with the test at saturated conditions

CBR is the California Bearing Ratio

Crushed Limestone CBR = 100 Good Soil CBR = 17 Medium Soil CBR = 9 Poor Soil CBR = 3

New Measure is Resilient Modulus

Page 70: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Structural Number (Dt)

is an abstract number related to the strength required of the total pavement structure and is the sum of the strength of each pavement layer. It is calculated by multiplying the thickness of the layer by the strength coefficient of the layer. Dt = a1D1 + a2D2 + a3D3 a1, a2, a3 are coefficients of Strength of the surface, base, and subbase materials. D1, D2, D3 are the thickness in inches of the surface, base, and subbase materials

Structural Number

TF

IBR

Page 71: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 72: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Thickness Design Bulletin

Page 73: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Location of crack along HMA Surface

Contraction

HMA surface

Friction on Underside of HMA Surface

Tensile Stress in

HMA Surface

Existing

Crack or

Cold Joint

Existing

Crack or

Cold Joint

Temperature-Related

Page 74: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Age Related

Asphalt pavement oxidizes from

exposure to sunlight (Ultra-Violet

Rays cause the pavement to be less

flexible)

Page 75: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Life of an Asphalt Surface - 1

“Almost” New Street

Page 76: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Life of an Asphalt Surface - 2

“Transverse Cracking”

Page 77: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Life of an Asphalt Surface - 3

“Start of Block Cracking”

Page 78: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Life of an Asphalt Surface - 4

“Alligatoring with Pothole”

Page 79: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

6. Design for Maintenance

Adequate road and shoulder width

Adequate ditches…deep enough & no erosion

Culverts marked for inspection and cleaning

Enough space for snow to be lowed off the road

Proper ditch cross slopes

Safe roadside clear zone

Roadside that can be mowed easily

Page 80: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

7. Pave Only When Ready

25,000 miles of gravel road in Wisconsin

Adequate until 300 vehicles per day

Don’t assume putting on a lift of asphalt will fix a poor gravel road

Test the soil to determine syrength

Count the trucks

Don’t build a road in a bathtub --daylight the base

Adequate ditches that drain the pavement structure -- at least one foot below the bottom of the pavement structure

Adequate crushed aggregate base

Page 81: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

8. Build from the bottom up

Road failures start at the bottom

Poor soil support

Loads exceed the design life

Poor drainage

Loss of surface integrity

Fixes of road failure often need to start at the bottom, too

Page 82: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

http://tic.engr.wisc.edu/publications.html

Time to

Use your

PASER

rating to

plan

9. Protect your Investment

Page 83: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

PASER rating system for paved surfaces

Page 84: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Pavement Rating

Overlays & Reconstruction

Surface Treatments

Routine Maintenance

Page 85: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Importance of preventive maintenance

Page 86: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Importance of preventive maintenance

Type 70 - HMAC y = -0.00005610x3 + 0.00720159x2 - 0.34291690x + 9.66382562

R2 = 0.98940032

0.0000.5001.0001.5002.0002.5003.0003.5004.0004.5005.0005.5006.0006.5007.0007.5008.0008.5009.0009.500

10.00010.500

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78

Age

Ra

tin

g

Page 87: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Visual Distresses in Asphalt Pavements

1. Surface Defects

2. Surface Deformation

3. Cracking

4. Potholes and Patches

Page 88: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Asphalt Surface Defects

Ravelling

Flushing

Polishing

Page 89: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Asphalt Surface Deformation

Rutting

Shoving

Settling

Frost Heave

Page 90: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Cracking

Transverse

Reflective

Slippage

Longitudinal

Block

Alligator

Page 91: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Potholes & Patches

Page 92: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Asphalt Pavement Treatments

Crack fill or crack seal

Chip seal

Double chip seal

Slurry seal

Fog seal

Temporary patch

Spray patch

Permanent hot patch

Infra-red patch

Thin Overlay (3/4”)

Overlay (2-3”)

Mill and Overlay

Full depth reclaim

White top with PCC

Reconstruction

Page 93: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 94: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Filling and Sealing Cracks

Crack sealing

prevents damage

Page 95: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Rout the cracks

Page 96: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Seal the Cracks

Page 97: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Sealcoats Reduce Sun Damage

Page 98: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Chip Seal Process -- Oil Distributor

Page 99: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 100: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Coat with stone chips

Page 101: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Place chips, one stone deep

Page 102: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Roll stone into the oil

Page 103: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Slurry Seal

Page 104: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 105: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Slurry is asphalt emulsion + aggregate

Page 106: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Wet Slurry

Cured Slurry

Page 107: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

8 - 15 Ultrathin Bonded HMA

6 - 12 Microsurfacing

4 - 10 Slurry Seals

4 - 8 Chip Seals

2 - 4 Fog Seals

2 - 4 Crack Sealing

Years Treatment

Frequency of Preventive Maintenance

Page 108: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

2 - 4 5 - 7 8 - 12 Thin Overlay

2 - 4 5 - 7 8 - 12 Microsurfacing

1 - 3 3 - 5 7 - 10 Slurry Seal

1 - 3 3 - 5 7 - 10 Chip Seal

1 - 2 1 - 3 3 - 5 Fog Seal

Poor Condition

Fair Condition Good Condition

Treatment

Estimated Life Extension (years)

Page 109: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Overlay

Page 110: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 111: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Overlay

Mill then Overlay

Page 112: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Milling / Overlays

Page 113: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Preheater

Preheater Heater/Scarifier

Paver Roller

Hot In-Place (Surface) Recycling

Page 114: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Cold In-Place Recycling

Page 115: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Full Depth Reclamation

Page 116: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important
Page 117: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Reconstruction

Page 118: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Utility Accommodation & Permits

Governments own the ROW and should require permits for all work in it

There should be standard locations to reduce conflicts

Inspect construction by others in ROW to stop buried mistakes and future problems

Participate in a utility coordination and planning process to coordinate future activities of all utilities with street work

Page 119: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Road Cuts Shorten Pavement Life

Page 120: Built to Work, Built to Last - dev.wisctowns.comdev.wisctowns.com/uploads/ckfiles/files/Pudloski_steve(1).pdf · Built to Work, Built to Last ... Compaction of stone is important

Transportation Information Center thanks its partners for their support and assistance