17

C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Embed Size (px)

Citation preview

Page 1: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners
Page 2: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank.

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

60 wind turbines 5 MW

Installed capacity 300 MW

Annual generation 1000.000.000 kWh

Annual consumption of 600.000 inhabitants Avoided CO2 emission: 450.000 tonnes/year ~ forest 90.000 ha

Page 3: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Shareholders

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Financing Delivery & Execution works PPAInsurance

Page 4: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Foundation design and buildOffshore cable laying (up to temporary hang off)Dune crossing boringOnshore cable supply and layingWindmet mast design, supply and installation

Offshore cable design and supplyOffshore cable connecting(from temporary hang off)Installation electrical equipmentSupply and installation onshore trafo

Design, manufacture, delivery and installation of turbinesOperation and Maintenance over 10 years after comissioning

* *

* Interface agreement between C-Power and its 3 contractors

FIDIC based contract

AAV based contract

Framework Agrmnt.

based contract

ContractsContracts

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Page 5: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Engineering Department

Mari

ne W

ara

nty

Su

rveyor

Len

ders

En

gin

eer

Technical Control Bureau for Construction

Certification

THV Seawind Marine Contractor Engineer

OWNER Owners Engineer

Engineering Department

Mari

ne W

ara

nty

Su

rveyor

Len

ders

En

gin

eer

Technical Control Bureau for Construction

Certification

THV Seawind Marine Contractor Engineer

OWNER Owners Engineer

Page 6: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Phase 1 Participants

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Page 7: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Phase 1 Participants

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Page 8: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Trailing Suction Hopper Dredger Brabo

Trailing Suction Hopper Dredger Breydel

Trailing Suction Hopper Dredger Jade

TSHD & sand-stones supply vessel Vlaanderen XX1

DP2 fallpipe vessel Seahorse Jack-Up Platform Vagant

Jack-Up Platform Buzzard Jack-Up Tijl Multi-purpose barge Thornton 1

Shear Leg Crane Barge Rambiz

Shear Leg Crane Barge Norma

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Page 9: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Cable lay barge Stemat Oslo Cable lay barge Eide 28 Jack-UP Pauline

Cable Burial vessel CS Sovereign

Cable Detector Vessel MS Nico

Anchor Tug Eide Feighter

Grapnel Vessel Maggie M Crew Boat Callisto Maasluis Cable lay Vessel Northern Canyon

Cable Lay Vessel Wave Sentinel

Crew boat Valkyrie Crew boat Valhalla

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Page 10: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Tug Boat MS Valliant Survey Vessel Coastal Surveyor Anchor Handling Tug Zumala Sexto

Tug Boat Sea Bravo Anchor Handling Tug Viking Anchor Handling Tug Amstelstroom

Anchor Handling Tug Lenie Anchor Handling Tug MC Alix Multicat MC Ailsa

Guard Vessel Walvis Guard Vessel Dolfijn Guard Vessel Michelle Louisa

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Page 11: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Page 12: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

18

4

m

10

2

m

© vzw Atomium, Conix Architecten

Page 13: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

Evolution Construction Phases

Innovation: Thorntonbank Project

Evolution Construction Phases

Innovation: Thorntonbank Project

Page 14: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

2007/2009phase I

Demonstration phase: Construction of 6 turbines – 1st electricity cable: 150 kV (40km)

2009/2011phase II

Construction of 24 turbines and the offshore transformer station

2012/2013phase III

Construction of 24 turbines – 2nd electricity cable: 150kV (40km)

GENERAL PLANNING

Page 15: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

LESSONS LEARNED

design basis:Importance detailed site investigation ‘money well spent’=> for example -> Detected objects during investigation (width 50m, 11 lines) 165 objects detected with electromagnetic survey, 20 objects detected with side scan sonar -> local adjustments cable route + 60 investigated locations (± 25 objects were removed)!

design: Involve contractor at an early stage in design & build phase

construction: 1 lead maritime partner “1 admiral at sea”=> owner of the key maritime department

contracting:Reduce interfaces; the more interfaces, the more potential risks for owner

financing: Transparent communication to lender & lender’s engineer

permits & supervision:Early involvement of authorities; 1 single point of contact within owner’s organisation

O&M: Accessibility=>availability (e.g. service crane at each windturbine).

Page 16: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

Welcome

Objective

Partners

Location

Wind Turbines

Timing

Energy transport

Environmental impact

Construction phases

Investment

EMPLOYMENT Ostend/Zeebrugge and offshoreEMPLOYMENT Ostend/Zeebrugge and offshore

TOTAL : 1.036.650 working hours

on site: 7.950 working hours

EMPLOYMENT PHASE I: Ostend/Zeebrugge and offshore

EMPLOYMENT PHASE I: Ostend/Zeebrugge and offshore

on site: 18.700 working hours

on site: 1.010.000 working hours

Page 17: C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners

WIND ENERGY 30 km at sea? A GOOD IDEA !

www.c-power.be