CAM FRAMIS Museum / Jordi Badia
oject: CAN FRAMIS Museum at 22@
Location: Can Framis, 22@ District, Poble Nou, Barcelona, Spain
Architect: Jordi Badia
Project leader: Jordi Framis
Team: Daniel Guerra, Marta Vitório, Mercè Mundet, Miguel Borrell, Moisés
Garcia
Collaborators
Structure: BOMA, Josep Ramón Solé
Installations: PGI engineering
Measuring and budget: FCA Forteza Carbonell Associats
Executive direction: GPO-Meritxell Bosch
Landscape: Martí Franch
Project Management: LAYETANA
Contractor: Construcciones San José
Client: Fundació Vila Casas. Layetana
Project: 2007Construction: 2008
Area: 5.468 m2
Photography: FG + SG – Fernando Guerra, Sergio Guerra
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 2/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 3/20
The two buildings to be preserved have little architectural worth and are currently
derelict. Their main interest lies in the contrast of their location, based on the
former agricultural sketches prior to the implementation of the Cerdà plan at a level
of 1.5m below the current road.
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 4/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 5/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 6/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 7/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 8/20
Visitors will begin on the highest level and
continuously move downwards through
semi-lit areas, which will then light up to
showpiece the exhibited pieces.
Wood appears copiously on window
frames, staircases and between the
buildings, as well as on the painting
support screens, in reference to the
material of the canvas frames.
Outside, the lime mortar which blends with
the existing stonework merges with theexposed concrete of the new buildings.
The façade then becomes a collage of
textures, niches and coverings which
reflect the different ups-and-downs of the
building throughout time.
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 9/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 10/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 11/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 12/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 13/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 14/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 15/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 16/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 17/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 18/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 19/20
8/7/2019 CAM FRAMIS Museum
http://slidepdf.com/reader/full/cam-framis-museum 20/20