1
Drawing No.: Title: Drawn: Scale: Date: Status: Plot Date: Drawing: Amendments: Rev: Date: Legend: Detail: Bar Scale: Client: Project No: Project: North Point: 08:16 Project Name: Alterations Stage 2: San Clemente Catholic High School SRB/LE CC 31/03/09 carste STUDIO PTY LTD All information, concepts and ideas contained herein are the property of Carste Studio Pty Ltd and may not be distributed and/ or reproduced without express permission from Carste Studio Pty Ltd. It is the responsibility of the builder to check and verify all dimensions on-site prior to the commencement of work and to notify Carste Studio Pty Ltd of any errors and omissions. Do not scale drawing. Do not use drawing for consrtuction purposes unless issued by Carste Studio Pty Ltd for construction. ABN 16122394450 trading as ACN 122394450 p: (02) 4951 2578 m: 0427 432 720 f: (02) 4950 0591 e: [email protected] a: PO Box 149 Wallsend 2287 stephen booker architect Architects and Heritage Consultants 30.08.08 CATHOLIC SCHOOLS OFFICE Diocese of Maitland - Newcastle 1st Floor Refurbishment Plan 78 Havelock Street Mayfield 1:100 08:16-CC A-04 N 1.07 STAFFROOM CPT 125.00m2 1.18 STAFFROOM (SEPARABLE PORTION) CPT W07 Sill 1,800 1,780 700 W08 Sill 1,800 1,780 700 036 2,050 950 035 2,100 1,495 033 950 2,050 029 2,050 900 027 2,988 785 031 2,988 1,095 045 2,050 990 026 950 2,050 044 2,050 1,015 W06 Sill 0 2,657 1,210 030 1,000 2,400 032 2,050 950 028 900 2,050 043 850 2,400 025 2,100 950 034 950 2,050 71 72 73 74 67 68 69 70 59 60 61 62 88 89 90 91 75 76 77 78 80 81 82 83 84 85 86 87 63 64 65 66 13 14 15 16 02 Stair 01 A A A1 A1 F F 1,690 1,400 8,230 90 2,000 90 8,210 600 2,000 1,200 1,640 735 1,640 735 1,500 1,800 600 2,200 1,350 995 965 4,675 2,025 79 INFILL EXISTING OPENING AND PROVIDE NEW DOOR INSTALL NEW WALL NEW TOILET PARTITIONS W.C. SUITES, WALL TILES, URINALS, WASH BASINS & HAND DRYERS REFURBISH TEA AREA BAG RACKS INFILL OPENING AND MAKE GOOD REPAIR CORNICE AND CEILING CLEAN AND PAINT ORNATE CORNICE AND CEILING EXISTING PELMET TO REMAIN REPAIR GUTTER NEW FLOOR INFILL NEW POLYCARBONATE ROOF NEW PLASTERBOARD CEILING CPT1 NEW BAG RACKS INFILL CAVITY BRICK NEW FACE BRICKWORK SERVICE HOB TO EACH BENCH DUCTED SKIRTING TO DETAIL MODIFY HANDRAILS AS PER DETAIL A-13 CLEAR GLAZE DOOR BAG RACK HOOKS NEW BRICKWORK AND RENDER SET SOLID WALL TO 1200h TWO ROOF VENTILATORS RELOCATE RELOCATE NEW PLASTERBOARD CEILING NEW PLASTERBOARD CEILING NEW CARPET COLOUR T.B.A. MODIFY HANDRAILS AS PER DETAIL A-13 REPAIR WALL WHERE PANELLING REMOVED REVERSE DOOR HANDLING REMOVE SHELVING NEW SHELVING BY OTHERS R.L. + 23.600 R.L. + 23.600 200 STEP Louvres Louvres Louvres Louvres FE AC AC AC Patch Panel Patch Panel CPT1 CPT1 CPT1 CPT1 SV CPT1 SV AC NEW LOCATION AC NEW LOCATION NEW F.C. CEILING REMOVE HEATER NEW SKIRTING TO MATCH EXISTING 120x25 BULLNOSED REPLACE CEILING, INSTALL OVER FORMER CEILING AFTER REMOVING CORNICE NEW SHADOW MOULD CORNICE 1.15 (D7): SCIENCE LAB SV 1.05 EXISTING STAIR 1.14 TECHNICAL AND APPLIED STUDIES CPT 1.13 GENERAL PURPOSE LEARNING AREA CPT 1.11 GENERAL PURPOSE LEARNING AREA CPT 1.12 GENERAL PURPOSE SECURE STORE CPT 9.65m 2 EXISTING STAIRS 1.06 WC: MALE CT EXISTING STAIR 1.09 GENERAL PURPOSE LEARNING AREA CPT 1.08 GENERAL PURPOSE LEARNING AREA CPT 1.01 MEETING/ CONFERENCE ROOM CPT EXISTING LIGHTWELL 1.04 NEW STAIR 01 TO DETAIL 02 - A-13 C4 CPT m 2 C2 CPT m 2 1.04 STAFF KITCHENETTE CPT 1.03 W.C. CT 1.10 CORRIDOR CPT NO NEW WORK IN THIS AREA NEW AIRLOCK SV HALL CPT CPT 1.02 CORRIDOR CPT NO NEW WORK IN THIS AREA NO NEW WORK IN THIS AREA NO NEW WORK IN THIS AREA SERVER ROOM 1.08 GENERAL PURPOSE LEARNING AREA CPT 037 2,050 950 INFILL EXISTING OPENING DOOR NG BUILDING 041 885 2,050 042 885 2,050 038 2,050 895 040 890 2,050 039 2,050 890 96 97 98 99 92 93 94 95 88 89 90 91 270 5,675 270 5,800 270 5,675 6,340 1,223 4,495 950 230 6,340 18,765 270 735 1,640 735 1,640 735 1,640 735 1,500 3,725 1,770 1,100 470 600 600 4,675 2,025 1,100 EXISTING FUME CUPBOARD fall EXISTING FUME CUPBOARD NEW LOCKS & FURNITURE & VISION PANEL EXISTING CUPBOARD TO REMAIN SAFETY SHOWER AND EYEWASH SERVICE HOB TO EACH BENCH DUCTED SKIRTING TO DETAIL DEMONSTRATION BENCH NEW LOCK FURNITURE & VISION PANEL REPAIR BRICKWORK POINTING MODIFY HANDRAILS AS PER DETAIL A-13 DEMONSTRATION BENCH NEW BENCHES CPT Extent of shower spray FW Extent of shower spray FW 1.17 (D6): SCIENCE LAB SV 1.15 (D7): SCIENCE LAB SV 1.16 (P): PREPARATION ROOM - REFURBISHMENTS TO INCLUDE THE INSTALLATION OF NEW PBD CEILING SV SAFETY SHOWER EXISTING CONSTRUCTION ACOUSTIC WALL - PBD EQUIV TO BORAL T1616F 230 BRICK. SEE SCHEDULE OF FINISHES FOR SURFACE FINISH 270 BRICK SEE SCHEDULE OF FINISHES FOR SURFACE FINISH = BRICK BK = STUD (TIMBER OR STEEL) ST 0 1 2 3 4 5

carste STUDIO P T Y L T D...Patch Panel Patch Panel CPT1 CPT1 CPT1 SV CPT1 CPT1 SV AC NEW TION AC NEW TION NEW F.C. CEILING REMOVE HEATER NEW SKIRTING TO MATCH EXISTING 120x25 BULLNOSED

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: carste STUDIO P T Y L T D...Patch Panel Patch Panel CPT1 CPT1 CPT1 SV CPT1 CPT1 SV AC NEW TION AC NEW TION NEW F.C. CEILING REMOVE HEATER NEW SKIRTING TO MATCH EXISTING 120x25 BULLNOSED

D r a w i n g N o . :

T i t l e :

D r a w n :

S c a l e :

D a t e :

S t a t u s :

P l o t D a t e :

D r a w i n g :

A m e n d m e n t s :R e v : D a t e :

L e g e n d :

D e t a i l :

B a r S c a l e :

C l i e n t :

P r o j e c t N o :

P r o j e c t :

N o r t h P o i n t :

08:16

P r o j e c t N a m e :

Alterations Stage 2:San Clemente Catholic High School

SRB/LE

CC

3 1 / 0 3 / 0 9

c a r s t e S T U D I O P T Y L T D

Al l i n fo rma t ion , concep ts and i deas con ta ined he re in a rethe p rope r t y o f Ca rs te S tud io P ty L td and may no t bed is t r i bu ted and / o r rep roduced w i thou t exp ress pe rm iss ionf rom Cars te S tud io P ty L td . I t i s t he respons ib i l i t y o f t hebu i l de r t o check and ve r i f y a l l d imens ions on -s i t e p r i o r t othe commencemen t o f wo rk and to no t i f y Cars te S tud ioP ty L td o f any e r ro rs and omiss ions . Do no t sca led raw ing . Do no t use d raw ing fo r cons r tuc t i on pu rposesun less i ssued by Cars te S tud io P ty L td fo r cons t ruc t i on .

A B N 1 6 1 2 2 3 9 4 4 5 0 t r a d i n g a s A C N 1 2 2 3 9 4 4 5 0

p : ( 0 2 ) 4 9 5 1 2 5 7 8 m : 0 4 2 7 4 3 2 7 2 0 f : ( 0 2 ) 4 9 5 0 0 5 9 1e : b o o k e r a r c h @ t p g . c o m . a u a : P O B o x 1 4 9 W a l l s e n d 2 2 8 7

s t e p h e n b o o k e r a r c h i t e c tA r c h i t e c t s a n d H e r i t a g e C o n s u l t a n t s

30.08.08

CATHOLICSCHOOLSOFFICEDiocese ofMaitland - Newcastle

1st Floor Refurbishment Plan

78 Havelock Street Mayfield

1:100

08:16-CC A-04

N

1.07 STAFFROOMCPT

125.00m2

1.18 STAFFROOM (SEPARABLE PORTION)CPT

W07

Sill 1,800

1,780700

W08

Sill 1,800

1,780700

036

2,050950

035

2,1001,495

033

9502,050

029

2,05

090

0

027

2,988785

031

2,9881,095

045

2,050990

0269502,050

044

2,0501,015

W06

Sill 0

2,65

71,

210

030

1,0002,400

032

2,050950

028900

2,050

043

850

2,40

0

025

2,100950

034950

2,050

7172

7374

6768

6970

5960

6162

8889

9091

7576

7778

8081

8283

8485

8687

6364

6566

1314

1516

02Stair 01

AA

A1

A1

F F

1,690

1,40

0

8,230 90

2,00

090

8,21

0

600

2,000

1,20

0

1,64

073

51,

640

735

1,50

01,800

600

2,20

0

1,350 995 9654,675 2,025

79

INFILL EXISTING OPENINGAND PROVIDE NEW DOOR

INSTALLNEW WALL

NEW TOILET PARTITIONSW.C. SUITES, WALL TILES,URINALS, WASH BASINS &HAND DRYERS

REFURBISH TEA AREA

BAG RACKS

INFILL OPENINGAND MAKE GOOD

REPAIR CORNICEAND CEILING

CLEAN AND PAINTORNATE CORNICE

AND CEILING

EXISTING PELMETTO REMAIN

REPAIR GUTTER

NEW FLOORINFILL

NEW POLYCARBONATE ROOF

NEW PLASTERBOARD CEILING

CPT1

NEW BAG RACKS

INFILL CAVITY BRICK

NEW FACEBRICKWORK

SERVICE HOBTO EACH BENCH

DUCTED SKIRTINGTO DETAIL

MODIFY HANDRAILSAS PER DETAIL A-13

CLEAR GLAZEDOOR

BAG RACKHOOKS

NEW BRICKWORKAND RENDER SET

SOLID WALLTO 1200h

TWO ROOFVENTILATORS

RELOCATE

RELOCATE

NEW PLASTERBOARD CEILING

NEW PLASTERBOARD CEILING

NEW CARPETCOLOUR T.B.A.

MODIFY HANDRAILSAS PER DETAIL A-13

REPAIR WALL WHEREPANELLING REMOVED REVERSE DOOR HANDLING

REMOVE SHELVINGNEW SHELVING

BY OTHERS

R.L. + 23.600

R.L. + 23.600

200STEP

Louvres Louvres LouvresLouvres

FE

AC

AC

AC

PatchPanel

PatchPanel

CPT1CPT1

CPT1

CPT1SV

CPT1

SV

ACNEW

LOCATION

ACNEW

LOCATION

NEW F.C.CEILING

REMOVE HEATERNEW SKIRTING TO MATCH EXISTING 120x25 BULLNOSEDREPLACE CEILING, INSTALL OVER FORMER CEILINGAFTER REMOVING CORNICENEW SHADOW MOULD CORNICE

1.15 (D7): SCIENCE LABSV

1.05 EXISTING STAIR

1.14 TECHNICAL ANDAPPLIED STUDIES

CPT

1.13 GENERAL PURPOSELEARNING AREA

CPT

1.11 GENERAL PURPOSELEARNING AREA

CPT

1.12 GENERALPURPOSE

SECURE STORECPT

9.65m2

EX

ISTIN

G S

TAIR

S

1.06 WC: MALECT

EXISTING STAIR

1.09 GENERAL PURPOSELEARNING AREA

CPT

1.08 GENERAL PURPOSELEARNING AREA

CPT

1.01 MEETING/ CONFERENCE ROOMCPT

EXISTING LIGHTWELL

1.04 NEW STAIR 01TO DETAIL 02 - A-13

C4CPTm2

C2CPTm2

1.04 STAFFKITCHENETTE

CPT

1.03 W.C.CT

1.10 CORRIDORCPT

NO NEW WORKIN THIS AREA

NEWAIRLOCK

SV

HALLCPT

CPT

1.02 CORRIDORCPT

NO NEW WORKIN THIS AREA

NO NEW WORKIN THIS AREA

NO NEW WORKIN THIS AREA

SERVER ROOM

1.08 GENERAL PURPOSELEARNING AREA

CPT

037

2,050950

INFILL EXISTINGOPENING

DO

OR

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

041

8852,050

042

8852,050 038

2,050895

0408902,050

039

2,050890

9697

9899

9293

9495

8889

9091

2705,675

2705,800

270

5,6756,340

1,2234,495

950230

6,340

18,765

270

735

1,64

073

51,

640

735

1,64

073

51,

500

3,725 1,770

1,10

0

470

600

600

4,675 2,025

1,10

0

EXISTINGFUMECUPBOARD

fall

EXISTING FUMECUPBOARD

NEW LOCKS & FURNITURE& VISION PANEL

EXISTINGCUPBOARDTO REMAIN

SAFETY SHOWERAND EYEWASH

SERVICE HOBTO EACH BENCH

DUCTED SKIRTINGTO DETAIL

DEMONSTRATIONBENCH

NEW LOCK FURNITURE& VISION PANEL

REPAIR BRICKWORKPOINTING

MODIFY HANDRAILSAS PER DETAIL A-13

DEMONSTRATIONBENCH

NEW BENCHES

CPT

Extent

of sh

ower

spray

FW

Extent

of sh

ower

spray

FW

1.17 (D6): SCIENCE LABSV

1.15 (D7): SCIENCE LABSV

1.16 (P): PREPARATION ROOM -REFURBISHMENTS TO INCLUDE THEINSTALLATION OF NEW PBD CEILING

SV

SAFETYSHOWER

EXISTINGCONSTRUCTION

ACOUSTIC WALL - PBDEQUIV TO BORAL T1616F

230 BRICK.SEE SCHEDULE OF FINISHESFOR SURFACE FINISH

270 BRICKSEE SCHEDULE OF FINISHESFOR SURFACE FINISH

= BRICKBK

= STUD (TIMBER OR STEEL)ST

0 1 2 3 4 5