    CENTRAL ELECTRICITY REGULATORY COMMISSIONNEW DELHICoram: Dr. Pramod Deo, Chairpero!Shri S. "a#arama!, Mem$erShri %.S. %erma, Mem$er

    Shri M. Dee!a Da#a&a!, Mem$erDa'e: ().*.(+(I! 'he ma''er o-:Central Electricity Regulatory Commission (Grant of Connectivity,LongtermAccess and Medium-term Open Access in inter-State ransmissionandrelated matters! ("ird Amendment! Regulations, #$%&Statement of Reason

    The Commission had notifed the Central Electricity Regulatory Commission(Grant o Connectivity, Long-Term Access and Medium-Term !en Access in

    "nter-#tate Transmission and related matters$ Regulations, %&&' (hereinaterConnectivity Regulations)$ *hich came into orce *ith e+ect rom %&&.ith the o/0ective o acilitating grid connectivity to the generating stations/ased on Rene*a/le sources o energy, the Commission issued anamendment to the Connectivity Regulations vide notifcation dated 1rd#e!tem/er, %&&, *herein, the threshold ca!acity or connecting to inter-#tate grid *as reduced rom %2& M. to 2& M. or the generating stationsusing Rene*a/le sources o energy The relevant Regulation % (/$ (i$ o theConnectivity Regulations, as amended, defnes the term A!!licant) orGrant o Connectivity as under3(a) A generating station with installed capacity of 250 MW andabove, including a captive generating plant of eportable capacity of250 MW and above or!(b) A "ydro #enerating station or generating station using renewablesource of energy, of installed capacity between 50 MW and 250 MW$(c) %ne of the "ydro #enerating stations or generating stations usingrenewable sources of energy, individually having less than 50 MWinstalled capacity, but collectively having an aggregate installedcapacity of 50 MW and above, and acting on behalf of all thesegenerating stations, and see&ing connection fro' * at a singleconnection point at the pooling sub+station under *, ter'ed as thelead generator, or! $-% E4isting generating stations connected to the inter-state grid and havingsur!lus land, can add a small ca!acity o rene*a/le source o energy in thesame !remises 5y co-locating this ne* and rene*a/le energy source *iththe e4isting inrastructure and the associated interconnection andtransmission acilities, e4isting generating stations can ma4imi6e use o theirland and transmission systems 7o*ever, e4isting Connectivity Regulationsdonot allo* connectivity or such small generating !lants /ased on rene*a/lesources o energy 8resently, such !lant is re9uired to /e connected *ith the#tate transmission system, *hich may re9uire laying do*n long transmissionlines or evacuation o its !o*er "t *ill, a!art rom other !ro/lems related tothe construction o the transmission lines including Ro. issues, increase notonly the cost o evacuation /ut also the transmission and *heeling losses1 "n order to acilitate develo!ment o rene*a/le energy !ro0ects in the

  • 7/25/2019 CEA Terminolgy

    2/9

    !remises o e4isting generating stations, the Commission !ro!osed anamendment in the Regulation % o the Connectivity Regulations, /y includinga s!ecifc !rovision or rene*a/le energy generating station o M. anda/ove to grant connectivity to such stations at the e4isting connection !oint*ith Central Transmission :tility as under3

    e Any rene*a/le energy generating station o M. ca!acity anda/ove develo!ed /y a generating com!any in its generating stationo descri!tion reerred to in su/ clauses (/$(i$(a$ to (c$ o this clauseand see;ing connectivity at the e4isting connection !oint *ith inter-#tate Transmission #ystem su/0ect to availa/ility o transmissionca!acity margin)T8C, 8#C, CT:, CEA and M=s Transtech Green 8o*er 8vt Ltd havemade their suggestions=comments on the drat amendments The commentso the sta;eholders on various issues are discussed in su/se9uent

    !aragra!hsConnectivity and Metering2 >T8C has su/mitted *ith regard to connectivity at the e4isting connection!oint that in a generating station, various acilities li;e Rail*ay sidings, MGR,ma;e u! *ater system, colony, Ash dy;e ? Ash .ater Recirculation #ystem(A.R#$ etc *ould not /e located *ithin the /oundary o !o*er !lant These!lant acilities could /e located a*ay rom !o*er house /ased on theland=*ater source availa/ility "t has /een urther su/mitted that therene*a/le ca!acities could also /e !lanned /y co-locating along *ith suchacilities= in the sur!lus land availa/le a*ay rom the !o*er house !remisesA rene*a/le generating station shall /e generating electricity at voltage

    level o a e* hundred volts (eg in case o @adri #olar 8 !lant, generation isat

  • 7/25/2019 CEA Terminolgy

    3/9

    e4isting !rovisions o Regulation %(n$ CERC (Terms and Conditions or Tari+determination rom Rene*a/le Energy #ources$ Regulations, %&% *hich ise4tracted as under3.(n) /nter+connection 1oint shall 'ean interface point of renewableenergy generating facility with the trans'ission syste' or distribution

    syste', as the case 'ay be3i$ in relation to wind energy pro4ects and olar 1hotovoltaic1ro4ects, inter+connection point shall be line isolator on outgoingfeeder on "6 side of the pooling sub+station!ii$ in relation to s'all hydro power, bio'ass power and non fossilfuel based cogeneration power pro4ects and olar her'al 1ower1ro4ects the, inter+connection point shall be line isolator onoutgoing feeder on "6 side of generator transfor'er$.

    The defnition o !ooling su/station as e4!lained in the #R is e4tracted asunder3he ter' 1ooling sub7station- is very co''only understood in the

    industry 'eaning a sub7station developed by the developer8generator where pooling of generation fro' individual turbine isdone for interface with receiving sub7station$-B "n vie* o a/ove, >T8C has su/mitted that or rene*a/le energygenerating station /eing develo!ed at e4isting generating station,Connectivity ? metering should /e at line isolator on outgoing eeder on 7side o the !ooling su/-station or *ind energy !ro0ects and #olar8hotovoltaic 8ro0ects ? on line isolator on outgoing eeder on 7 side ogenerator transormer or small hydro !o*er, /iomass !o*er and non ossiluel /ased cogeneration !o*er !ro0ects and #olar Thermal 8o*er 8ro0ects as!rovided vide a/ove CERC Regulations #uch integration o rene*a/le

    !o*er *ith the generating station system *ould ena/le !o*er o* to "#T# ondis!lacement /asis' The >T8C urther su/mitted that such as rene*a/le !o*er is green!o*er and should /e harnessed *ith techno-economically easi/le o!tion/ased on the ca!acity o rene*a/le !lant and availa/le voltage sourcenear/y "n uture, rene*a/le ca!acities can /e !lanned on e4isting /uilding=to*nshi! o !o*er !lant 7ence, it has /een re9uested to include theca!acity less than M. (say 2&&D.$ also in order to harness #olar on rooto!s o !o*er !lant /uildings& >T8C has su/mitted that to acilitate such rene*a/le energy generatingstations see;ing Connectivity at electrical systems o such generating station,

    the !ro!osed !roviso to Clause ($ o Regulation % may /e modifed as3Any rene*a/le energy generating station, develo!ed /y agenerating com!any in its e4isting generating station o the descri!tionreerred to in su/ -clauses (/$(i$(a$to(c$ o this clause and see;ingconnectivity at electrical systems o such generating station throughe4isting connection *ith inter-state Transmission system su/0ect toavaila/ility o transmission ca!acity margin) CT: has su/mitted that in the last line o amendment it has /eenmentioned that H--------su/0ect to availa/ility o transmission ca!acitymarginH

    The as!ect should /e a !art o LTA and not connectivity Thereore, theamendment /e modifed as ollo*s3HAny rene*a/le energy generating station o M. ca!acity and a/ovedevelo!ed /y a generating com!any in its e4isting generating station o the

  • 7/25/2019 CEA Terminolgy

    4/9

    descri!tion reerred to in su/-clause (/$ (i$ (a$ to (c$ o the clause andsee;ing connectivity at the e4isting connection !oint *ith inter-statetransmission systemHMetering should also /e !rovided at rene*a/le energy generating station sothat rene*a/le energy can /e scheduled and metered se!arately

    % .ith regard to connectivity and metering, 8#C has su/mitted thatthe metering shall /e done at I"nter-connection 8ointJ Kor Rene*a/le (*indenergy !ro0ects and #olar 8hotovoltaic 8ro0ects$ inter-connection !oint *iththe e4isting conventional generator shall /e line isolator on outgoing eederon 7 side o the !ooling su/-station, *here !o*er generated /y allrene*a/le generators at the station *ould /e !ooled1 "n our vie*, it may /e desira/le that the generation rom the rene*a/le!o*er generating station *hether situated *ithin the !o*er !lant /oundaryor acilities located a*ay rom the !o*er !lant /oundary o the e4istinggenerating station li;e Rail*ay siding=MGR, Ash @y;e, Colony, etc can /eintegrated at the nearest voltage level such as D =11 D availa/le *ithin

    the !o*er !lant This is in order to avoid #te!!ing u! small ca!acityrene*a/le !o*er to E7 level (

  • 7/25/2019 CEA Terminolgy

    5/9

    desira/le to dis!atch and grant connectivity to a rene*a/le generatingstation o less than 2 M. ca!acity Accordingly, a rene*a/le generatingstation o ca!acity 2 M. and a/ove /ut less than 2& M. develo!ed in thee4isting generating station connected to the "#T# may /e grantedconnectivity

    2 "n the light o a/ove, it is not desira/le to grant connectivity torene*a/le generating stations including roo to! solar or a ca!acity lessthan 2M. to "#T# #uch !lants may use solar generation or ca!tiveconsum!tion and get the REC issued or the solar generation The CT: has suggested deleting the *ords Hsu/0ect to availa/ility otransmission ca!acity marginH ater the !ro!osed amendment as it is a !arto LTA and not connectivity There is merit in their contentionSc"eduling .ith regard to scheduling 8#C has su/mitted that the rene*a/leenergy generating station o M. ca!acity and a/ove *ith connection!oint at 11 D and a/ove, develo!ed /y a generating com!any in its

    generating station, shall /e su/0ected to scheduling and des!atch code ass!ecifed under "ndian Electricity Grid Code ("EGC$ -%&&, as amended romtime to time"EGC Regulation 21

  • 7/25/2019 CEA Terminolgy

    6/9

    (b) A "ydro #enerating station or generating station using renewable sourceof energy, of installed capacity between 50 MW and 250 MW$(c) %ne of the "ydro #enerating stations or generating stations usingrenewable sources of energy, individually having less than 50 MW installedcapacity, but collectively having an aggregate installed capacity of 50 MW

    and above, and acting on behalf of all these generating stations, andsee&ing connection fro' * at a single connection point at the poolingsubstationunder *, ter'ed as the lead generator, or!(d) A bul& consu'er$-#econd !roviso to Regulation B($ 1rovided further that the application by the applicant de9ned under:egulation 2(;) (b)(i) (c) shall be considered by * only if all the generators,whose aggregate capacity is connected at the single connection point,for'ali? in whose control area it is located$1rovided further that the * shall suitably incorporate the re@uire'ent offor'al agree'ent a'ongst such generators in the detailed procedure andonnection Agree'ent signed with such lead generator$-"t *ould, thereore /e !reera/le that the e4isting generating stations,

    in *hose !remises the rene*a/le generator is located, coordinate all theo!erational and commercial res!onsi/ilities /ased on the instructions given/y the RL@C Then such !roviso *ould have to /e added to regulation >o B%& 8#C has urther su/mitted that in case o Rene*a/le energygenerating station(s$ o M. ca!acity and a/ove develo!ed /y agenerating com!any in its generating station is=are connected to "#T#through e4isting generating station, then e4isting generating station *ill actas the !rinci!al generator 8rinci!al Generator *ill coordinate *ith RL@C orMetering ? #cheduling on /ehal o Rene*a/le 8lant(s$ located at the samelocation% "t may also /e !ossi/le that the e4isting generating station may have

    more than one rene*a/le generating !lant in the generating station !remiseor near its !lant acilities "n such situation the e4isting generating stationshould act as H8rinci!al GeneratorH and all such rene*a/le generatingstations shall /e inter connected one single !oint or the !ur!ose oscheduling and metering%% "t is also !ro!osed to add the ollo*ing !roviso ater the second !rovisoto Regulation B ($3H8rovided urther that the a!!lication /y the a!!licant defned underRegulation %($ (/$(i$ (e$ shall /e considered /y CT: only i thegenerating station agrees to act as the lead generator on /ehal oother rene*a/le generating stations to underta;e all o!erational andcommercial res!onsi/ilities or the rene*a/le generating stations alsoand ormali6e a *ritten agreement among them in this res!ect and inollo*ing the !rovisions o the "ndian Electricity Grid Code and all other

  • 7/25/2019 CEA Terminolgy

    7/9

    Regulations o the Commission, such as grid security, scheduling anddis!atch, collection and !ayment= ad0ustment o Transmission charges,:" charges, congestion and other charges, etc, and su/mit a co!y othe agreement to the CT:, *ith the a!!lication o connectivity, along*ith a co!y to the res!ective RL@C in *hose control area it is located

    ransmission Losses%1 8#C has su/mitted that as !er the Central Electricity RegulatoryCommission (#haring o "nter #tate Transmission Charges and Losses$Regulations, %&&, no transmission losses or the use o "#T# net*or; shall /eattri/uted to solar /ased generation This shall /e a!!lica/le or the useullieo the !ro0ects commissioned in ne4t three years rom the date o notifcationo the sharing Regulations This could also /e as !er the regulations o CERCin orce rom time to time

    The Central Electricity Regulatory Commission (#haring o "nter #tateTransmission Charges and Losses$ Regulations, %&& *ould ta;e care o this

    as!ect 7o*ever, or the rene*a/le generators the /oundary line ormetering shall /e the 7 side o frst-setu! transormer The metering at this/oundary o rene*a/le generator shall /e considered or the com!utationo net in0ection o !rinci!al generating station at its metering !oint Any lossinthe electrical system o the generating station due to integration orene*a/le energy sources shall /e /orne /y the !rinci!al generator The8#C shall clearly /ring out the scheduling !rocedure *ith illustrativee4am!les or the sa;e o clarity o all concernedransmission C"arges%

  • 7/25/2019 CEA Terminolgy

    8/9

    data o meters shall /e or*arded /y the RL@C to the R8C secretariat on a*ee;ly /asis or the seven day !eriod ending on the !revious #undaymidnight,to ena/le the latter to !re!are and issue the unscheduled interchange(:"$ account This could also /e as !er the relevant regulations o

    CERC in orce rom time to timeThe relevant Regulations *ould ta;e care o this as!ectRLC C"arges% 8#C has also su/mitted that scheduling, metering and energyaccounting o Rene*a/le energy generating station o M. ca!acity ?a/ove *ith !rinci!al Generator shall /e done /y RL@C and such Rene*a/leenergy generating station shall !ay a!!lica/le RL@C ees and charges

    This *ould /e as !er ees and charges o Regional Load @es!atchCentre and other related matters Regulations, %&&'Rene)a*le Generation at Su*-Stations for captive consumption%B 8#C has also su/mitted that there are almost 2& su/-stations

    o*ned /y "nter-state transmission licensees and land availa/le at thesu/stationcan /e utilised or rene*a/le generation or ca!tive consum!tionREC could /e issued or the 9uantum o !o*er in0ected /y such generators

    This issue is not connected *ith the connectivity regulation and can /edealt as !er Terms and Conditions or recognition and issuance oRene*a/le Energy Certifcate or Rene*a/le Energy Generation Regulations,%&&Gaming%' The 8#C has su/mitted that there is not much o e4!erience *ithRL@Cs to ta;e care o gaming and other diculties li;ely to /e encountered

    during e4ecutions RL@Cs *ill a!!roach to the 7on/le Commission or theredressal o the same rom time to time The Commission shall ta;ea!!ro!riate vie* on the 9uestion o gaming and other diculties as and*hen /rought /eore it1& CEA has also su/mitted that the tari+ o such rene*a/le generator*ould have to /e e4amined, since the land and evacuation acilities may /ecommon /et*een the e4isting generator and the rene*a/le generator "ncase, the tari+ or sale o this !o*er is /eing ta;en as the CERC regulatedtari+, then some !art on account o common usage o land and evacuationacilities may have to /e reduced rom the tari+, or these assets may have to/e shared /et*een the e4isting generating station and the rene*a/le

    generator or the !ur!ose o tari+This as!ect may /e dealt in the amendment to the CERC Tari+Regulation or Rene*a/le Energy #ources1 5ased on the deli/erations in the a/ove !aragra!hs, the ollo*ing!rovisions ater su/-clause / (i$(d$ o clause o Regulation % o the 8rinci!alRegulations, namely through 1rd amendment to the Connectivity Regulationso CERC3H(e$ Any rene*a/le energy generating station o 2 M. ca!acity anda/ove /ut less than 2& M. ca!acity develo!ed /y a generatingcom!any in its e4isting generating station o the descri!tion reerred toin su/-clauses (/$(i$(a$ to (c$ o this clause and see;ing connectivity tothe e4isting connection !oint *ith inter-#tate Transmission #ystemthrough the electrical system o the generating station H1% Kurther, the ollo*ing !roviso has /een added ater the third !roviso to

  • 7/25/2019 CEA Terminolgy

    9/9

    Regulation B ($ 3H8rovided urther that the a!!lication /y the a!!licant defned underRegulation %($ (/$(i$ (e$ shall /e considered /y CT: only i the e4istinggenerating station agrees to act as the H8rinci!al GeneratorH on /ehalo the rene*a/le generating station(s$ see;ing connectivity through

    the electrical system o the generating station and ormali6es a *rittenagreement=arrangement among them to underta;e all o!erationaland commercial res!onsi/ilities or the rene*a/le generating stationsin ollo*ing the !rovisions o the "ndian Electricity Grid Code and allother Regulations o the Commission, such as grid security, schedulingand dis!atch, collection and !ayment= ad0ustment o Transmissioncharges, :" charges, congestion and other charges, etc, and su/mit aco!y o the agreement to the CT:, *ith the a!!lication oconnectivity, along *ith a co!y to the res!ective RL@C in *hosecontrol area it is locatedHsd=N sd=N sd=N sd=N

    M Dee!a Da#a&a!/ % S %erma/ S "a#arama!/ Dr Pramod Deo/Mem$er Mem$er Mem$er Chairpero!