Design Concepts

Static Rack

- No moving parts

- 4-Cell design

-  Sturdy, simple construction

-  Bolted connections for easy disassembly

-  Some welding required

Page 3: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

Design Concepts Dynamic Rack

- Moving Parts

- More involved construction

- Bolted and welded connections

- Damper mechanism

Page 4: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

Design Direction Static Design

-  Cheaper to construct

- Negligible maintenance

- Easy to repair

- Safer

- Approximately the same spool capacity as the Dynamic Rack

Page 5: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

Design Conditions Increase Accessibility Increase Capacity Reduce exposure to the elements

Page 6: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

Connections Both welded and bolted connections End plate to distribute loads applied to HSS

Column I-beams are bolted for easy assembly and

disassembly

Page 7: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

PATRAN Analysis

Maximum displacement: 0.0575”

Page 8: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

PATRAN Analysis

Bending Stress: 6710 psi

Page 9: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

PATRAN Analysis

Axial Stress: 1270 psi

Page 10: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

SolidWorks Model

Page 11: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

Remaining Goals

Consult Shipyard Finish design Cost and Labor Analysis CAD blueprints

Page 12: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

Gantt ChartID Task Name

1 Initiate Project

2 Contact Consultant

3 Acquire Identification Badges

4 Safety & Security Briefing

5 Visit Norfolk Naval Shipyard

6 Acquire Rough Estimates for Space

7

8 Preliminary Design Ideas

9 Brainstorm Ideas for Design

10 Design 1

11 Design 2

12 Gather data for materials and equipment

13 Draw designs in CAD software

14 Meeting

15 Presentation of designs

16

17 Team Meetings - Spring 2011

32

33 Advisor Meetings

46

47 Design Phase

48 Materials Research

49 Hand Calculations for Material Selection

50 FEA testing for Material Selection

51 Structural Design

52

53 Cost Analysis

54 Material Cost Analysis

55 Labor Cost Analysis

56

57

58 Final Design Phase

59 1st Status Report Due

60 Mid Term Report Due

61 2nd Status Report Due

62 Final Status Report Due

Parker,Caitlin

Parker

Hunter

Caitlin

Parker,Caitlin

Parker

Caitlin,Christina

Parker

Hunter,Parker,Caitlin,Christina