ROLID SETIA SDN BHD is a wholly owned Bumiputera construction company
which was incorporated in 2002 and commenced its business 2002.
The company’s core business is in pavement construction and maintenance
project. With the management expertise in field of pavement technology, the
company is recognized as a pavement construction and maintenance specialist in
the country.
The company is now registered with KementerianKewangan Malaysia and
CIDB (G7-Bumiputera). The company is diversifying into other area of construction
to take advantage of the opportunities from the infrastructure development of the
nation.The company vision is to become a leading bumiputra contractor and will
continuously upgrade its management and technical skills to the goal.
Private & Confidential Page 2
Company Profile
SCOPE OF WORK
ROLID SETIA SDN BHD has the expertise to provide services in the following area:-
1. Pavement Upgrading and Rehabilitation of existing road, highway and airport using the following methods :-
i. Conventional method of milling, resurfacing and reconstruction.
ii. Recycling method of Hot-In Place Recycling (HIPR) and Cold In-Place Recycling (CIPR) using cement, emulsion and foamed bitumen
iii. Special asphalt mix using modified binder for Porous Asphalt, Thin
Overlay and Stone Mastic Asphalt (SMA)
iii. Concrete Pavement
2. New Pavement construction for road, highway and airports
3. Landscaping and routine maintenance
4. Infra works i.e. earthwork and drainage
5. Design and construct slope & soil
Private & Confidential Page 3
Company Profile
CORPORATE
INFORMATION
Private & Confidential Page 4
Company Profile
CORPORATE INFORMATION
Company Name : RolidSetiaSdnBhd(586642-W)
Date of Incorporation : 17 July 2002
Paid-Up Capital : RM10, 000,000.00
Authorized Capital : RM10, 000,000.00
Principle Office : No. 4-1, Jalan 3/146 Bandar Tasik Selatan 57000 Kuala Lumpur Branch : B 58, Tingkat 1 LorongTun Ismail 8, Sri Dagangan 2 25000, Kuantan
Pahang DarulMakmur Warehouses
i) Heavy Machineries : Lot-08, JalanPerindustrianMahkota
5, Taman PerindustrianMahkota,
43700 Beranang, Selangor DarulEhsan
ii) Light Vehicle : 53-G Jalan LJ3, Taman IndustrianLembah
Jaya, 68000 Ampang, Selangor DarulEhsan
Shareholders/ Directors : i) Dato’ RomziSaat Bin Din
ii) Muhammad Khalid BinSidiAbdul Latiff
Private & Confidential Page 5
Company Profile
ORGANIZATION
CHART
Private & Confidential Page 6
Company Profile
CHAIRMAN MOHD NASIR
HASSAN
MANAGING DIRECTOR
DATO' ROMZI SAAT BIN DIN
DIRECTORMUHAMMAD
KHALID BIN SIDI ABDUL LATIFF
OPERATION DIRECTOR
RAZLISHAM BIN GHAZAR
PROJECT DIRECTOR MAZLAN AHMAD
PROJECT DIRECTOR Ir MAZLAN ABDULLAH
SENIOR MANAGEMENT
Private & Confidential Page 7
Company Profile
OPERATION DIRECTOR RAZLISHAM BIN GHAZAR
PROJECT DIRECTOR MAZLAN AHMAD
SENIOR PROJECT MANAGER
MUHD NIZAM AB WAHAB
SITE ENGINEER MOHD HAFIZ ZAINOL
SITE ENGINEE0R AZMAN ABD WAHIB
SITE SUPERVISOR ZULKANINE HARUN
SENIOR PROJECT MANAGER
MOHD YUSOFF AB GHANI
SITE ENGINEER
WAN MOHD NASRAM
SITE SUPERVISOR ADAM YOUSRI
PLANT & EQUIPMENT
TG MOHD ZUKRI
QUANTITY SURVEYOR
MOHD FADIL ABU HASSAN
OPERATION TEAM
Private & Confidential Page 8
Company Profile
CHAIRMAN
Name : MOHD NASIR BIN HASSAN
Qualification : Advance Diploma Civil Engineering (UITM)
2014 – Present Chairman of ROLID SETIA SDN BHD
1993 – 2014 General Manager and Director
HCM Engineering (M) SdnBhd
1983 – 1993 Asst Resident Engineers
SepakatSetiaPerundingSdnBhd
MANAGING DIRECTOR
Name : DATO’ ROMZI SAAT BIN DIN
Experience : 2002 - Present Managing Director of ROLID SETIA SDN BHD
2000 - 2002 RK MajuSdnBhd - Director
1995 - 1999 Propel Berhad –Supervisor
DIRECTOR
Name : MUHAMMAD KHALID BIN SIDI ABDUL LATIFF
Qualification : Bachelor of Mechanical Engineering (UTM)
Experience : 2002 - Present Director of ROLID SETIA SDN BHD
2000 - 2002 RK MajuSdnBhd–Director
1997 - 2000 BumiHiway (M) SdnBhd - Engineer
1995 - 1997 MTD Construction SdnBhd–Engineer
OPERATION DIRECTOR
Name : RAZLISHAM BIN GHAZAR
Qualification : Degree Science Survey andGeomatic, UiTM,
Shah Alam, Selangor (1994)
: Diploma in Land Survey, Engineering, UiTM
Shah Alam, Selangor, Malaysia (1991)
: Post Graduate Diploma in Construction and Management,
Engineering, UTM, Skudai, Johor (1995)
Private & Confidential Page 9
Company Profile
Experience : KTM Berhad (1999-2000) - Senior Executive Properties
: PROPEL Berhad
i. 2006-2013 - Project Manager
ii. 2004-2006 - Project Engineer
iii. 2000-2004 - Section Maintenance Executive
PROJECT DIRECTOR
Name : MAZLAN AHMAD
Qualification : Master of Engineering (MEng) (Geotechnics) UTM (2007)
Bachelor of Engineering (Civil) University of Wollongong (1990)
Experience : 2015 - Present Project Director of ROLID SETIA SDN BHD
2000 - 2015 PROPEL Berhad
PROJECT DIRECTOR
Name : IR. MAZLAN BIN ABDULLAH
Membership in
Professional Bodies : Professional Engineer, Board of Engineers, Malaysia Corporate
Member, Institution of Engineers, Malaysia Professional Geologist,
Board of Geologist, Malaysia Member, Institute of Geology, Malaysia
Qualification : 2004 – 2008 (Part time) B.Eng (Hons), Civil Engineering, UITM,
ShahAlam)
1995 – 1996 MSc (Eng), Foundation Engineering (Geotechnical
Engineering), University of Birmingham, UK
1989 – 1993 AsasiSains University Malaya, BSc (Hons),
Applied Geology, University of Malaya
Experience : 2008 – Present ROLID SETIA SDN BHD
2005 – 2007 RMR Consult
Associate Director (Geotechnical)
2004 – 2005 Azffar Engineering Services
Resident Engineer
Private & Confidential Page 10
Company Profile
Private & Confidential Page 11
Company Profile
Private & Confidential Page 12
Company Profile
Private & Confidential Page 13
Company Profile
Private & Confidential Page 14
Company Profile
Private & Confidential Page 15
Company Profile
\
Private & Confidential Page 16
Company Profile
Private & Confidential Page 17
Company Profile
Private & Confidential Page 18
Company Profile
Private & Confidential Page 19
Company Profile
Private & Confidential Page 20
Company Profile
Private & Confidential Page 21
Company Profile
Private & Confidential Page 22
Company Profile
Private & Confidential Page 23
Company Profile
Private & Confidential Page 24
Company Profile
Private & Confidential Page 25
Company Profile
Private & Confidential Page 26
Company Profile
Private & Confidential Page 27
Company Profile
ASSETS &
MACHINERIES
Private & Confidential Page 28
Company Profile
ITEM DESCRIPTIONS REGISTRATION NO. DATE PURCHASED
1 Milling Wirtgen W2000 BLF 8925 September 2010
2 Milling Wirtgen 2100DC BLF 8917 April 2011
3 Milling Wirtgen 1900DC BLF 8919 September 2011
4 Milling Wirtgen 2000DC BMA 1294 April 2012
5 Wirtgen WR2500- Recycler BHD 2969 May 2015
6 Wirtgen 2100DCR - Recycler WLJ 7089 May 2012
7 Paver Vogelle 1804 BLF 8519 February 2011
8 Paver Vogelle 1804 BLQ 6345 March 2012
9 Paver Vogelle 1800 BLK 7723 September 2014
10 Paver Vogelle super1603 BLS 4553 April 2012
11 Paver ABG Volvo 473 BME 2442 January 2012
12 Tandem Roller Sakai CC21 AFD 7456 August 2012
13 Tandem Roller Hamm HD75.4 AHV4121 Oct 2014
14 Tandem Roller Hamm HD75 BLG5677 January 2012
15 Tyre Roller Sakai T2 BFG1444 June 2010
16 Tyre Roller Sakai T2 BGY 6802 November 2003
17 Tyre Roller Sakai T2 AHV4121 March 2012
18 Tyre RollerDynapac AJP3021 January 2014
19 JAC Truck c/w Metong Semi -Automatic Asphalt W1844R Mar 2014
Private & Confidential Page 29
Company Profile
ITEM DESCRIPTIONS REGISTRATION NO. DATE PURCHASED
20 Compactor Roller Dynapac WBX 6897 May 2012
21 Backhoe Loader WCX 6881 April 2012
22 JCB Road sweeper WCW 3346 June 2011
23 Ford Back pusher AN 2653 May 2012
24 Bobcat BNH 5685 July 20458
25 Ford Back pusher WBX 7899 May 2011
26 Scania low loader 5excel WVH 4639 June 2011
27 Nissan Low loader 2excel WWL 4360 May 2012
28 3MT Isuzu Lorry WQC 377 May 2007
29 3MT Daihatsu Lorry WRF 7232 April 2008
30 3MT Isuzu Lorry WSL 8040 April 2009
31 3MT Isuzu Lorry MBE 6975 Jan 2009
32 1MT Isuzu Lorry BDH 1346 Mac 2006
Private & Confidential Page 30
Company Profile
EXPERIENCES (2015-CURRENT)
Private & Confidential Page 31
Company Profile
NO. CONTRACT NAME
CONTRACT
SUM
(RM)
DATE OF CLIENT
COMMENENCEMENT COMPLETED
1
Proposed Development of Langat 2 Water
Treatment Plant and Water Reticulation
System in Selangor Darul Ehsan/ Wilayah
Persekutuan Kuala Lumpur (Langat 2 WTP
and Water Reticulation – Phase 1)
9,145,782.00 10 Jul 2017 31 Dec 2017 Salcon MMCES AZSB JV Sdn Bhd
2
Proposed resurfacing &road marking works
at coplace1, Jalan Usahawan 2, Cyber 6,
Cyberjaya Selangor Darul Ehsan
199, 990.20 14 Jul 2017 23 Jul 2017 Cyberview Sdn Bhd
3
KontrakPenyelenggaraanJalan-Jalan Di
negeri Kedah BagiTempohSatuTahunBagi
Daerah Kota Setar/ Kuala Muda / Sik,
KubangPasu, Kulim, Pendang/Yan & Baling
1,002, 336.00 02 Jan 2017 02 Jul 2017 BDB Infra SdnBhd
4
Kerja-kerjamembaikpulihpermukaanJalan
yang telahRosak Serta Kerja-Kerja lain yang
BerkaitanDidalamNegeri Selangor (Zon B)
3, 670,228.80 12 Apr 2017 12 Jul 2017 Eurowide Construction SdnBhd
5
Proposed Pavement Resurfacing Works
From KM 265.80 To KM266.70 North-South
Expressway (E2) Using Stone Mastic
Asphalt
1,500,191.50 02 March 2017 27 Apr 2017 Sime Darby Property
6
KontrakPenyelenggaraanJalan-Jalan Di
negeri Kedah BagiTempohSatuTahunBagi
Daerah 135, 996.26 28 July 2016 28 July 2017 BDB Infra SdnBhd
7
Firewall Painting Works at North Port
Installation for BHP Marketing 26,500.00 13 Oct 2016 20 Oct 2016
Bousted Petroleum Marketing
SdnBhd
8
The Repainting Works at Workshop Area
Structure Pome Uploading Area Structure
at North Port Installation 34,980.00 17 Oct 2016 14 Nov 2016
Bousted Petroleum Marketing
SdnBhd
9
Pavement Rehabilitation Works at Various
Location of Kajang SILK Highway Year 2016
(Package 2) 1, 730, 190.90 10 Nov 2016 15 Dec 2016 SistemLingkaranLebuh Raya (SILK)
Private & Confidential Page 32
Company Profile
10
PenyelenggaraanJalan-Jalan Persekutuan di
Semenanjung Malaysia (Zone Utara)- Kerja-
kerja Pavemen dan bahu jalan 161,600.53 7 Nov 2016 15 Nov 2016 LaluanBinaSdnBhd
11
CadanganKerjaPenyelenggaraanJalan Di
KampungBaru Kuala LanarsertaJalan-
Jalanberkaitan Daerah Lipis, Pahang 170,165.56 17 Nov 2016 30 Nov 2016 MuhibbahBina Resources SdnBhd
12
KontrakJangkaPanjangPenyelenggaraanJala
n-JalanNegeri Di Negeri Selangor
DarulEhsan (Zon 1) -5 Years 120,774, 072.00 01 Feb 2016 31 Jan 2021 JKR Selangor
13
LebuhrayaPersisiranPantai Barat: Kerja-
KerjaMenaiktarafJalan Persekutuan FT005
(TelukIntan – Kg. Lekir), RerakDarulRidzuan 25, 142, 100.00 03 May 2016 30 April 2018 MenujuAsasSdnBhd (MASB)
14
Prposed Refurbishment of Existing Main
Workshop Building at Subang Depot of
Kelana Jaya Line 2,001,815.00 15 May 2015 30 Nov 2017 NLS HitechNiaga
15
Panel Contractor For Potholes Patching
Works At Package 1, 2 & 3 Along Senai-
Desaru Expressway (E22)
650,000.00 01 Jul 2014 30 Jun 2017 Senai – Desaru Expressway Berhad
16 Ampang – Kuala Lumpur Elevated Highway
(AKLEH Intersection Improvement
825, 527.70 07 Apr 2016 31 May 2016 ProjekLintasan Kota SdnBhd
17
The Proposed Construction Works for the
Completion of Schedule Waste Storage at
North Port Installtion Terminal 37,600.00 07 Apr 2016 16 April 2016
Bousted Petroleum Marketing
SdnBhd
18
Proposed Pavement Spot Repair
(Regulating Works) Along Kajang Silk
Highway)
1,071,056.33 01 Feb 2016 10 Mac 2016 LebuhrayaKajang Silk Highway
19 Upgrading of Kajang Silk Highway From
UNITEN Interchange to UPM Interchange 2,262,665.50 28 Aug 2015 15 Oct 2015
JuangSetiaSdn. Bhd
20
Pavement Rehabilitation Works Along
Package 1 (Km0.00 – Km20.00 East Bound)
Senai – Desaru Expressway
1,996,188.30 26 Jul 2015 25 Sep 2015 Senai – Desaru Expressway Berhad
21
Proposed Remedial Works using DCP
Testing, Reconstruct the Pavement and
Drainage works at KM241.70 Eastbound
and Westbound
972,452.00 27 May 2015 30 June 2015 Alloy Maintenance Engineering
SdnBhd
22
Proposed Fourth Lane Widening Between
Bukit Lanjan (Km 22) And Jalan Duta Toll
Plaza (Km 29) - Pakej B
23,401,572.00 21 Oct 2013 21 May 2015 Projek Penyelenggaraan Lebuhraya
Berhad
Private & Confidential Page 33
Company Profile
23
Kerja-KerjaPenstabilanCerun
(RekadanBinauntuk “Cadangan
Pembangunan PerumahanPenjawatAwam
1 Malaysia yang mengandungi 650 Unit
Pangsapuri Kos SederhanadanKemudahan
– KemudahanAwam, Plot 8.5, Precinct 11,
Wilayah Persekutuan Putrajaya
1, 530, 000.00 18 April 2016 21 Sept 2016 GAC Builders SdnBhd
22
Cadangan Skim Perumahan 1 Malaysia
(Prima Pahang), Tanah Rata, Cameron
Highland, Pahang
1, 200, 000.00 10 Feb 2017 18 July 2017 GAC Builders SdnBhd
Private & Confidential Page 34
Company Profile
Private & Confidential Page 35
Company Profile
Private & Confidential Page 36
Company Profile
Private & Confidential Page 37
Company Profile
Private & Confidential Page 38
Company Profile
Private & Confidential Page 39
Company Profile
Private & Confidential Page 40
Company Profile
Private & Confidential Page 41
Company Profile
Private & Confidential Page 42
Company Profile
Private & Confidential Page 43
Company Profile
Private & Confidential Page 44
Company Profile
Private & Confidential Page 45
Company Profile
Private & Confidential Page 46
Company Profile
Private & Confidential Page 47
Company Profile
Private & Confidential Page 48
Company Profile
Private & Confidential Page 49
Company Profile
Private & Confidential Page 50
Company Profile
Private & Confidential Page 51
Company Profile
Private & Confidential Page 52
Company Profile
EXPERIENCES (2007-2015)
Private & Confidential Page 53
Company Profile
NO. CONTRACT NAME CONTRACT
SUM (RM)
DATE OF CLIENT
COMMENCEMENT COMPLETED
1
Pavement Rehabilitation Works At Various Location At Guthrie Corridor Expressway (GCE) Year 2014 For Prolintas Expressway SdnBhd
565,804.20 Oct 2014 Dec 2014 KonsortiumLebuhraya Duta – Ulu
Kelang (DUKE)
2
Proposed Fourth Lane Widening Between Bukit Lanjan (KM 22) And Jalan Duta Toll Plaza (KM 29) – Package B – Pavement Works
23,401,572.00
Oct 2013 May 2015 Propel
3
Proposed Infrastructure Package Including Road And Drainage, Water Reticulation, Electrical And Telephone Services, Supply And Install Street Lighting And Landscaping To Desaru Coast Course And Surrounding Development
35,644,242.70
July 2013 Nov 2014 HCM Engineering
SdnBhd
4 Pavement Rehabilitation At Various Location Of Kajang Silk Highway 1,978,800.00 Jul 2014 Oct 2014
Kajang Silk Highway
5
Proposed Pavement Rehabilitation And Associated Works From KM272.80 To KM 273.80 South Bound, Section N5, North South Expressway
371,023.66 Aug 2014 Sept 2014 Propel
6
Proposed Pavement Rehabilitation And Associated Works From KM 128.80 To KM 429.30 South Bound, Section N3, North South Expressway
424,252.00 Feb 2014 Apr 2014 Propel
7 Pavement Rehabilitation And Other Related Works At Package 3 Of Senai - Desaru Expressway (E22)
1,421,269.10 Jan 2014 Apr 2014 Senai-Desaru
Highway Berhad
8
Proposed Pavement Rehabilitation And Associated Works From KM 355.2 To KM355.6 South Bound, Section C2, North South Expressway
240,641.40 Feb 2014 Feb 2014 Propel
9 Pavement Resurfacing Works Along Ampang – Kuala Lumpur Elevated Highway (AKLEH) For Project Lintasan Kota SdnBhd
862,150.00
Jan 2014
Feb 2014
Turnpike Synergy SdnBhd
10
Proposed Pavement Rehabilitation And Associated Works At Sungai Petani Selatan Interchange, Section N2, North South Expressway
920,146.50 Jan 2014 Feb 2014 Propel
11 Cadangan Kerja-Kerja Pengukuhan Cerun dan Kerja-Kerja berkaitan di Lot 175, Jalan 5/64, Bukit Gasing, Petaling Jaya
550, 000.00 June 2014 Nov 2014 GAC Builders Sdn
Bhd
12 Cadangan Membaikpulih Cerun bagi Cadangan Jalan dari Ibok ke Seri Bandi, Daerah Kemaman, Terengganu
210, 000.00 April 2014 Sept 2014 GAC Builders Sdn
Bhd
13 Cadangan Jalan Gunung ke Keruak, Hulu Terengengganu – Pakej 1
2, 000, 000.00 March 2014 July 2014 GAC Builders Sdn
Bhd
Private & Confidential Page 54
Company Profile
14
Proposed Pavement Rehabilitation And Associated Works At KM 286.98 SimpangPulai Toll Plaza, Section C1, North South Expressway
357,361.70 Dec 2013 Jan 2014 Propel
15 Milling And Pavement Works At Immigration Area CIQ 2nd Link TanjungKupang, GelangPatah, Johor
416,000.00 Oct 2013 Dec 2013 HCM Engineering
Sdn Bhd
16 Proposed Pavement Rehabilitation And Associated Works From Km399 To KM399.7 North Bound, Section C2, North South
314,005.30 Sept 2013 Oct 2013 Propel
17
Proposed Pavement Rehabilitation And Associated Works From KM353.9 To KM354.2 South Bound Section C2, North South Expressway
301,091.60 Sept 2013 Oct 2013 Propel
18
Proposed Pavement Rehabilitation And Associated Works From Km386.8 To KM385.6 North Bound, Section C2, North South Expressway
568,444.90 Oct 2013 Nov 2013 Propel
19
Privatizing Of East Coast Expressway Phase 1, Operation And Maintenance Of East Coast Expressway, Proposed Pavement Rehabilitation Works At Kuantan Section
10,656,000.30 Dec 2012 July 2013 Alloy MTD
20
Pavement Works (CIPR) For Periodic Maintenance Works 2013 At Route FT126, Section 6.50 - 11.70 And Section 00.00 - 4.50, Jalan Sri Bandi, Cheneh - Cerul, Daerah Kemaman, Terengganu DarulIman
1,403,954.00 June 2013 June 2013 HCM
Engineering Sdn Bhd
21
Pavement Works (CIPR) For Periodic Maintenance Works 2013 At Route FT14, Section 29.30 - 30.30 JalanJerangauJabor And FT03, , Section 391.00 391.60, JalanKuantan - Kuala Terengganu, Kemaman, Terengganu DarulIman
1,043,303.50 June 2013 June 2013 HCM
Engineering Sdn Bhd
22 Cadangan Jalanraya Simpang Pulai-Lojing-Aring – Kuala Berang : Pakej 7 : Aring ke Jambatan Pasir Aur
4, 323, 000.00 Feb 2013 July 2013 GAC Builders
Sdn Bhd
23
Pavement Work At Route FT14, Section 66.00 - 66.95, Jalan Jerangau -Jabor, District Of Kemaman, Terengganu
834,560.85 Mei 2013 Mei 2013 HCM
Engineering Sdn Bhd
24
Pavement Work At Route Ft02, Sec 282.00- 285.00, Jalan Temerloh- Kuantan, Daerah Maran, Pahang DarulMakmur
1,101,424.69 Mei 2013 Mei 2013 HCM
Engineering Sdn Bhd
25 Cadangan “Soil Grouting” dan Kerja-Kerja Berkaitan, Seksyen 6, Wangsa Maju, Setapak, Kuala Lumpur
630, 000.00 April 2013 Sept 2013 GAC Builders
Sdn Bhd
26
Pavement Works (CIPR) For Periodic Maintenance Works 2013 (Pavement) At Route FT04, Section 73.50-74.50 & Section 74.50-75.50 Jalan Jerangau Jabur, District Of Dungun, Terengganu DarulIman
1,544,268.30 April 2013 April 2013 HCM
Engineering Sdn Bhd
Private & Confidential Page 55
Company Profile
27
Pavement Works At Route FT87, Sec 0.00-4.40, Jalan Utama Temerloh - Mentakab, Daerah Temerloh, Pahang DarulMakmur
332,520.00 Mac 2013 April 2013 HCM
Engineering Sdn Bhd
28
Pavement Works (CIPR) For Periodic Maintenance Works 2013(Pavement) At Route FT125, Section 4.00-5.00, Jalan Masuk Felda Kerteh, District Of Dungun, Terengganu DarulIman
442,728.00 MAC 2013 MAC 2013 HCM
Engineering Sdn Bhd
29
Membaikpulih Permukaan Jalan Di Laluan FT54, Seksyen 5.00-7.00, Jalan Kepong - Kuala Selangor Daerah K.Selangor. Selangor DarulEhsan
562,182.00 Feb 2013 Feb 2013 HCM
Engineering Sdn Bhd
30
Pavement Works For Periodic Maintenance Works 2013 (Pavement) At Route FT04, Section 90.50-91.225 & 94.80-97.116 & 124.85-125.19 & 127.67-128.01, Jalanraya Timur Barat, District Of Jeli. Kelantan Darul Naim
880,318.40 Jan 2013 Feb 2013 HCM Engineering
Sdn Bhd
31
Cadangan Membaikpulih Jalan Menggunakan Kaedah Regulating And Pave FT029, Jalan Puchong- Putrajaya, Seksyen 45.00-48.00daerah Sepang Selangor
1,185,907.80 Jan 2013 Jan 2013 HCM Engineering
Sdn Bhd
32
Cadangan Membaikpulih Expension Joint Di atas Jambatan Jalan Panglima Bukit Gantang Wahab, Ipoh Perak
229,000.00 Jan 2013 Jan 2013 Majlis Bandaraya
Ipoh
33
Membina Dan Menyiapkan Kerja Logi Rawatan Air Pancing Di Mukim Kuala Kuantan, Daerah Kuantan Pahang Untuk Pembangunan Ekonomi Timur (ECER)
128,420.00 Jan 2013 Jan 2013 George –Leika JV
Sdn Bhd
34
Pavement Works For Periodic Maintenace Works 2012 (Pavement) At Route Ft 09, Section 109.17 - 109.90, Jalan Karak - Pelangai, Daerah Bentong, Pahang Darul Makmur
425,197.20 Dec 2012 Dec 2012
Fadilat Budi Sdn Bhd /
Roadcare (M) SdnBhd
35
Pavement Works For Periodic Maintenace Works 2012 (Pavement) At Route FT 09, Section 117.81 - 118.44, Jalan Karak - Pelangai, Daerah Bentong, Pahang Darul Makmur
308,100.95 Dec 2012 Dec 2012
Fadilat Budi Sdn Bhd /
Roadcare (M) Sdn Bhd
36
Pavement Works For Periodic Maintenance Works 2012 (Pavement) At Route FT 54, Section 41.30 - 41.85 & 42.20, Jalan Kepong - Kuala Selangor, District Petaling Jaya, Selangor
314,252.50 Dec 2012 Dec 2012
SG Venture (M) Sdn Bhd /
Roadcare (M) Sdn Bhd
37
Cadangan Kerja-Kerja Membaikpulih Jalan Persekutuan Menggunakan Kaedah "Mill & Pave Dan Overlay" Serta Kerja-Kerja Berkaitan Di laluan Ft 002, Sec 347.30 - 348.00 Jalan Kuantan - Gambang, Daerah Kuantan, Pahang Darul Makmur
380,520.00 Dec 2012 Dec 2012 UtasMasyhurSdnBhd / Roadcare
(M) Sdn Bhd
38
Cadangan Kerja-Kerja Membaikpulih Jalan Persekutuan Menggunakan Kaedah Mill & Pave Dan Overlay Serta Kerja-Kerja Berkaitan Di laluan FT002, Sec 346.6 - 347.3, Jalan Kuantan - Gambang, Daerah Kuantan, Pahang Darul Makmur
400,155.00 Dec 2012 Dec 2012 Syarikat Setia
Jaya/Roadcare (M) Sdn Bhd
Private & Confidential Page 56
Company Profile
39
Cerun Runtuh di Laluan FT 185, Seksyen 37 Jalan Aring 8 – Kenyir – Kuala Jeneris, Daerah Hulu Terengganu
4, 509, 250.00 Dis 2012 Sept 2013 Versi Lima Sdn
Bhd
40
Pavement Works For Periodic Maintenance Work With Regulate And Resurfacing At Route T052, Jalan Pulau Musang/Sungai Rengas (KM0.00 - KM1.80), Daerah Kuala Terengganu, Terengganu DarulIman
431,653.04
Nov 2012 Nov 2012
UtasMasyhur SdnBhd / Pemint
Granite-HCM Sdn Bhd
41
Pavement Works For Periodic Maintenace Works 2012 (Pavement) At Route Ft 09, Section 109.17 - 109.90, Jalan Karak - Pelangai, Daerah Bentong, Pahang DarulMakmur
425,197.20 Dec 2012 Dec 2012
Fadilat Budi Sdn Bhd /
Roadcare (M) Sdn Bhd
42
Pavement Works For Periodic Maintenace Works 2012 (Pavement) At Route FT 09, Section 117.81 - 118.44, Jalan Karak - Pelangai, Daerah Bentong, Pahang DarulMakmur
308,100.95 Dec 2012 Dec 2012
Fadilat Budi Sdn Bhd /
Roadcare (M) Sdn Bhd
43
Pavement Works For Periodic Maintenance Works 2012 (Pavement) At Route FT 54, Section 41.30 - 41.85 & 42.20, Jalan Kepong - Kuala Selangor, District Petaling Jaya, Selangor
314,252.50 Dec 2012 Dec 2012
SG Venture (M) Sdn Bhd /
Roadcare (M) Sdn Bhd
44
Cadangan Kerja-Kerja Membaikpulih Jalan Persekutuan Menggunakan Kaedah "Mill & Pave Dan Overlay" Serta Kerja-Kerja Berkaitan Di laluan Ft 002, Sec 347.30 - 348.00 Jalan Kuantan - Gambang, Daerah Kuantan, Pahang Darul Makmur
380,520.00 Dec 2012 Dec 2012
Utas Masyhur SdnBhd /
Roadcare (M) Sdn Bhd
45
Cadangan Kerja-Kerja Membaikpulih Jalan Persekutuan Menggunakan Kaedah Mill & Pave Dan Overlay Serta Kerja-Kerja Berkaitan Di laluan FT002, Sec 346.6 - 347.3, Jalan Kuantan - Gambang, Daerah Kuantan, Pahang Darul Makmur
400,155.00 Dec 2012 Dec 2012 Syarikat Setia
Jaya/Roadcare (M) Sdn Bhd
46
Pavement Works For Periodic Maintenance Work With Regulate And Resurfacing At Route T052, Jalan Pulau Musang/Sungai Rengas (KM0.00 - KM1.80), Daerah Kuala Terengganu, Terengganu Darul Iman
431,653.04
Nov 2012 Nov 2012
Utas Masyhur Sdn Bhd / Pemint
Granite-HCM Sdn Bhd
47
Cadangan Membaikpulih Jalan Menggunakan Kaedah Cipr Di Lalauan FT14, Jalan Jerangau Jabur, Seksyen 77.00 - 78.00, Kemaman, Terengganu
475,500.00
Nov 2012 Nov 2012 HCM Engineering
Sdn Bhd
48
Cadangan Membaikpulih Jalan Menggunakan Kaedah CIPR Di Laluan FT 14, Jalan Jerangau Jabur, Seksyen 45.0 - 46.0, Kemaman, Terengganu
760,012.40 Oct 2012 Dec 2012 Roadcare (M) Sdn
Bhd
49
Pavement Works At JalanKolam, Jalan Ipoh, Kuala Lumpur 78,931.33 Sept 2012 Sept 2012
DBKL / Innovatif Teguh Const.
50
Pavement Works For Periodic Maintenance Works 2012 At FT 29, Section 39.90 - 40.00, 40.90 - 41.99, 41.80 - 42.22 And 42.70 - 43.00, Lebuhraya Putrajaya - Puchong, District Sepang, Selangor
889,547.45 Aug 2012 Aug 2012 HCM Engineering
Sdn Bhd
Private & Confidential Page 57
Company Profile
54
Pavement Works For Periodic Maintenance Works 2012 At Laluan 1500, Seksyen 0.00 - 4.00, 10.00 - 11.00, Jalan Utaman Mempaga - Lakum, Daerah Temerloh, Pahang Darul Makmur
398,445.00 Aug 2012 Aug 2012 IAC Technique
Sdn Bhd
52 Pavement Works At Taman Sri Rampai, Setapak, Kuala Lumpur 178,122.32 Aug 2012 Aug 2012
DBKL / Innovatif Teguh Const.
53
Pavement Works At Taman Shamelin Perkasa, Cheras, Kuala Lumpur 124,023.68 Aug 2012 Aug 2012
DBKL / Innovatif Teguh Const.
54
Privatisation Of East Coast Expressway (Phase 1) - Proposed Pavement Rehabilitation Works At Package B - Kuantan Section Km 175.00 To Km 250.60 Eastbound & Westbound
10,243,443.80 Jul 2011 Oct 2011
Alloy Maintenance Engineering
Sdn Bhd
55
Pavement Works For Periodic Maintenance Works 2011 (Pavement) At Route T 113, Section 7.00 - 10.20, JalanBatu 24 – Pengkalan Ajal – Sempadan Felda Terset, Hulu Terengganu, Terengganu
313,290.00 Apr 2011 Apr 2011 Permint Granite
Hcm Sdn Bhd
56
Pavement Works For Periodic Maintenance Works 2011 (Pavement) At Route T 117, Section 7.00 - 8.00, Jalan Bukit Diman – Pengkalan Ajal – Sempadan Felda Terset, Hulu Terengganu, Terengganu
137,643.00 Apr 2011 Apr 2011 Permint Granite
HCM Sdn Bhd
57 Penyelenggaraan Berkala Pavemen Di LaluanDalam Bandar Permaisuri, Seksyen 0.00 - 0.75, Daerah Setiu, Terengganu
288,750.00 Apr 2011 Apr 2011 Permint Granite
HCM Sdn Bhd
58
Pavement Works For Periodic Maintenance Works At FT 185, Jalan Kg Jenerih – Sg Gawi, Seksyen 1.70-5.70, Daerah Hulu Terengganu, Terengganu
351,878.90 Feb 2011 Feb 2011 Permint Granite
HCM Sdn Bhd
59 Penyelenggaraan Berkala Pavemen Di Laluan Dalam Bandar Permaisuri, Seksyen 0.00 - 0.75, Daerah Setiu, Terengganu
288,750.00 Apr 2011 Apr 2011 Permint Granite
HCM Sdn Bhd
60
Pavement Works For Periodic Maintenance Works At FT 185, Jalan Kg Jenerih - SgGawi, Seksyen 1.70-5.70, Daerah Hulu Terengganu, Terengganu
351,878.90 Feb 2011 Feb 2011 Permint Granite
HCM Sdn Bhd
61
Pavement Works For Periodic Maintenance Works 2010 At FT 98, Section 4.00-4.60 JalanTemerloh - Jerantut, District Temerloh, Pahang DarulMakmur
120,685.00 Jan 2011 Jan 2011 Samba Services
62
Pavement Works For Periodic Maintenance Works 2010 (Pavement) At FT 3217, Section 15.50, Jalan (Shahpadu Interchange) IndustriMeru, District Of Klang, Selangor
194,378.70 Jan 2011 Jan 2011
IPTA Enterprise
67
Pavement Works For Periodic Maintenance 2010 At FT 108, Section 54.20-56.40, Jalan Raub - Benta (Dong), Daerah Raub, Pahang Darul Makmur
439,722.80 Sept 2010 Sept 2010 Syaiful Shahir
Enterprise
Private & Confidential Page 58
Company Profile
68
Pavement Works For Periodic Maintenance 2010 (Pavement) At FT05, Section 478.00-500.00, Jalan Klang – Sabak Bernam, District Kuala Selangor, Selangor
259,984.90 Aug 2010 Aug 2010
ZAS Pretige Resources
69
Pavement Works For Periodic Maintenance 2010 (Pavement) At FT05, Section 506.00-526.00, Jalan Klang – Sabak Bernam, District Sabak Bernam, Selangor
311,618.34 Aug 2010 Aug 2010 AKS Wibawa
Enterprise
70
Pavement Works For Periodic Maintenance 2010 (Pavement) At FT181, Section 1.60-16.00 (L&R) Lebuhraya Pulau Indah, District Of Klang, Selangor
113,630.26 Aug 2010 Aug 2010 Alya Syahin Const
71
Penyelenggaraan Berkala Pavemen Di Laluan T116, Jalan Gong Pasir – Balai Besar, Daerah Dungun, Terengganu
490,850.00 June 2010 June 2010
RK Maju Sdn Bhd
72
Penyelenggaraan Berkala Pavemen Di Laluan T116, Jalan Kg Jenerih – Sg Gawi, Daerah Hulu Terengganu, Terengganu
629,458.00 May 2010 May 2010
Permint Granite HCM SdnBhd
73
Pavement Works For Periodic Maintenance (Pavement) 2010 At Route FT180, Section 4.00 - 3.30 (Lhs) & 0.00 - 2.70, Jalan Pelabuhan Utara Ke Pelabuhan Barat, District Klang, Selangor
628,496.20 Apr 2010 Apr 2010 Jejak Kuasa Sdn Bhd
74
Pembinaan Persimpangan Bertingkat Jenis 'Clover Leaf' Di KM P2.2 Lebuhraya Sambungan Putrajaya Dan Kerja-Kerja Yang Berkaitan Ke Taman Sains Selangor 2, Bukit Raja, Mukim Dengkil, Daerah Sepang, Selangor
108,991.94 Apr 2010 Apr 2010 Eurowide Const Sdn
Bhd
75
Pavement Works For Periodic Maintenance Works 2010 (Pavement - Ltd) At Route FT106, Section 0.00 - 1.00, JalanAjil - Kuala Berang, Daerah Hulu Terengganu, Terengganu
223,552.59
Mac 2010 Mac 2010 RkMaju SdnBhd
76
Pavement Works For Periodic Maintenance Works (Pavement) 2010 At Route FT14, Sec 96.0 - 97.0, 96.0 - 97.0, Jalan Jerangau Jabur, Dungun, Terengganu DarulIman
358,488.00
Jan 2010 Jan 2010 Utas Mashyur Sdn
Bhd
77
Pavement & Roadmarking Works At Route FT03, Section 391.5 - 392.02, Jalan Kuala Terengganu, Kemaman, Terengganu
305,115.35
Jan 2010 Jan 2010 Rk Maju Sdn Bhd
78
Penyelenggaraan Berkala Pavement Dilaluan T199, KM 4.00 - KM 6.00 (Hadapan Sek. Keb. Kg. Bukit) Jalan Chendering - Bukit Payung, Darah Kuala Terengganu, Terengganu Darul Iman
342,408.79
Dec 2009 Dec 2009 Permint Granite
HCM SdnBhd
Private & Confidential Page 59
Company Profile
79
Privatisation Of Karak - Kuantan Expressway. Operation And Maintenance Of Karak - Kuantan Expressway. Proposed Drainage Renedial Works Along Ece-1 (Temerloh & Kuantan)
247,276.00 Aug 2009 Mac 2010
Alloy Maintenance Engineering
SdnBhd
80
Pavement Works For Periodic Maintenance Works (RangsanganFelda) 2009 At Route FT1690, Sec 0.00-0.67, Sec 0.67-1.34, Sec 1.34-2.00, Sec 2.00-2.67, Sec 2.67-3.34 & Sec 3.34-4.00, Jalan Kilang Sawit Jerangau Jabur Barat, Hulu Terengganu, Terengganu
767,931.46 July 2009 July 2009 Rk Maju Sdn Bhd
81 Cadangan Membina Dan Menyiapkan Masjid Taman Hadhari, Paka, Dungun, Terenggnu
4,586,421.00 July 2007 Dec 2009 Utas Mashyur
Sdn Bhd
82 Pavement Work For Periodic Maintenance Works At Route FT14, Sec 95.0 - 97.0, Jalan Jerangau Jabut, Dungun, Terengganu
314,550.00 Apr 2009 Apr 2009 Rk Maju Sdn Bhd
83 Pavement Works At Route FT14, Sec. 23.0 - 24.0, Jalan Jerangau Jabur, Kemaman, Terengganu
450,500.00 Mac 2009 Apr 2009 Utas Mashyur
Sdn Bhd
84 Pavement Works At Route FT14, Sec. 23.0 - 24.0, Jalan Jerangau Jabur, Kemaman, Terengganu
450,500.00 Mac 2009 Apr 2009 Utas Mashyur
Sdn Bhd
85 Pavement Works At Route FT03, Sec 653.0 - 657, Jalan Jerteh - Kota Bharu, Besut, Terengganu
339,148.80 Mac 2009 Apr 2009 Utas Mashyur
Sdn Bhd
86 Proposed Upgrading Pavement At Sirside Area, Kl International Airport Sepang,
2,047,119.13 Feb 2009 Apr 2009 Wirasa Timur
Sdn Bhd
87 Pavement Works At Route DT2687, Sec 14.60 - 14.71, 5.10 - 5.20, 4.80 - 4.90 & 0.80 - 0.90, Jalan Cerul Bukit Sagu, Kemaman, Terengganu
211,626.93 Feb 2009 Feb 2009 Utas Mashyu
Sdn Bhd
88 Pavement Works At Route FT03, Sec 545.5 - 546, Jalan Seberang Baroh, Terengganu 264,100.00 Dec 2008 Dec 2008
RK Maju Sdn Bhd
89 Pavement Works At Route FT14, Sec 179.5 - 180, JalanAjil - Kuala Terengganu, Terengganu 264,100.00
DEC 2008
DEC 2008 RK Maju Sdn
Bhd
90 Pavement Works At Route FT03, Sec 536 - 536.5, Jalan Kuala Terengganu - Kuantan, Terengganu
306,944.58 Dec 2008 Dec 2008 IAC Techique
Sdn Bhd
91 Pavement Works At Route FT03, Sec 538.8 - 538.37, Jalan Kuala Kamaruddin (Dalam Bandar) Kuantan, Terengganu
152,624.17 Dec 2008 Dec 2008 IAC Techique
Sdn Bhd
92 Pavement Works At Route FT03, Sec 539.88 - 539.64, Jalan Kuala Kamaruddin (Dalam Bandar) Kuantan, Terengganu
118,500.00 Dec 2008
Dec 2008 IAC Techique
Sdn Bhd
93 Pavement Works At Route FT03, Sec 539.460 - 539.160, Jalan Kuala Kamaruddin (Dalam Bandar) Kuantan, Terengganu
139,400.51 Dec 2008 Dec 2008 IAC Techique
Sdn Bhd
94 Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT14, Sec 109-109.5, Jalan Jerangau Jabur, Dungun,
266,106.98 Oct 2008 Oct 2008 RK Maju Sdn Bhd
Private & Confidential Page 60
Company Profile
Kuala Terengganu
95
Cadangan Menambah Dan Menaiktaraf Tebingan Sungai, Membina Jalan Serta Kerja Berkaitan Di Uitm Cawangan Terengganu, Terengganu
2,785,915.00
Oct 2008 Oct 2011 Utas Mashyur
Sdn Bhd
99 Proposed Rehabilitation Work For Elite Highway – Cyberjaya 144,668.03 Aug 2008 Aug 2008
B & I Builders Sdn Bhd
100 Pavement Works At Sec. 30.65 - 30.85 East Bound, Kuala Lumpur - Karak Highway 136,295.00 July 2008 July 2008
Alloy Maintenace Eng
Sdn Bhd
101
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT03, Sec. 619.50 - 620.00, Jalan Kuala Terengganu - Kota Bharu, Setiu, Terengganu
125,615.00 June 2008 June 2008 RK Maju Sdn Bhd
102
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT05, Sec. 349.50 - 352.00, Jalan Sepang - Klang, Daerah K. Selangor, Selangor
658,452.34 June 2008 June 2008 LZ Teraju
Resources
103
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT026, Sec. 12.30 - 12.90, Lebuhraya Klia, Arah Kuala Lumpur, Sepang, Selangor
434,793.80 April 2008 April 2008 LZ Teraju
Resources
104
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT10, Sec. 116.83 - 117.85, Jalan Gemas - Temerloh, District Bera, Pahang Darul Makmur
468,351.00 April 2008 April 2008 HCM
Engineering Sdn Bhd
105
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT03, Sec. 384 - 385, Kemaman, Terengganu
299,460.00 April 2008 April 2008 Daing Serasi Enterprise
106
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT084, Sec. 15.50 - 15.90, JalanJerteh - Kuala Besut, Besut, Terengganu
139,600.00 April 2008 April 2008 RK Maju Sdn Bhd
107
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT14, Sec. 30.50 - 31.50, JalanKuantan - Kuala Terengganu, Kemaman,, Terengganu
203,040.00 April 2008 April 2008 RK Maju Sdn Bhd
108
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT003, Sec. 630.00 - 630.50, Jalan Kuala Terengganu - Kota Bharu, Besut, Terengganu
226,450.00 April 2008 April 2008 IAC Technique
Sdn Bhd
109
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT003, Sec. 446.8 - 446, Dungun, Terengganu
231,026.00 April 2008 April 2008 IAC Technique
Sdn Bhd
110
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT14, Sec. 129.0 - 130.0, JalanAjil - Kuala Terengganu, Marang, Terengganu
220,590.00 April 2008 April 2008 AJH Sepakat
Sdn Bhd
Private & Confidential Page 61
Company Profile
111
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT14, Sec.12.50 - 124.00, Jalan Jerangau Jabur, Dungun, Terengganu
168,220.00 April 2008 April 2008 AJH Sepakat
Sdn Bhd
112
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT14, Sec. 129.0 - 130.0, Jalan Ajil - Kuala Terengganu, Marang, Terengganu
220,590.00 April 2008 April 2008 AJH Sepakat
Sdn Bhd
113
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT003, Sec. 446.8 - 446, Dungun, Terengganu
231,026.00 April 2008 April 2008 IAC Technique
Sdn Bhd
114
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT03, Sec. 651.00 - 652.00, Jalan Kuala Terengganu - Kota Bharu, Setiu, Terengganu
279,898.27 April 2008 April 2008
Daing Serasi Enterprise
115
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT189, Sec. 4 - 7, JalanPacakan - Jerteh, Besut, Terengganu
259,872.20 Mac 2008 Mac 2008
RK MajuSdnBhd
116
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT003, Sec. 650.50 - 651.00, Besut, Terengganu
163,000.00 Mac 2008 Mac 2008
RK MajuSdnBhd
117
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT29, Sec. 33.30 - 34.30 &SusurKeKajang, Lebuhraya LDP - Putrajaya/Dengkil, Sepang, Selangor
108,998.00 Mac 2008 Mac 2008
LZ Teraju Resources
118
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT14, Sec. 73 - 74, Jalan Kuantan - K. Terengganu, Terengganu
210,960.00 Apr 2008 Apr 2008 Daing Serasi Enterprise
119
Pavement Works For Periodic Maintenance Works (Pavement) 2008 At Route FT14, Sec. 49 - 50, Jalan Jerangau Jabur, Kemaman,, Terengganu
210,960.00 Mac 2008 Mac 2008 Rk Maju Sdn Bhd
120
Pavement Works For Periodic Maintenance Works (Pavement) At Route FT03, Sec. 615.3 - 615.7, Jalan Kuala Terengganu - Kota Bharu, Setiu, Terengganu
278,974.50 Sept 2007 Oct 2007 Daing Serasi Enterprise
121 Pavement Reconstruction And Resurfacing Works At FT1206, Felda Soeharto, Daerah Hulu Selangor, Selangor Darul Ehsan
1,141,774.55 Aug 2007 Sept 2007 HCM Engineering
Sdn Bhd
122 Pavement Works At Route FT3685, Sec. 5.5 - 7.2, Jalan Kuala Terengganu - Permaisuri, Kuala Terengganu, Terengganu
343,794.40 Aug 2007 Sept 2007 RK Maju Sdn Bhd
123 Pavement Works For Periodic Maintenance Works (Pavement) At Route FT84, Section 0.59 - 3.00, JalanJertih - Besut, Besut, Terengganu
342,987.19 May 2007 June 2007 RK Maju Sdn Bhd
124 Pavement Works At Route FT189, Sec. 15.50 - 15.90, Jalan Seberang Jertih - Pacakan, Besut, Terengganu
122,069.90 May 2007 June 2007 Abdul Ghani Kejuruteraan
125 Pavement Works At Route FT03, Sec 536.3 - 538.0, Jalan Kuantan - Kuala Terengganu, Kuala Terengganu
406,295.20 May 2007 May 2007 RK Maju Sdn Bhd
Private & Confidential Page 62
Company Profile
Private & Confidential Page 63
Company Profile
Private & Confidential Page 64
Company Profile
Private & Confidential Page 65
Company Profile
Private & Confidential Page 66
Company Profile
Private & Confidential Page 67
Company Profile
Private & Confidential Page 68
Company Profile
Private & Confidential Page 69
Company Profile
Private & Confidential Page 70
Company Profile
Private & Confidential Page 71
Company Profile
Private & Confidential Page 72
Company Profile
Private & Confidential Page 73
Company Profile
Private & Confidential Page 74
Company Profile
Private & Confidential Page 75
Company Profile
Private & Confidential Page 76
Company Profile
Private & Confidential Page 77
Company Profile
Private & Confidential Page 78
Company Profile
Private & Confidential Page 79
Company Profile
Private & Confidential Page 80
Company Profile
PHOTO GALLERY
Private & Confidential Page 81
Company Profile
MILLING & PAVEMENT CONSTRUCTION FOR ROAD & HIGHWAY
Private & Confidential Page 82
Company Profile
MILLING & PAVEMENT CONSTRUCTION FOR ROAD & HIGHWAY
Private & Confidential Page 83
Company Profile
NEW PAVEMENT CONSTRUCTION FOR ROAD & HIGHWAY
Private & Confidential Page 84
Company Profile
CONVENTIONAL METHOD OF CIPR & LAY PREMIX
Private & Confidential Page 85
Company Profile
CONVENTIONAL METHOD OF CIPR TREATMENT
Private & Confidential Page 86
Company Profile
INFRA WORKS I.E. EARTHWORK AND DRAINAGE
Private & Confidential Page 87
Company Profile
INFRA WORKS I.E. EARTHWORK AND DRAINAGE
Private & Confidential Page 88
Company Profile
LANDSCAPING AND ROUTINE MAINTENANCE
Private & Confidential Page 89
Company Profile
LANDSCAPING AND ROUTINE MAINTENANCE
Private & Confidential Page 90
Company Profile
RO1 - PAVEMENT
RO2 – ROAD SHOULDER
Private & Confidential Page 91
Company Profile
R03 – GRASS CUTTING
RO4 – ROAD FURNITURE
Private & Confidential Page 92
Company Profile
RO6 – ROADLINE MARKING
RO8 – ROAD CLEANING
Private & Confidential Page 93
Company Profile
NEW PAVEMENT CONSTRUCTION FOR ROAD& HIGHWAY
Private & Confidential Page 94
Company Profile
CONVENTIONAL METHOD OF MILLING & CIPR WORKS
Private & Confidential Page 95
Company Profile
INFRA WORKS I.E. EARTHWORK AND DRAINAGE
Private & Confidential Page 96
Company Profile
INFRA WORKS I.E. EARTHWORK AND DRAINAGE
Private & Confidential Page 97
Company Profile
LANDSCAPING AND ROUTINE MAINTENANCE
Private & Confidential Page 98
Company Profile
LANDSCAPING AND ROUTINE MAINTENANCE