State of ERM at FLO 2011-2014 OverworkedOverworked by
bemycareercoach.combemycareercoach.comAbout ResourcesAbout
Resources by University of Notre DameUniversity of Notre Dame
Slide 4
Satisfaction Expectations o And what it says about human nature
Obstacles Aspirations Major Findings ExpectationExpectation by
Steffen Boelaars CC BY- NC-SA 2.0CC BY- NC-SA 2.0
Slide 5
Sharing licensing data Terms tool review Statistics module
EZProxy audit Next Steps Cats on StairsCats on Stairs by
Christopher Harris CC BY-NC-SA 2.0CC BY-NC-SA 2.0
Slide 6
The FCDC Project
Slide 7
Slide 8
Katherine Berry - Wentworth Louisa Choy-Wheelock Kelly
Drake-FLO Marilyn Geller-Lesley Ann Glannon-Wheelock Who is FCDC?
Allyson Harper-Nixon - Wheelock Adam Shire - FLO Walter Stine-FLO
Catherine Tuohy-Emmanuel Erin Wentz-MCPHS
Slide 9
Process: Inspiration Macro testingMacro testing by Kristy
(kristykay22) CC BY-NC-SA 2.0 CC BY-NC-SA 2.0 The sound of a
wishThe sound of a wishby Luigi Anzivino CC BY-NC-SA 2.0 CC
BY-NC-SA 2.0
Slide 10
Process: Elaboration Chaise Longue 2Chaise Longue 2 by John
Connell CC BY-NC-SA 2.0 (Cropped and resized.)CC BY-NC-SA 2.0 Tell
me about a time when.
Slide 11
Process: Negotiation My bikeMy bike by Stefan Georgi CC
BY-NC-SA 2.0CC BY-NC-SA 2.0 Metallic Green 2008 Kawasaki Vulcan 900
MotorcycleMetallic Green 2008 Kawasaki Vulcan 900 Motorcycle by
Nicholas D. CC BY-NC 2.0CC BY-NC 2.0
Slide 12
Process: Result Cost per: Resource, Organization, or Fund Code
Cost Type Subscription End Date
Slide 13
Process: Impact Time is MoneyTime is Money by TaxCredits.net CC
BY 2.0CC BY 2.0 crystal ballcrystal ball by Ed Schipul CC BY-SA
2.0CC BY-SA 2. See-SawSee-Saw by Joe Shlabotnik CC BY 2.0
(cropped)CC BY 2.0 Poker chipsPoker chips by Angellea CC BY-NC 2.0
CC BY-NC 2.0
Slide 14
The Future of the Cost History Specification
Slide 15
What was the required overhead for the Specification
Development? 8 ACTIVE COMMITTEE MEMBERS 10 4-6 MONTHS OF WORKING
MEETINGS HOURS OF SPEC DEVELOPMENT PER PERSON PER MONTH
Slide 16
Sharing our story with the world
Slide 17
Iterative Evaluation and Development Cycle
Slide 18
Open Source Opens Opportunities Freely available Shared
development Advancement for all
Slide 19
Developing the Matrix - Product Specs Software
Slide 20
The Organization Guide Organization
Slide 21
The Community Guide Community
Slide 22
How to Commit to an OS Product
Slide 23
What we think we learned
Slide 24
The Proposal Community Involvement with CORAL The FCDC Project
1 What is the required overhead? 2. What is our capacity? 3. How
great is the need? 4. Can it work for us so that the benefits
outweigh the cost
Slide 25
Katherine Berry - Wentworth Louisa Choy-Wheelock Kelly
Drake-FLO Marilyn Geller-Lesley Ann Glannon-Wheelock Who is FCDC?
Allyson Harper-Nixon - Wheelock Adam Shire - FLO Walter Stine-FLO
Catherine Tuohy-Emmanuel Erin Wentz-MCPHS