23
CSR Calculation for TTF2 1. method 2. no CSR, ϕ rf = 8 deg 3. CSR “projected”, optics = option 1 & 2, ϕ rf = 8 deg 4. CSR “projected”, optics = option 1 & 2, ϕ rf = 12 deg 5. CSR “projected”, optics = option 1, ϕ rf = 7 deg 6. some LOLA pictures 7. conclusion / remarks ϕ rf on crest

CSR Calculation for TTF22. CSR model for TTF2 with space charge in ACC1, “projected” method in BC2 & BC3, transport matrix for BC2 → BC3, ACC4 → undulator not considered jet

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • CSR Calculation for TTF2

    1. method2. no CSR, ϕrf = 8 deg3. CSR “projected”, optics = option 1 & 2, ϕrf = 8 deg4. CSR “projected”, optics = option 1 & 2, ϕrf = 12 deg5. CSR “projected”, optics = option 1, ϕrf = 7 deg6. some LOLA pictures7. conclusion / remarks

    ϕrfon crest

  • 1. method

    from: Commissioning of TTF2 Bunch Compressor For The Femptosecond (fs) FEL Mode Operation, Yujong Kim

    ASTRA distribution (xfel.1200.001.txt)1nC, 200000 particles

    1) extract rf (longitudinal momentum)2) add ACC1 rf as required

    3) calculate Twiss parameters fromcore of bunch (particles between ±2mm)use transport matrix for matching torequired values (Nina Golubeva)

    ( )rf

    rfacc cos

    cos)(ϕ

    ϕ+= ksVsV

    m 809.2 012.0m 174.20 619.4

    =−===yy

    xx

    βαβα

    ϕrf

  • MeVrefEE −

    deg 8rf =ϕ

    mmz

    mmz

    AI

    particles at entrance of BC1horizontal vs. longitudinal

    mz

    mxe.g.

  • particles at entrance of BC1(“slices” with 5000 particles)

  • method …

    from: Commissioning of TTF2 Bunch Compressor For The Femptosecond (fs) FEL Mode Operation, Yujong Kim

    4) calculate BC2 with projected methodsub-bunch length:

    reference plane = 1 m after BC

    2

    R = 1.614955 mr56 = -0.181496 mt586 = 0.296575 m

    ms

    µmσ

    3

  • from: Commissioning of TTF2 Bunch Compressor For The Femptosecond (fs) FEL Mode Operation, Yujong Kim

    5) transformation from exit BC2 to entrance BC3:

    longitudinal: add rf-field and wake of two modules

    transverse: use transport matrixoption 1: αx=-0.284, βx= 0.976m µx=0.328*2π to αx=-0.284, βx= 0.976m µx=1.427*2π

    αy= 2, βy=31.037m µy=1.427*2π αy= 2, βy=30.021m µy=1.465*2π

    option 2: … to αx=-0.495, βx=17.150m µx=1.478*2παy=-0.152, βy=19.719m µy=1.830*2π

    method …

    on crest

  • from: Commissioning of TTF2 Bunch Compressor For The Femptosecond (fs) FEL Mode Operation, Yujong Kim

    6) calculate BC3 with projected methodsub-bunch length = 3 µm

    reference plane = 1 m after BC

    R = 5.695 m

    r56 = -0.041226 mt586 = 0.064860 m

    method …

  • 12

    3

    4

    5

    6

    4

    5

    6

    12

    3

    4

    5

    6

    MeVrefEE −

    mmz

    before BC2 1m after BC2 1m after BC3

    12

    34

    5

    6

    4

    5

    6

    deg 8rf =ϕoptics = option 12. no CSR

  • 4

    5

    6

    4

    5

    6

    12

    3

    4

    5

    6

    MeVrefEE −

    mmz

    before BC2 1m after BC2 1m after BC3

    mmz

    AI

    deg 8rf =ϕoptics = option 1no CSR

  • 4

    5

    6

    12

    3

    4

    5

    6

    4

    5

    6

    12

    3

    4

    5

    6

    before BC2 1m after BC2 1m after BC31

    23

    4

    5

    6

    MeVrefEE −

    mmz

    deg 8rf =ϕoptics = option 13. CSR “projected”

  • 220

    before BC2 1m after BC2 1m after BC3

    mmz

    AI 44

    MeVrefEE −

    mmz

    deg 8rf =ϕoptics = option 1CSR “projected”

    1400

  • long. phase space in BC3

    1 2 34 5

    6

    MeVrefEE −

    mmz

    1 2

    3

    4 5 6

    deg 8rf =ϕoptics = option 1

  • MeVrefEE −

    mmz

    mmz

    AI

    longitudinal horizontal“top”

    mmz

    mmx

    mmx

    mradx′

    x

    z

    deg 8rf =ϕoptics = option 1CSR “projected”

    1400

    all particles:emittance/um = 10.1rms-length/um = 722rms-energy spread/keV = 1450

    “black” particles:emittance/um = 4.13rms-length/um = 5.6rms-energy spread/keV = 476

  • longitudinal “top” horizontal

    MeVrefEE −

    mmz

    mmx

    mmz

    mradx′

    mmx

    mmz

    AI

    z

    x

    deg 8rf =ϕoptics = option 2CSR “projected”

    907

    all particles:emittance/um = 10.6rms-length/um = 722rms-energy spread/keV = 1419

    “black” particles:emittance/um = 3.63rms-length/um = 6.8rms-energy spread/keV = 418

  • 230

    before BC2 1m after BC2 1m after BC3

    mmz

    AI 46

    MeVrefEE −

    mmz

    854

    deg 12rf =ϕoptics = option 14. CSR “projected”

  • deg 12rf =ϕoptics = option 1CSR “projected”

    MeVrefEE −

    mmz

    longitudinal horizontal“top”

    mmz

    mmx

    mmx

    mradx′

    x

    z

    all particles:emittance/um = 10.55rms-length/um = 339rms-energy spread/keV = 1380

    “black” particles:emittance/um = 4.56rms-length/um = 13.0rms-energy spread/keV = 324

    mmz

    AI

    854

  • MeVrefEE −

    mmz

    longitudinal horizontal“top”

    mmz

    mmx

    mmx

    mradx′

    x

    zmmz

    AI

    637

    deg 12rf =ϕoptics = option 2CSR “projected”

    all particles:emittance/um = 10.74rms-length/um = 338rms-energy spread/keV = 1380

    “black” particles:emittance/um = 5.43rms-length/um = 13.8rms-energy spread/keV = 313

  • 240

    before BC2 1m after BC2 1m after BC3

    mmz

    AI

    36.5

    MeVrefEE −

    mmz

    1430

    deg 7rf =ϕoptics = option 15. CSR “projected”

  • MeVrefEE −

    mmz

    longitudinal horizontal“top”

    mmz

    mmx

    mmx

    mradx′

    x

    z

    deg 7rf =ϕoptics = option 1CSR “projected”

    mmz

    AI

    1430

    all particles:emittance/um = 3.38rms-length/um = 923rms-energy spread/keV = 880

    “black” particles:emittance/um = 2.06rms-length/um = 4.2rms-energy spread/keV = 256

  • 6. some LOLApictures

    deg 8rf =ϕoptics = option 1

  • deg 12rf =ϕoptics = option 1

  • 7. conclusion / remarks1. settings and beam parameters only known to a certain precision

    2. CSR model for TTF2 with space charge in ACC1,“projected” method in BC2 & BC3,transport matrix for BC2 → BC3,ACC4 → undulator not considered jet

    3. ASTRA calculations for BC2 → BC3 and ACC4 → undulator in preparation“projected” CSR calculations in ASTRA in principle possible

    4. “3D” CSR calculations with full- & over-compression difficult(variable sub-bunch needed due to long tails ↔ meshed green’s function)“projected” CSR calculations need better smoothing/filter-algorithms

    5. qualitative understanding of compression process,complicated interaction of “full” compressed part to rest of bunch

    6. qualitative agreement with LOLA pictures

    7. optics “option 1” and “weak over-compression” in BC2 seems preferable