6
CURRICULUM VITAE 5+ YEARS EXPERIENCE M.RAJASEKAR 7a,80-H,Sivan Kovil Street Mangalapuram, E.Mail:[email protected] Nagalnagar, Mobile :( +91)-9566862472 Dindigul-624003 (+91)-7810892217 CAREER OBJECTIVE Ensure a smooth production plan with continuous work flow and meet out the client satisfaction, And utilizing myself for achieve ultimately organizational growth and objectives. EDUCATIONAL QUALIFICATION M.B.A PROJECT MANAGEMENT Completed in Alagappa University of Distance Education,Karaikudi at Jan 2014 With 60% B.E.MECHANICAL Engineering completed in Sri Subramanya College of Engineering & Technology,palani at May 2011 with 69.7%. Diploma In Mechanical completed in Christian polytechnic college of technology, oddanchatram at April 2008 with 70.04% SSLCCompleted in John Paul Hr.Sec.School ,Dindigul at March 2005 with 78.6% AREAS OF EXPERTISE

CURRICULUM VITEA

Embed Size (px)

Citation preview

Page 1: CURRICULUM VITEA

CURRICULUM VITAE5+ YEARS EXPERIENCE

M.RAJASEKAR

7a,80-H,Sivan Kovil Street

Mangalapuram, E.Mail:[email protected]

Nagalnagar, Mobile :( +91)-9566862472

Dindigul-624003 (+91)-7810892217

CAREER OBJECTIVE

Ensure a smooth production plan with continuous work flow and meet out the client satisfaction, And

utilizing myself for achieve ultimately organizational growth and objectives.

EDUCATIONAL QUALIFICATION

M.B.A PROJECT MANAGEMENT Completed in Alagappa University of Distance

Education,Karaikudi at Jan 2014 With 60%

B.E.MECHANICAL Engineering completed in Sri Subramanya College of Engineering &

Technology,palani at May 2011 with 69.7%.

Diploma In Mechanical completed in Christian polytechnic college of technology, oddanchatram at

April 2008 with 70.04%

SSLCCompleted in John Paul Hr.Sec.School ,Dindigul at March 2005 with 78.6%

AREAS OF EXPERTISE

PLANNING TOOL’S : MS-Excel

PROJECT MANAGEMENT TOOL’S : MS-Project,Primavera.P6

DRAFTING-SOFTWATE UTAILIZING: AutoCAD 2009/2010/2014 (2D & 3D) ,

Solid Works 2012/2013/2015.

Page 2: CURRICULUM VITEA

WORKING EXPERIENCE

MARCH 2016 TO TILL

ORGANIZATION : SREE VENKETASWARA STRUCTURAL PVT. LTD.

FIELD : HEAVY FABRICATION INDUSTRY

POSITION : SENIOR PROJECT ENGINEER

CLIENT’S : HAMON RESEARCH COTTRELL, PROLEC-GE.

EXCUTING PRODUCT’S : TRANSFORMER TANK (PROLEC-GE)

ESP COMPONENT (HAMON)

RESPONSIBILITIES IN SVSPL

Preparing project plan based on client completion date.

Preparing BOM from Drawing and prepare cumulative material list (BOQ).

Preparing Cutting plan using AutoCAD and material Indent through to Purchase dept.

Estimate the resources ( man power, tool & machinery requirements) based on projects and it get

from Contract management &Store’s

Preparing Shop drawing from client drawing.

Preparing 3D modeling by using Solid works Software for eliminate production defects.

Executing the production by coordinate with production team.

Engage Outsourcing Contract’s and man power contract’s

Day to day monitoring & Update the Record and push up to next level of production.

Dispatch the product with planned date.

Follow-up the project to till End.

JANUARY 2014 TO FEBRURAY 2016

ORGANIZATION : FEDDERS LLOYD CORPORATION LTD – RANIPET, VELLORE.

FIELD : HEAVY FABRICATION INDUSTRY

POSITION : PROJECT PLANNNING AND CONTROL ENGINEER

CLIENT’S : ALSTOM, HAMON RESEARCH COTTRELL, EIL, PROLEC-GE,

BHEL-TRICHY.

EXCUTED PRODUCT’S: TRANSFORMER TANK ( PROLEC-GE)

ESP COMPONENT (HAMON)

ESP COMPONENT (ALSTOM)

BOILER SUPPORTING COMPONENT (BHEL)

PIPE RACK SUPPOTING COMPONENT (ALSTOM)

Page 3: CURRICULUM VITEA

RESPONSIBILITIES IN FLCL

Preparing the Task scheduling (Macro plan ) based on client’s delivery date.

Update & monitoring project schedule based on the client requirement.

Monitor critical activities based on the project schedule and preplan to achieve activity without

risk.

Monitor day to day work progress and prepare the weekly and monthly program and report.

Maintain and record update of site work progress.

Prepares monthly & Quarterly year-wise plan of work progress summary.

Report to the higher official about the current work progress and make comparison between plan

and actual progress

Preparation of Detailed Production Plan (Micro plan )for weekly production

Monitoring the Inventory and Consumable for continuous workflow.

Allocation the job for production contracts.

Tracking &Follow up to till End of the project.

If required preparation of Shop fabrication split drawing from GA drawing by using of Autocad

& Solid works software’s.

JULY 2011 TO JAN 2014

ORGANIZATION : RENERGY EQUIPMENTS INDIA PVT LTD – DINDIGUL

FIELD : HEAVY FABRICATION INDUSTRY

DURATION : JULY 2011 TO JAN 2014

POSITION : PLANNING ENGINEER

CLIENT : BHEL- Trichy , HERRENKNECHT, AVASARALA

EXCUTED PRODUCT’S: BOILER SUPPORTING COMPONENT (BHEL)

TUNNEL BORING EQUIPMENT’S (HERRENKNECHT)

CONVOYER STRUCTURAL (AVASARALA)

RESPONSIBILITIES IN REIPL

Receive the project purchase order from Business Development department.

Preparing the plan for the project as per the client requirement date.

Page 4: CURRICULUM VITEA

Arrange the drawing from drafting dept, and issued to production dept.

Allot the job for contract with approval of higher official

Update the day to day activity of production and submit the report to higher official

Follow up the out-sourcing jobs and contract’s billing

Preparing the Bills monthly-wise for all in house contractor’s

Trace and follow up the production as per the planned date.

PERSONAL DETAILS:

Name : M.Rajasekar

Father Name :K.M.Murugan

Date of Birth : 01-OCT-1989

Sex : Male

Language Known : Tamil,English,Hindi

Nationality : Indian

Marital Status : Single

Passport No : J3855997

DECLARATION:

I do hereby declare that the particulars of information and facts stated above are true and correct to

the best of knowledge and belief.

Place: Dindigul

Date: (M.RAJASEKAR)