6

Click here to load reader

CV Adityafarizpermana

Embed Size (px)

Citation preview

Page 1: CV Adityafarizpermana

8/10/2019 CV Adityafarizpermana

http://slidepdf.com/reader/full/cv-adityafarizpermana 1/6

Page 1 of 6

ADITYA F ARIZ P ERMANA

Jl. Rasamala 2 No. 1, South JakartaIndonesia

Mobile: +62 812 8439 6722 Email: [email protected]

P ERSONAL P ROFILE Strong leadership and team work ability. Motivate team by recognizing high standards of

Performance. Give feedback to encourage people to be open and to foster sense of trust. Self-learner who aspire to grow and lead. Strong passion for new ideas and desire to achieve

excellent outcomes in every project dealt with. Learn new skills rapidly. Exceptional interpersonal and communication skills (network, collaborate, negotiate), build

positive, effective relationship with people from diverse cultures. Dynamic person with goodadaptability to global and multicultural environments.

F ORMAL E DUCATION

Bachelor of Mechanical & Marine Engineering Majoring in Reliability, Availability,Maintenance, Management and Safety (RAMMS)Tenth November institute of technology (ITS) – SurabayaFaculty of Marine Technology, Department of Marine Engineering

Obtained cumulative GPA of 3.49 (0 – 4 scale). Major Course taken : - Reliability, Availability, Maintenance, Management and Safety

-Piping Engineering. -Pipeline Engineering.

Final Project Study : “ Risk Assessment Offshore And Onshore Gas Pipeline Crossings

COMMUNICATION SKILLS

IndonesianFluent in speaking, writing and listening in Indonesian

EnglishFluent in speaking, writing and listening in English (TOEFL Paper Based: 523)

ADDITIONAL QUALIFICATIONS Advance stress analyst Piping Engineer

Pipeline Engineer Risk Assessment & Project management

Page 2: CV Adityafarizpermana

8/10/2019 CV Adityafarizpermana

http://slidepdf.com/reader/full/cv-adityafarizpermana 2/6

Page 2 of 6

T ECHNICAL SKILLS & KNOWLEDGE PID for ship system and machinery: AutoCad Piping Design : PDMS, AVEVA Marine, PDS, Naviswork. Piping Stress analysis : CAESAR II, Auto Pipe.

Pipeline design and installation : OFFPIPE. Project Management : Primavera, Ms Project Pipeline Engineering Pipeline Risk assessment Finite element analysis : ANSYS

CODE , R ULES AND STANDARD DNV OS-F101 Submarine Pipeline System DNV RP-F107 Risk Assessment of Pipeline Protection DNV RP-F109 On-Bottom Stability Design Of Submarine Pipelines

DNV RP-A025 Offshore classification project – Testing and commissioning ASME B31.8 Gas Transmission And Distribution Piping Systems ASME B31.3 Process Piping Guide API RP 1102 Steel Pipelines Crossing Railroads and Highways API RP 2201 Safe Hot Tapping Practices in the Petroleum & Petrochemical Industries API 610 Centrifugal pumps for Petroleum, Petrochemical and Natural gas industries SNI 3474:2009 Sistem Penyaluran dan Distribusi Pipa Gas Lloyd Register rules & regulation for ship classification

KEY AREAS OF E XPERIENCE P&ID design for ship system and machinery Plant design and Piping layout FPSO Offshore and Onshore pipeline design and engineering Offshore pipeline risk assessment Project Management and schedulling

R ELATED E XPERICENCES : Field Engineer: Piping, Pipeline, Equipment and Hull construction Conceptual layout & FEED

Commissioning Offshore facility: piping and equipment

T RAINING AND COURSE Internal Combustion Engine Basic Training – Institute of Marine engineering (January 2010) Engine Project Guide - Marine Engineering Department ITS (March 2011) AUTO CAD 2011 – Marine Engineering Department ITS (May 2011) Basic of Project management – LPPM ITS (March 2012) AVEVA MARINE PDMS – PT. DSME INDONESIA (May – June 2013) CAESAR II 5.3 – PT. DSME INDONESIA (June – August 2013)

Page 3: CV Adityafarizpermana

8/10/2019 CV Adityafarizpermana

http://slidepdf.com/reader/full/cv-adityafarizpermana 3/6

Page 3 of 6

CAREER H ISTORY 1. PT DSME Indonesia (Daewoo Shipyard and Marine Engineering) - Mechanical & Piping Enginee r (May 2013 – Till

now)

Projet involved:

Ichtys Project – FPSO Project , INPEX Australia Operation Pty Ltd. May 2013 – March

2014

Responsibilities: Responsible for undertaking, piping and insulation design reviews in accordance with appropriate technical standards

and specifications associated with the services provided by the Engineering Sub-Contractor.

Personal in Charge (PIC) for MEG regeneration module packages and LP compression packages. Monitor and report on work packages progress especially for LP compression packages and MEG regeneration packages. Review of the piping stress procedures and activities with particular regard to fatigue and the information interface with

other disciplines; Supervise and review Piping stress work from sub-contractor to ensure all work follow appropriate procedure and

project specificaton. Prepare and participate in design reviews and other meetings regarding piping work progress and others issue if

necessary. Oversees and reporting weekly progress of piping stress and SPS to piping lead engineer. Manage, Inform and follow up for any piping vessel clip support and nozzle load exceeding limit to Equipment vendor. Submitting the piping stress calculation packages to the company client (INPEX) for acceptance once the Detailed Design

Contractor has approved them

MARINER Topside Project – Fixed Platform, North sea, Statoil Mariner

development March 2013 - Now

Responsibilities: Review Pipe stress Mariner Topside project procedure

Review Pipe support standard for Mariner Project. Compile, review and develop work packages of piping stress analysis activities in accordance with the work instruction

and associated standards and procedures. Review and Compile piping isometric drawings/support drawings/method statements. Monitor and report on work packages team progress. Design and Select Spring Support and Expansion Joints Detailed Design of pipe support arrangement and Special Support.

Page 4: CV Adityafarizpermana

8/10/2019 CV Adityafarizpermana

http://slidepdf.com/reader/full/cv-adityafarizpermana 4/6

Page 4 of 6

2. LPPM ITS - Pipeline Risk Engineer (concurrently as assistant project manager) (Jan 2012 – May 2013)

Projet involved:

Ketapang Bukit tua PSC, East Java, PETRONAS CARIGALI Jan 2012 – May

2012 Responsibilities:

to Perform Stress Analysis for offshore pipeline Pipeline Crossing Design analysis and Soil Settlement Study Perform Pipeline Risk assessment for drop & drag anchor and ship sinking. Soil Settlement Study in pipeline crossing. Perform On bottom stability for offshore pipeline Reporting weekly team progress to project manager.

ENI Muara Bakau PSC, Jangkrik Pipeline Risk Assessment Project ,East Kalimantan

May 2012 – Aug

2012

Responsibilities: Perform Pipeline Risk assessment for drop & drag anchor and ship sinking. Soil Settlement Study in pipeline crossing. Perform On bottom stability for offshore pipeline Perform On bottom stability for offshore pipeline

Reporting weekly team progress to project manager.

Husky-CNOOC madura limited Pipeline project , East Java Aug 2012 – Dec

2012

Responsibilities: Perform Stress Analysis for offshore pipeline

Pipeline Crossing Design analysis and Soil Settlement Study Perform Pipeline Risk assessment for drop & drag anchor and ship sinking. Perform On bottom stability for offshore pipeline Hot Tap and tie in Procedure Review by Standard and Codes Reporting weekly team progress to project manager.

Page 5: CV Adityafarizpermana

8/10/2019 CV Adityafarizpermana

http://slidepdf.com/reader/full/cv-adityafarizpermana 5/6

Page 5 of 6

Pertamina Hulu Energi Pipeline relocating Project Risk assessment

(FEED), East Java Aug 2012 – Dec

2012

Responsibilities:

Perform Pipeline Risk assessment for drop & drag anchor and ship sinking. Analyze and review for pipeline trenches method and cathodic protection calculation Analyze Pipeline Free Span Ensure meet the standard and safety. Reporting weekly team progress to project manager.

General Responsibility: To perform Pipeline sizing, Pipeline wall thickness design, Pipeline internal and external coating design. To perform Pipeline Crossing design and calculation. To perform Pipeline spanning calculation. To perform Pipeline Stress analysis using software CAESAR II. To perform Pipeline Risk assessment for drop & drag anchor and ship sinking. Understanding Pipeline Installation and tie in method and procedure. Participate as necessary in discussions with clients and multidiscipline team project and visit job sites as

required. Assist project manager to planning and schedulling project.

3. BKI Indonesia - Jr Marine Surveyor (Aug 2011 – Oct 2011)

Biro Klasifikasi Indonesia - Jr Marine Surveyor, Surabaya Aug 2011 – Dec

2011 Responsibilities:

Surveys marine vessels and watercraft, such as ships, boats, tankers, and dredges, to ascertain condition of hull,machinery, equipment, and equipage, and to determine repairs required for vessel to meet requirements for insuring:Examines underwater section of hull while ship is drydocked to ascertain conditions that indicate repairs are required.

Takes readings on tailshaft and tailshaft bearings. Inspects condition of propellers, rudders, and sea valves. Inspects above waterline section of ship, such as hatchways, freeing ports, ventilators, bulkheads, fittings, and

attachments, for compliance with operating standards, and compliance with standards for protection of crew. Observes operating tests on machinery and equipment and inspects opened up machinery for interior condition. Observes testing of cargo gear for compliance with testing standards and issues or endorses certificate for gear tested.

Page 6: CV Adityafarizpermana

8/10/2019 CV Adityafarizpermana

http://slidepdf.com/reader/full/cv-adityafarizpermana 6/6

Page 6 of 6

4. PT Daya Radar Utama Shipyard - Jr Piping Inspector (Jan 2011 – May 2011)

PT Daya Radar Utama Shipyard - Jr Piping Inspector , Jakarta Jan 2011 – May

2011

Responsibilities: Thorough study on various Structural and Piping drawings Identification of material and stamp transfer Monitoring Weld joint preparation Perform fit-up inspection during shop fabrication & erection on structures and piping. Verification of Structure and Piping Dimensions as per requirements. Monitoring of Pre Heat treatment before Welding During welding, check proper parameters as per WPS and Procedures Monitor PWHT in special requirements

Co-ordinate dimension checks before and after Welding as per special requirements Witness WPS consequent PQRs in requirements and also witness Welder Qualification and Performance Tests. Inspection & co-ordination of Insulation in LQ Quarters and Piping in Engine room.