3
1 Name Email Mob Abhishek Kumar Sinha [email protected] 9717528380 2 Date of Birth 26-04-1984 3 Nationality Indian 4 Education Post Graduate Diploma in Water Resources Development and Management Annamalai University, 2009 -10 Bachelor in Civil Engineering Visvesvaraya Technical University, 2005 06 5 Key Qualification Over 10 years of experience in Water Resources Consultancy sector with specialization in design and modeling of wet utility infrastructure for urban development projects. 6 Software Proficiency Bentley WaterGEMS, StormCAD and SewerCAD AutoCAD ArcGIS 7 Training Training Course : ISO 9000 2000 Quality management system 8 Employment Record Name of Organization Position held Duration Feedback Infra P. Ltd Manager - PHE 2016 - present CH2M HILL P. Ltd Infrastructure Engineer 2015 - 2016 Mott MacDonald P. Ltd. Engineer Water resources 2010 - 2015 STUP Consultant P. Ltd. Design Engineer 2008 - 2010 SECON P. Ltd. Planning Engineer 2006 - 2008 9 Name of Project: Dholera Special Investment Region Urban Utility infrastructure design for TP1 and TP-2 East (Activation area) Year: 2016 Location: Dholera, Gujarat Client: Delhi Mumbai Industrial Corridor Development Corporation (DMICDC) Main project features: Design of wet utilities services of the TP- 1 and Proof checking of the DPR for Utility design of TP-2 East (Activation Area). Positions held: Manager Activities performed: Evaluated TP-1 Development Plan and available reports on Dholera SIR Prepared Inception stage report with method statements for design of all wet utility services. Conducted peer review of designs for Water supply, Sewerage, Storm water and Recycled water services design for 22.5 Sq. Km. area of TP-2 Conducted Hydraulic design review using modeling software by Bentley systems which is compatible with GIS platform. 10 Name of Project: New Capital Amaravati - Project management for Interim Government Complex Year: 2016 Location: Vijayawada, Andhra Pradesh Client: Andhra Pradesh Capital Region Development Authority (APCRDA) Main project features: Project management consultancy for Infrastructure development for 45 Acre Interim Government complex at Amaravati.

CV_Abhishek Sinha

Embed Size (px)

Citation preview

Page 1: CV_Abhishek Sinha

1

Name Email Mob

Abhishek Kumar Sinha [email protected] 9717528380

2 Date of Birth 26-04-1984

3 Nationality Indian

4 Education Post Graduate Diploma in Water Resources Development and Management Annamalai University, 2009 -10

Bachelor in Civil Engineering Visvesvaraya Technical University, 2005 – 06

5 Key Qualification

Over 10 years of experience in Water Resources Consultancy sector with specialization in design and modeling of wet utility infrastructure for urban development projects.

6 Software Proficiency

Bentley WaterGEMS, StormCAD and SewerCAD

AutoCAD

ArcGIS

7 Training Training Course : ISO – 9000 – 2000 Quality management system

8 Employment Record

Name of Organization Position held Duration

Feedback Infra P. Ltd Manager - PHE 2016 - present

CH2M HILL P. Ltd Infrastructure Engineer 2015 - 2016

Mott MacDonald P. Ltd. Engineer – Water resources 2010 - 2015

STUP Consultant P. Ltd. Design Engineer 2008 - 2010

SECON P. Ltd. Planning Engineer 2006 - 2008

9 Name of Project: Dholera Special Investment Region – Urban Utility infrastructure design for TP–1 and TP-2 East (Activation area)

Year: 2016

Location: Dholera, Gujarat

Client: Delhi Mumbai Industrial Corridor Development Corporation (DMICDC)

Main project features: Design of wet utilities services of the TP- 1 and Proof checking of the DPR for Utility design of TP-2 East (Activation Area).

Positions held: Manager

Activities performed:

Evaluated TP-1 Development Plan and available reports on Dholera SIR

Prepared Inception stage report with method statements for design of all wet utility services.

Conducted peer review of designs for Water supply, Sewerage, Storm water and Recycled water services design for 22.5 Sq. Km. area of TP-2

Conducted Hydraulic design review using modeling software by Bentley systems which is compatible with GIS platform.

10 Name of Project: New Capital Amaravati - Project management for Interim Government Complex

Year: 2016

Location: Vijayawada, Andhra Pradesh

Client: Andhra Pradesh Capital Region Development Authority (APCRDA)

Main project features: Project management consultancy for Infrastructure development for 45 Acre Interim Government complex at Amaravati.

Page 2: CV_Abhishek Sinha

Positions held: Manager

Activities performed:

Assisted the APCRDA in managing water and sanitation systems, including managing design, installation, and operation of Water supply, Sewerage, Storm water and Recycled water infrastructure systems.

Prepared the tender documents for issuing construction contracts for entire area.

Overseeing the work of design consultant appointed by APCRDA and reporting to the client on project progress.

Executed the activities of the Project Management Unit, ensuring adherence to the project documents, staff supervision, site management and work plans.

Conducted design review for STP and WTP with FBBR Technology and PSF technology respectively as well.

11 Name of Project: Shendra-Bidkin Industrial Area (SBIA) Smart City

Year: 2015

Location: Aurangabad, Maharashtra

Client: DMICDC and MIDC

Main project features: The SBIA is envisioned as a large-scale industrial cluster with wide ranging Infrastructure services.

Positions held: Infrastructure Engineer

Activities performed:

Involved in design check of Water supply, Sewerage, Storm water and Recycled water systems submitted by the consultant for Phase-I covering an area of 8.39 sq. km.

Review of 3D model of utility services in AutoCAD Civil 3D.

Assisted TL in preparation of tender package for construction of road and wet utilities contracts at Shendra and Program delivery services for Shendra Bidkin Industrial Area.

12 Name of Project: World Bank funded - Punjab Rural Water Supply & Sanitation Project

Year: 2014

Location: Mohali (Punjab)

Client: State Project Management Cell (Government of Punjab)

Main project features: Feasibility study to assess feasibility of shifting from ground water based drinking water schemes to surface water sources.

Positions held: Engineer - Water Resources

Activities performed:

Worked as a lead designer for all aspects of water supply distribution systems villages falling under 6 districts of Punjab.

Developed hydraulic model using Bentley WaterCAD v8i for design of pressurized water supply pipe network.

Involved in pump modeling and rising main design for Water supply system.

Preparation of Feasibility report including review of regulatory and Institutional framework in rural water services.

Preparation of cost estimates and financial modeling on Return on Investment.

13 Name of Project: Design of urban Infrastructure for Manama Lagoon, Kingdom of Bahrain.

Year:2013 - 2014

Location: Ahmedabad

Page 3: CV_Abhishek Sinha

Client: Bayside Developments W.L.L.

Main project features: Detailed design of Storm water drainage.

Positions held: Engineer- Water Resources

Activities performed:

Worked as Design Engineer for Preparation of storm water drainage of 100 Ha of project area in compliance with Bahrain Road Design Manual and relevant British Standards such as Sewers for Adoption (6th edition).

Responsible for detailed design of new storm sewer system using the automated, constraint based feature in StormCAD V8i.

Prepared Good for construction drawing for the network component including Rainwater harvesting well, Manhole and Gullies.

Developed an alternate strategy for storm water drainage based on the use of soak‐away sites within the central reserve area (Medians) of the carriageway.

14 Name of Project: Design of urban Infrastructure for Dilmunia Health Island, Kingdom of Bahrain

Year: 2010 - 12

Location: Ahmedabad

Client: Ithmaar Development Company

Main project features: Detailed design of Wet utility infrastructure for Dilmunia Health Island located in Kingdom of Bahrain.

Positions held: Engineer - Water Resources

Activities performed:

Planning, Design and Estimation of Sewerage Network for Dilmunia Health Island with total area of 1.25 Sq. Km.

The role assigned was to carry out detailed hydraulic design of Sewage network in SewerCAD V8i. Total pipe network designed is 9.5 Km.

Extensive use of SewerCAD Scenario Management Center to visualize, and compare flow scenarios of 4 planned phases of project development within a single file. This enabled me in evaluating pump operation strategies and proposing flushing alternatives for initial project life cycle.

Preparation of Good for Construction drawings and Bill of Quantities.

14 Certification I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes me, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

15 Signature