Dadan Rusdiana Empowering Bioenergy Policies Implementation

Embed Size (px)

DESCRIPTION

Dadan Rusdiana Empowering Bioenergy Policies Implementation

Citation preview

  • Energy and Mineral Resources for Peoples Welfare

    Empowering Bioenergy Policies Implementation

    MINISTRY OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIADIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION

    The 3rd Indonesia EBTKE Conference and Exhibition 2014Jakarta Convention Centre, Jakarta, 4 - 5 of June 2014

    6/6/2014 1Energy and Mineral Resources for Peoples Welfare

    delivered by:DR. DADAN KUSDIANADirector for Bioenergy

  • Energy and Mineral Resources for Peoples Welfare

    The role of bioenergy -as a part of renewable energy- on national energy mix will beincreased significantly under National Energy Policy

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    2015 2020 2025 2030 2035 2040 2045 2050

    Oil Natural Gas CoalBioenergy Geothermal Hidro EnergySolar Energy Ocean Energy Other RE (Wind) NE (Nuclear, CBM, etc)

    Note:Based on draft of Government Regulation on National Energy Policy that has been approved by Parliament and being processed to signed by the President

    Bioenergy

    New and Renewable Energy (NRE)

    Coal

    Gas

    Oil

    by 2015NRE: 23%

    (Bioenergy: 10%)

    by 2050NRE: 31%

    (Bioenergy: 14%)

    Product of bioenergy:

    1. Various products, for fuel, heat andelectricity. Bioenergy can be directlyutilized in energy conversionsystems/existing equipment (biomasson power plant, biofuel in vehicles).

    2. The fuel from bioenergy can beutilized in liquid, gas and solidform; always continue to adapt to theneeds.

    3. Directly involvement of the community(pro-growth, pro-job, pro-poor)

    4. Source of bioenergy feedstock dependson human effort (not depend onnature)

  • Energy and Mineral Resources for Peoples Welfare

    No Potential(MWe) Unit Sumatera Kalimantan Jawa-Bali-

    MaduraNusa

    Tenggara Sulawesi Maluku Papua Total

    1 Palm oil MWe 8.812 3.384 60 - 323 - 75 12.654

    2 Sugar cane MWe 399 - 854 - 42 - - 1.295

    3 Rubber MWe 1.918 862 - - - - - 2.781

    4 Coconut MWe 53 10 37 7 38 19 14 177

    5 Rice husk MWe 2.255 642 5.353 405 1.111 22 20 9.808

    6 Corn MWe 408 30 954 85 251 4 1 1.733

    7 Cassava MWe 110 7 120 18 12 2 1 271

    8 Wood MWe 1.212 44 14 19 21 4 21 1.335

    9 Sapi MWe 96 16 296 53 65 5 4 535

    10 MSW MWe 326 66 1.527 48 74 11 14 2.066 Total potential MWe 15.588 5.062 9.215 636 1.937 67 151 32.654

  • Energy and Mineral Resources for Peoples Welfare

    Increasing the use of biofuel as a fossil fuel

    substitution

    Development of bioenergy based power plant (as based load )

    Increasing the sustainability supply

    of bioenergy feedstock through development

    of energy farms/forest

    Utilization of organic waste as source of

    energy

    Contribution to national economy

    through development of bioenergyindustries MAIN VISION OF

    BIOENERGY DEVELOPMENT

  • Energy and Mineral Resources for Peoples Welfare

    -

    5

    10

    15

    20

    25

    30

    2013 2015 2017 2019 2025 2035 2045

    Capa

    city

    (KL)

    Mill

    ions

    Biodiesel Demand

    Biodiesel Installed Capacity

    Increasing demand of biofuel since the implementation of mandatory policy throughMEMR Regulation 25/2013

    Biofuels domestic usage mandatory policy:

    Fossil fuel substitution/reduce oil import creating the market of biofuel industrial

    development

    improvement of domestic economy

    installed capacity (BaUconditon)

    shortages of supply

    great opportunities

    190 243

    1,812

    2,221

    2,805

    70 20

    1,453 1,5521,757

    119 223359

    669

    1,048

    0

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    2009 2010 2011 2012 2013*

    Ribu k

    L

    Produksi Ekspor Domestik

    BIOFUEL PRODUCTION

    AND UTILIZATION

  • Energy and Mineral Resources for Peoples Welfare

    Currently, Indonesia has implemented biodiesel blending B-10 on transportation and industry sectorand B-30 to B-60 on electricity.

    Recently, new Market Price Index for Biodiesel that blended with subsidized fuel has been launched.

    Now the Government are preparing preparation stages to implement B-20 on 2016 by conduct anengine testing together with automotive engine principal, automotive and expertise association,university and research institution.

    Implementation B-25 will be conducted on 2025

    Bioethanol utilization/blending become a trending issues in many countries. Implementation ofbioethanol blending has increased significantly in many countries

    There is no doubt related on technical aspect of bioethanol blending

    Preparation for E-0,5 for subsidized fuel and E-1 for on-subsidized fuel will be finished shortly

    Revision of Market Price Index of Bioetanol that blended with subsidized fuel still under finalizationwith Ministry of Finance

  • Energy and Mineral Resources for Peoples Welfare

    Global demand of biofuel (biodiesel) is increasing

    Source: Biofuel Market and Outlook, September 2013

    Indonesia is a leading on biodiesel blending B-10 and will be increased to B-20 for transportation

    B-30 B-60 for electricity

    B-30 s.d. B-60 for electricity generation

  • Energy and Mineral Resources for Peoples Welfare

    with new feed-in tariff, the installed capacity of bioenergy based power plant hasincreased rapidly

    0

    20

    40

    60

    80

    100

    2008 2009 2010 2011 2012 2013

    18 18

    41

    59

    75.5

    90.5

    Installed Capacity (MW)

    FEED-IN TARIFF FOR BIOENERGY BASED POWER PLANT(MEMR Regulation No. 4 Year 2012 and No. 19 Year 2013)

    No Energy Capacity Electricity Tariff NoteMedium Voltage1. Biomass until 10 MW Rp. 975,- / kWh X F

    2. Biogas until 10 MW Rp. 975,- / kWh X F Non Municipal Solid Waste

    3. Municipal Solid Waste (MSW) until 10 MW Rp. 1.450,- / kWh Zero waste *)

    4. Municipal Solid Waste (MSW) until 10 MW Rp. 1.250,- / kWh Landfill *)

    Low Voltage1. Biomass until 10 MW Rp. 1.325,- / kWh X F

    2 Biogas until 10 MW Rp. 1.325,- / kWh X F Non Municipal Solid Waste

    3 Municipal Solid Waste (MSW) until 10 MW Rp. 1.798,- / kWh Zero waste *)

    4 Municipal Solid Waste (MSW) until 10 MW Rp. 1.598,- / kWh Landfill *)reducing the use of fossil fuels as fuel for

    power plants and increasing national security of supply of electricity

    Note : *) Based on Act No. 18 Year 2008 concerning to Waste Management.

    F as an incentive factor based on the region where the power plant installedJawa, Bali, and Sumatera region F = 1Kalimantan, Sulawesi , NTB and NTT region F = 1,2Maluku and Papua region F = 1,3

    great opportunities

    Current capacity of on-grid bioenergy based power plant on 2013 was 90.5 MW (palm waste 76 MW ;municipal solid waste 14.5 MW )

    and off-grid power plant was 1,626 MW).

  • Energy and Mineral Resources for Peoples Welfare

    Area and Source of Biomass

    CapacityOff-Grid (MW)

    CapacityOn-Grid (MW) Total

    SumateraPalm oil mills

    POMESugarcanePulp and paper

    3359

    66955

    76---

    4059

    66955

    KalimantanPalm oil mills 91 - 91

    Jawa-BaliPalm oil millsSugarcaneMSW

    2142

    -

    --

    14,5

    214214,5

    SulawesiPalm oil millsSugarcane

    1111

    --

    1111

    PapuaPalm oil mills 4 - 4

    TOTAL 1.626 90,5 1.716,5

  • Energy and Mineral Resources for Peoples Welfare

    by utilizing waste into biogas we can conserve our fossil energy resources and atthe same time we can conserve our environment

    Currently there is more than 13.500 unitof biogas digester are installed to meetdomestic needs (cooking and lighting).The program is implemented both onsemi and non-commercial approaches bythe Government and also under thepartnership with donors and internationalNGO;

    13,83620,062

    44,841

    62,721

    0

    10,000

    20,000

    30,000

    40,000

    50,000

    60,000

    70,000

    2011 2012 2013 2014

    Biogas Production (M3/days)

    62 thousand m3 biogas production can save 38

    thousand liter of kerosese

    Approach for biogas

    implementation

    Domestic utilization

    Commercial/industry

    sector

    Biogas program is implemented throughthe commercial basis. The biogas unitsystem is built in a large scale, usually togenerate an electricity; such as electricitypower plant in the palm oil mills. Biogasis produced from palm oil mill effluent(POME).

  • Energy and Mineral Resources for Peoples Welfare

    achievement of bioenergy green house gas emission reduction

    -

    200

    400

    600

    800

    1,000

    1,200

    1,400

    1,600

    2010 2011 2012 2013

    131 234

    329

    517

    325

    522

    975

    1,540

    3 7 10 14

    (Tho

    usan

    d to

    n CO

    2e)

    Emission Reduction of Biomassa Power Plant (ton CO2e)

    Emission reduction of Biodiesel Utilization (ton CO2e)

    Emission Reduction of Biogas Utilization (ton CO2e)

    Total Emission Reduction - Bioenergy(ton CO2e)

    2010 2011 2012 2013

    458,841 763,485 1,312,920 2,071,121

  • Energy and Mineral Resources for Peoples Welfare

    Pricing policy for bioenergy

    Development of integrated bioenergy production facility with dedicated feedstocks

    Supply of sustainable bioenergy feedstock

    Regulating waste/biomassa for export purposes

    Availability of transmission network/national grid

    Business regulation on non liquid bioenergy product

    Infrastructure and technology

  • Energy and Mineral Resources for Peoples Welfare

    JALAN PEGANGSAAN TIMUR NO. 1, MENTENG, JAKARTA 10320Phone: +62 21 39830077 Fax: +62 21 31901087

    www.esdm.go.id - www.ebtke.esdm.go.id

    Email: [email protected]

    MINISTRY OF ENERGY AND MINERA RESOURCES DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION

    PresenterPresentation NotesSelain itu, terdapat 5 isu lainnya yang masih dalam proses penyelesaian, yaitu:PLTP Rajabasa dan PLTP Muaralaboh (Penanggung Jawab: PLN)5 WKP PGE dengan total 610 MW dapat menjadi quick wins (Penanggung Jawab: Kemen BUMN, PLN dan PGE)PLTA Upper Cisokan Pumped Storage (Penanggun Jawab: BPN)PLTA Asahan 3 (Penanggun Jawab: PLN)PLTU Jateng (Penanggun Jawab: BKPM dan PLN)

    Kami terus berkoordinasi dengan dan memantau pihak-pihak terkait khususnya PLN agar isu-isu tersebut dapat terselesaikan sesuai target yang ditetapkan.Demikian yang dapat kami sampaikan sementara ini.

    Terima Kasih atas perhatiannyaWassalamualaikam Warahmatullahi Wabarakatuh

    (Catatan : Apabila diperlukan, narasi penjelasan lebih rinci dari masing-masing isu terdapat pada lampiran.

    Slide Number 1The role of bioenergy -as a part of renewable energy- on national energy mix will be increased significantly under National Energy PolicySlide Number 3Slide Number 4Slide Number 5Biodiesel implementation: B-10 and will increased to B-20 by 2016 and to B-25 by 2025Slide Number 7Slide Number 8Achievement of bioenergy based power plant development until 2013Slide Number 10Slide Number 11Current issues on bioenergy developmentSlide Number 13