DAE YOUNGGeneral Industrial Equipments Co., Ltd 1 / 18
Underground Power Supply Lines
2001KORAIL Subway Construction Office
Installation of Power Transfer Equipments for Honam Doogye S/S and 6 places
* Underground power transfer line (154KV Φ200 6hole) 3.13 ㎞
2001.12~
2003.123,274,814
Iron Tower Maintenance Works
2005 Hansol PapersCleaning of Live Wire Insulator
* Cleaning of live wire insulator and repair 17 insulators
2005.03~
2006.013,264
2006 Hansol EME154kv Iron Tower Cleaning of Live Wire Insulator
* Cleaning of live wire insulator and repair 17 insulators
2006.01~
2006.1211,871
2006 SeAH Besteel Co.154KV T/L Cleaning and change of suspension insulator
* 19 live wire insulators of154KV line iron tower
2006.02~
2006.085,540
2006 Asia Paper MFG154KV Power line repair work
* Inspection, tighten volts, painting and change of insulator for 22 iron towers
2006.01~
2006.059,712
2006 KEPCO - Suwon154KV Nam Suwon S/S #5
M.TR Extention Work* Installation of TR 154KV/22KV
1Φ 15/20MVA *3 1BANK
2006.05~
2006.07 31,573
Transmission Line Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 2 / 18
Installation Works for Transformer
2006 Iljin HeavyHwanyoung Steel 154KV Transformer Installation Work
* Installation of TR 154KV 3Φ 30/40MVA 1BANK
2006.09~
2006.09 21,763
2006 Daehan SteelRemove and installation work for 40t of transformer for electric furnace
* Installation of 22.9KV 42MVA transformer for furnace
2006.08~
2006.10 18,201
2006 Dongbu SteelIncheon Factory - Purchase and Installation of 154KV transformer
* Installation of 154KV/22.9KV 30/40MVA 1BANK
2006.07~
2006.12 201,799
2006 Iljin Heavy POSCO Pohang - Installation of 154KV M.TR
* TR 154KV 3Φ 10MVA 1BANK Installation
2006.07~
2006.09 9,496
2007Hyundai Steel - Pohang
Daehyung Steel - Urgent recovery works for transformer of 100t electric furnace
* Detailed inspection of transformer 22.9KV 95MVA for furnace
* Remove of 22.9KV 95MVA transformer and installation of 66MVA transformer for furnace
* Remove of 22.9KV 66MVA transformer and installation of 95MVA transformer for furnace
2007.03~
2007.10 166,741
Details for Major Projects CompletedPower Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
DAE YOUNGGeneral Industrial Equipments Co., Ltd 3 / 18
Installation Works for Transformer
2007 SeAh Besteel
Assembling work for warehousing of electric furnace TR 62MVA for contingency
* Installation of 22.9KV 62MVA transformer for furnace
2007. 07~
2007. 1116,000
2007 Iljin HeavyPOSCO Pohang - Installation of 154KV M.TR
* Installation of TR 154KV 3Φ 100/120MVA 3BANK
2006. 02~
2006. 03 25,165
2007 KEPCO - Seongnam
Urgent recovery works for Ansung S/S #2M.TR
* Installation of TR 154KV/22KV 1Φ 15/20MVA *3 1BANK
2007.08
12,000
2008 KEPCO - Nam SeoulInstallation work for 154kv at Ganam S/S M.TR
* Installation of TR 154KV/22KV 1Φ 15/20MVA *6 2BANK
2008. 01~
2008. 05 70,419
2008Seoul Power Management Office
Installation work for 345KV at Mikeum S/S #3MTR
* Installation of TR 345KV/161KV/23KV 166.7MVA*3
2008. 03~
2008. 07 134,964
2008 Daehan SteelNoksan Steel Mill Factory - Installation work for transformer
* Installation of TR 154KV/22KV 3Φ 30MVA 1BANK
2008. 05~
2008. 09 94,964
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 4 / 18
InstallationWorks forTransformer
2008 KEPCO - Nam SeoulInstallation work for Dong Pangyo S/S M.TR
* Installation of TR 154KV/22KV 1Φ 15/20MVA *6 2BANK
2008. 02~
2008. 11 81,243
2008 KEPCO - IncheonExpansion of 154KV at Yeokgok S/S#4 M.TR
* Installation of TR 154KV/22KV 1Φ 15/20MVA *3 1BANK
2008. 06 ~
2008. 12 42,017
InstallationWorks forBreaker(GIS)
2005
KEPCO - Joongbu
Installation of GIS for 154KV at Jido S/S #4M.Tr
* Installation of GIS 170KV 50KV 1200A * 1CCT* Installation of GIS 25.8KV 25KA 600A 2BAY
2005. 05~
2005. 06
38,973
2005 KEPCO - IncheonExpanded work for 345kv at New Bupyong S/S #64 D.Tr (25.8kv GIS)
* Installation of GIS 25.8KV 25KA 600A 7BAY
2005. 05~
2005. 06 22,025
2005 KEPCO - CheongwonExpanded work of breaker at Bugang and Manseung S/S 23KV
* Installation of GIS 25.8KV 25KA 600A 2BAY
2005. 03~
2005. 03 20,446
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 5 / 18
InstallationWorks for Breaker(GIS)
2005KEPCO - New Seongnam
Installation of 345KV at New Suwon S/S 170KV GIS
* Installation of GIS 170KV 50KV 1200A * 2CCT
2005. 05~
2005. 09 7,668
2006 KEPCO - SuwonInstalation of 345KV at New Seongnam S/S 362KV GIS
* Installation of GIS 362KV 3CB 2006.04
~2006.08
53,013
2006 KEPCO - IncheonInstallation at Gokang S/S 25.8KV GIS
* Installation of GIS 25.8KV 25KA 600A 13BAY
2006.08~
2006.12 88,772
2006 KEPCO - JecheonInstallation at Moonmak S/S 170KV GIS
* Installation of GIS 170KV 50KV 1200A * 1CCT
2006.01~
2006.12 10,191
2006 KEPCO - SeongdongExtended works for new SW at Jongam S/S 23KV
* Installation of GIS 25.8KV 25KA 600A 1BAY
2006. 03~
2006. 05 18,024
2006 KEPCO - Seo SeoulInstallation for 154KV at Shihwa S/S 23KV GIS
* Installation of GIS 25.8KV 25KA 600A 41CCT
2006.08~
2006.12 274,139
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 6 / 18
InstallationWorks for Breaker(GIS)
2006
Yoosuk Ind. & Dongyang Sement
Instalation at Dongyang Sement for 154KV S/S GCB
* Installation of 1 unit of GCB 170KV 1 대 and remove I unit of OCB 169KV and control cable * Changes of MOF, CT and main line
2006. 02~
2006. 06
10,288
2007 KEPCO - SuwonInstallation at 07 Byongjeom S/S 23KV for New GIS
* Installation of GIS 25.8KV 25KA 600A 11CCT
2007. 03~
2007. 05 58,465
2007 KEPCO - GoonpoInstallation of S.W at Nam Ansan and other S/S
* Installation of GIS 25.8KV 25KA 600A 1CCT*2 units
2007. 01
2007. 04 11,214
2007KEPCO - New Seongnam
Extension at Seo Anyang S/S 23KV New SW
* Installation of GIS 25.8KV 25KA 600A 2CCT
2007. 08~
2007. 12 11,262
2008 KEPCO -GoonpoExtension at Jangdeok S/S 23KV New SW
* Installation of GIS 25.8KV 25KA 600A 1CCT
2008. 01~
2008. 02 16,596
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 7 / 18
InstallationWorks for Breaker(GIS)
2008 KEPCO - SuwonInstallation at 08 Cheongbuk S/S 154KV new GIS
* Installation of GIS 170KV 50KV 1200A * 2CCT
2008. 02~
2008. 06 31,068
2008 Iljin ElectricInstallation at KAIST for transformer breaker
* Installation of GIS 170KV 50KA 2CCT, M.TR 154KV 30/45MVA 1 unit
2008. 01~
2008. 11 214,388
2008 KEPCO - JejuExtension of 154KV at Sanji S/S 25.8KV GIS 2 Lines
* Installation of GIS 25.8KV 25KA 600A 2BAY
2008. 03~
2008. 05 19,571
Additional Construction, Inspection and Maintenance for substation
2005 KEPCO - SeoSeoulAnnula suppliers' work for '05
* 14 substations* Power transforming facilities (345KV, 154KV, 22KV TR, GIS, GCB, DS, MOF* P.T, C.T, LA, CABLE) inspection, maintenance and repair
2005.03~
2006.02
817,599
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 8 / 18
Additional Construction, Inspection and Maintenance for substation
2005 KNCElectric work for K.N.C new factory
TR 22KV/380,220V 4000KVA, CABLE 6200m, Power Line, Installation of 6 distributing Boards
2004.09~
2005.05 237,410
2005 KEPCO - IncheonCommon ispection at Inner S/S Main Transformer and OLTC precision inspection
Detailed inspection of OLTC for TR 154KV 62 units 대 OLTC and LA 80 units
2005. 03~
2005. 05 75,588
2005 Lotte Daesan Check all TRANSFORMERS in the Factories
Inspection and repair for TR 22KV/6.6KV 25/28MVA and 91 units
2005. 07~
2005. 11 49,856
2006KEPCO - New Seongnam
Inspection of New Ansung Station - Main Transformer (765KV)
* General inspection of 11 TANK for TR 765KV * Initial inspection of 6 TANK for TR 765KV * General inspection of 6 TANK for TR 765KV 3rd ReactorK
2006.04~
2006.06 63,553
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 9 / 18
Additional Construction, Inspection and Maintenance for substation
2006 Daekwang CableIksan Factory - Power Transformer
* 16 distributing boards, Cables installation for 6500m, input cables
2005.05~
2005.06 144,029
2006 KEPCO - Dong SeoulCommon inspection at Dong Seoul P/O Transformer and OLTC predision inspection
* Inspection for OLTC of TR 345KV 2 units, 154KV 37 units and Inspection for NGR 3 units and LA 50 units
2006 .06~
2006. 10 74,679
2006Hyundai Steel - Pohang
75t Furnace TR TAP CHANGER INSPECTION and Filtering insulating oil
* Inspection and filtering of 22.9KV 45/54MVA transformer for furnace
2006. 06~
2006. 07 9,496
2006Hyundai Steel - Pohang
80t Steel Manufacturing Furnace TR TAP CHANGER INSPECTION and Filtering insulating oil
* Inspection and filtering of 22.9KV 65MVA transformer for furnace
2006 .06~
2006. 08 9,496
2006Hyundai Steel - Dangjin
Repair work for 345kv main transformer
* Change bushing of TR 345KV/154KV 166.7/200MVA and filtering check
2006. 07~
2006. 10 8,753
2007 Hwanyoung SteelRepair works for electric furnace transformer and breaker
* 22.9KV 109MVA 1BANK transformer for furnace* Detailed inspection for 154KV 15MVA 2BANK power transformer
2007. 09~
2007. 09 52,784
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 10 / 18
Additional Construction, Inspection and Maintenance for substation
2007 KEPCO - New Incheon
Works for inner S/S GIS precision inspection and UHF sensor installation
* Detailed inspection for 345KV GIS - 4CCT* Detailed inspection for 170KV GIS - 24CCT * 66KV GCB -1CCT
2007. 05~
2008. 01 347,151
2007KEPCO - New Seongnam
Annual suppliers' works for '06-'07
* 16 substations* Power transforming facilities (345KV, 154KV, 22KV TR, GIS, GCB, DS, MOF P.T, C.T, LA, CABLE) inspection, maintenance and repair
2006.02~
2008. 02 1,890,101
2007Daehan Steel - Noksan
Noksan Steel Manufacturing Factory - Installation of transformer for EAF and LF
* Detailed inspection for 22.9KV 52MVA transformer for furnace and I unit of installation* Detailed inspection for 22.9KV 22.5MVA transformer for furnace and 1 unit of installation* 2nd BUS and installation of water cooling cable
2007. 05~
2007. 12 217,230
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 11 / 18
Power Generation
Inspection of Breaker for Power Generation and Transformer
2004Korea East-West Power
Inspection for inner of main transformer of 2nd GT #5, 6 & ST #2, 3
* Detailed inspection for internal TR 18KV/345KV 400MVA
2004.04~
2004.05 38,740
2004 Korea Midland PowerFiltering of insulating oil and detailed inspection for main transformer of GT 1,2
* Inspection for internal TR 154KV 60MVA and filtering
2004.03~
2004.04 22,237
2006Korea South-East Power
Detailed inspection for Mooju Water - Pumping 1, 2
* Detailed inspection for 2 units of 24KV 13000A 100KA(HEK4)
2006. 09~
2007. 05 323,022
2006 “ “
* Detailed inspection for 1 unit of phase transfer disconnect
2006 .08~
2006. 11
Included above
2006Korea East-West Power - Ulsan
Repair work for #1,2 GT Main TR Bushing Oil Leak
* Change of TR 154KV bushing and filtering
2006. 09~
2006. 11 7,360
2006Korea Midland Power - Boryong
Detailed breakdown inspection for GT1, 2 generator and breaker of 3rd station
* Detailed inspection for internal GCB HEC-3 18KV 8000A 100KA
2006. 05~
2006. 06 12,274
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 12 / 18
Inspection of Breaker for Power Generation and Transformer
2006Korea South Power - New Incheon
Detailed breakdown inspection for 3rd GT generator and breaker
* Detailed inspection for GCB HEK-3 124V 10KA
2006. 06~
2006. 10 28,094
2007Korea Western Power -Seo Incheon
Detailed breakdown inspection and repair works for 2nd generator and breaker
* Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-3 24KV 10000A 100KA
2007.01~
2007.02 89,568
2007Korea South Power - New Incheon
4MT 201 #2 COOLER change and filtering insulating oil
* Cooler changing and filtering for TR 154KV 60MVA
2007. 02~
2007. 03 9,353
2007Cheongpyong Water
Pumping#1 S.Tr Detailed inspection and repair work
* Detailed breakdown inspection for TR 154KV 25MVA 1BANK
2007. 05~
2007. 07 10,604
2007Korea South Power - Cheongpyong Water Pumping
#2 S.Tr OLTC detailed inspection
* Detailed breakdown inspection for TR 154KV 25MVA 1BANK OLTC
2007. 06~
2007. 07 40,360
2007Korea Western Power - Seo Incheon
Detailed breakdown inspection for breaker of 1st and 2nd generators
* Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-3 24KV 10000A 100KA * Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-1 24KV 6300A 63KA
2007. 01~
2007. 09 186,108
Power Generation
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 13 / 18
Inspection of Breaker for Power Generation and Transformer
2007
Korea South-East Power - Youngdong
Detailed inspection for 1st transformer
* Detailed inspection and filtering for internal M.TR 154KV 150MVA* Detailed inspection and filtering for internal S.TR 14KV 10MVA
2007. 10~
2007. 11 15,771
Power Generation
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 14 / 18
Electric Rail Road
Installation of Substation and Line for Electric Rail Road
2000 Suwon Stationrelocation work of power transformer facilities at Suwon sub-point
* Re-installation for 24 units of disconnecting switch (2P 72.5KV 800A)* Re-installation for 2 units of autotransformer (55KV/25KV 5MVA)* Re-installation for 3 units of breaker (36KV 1200A)
2000.04~
2000.06 241,367
2001
KORAIL - Subway Construction HQ
Installation of power transformer facilities at Doogye S/S and 6 others of Honam line
* Substation facilities 154KV 1 unit, 72.5KV 7 units (power equipments, lighting, power, electric power source facilities)
2001.12~
2003.12 3,274,814
2001KORAIL - Subway Construction HQ
Installation of lines between Shindo - Gangkyung of Honam line
* Installation of Electric Railway lines 112.423 ㎞ , Supplement lines 112.423 ㎞
2001.11~
2005.06 13,370,180
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 15 / 18
Installation,Repair, Inspection of Substation & Line for Electric Rail Road
2005Daegu Subway Construction HQ
Power transformer work for Daesil substation at subway Line No. 2
* Installation for 22.9KV power cable for 16,364m* Installation of underground lines for 1,856m * installation of truf 2,711m* Transforming facilities (Distributing boards of 17, TR, GIS and others)
2003.02~
2005.08
808,494
2005 KORAIL - SeoulRepair work for power transformer equipments at Jooan substation
* Detailed inspection for GIS AIR COM, P
2005. 02~
2005. 06 43,165
2005 KORAI - Youngju HQRepair works of power transformer at Anjeong and 3 others
* Repair TR 66KV/55KV 10MVA and GIS
2005. 06~
2005. 09 43,320
2005 Aju EngineeringGIS inspection at Wonduk sub-point of Joongan Line and other
* Detailed inspection for GIS 36KV 1P
2005. 07~
2005. 12 22,927
Electric Rail Road
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 16 / 18
Installation,Inspection of Substation & Line for Electric Rail Road
2006 KORAIL - SeeoulRelocation work of rail lines at Ichon station of Kyungwon Line
* Arrangement for Electric Railway lines and supplement lines of 912m, and installation of 14 electric poles* Emergency cable 716m, Protection line and Flashover protection line of 639m
2006.11~
2006.12 79,319
2006 KORAIL - Yangpyong
Detailed breakdown check for gas breaker at Wonju Substation of Joongang Line
* Detailed breakdown inspection for GIS 75KV 1200A 3P
2006. 06~
2006. 08 58,273
Electric Rail Road
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 17 / 18
Power Distribution, House
Installation, Repair, Inspection of Power Distribution, House and Dam
2005 KEPCO - Hwaseong
Works to resolve unbalanced external over load at Sunamgan 80 left distributor
* Installation of 21 poles, Installation of cable 2670m
2005. 05~
2006. 03 62,211
2005 KEPCO - DangjinDetailed inspection for ground equipment in 2005
* Ground breaker 107 units (GAS analysis, Thermal injury diagnosis)
2005. 05~
2005. 06 2,849
2005 KEPCO - Bookbu
Detailed inspection for Ground Breaker at Changdong 17-1 and 120 points
* Ground breaker 120 units (GAS analysis, thermal injury diagnosis)
2005. 06~
2005. 07 4,748
2005 KEPCO - KangnamGas analysis and insulation oil for Gannam street TR3 and 68 points
* Ground breaker 69 units (GAS analysis, thermal injury diagnosis)/ PAD TR OT supplement
2005. 04~
2005. 08 7,597
2005 KEPCO - BookbuGas refill and detailed inspection for year 2005 for PAD breaker
* Ground breaker 92 units (GAS analysis, Thermal injury diagnosis)
2005. 08~
2005. 07 7,914
2006 KEPCO - YonginHigh voltage H work for year 2005 Yongin Branch
* Annual contract for line maintenance for Yongin internal 22KV
2004.12~
2005.12 758,685
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 18 / 18
Inspection, Installation, Repair of Power Distribution, House, Dam
2006 KEPCO - OsanHigh voltage B work for year 2006 Osan Branch
* Annual contract for line maintenance for Osan internal 22KV
2005.12~
2006.12 503,597
2006 KEPCO - HwaseongReinforcement work for unstable facilities at 06 Youngheungji
* Installation of 17 poles, Underground cable 2,304m
2006. 01~
2006. 08 63,864
2006
Korea Water Resources Corp.
Electric work for Daeam Dam Sub-Water way
* Power equipments (Input 22.9KV 600m TR, MOF, 6 distributing boards)* Installation of cable (600V CV 325 ㎟ -1C 3,135m*3 / Low voltage line 7500m)* Tunnel lighting, lighting for building Park
2005.12~
2008.11
578,114
2007 KEPCO-OsanInstallation of 6 innes at Joam S/S
* Installation of 88 poles, Pipe lines 2,922m, Installation of underground cable 8,511m
2007. 03~
2007. 12 387,067
2007Korea National Housing Corp.
Electric work for Seongnam Pangyo Apt. 6th site
* Electric and fire protection works for APT 584 households
2007.01~
2009.12 1,040,415
Power Distribution, House
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed