2
No. Item Pekerjaan Standar Harga Pengujian Waktu Uji 1. Pengujian Laboratorium 1 Triaxial Test (UU) ASTM D 2859-70 Rp500,000.00 1 hari 2 Konsolidasi ASTM D 2435-70, AASTHO T 216-74 Rp300,000.00 8 hari 3 Direct Shear Test ASTM D 3080-72, AASTHO T 236-72 Rp300,000.00 1 hari 4 Unconfined Test ASTM D 2166-66, AASTHO T 208-70 Rp100,000.00 1 hari 5 Berat Jenis (Gs) ASTM D 854-58, AASTHO T 100-74 Rp100,000.00 1 hari 6 Atterberg Limit LL : ASTM D 424-74, AASTHO T 90-74 Rp100,000.00 2 hari PL : ASTM D 423-66, AASTHO 89-74 2 hari 7 Grain Size Analysis ASTM C 136-46, AASTHO 27-74 Rp100,000.00 1 hari 8 Density Test ASTM 2937 Rp100,000.00 2 hari 9 Water Content ASTM D 2216-90, AASTHO T 265 Rp100,000.00 2 hari 10 Permeabilitas Lab. ASTM D 2434 Rp150,000.00 1 hari 11 Pemadatan ASTM D 698-70, AASTHO T 99-74 Rp150,000.00 2 hari Laboratorium 12 CBR Laboratorium ASTM D 1883-73, AASTHO T 193-74 Rp150,000.00 2 hari 2. Pekerjaan Lapangan 1 Bor Mesin/ Meter Rp500,000.00 1 hari Kedalaman + SPT UDS Sample/ Nos Rp100,000.00 1 hari 2 Sondir SNI 2827 : 2008 Rp600,000.00 1 hari 3 Bor Tangan Rp300,000.00 1 hari 4 Permeabilitas Lapangan Rp150,000.00 1 hari 5 CBR Lapangan SNI 1738 : 2011 Rp100,000.00 1 hari 6 Sand Cone ASTM D 1556-82 Rp100,000.00 1 hari 7 SPT ASTM D 1586-84, SNI 4153 : 2008 Rp300,000.00 1 hari 8 Test Pit Rp150,000.00 1 hari 9 Dynamic Cone Rp100,000.00 1 hari Penetrometer 10 Bearing Plate ASTM D 4429-84 Rp250,000.00 1 hari 3. Mobilisasi Peralatan 1 Mobdemob Pindah antar Tergantung jarak Tergantung titik Bor dan lokasi jarak 2 Mobilisasi pekerjaan Rp1,000,000.00 s.d Tergantung Malang Tergantung jarak jarak dan lokasi 3 Mobilisasi pekerjaan Rp1,000,000.00 sd Tergantung luar Malang Tergantung jarak jarak dan lokasi Malang, Kepala Lab. Mekanika Ir. Yulvi Z NIP. 11968

Daftar Harga Pengujian Laboratorium Univ. Brawijaya (SIPIL - MEKTAN)

Embed Size (px)

DESCRIPTION

daftar harga pengujian lab. tanah univ. brawijaya

Citation preview

Sheet1No.Item PekerjaanStandarHarga PengujianWaktu UjiKeterangan1. Pengujian Laboratorium1Triaxial Test (UU)ASTM D 2859-70Rp500,000.001hariSesuai UDS2KonsolidasiASTM D 2435-70, AASTHO T 216-74Rp300,000.008hariSesuai UDS3Direct Shear TestASTM D 3080-72, AASTHO T 236-72Rp300,000.001hariSesuai UDS4Unconfined TestASTM D 2166-66, AASTHO T 208-70Rp100,000.001hari-5Berat Jenis (Gs)ASTM D 854-58, AASTHO T 100-74Rp100,000.001hariSesuai UDS6Atterberg LimitLL : ASTM D 424-74, AASTHO T 90-74Rp100,000.002hariSesuai UDSPL : ASTM D 423-66, AASTHO 89-742hariSesuai UDS7Grain Size AnalysisASTM C 136-46, AASTHO 27-74Rp100,000.001hariSesuai UDS8Density TestASTM 2937Rp100,000.002hariSesuai UDS9Water ContentASTM D 2216-90, AASTHO T 265Rp100,000.002hariSesuai UDS10Permeabilitas Lab.ASTM D 2434Rp150,000.001hari-11PemadatanASTM D 698-70, AASTHO T 99-74Rp150,000.002hari-Laboratorium12CBR LaboratoriumASTM D 1883-73, AASTHO T 193-74Rp150,000.002hari-2. Pekerjaan Lapangan1Bor Mesin/ MeterRp500,000.001hari/per MeterKedalaman + SPTkedalamanUDS Sample/ NosRp100,000.001hari-2SondirSNI 2827 : 2008Rp600,000.001hariMin. 4 titik3Bor TanganRp300,000.001hari/per Meterkedalaman4Permeabilitas LapanganRp150,000.001hari-5CBR LapanganSNI 1738 : 2011Rp100,000.001hariMin. 5 titik6Sand ConeASTM D 1556-82Rp100,000.001hari-7SPTASTM D 1586-84, SNI 4153 : 2008Rp300,000.001hari/per Sampel8Test PitRp150,000.001hari/per Meterkedalaman9Dynamic ConeRp100,000.001hari-Penetrometer10Bearing PlateASTM D 4429-84Rp250,000.001hari/per titik3. Mobilisasi Peralatan1Mobdemob Pindah antarTergantung jarakTergantung-titik Bordan lokasijarak2Mobilisasi pekerjaanRp1,000,000.00s.dTergantungUntukMalangTergantung jarakjarakPekerjaandan lokasiSondir3Mobilisasi pekerjaanRp1,000,000.00sdTergantungTergantungluar MalangTergantung jarakjarakjarakdan lokasiMalang,26 August 2013Kepala Lab. Mekanika Tanah dan GeologiIr. Yulvi Zaika, MT. Dr. EngNIP. 119680707 199403 2 002

Sheet2

Sheet3