174
Copyright © 2014 Samsung SDS Co., Ltd. All rights reserved | Confidential Detailed Drawing for Passive and Facility Version 2.0 2014. 04. 30

Detailed Drawing for Passive and Facility

Embed Size (px)

Citation preview

Page 1: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS Co., Ltd. All rights reserved | Confidential

Detailed Drawing for Passive and Facility

Version 2.0

2014. 04. 30

Page 2: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 2 xxx

Proposal Summary – Civil and Renovation Work

1. Basic Proposal (1)

Item Requirement RFP Ref# Remarks

Partitioning with 10 mm glass including locking facility

100 sft Section VI. 4.2. D

Floor Tiles 100 sft Section VI. 4.2. D

Wall Tiles 300 sft Section VI. 4.2. D

Cable trays and ladder 100 rft Section VI. 4.2. D

Brick Works 100 sft Section VI. 4.2. D

Replacement of Existing Doors

1 door Section VI. 4.2. D

Painting 200 sft Section VI. 4.2. D

Page 3: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 3 xxx

Proposal Summary – Equipment connectivity

1. Basic Proposal (2)

Item Requirement RFP Ref# Remarks

BdREN room to VC Room Fiber connectivity

250 Meter Assumption is made for each site considering both BdREN and VC room will be in the same building and cable running will be through surface conduiting or PVC/ Flexible pipe.

PGCB ODF to Supplier ODF fiber connectivity

Clarification Submission on 26th May 2013 and Contract document 42P clause 5&7

Supplier will provide required number of 42U racks to accommodate DWDM Optical Node, Router, Supplier’s ODF, Rack-mount UPS and ODF to be supplied by last mile connectivity vendor. Supplier will supply 42U rack instead of offered 6U Rack at the same price

A/C outdoor unit connecting pipe with indoor unit

12 Feet Standard Length

Page 4: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 4 xxx

Proposal Summary – Power Cabling

1. Basic Proposal (3)

Item Requirement RFP Ref# Remarks

Generator to ATS connectivity

20 M Consider the Generator with Canopy will be installed beside the building where BdREN and/or VC room is located

ATS to BdREN room’s SDB connectivity

70 M Building existing MDB/DB to BdREN room (presumably located in the same building) average cable distance is assumed as 70M.

ATS to VC room’s SDB connectivity

70 M Building existing MDB/DB to BdREN room (presumably located in the same building) average cable distance is assumed as 70M.

UPS battery bank connection with UPS

5 ft Consider the UPS and Battery bank in the same room

Page 5: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 5 xxx

2. Prerequisites

• Power from the grid to the building MDB should be ready

• Sufficient Space capacity for MCCB should be available at the building MDB

• Sufficient load capacity should be available at the building MDB

• Appropriate grounding should be ready for the Power Equipments

• Appropriate grounding should be ready for the electric system and equipment power supply

Page 6: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 6 xxx

3. Site Wise Variation Summary (1)

Sl. No Site Name Grounding with Distance (B+V) New MDB Power Cable Distance Electrical Equipment (New) Generator - ATS MDB - BdREN Room MDB - VC Room               1 BUET 87M + 90M 87M (revisit)     95M  90M 2 BUTex N125M + 35M 95M + 50M Yes   110M  35M 

3 BUP 20M + 30M 30M + 135M Yes   165M  135M 

4 DU N55M  + N40M 55M+40M Yes 35 M  80M 330M 5 IU N30M + N40M 30M + 40M Yes 60 M 60 M 330M

6 CU 40M + 60M 48M + 80M Yes 96 M 82 M 105 M

7 RU N40M + 30M 30M + 30M Yes 20 M 50 M 30 M8 JSTU N60M + 10M 60M + 10M   100 M 112 M 10M

9 CUET N55M + N55M 55M + 55M Yes 98 M 60M 150 M

10 CVASU N48M + N60M 48M + 60M Yes 30 M 130 M 330 M

11 RUET 15M + 20M 35M + 35M Yes 10 M 140 M 230M 12 Ishwardi (PGCB) 60M  27M     60 M  13 KUET N37M + N30M 37M + 30M   30 M 300 M 90 M

14 Feni (PGCB)            

15 NSTU N55M + N55M 55M + 55M Yes 20 M 215 M 108 M

16 KU N61M + 61M 15M + 61M Yes 100 M 71 M 61 M17 BSMRSTU N60M + 25M 60M + 25M     115 M 25 M18 COU N50M + 50M 40M + 50M Yes 50 M 20 M 50 M19 HSTU 20M + 20M 110M + 40M   136 M 124 M 145M 

20 Faridpur (PGCB) N40M 24M      10M  21 BRUR 20M + 40M 30M + 40M   210 M 50 M 385M 22 Natore (PGCB)            

23 Bogra (PGCB) 50M 60M     50 M  

Page 7: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 7 xxx

3. Site Wise Variation Summary (2)

Sl. No Site Name Grounding with Distance (B+V) New MDB Power Cable Distance

Electrical Equipment (New) Generator - ATS MDB - BdREN Room MDB - VC Room

               

24 BU N25M + 30M 46M + 30M Yes 100 M 108 M 104 M

25 JKKNIU N70M + N70M 70M + 70M Yes 30 M 210 M 190M

26 PSTU N46M + N50M 46M + 50M   40 M 270 M 220 M

27 BAU 5M + N40M 25M + 40M Yes 20 M 60 M 265 M

28 MBSTU N60M + 50M 60M + 50M Yes   150 M 50 M

29 BOU N75M + 15M 75M + 15M Yes 10 M 83 M 15M 

30 NU N168M + 17M 168M + 17M Yes 10 M 206 M  17M

31 Kabirpur (PGCB) 40M 65M     40 M  

32 JU N31M + 35M 31M + 35M Yes 60 M 60 M 35 M

33 BSMRAU N15M 15M     80M

34 DUET N45M + 35M 45M + 35M Yes 40 M 140 M 35 M

35 NSU 34M 130M     34 M  

36 BSMMU            

37 SBAU N30M + 10M 30M + 30M Yes   40 M

38 UGC 30M 130M Yes   130 M  

39 Tongi (PGCB)            

40 Rampura (PGCB) 30M 37M Yes   30 M  

41 JNU N25M + N60M 25M + 60M Yes 20 M 370 M 460 M

42 SAU N40M + 30M 20M + 30M Yes   60M  30M 

43 Shiraj Ganj (PGCB) 40M 24M     40 M  

44 SUST N50M + 25M 50M + 25M Yes 10 M 101 M 25M 

45 PUST N49M + N30M 49M + 30M   50 M 50 M 400 M

46 Ashugonj (PGCB) 40M 55M       40 M  

Page 8: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 8 xxx

1) BUET – Drawing of BdREN Room (DR)

Page 9: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 9 xxx

1) BUET – Drawing of Power Connectivity

Page 10: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 10 xxx

Note: This site’s BoM variation can be given after revisit this site for equipment earthing and proposed DR design finalization

1) BUET – BOM Variation

Page 11: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 11 xxx

2) BUTex – Drawing of BdREN Room

Page 12: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 12 xxx

2) BUTex – Drawing of Power Connectivity

Page 13: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 13 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles  Sft 100 110 10Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 40 -60Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 275 75Light

Set 0 3 3New requirment

0Fiber Meter 250 130 -120

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 110 40MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 35 -35

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

2) BUTex – BOM Variation (1)

Page 14: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 14 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 125 125Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 1 200 199GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

Grounding For BdREN Equipment

2) BUTex – BOM Variation (2)

Page 15: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 15 xxx

3) BUP – Drawing of BdREN Room

Page 16: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 16 xxx

3) BUP – Drawing of Power Connectivity

Page 17: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 17 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 250 150Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 30 -70Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 190 -10Light Set 0 3 3 New requirment

0Fiber Meter 250 145 -105

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0Power Cabling, Switch Gear and Protection From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 165 95MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 135 65AC indoor and outdoor unit connection pipe

Copper pipe for connection between AC indoor unit and outdoor unit Feet 216 604 388

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling of UPS,Generator,AC for VC sytems

3) BUP – BOM Variation (1)

Page 18: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 18 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 20 20Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 0 0Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 40 0 -40Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 40 0 -40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 30 30Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 135 135

BdREN BOM Variation

Electrical Earthing/Grounding

Grounding For BdREN Equipment

3) BUP – BOM Variation (1)

Page 19: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 19 xxx

4) DU – Drawing of BdREN Room

Page 20: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 20 xxx

4) DU – Drawing of Power Connectivity

Page 21: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 21 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facilitySft 100 130 30

Closing existing window

Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 30 -70Replacing existing doors  Set 1 2 1Painting and distempering interior or exterior walls  Sft 200 220 20Light Set 0 3 3 New requirment

0Fiber Meter 250 280 30

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 70 0MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB)Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 35 15

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 330 260

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and

Protection

Power Cabling of UPS,Generator,AC for VC sytems

4) DU – BOM Variation (1)

Page 22: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 22 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 55 55Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 100 100Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

4) DU – BOM Variation (2)

Page 23: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 23 xxx

5) IU – Drawing of BdREN Room

Page 24: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 24 xxx

5) IU – Drawing of Power Connectivity

Page 25: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 25 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 110 10 with 50SFT wall re-plasteringReplacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 540 340Light Set 0 4 4 New requirment

Fiber Meter 250 370 120Underground Fiber Laying Meter 0 290 290Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 50 50From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB)Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 60 40

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 330 330ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

5) IU – BOM Variation (1)

Page 26: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 26 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 30 30Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

5) IU – BOM Variation (2)

Page 27: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 27 xxx

6) CU – Drawing of BdREN Room

Page 28: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 28 xxx

6) CU – Drawing of Power Connectivity

Page 29: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 29 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 110 10Floor tiles  Sft 100 160 60Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 100 0Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 380 180Light Set 0 3 3

0Fiber Meter 250 155 -95

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 72 2MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 96 76

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 105 35

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

6) CU – BOM Variation (1)

Page 30: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 30 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm)Meter 0 25 25 Grounding for BdREN equipments Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding Need permission to 

use existing electrical grounding

Grounding For BdREN Equipment

6) CU – BOM Variation (2)

Page 31: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 31 xxx

7) RU – Drawing of BdREN Room

Page 32: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 32 xxx

7) RU – Drawing of Power Connectivity

Page 33: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 33 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 120 20Floor tiles  Sft 100 160 60Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 40 -60Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 440 240Light Set 0 3 3 New requirement

Fiber Meter 250 60 -190Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB)Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 20 0

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 30 -40

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

7) RU – BOM Variation (1)

Page 34: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 34 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 40 40Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 25 25Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

7) RU – BOM Variation (2)

Page 35: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 35 xxx

8) JSTU – Drawing of BdREN Room

Page 36: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 36 xxx

8) JSTU – Drawing of Power Connectivity

Page 37: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 37 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 260 160Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 850 650Light Set 0 3 3 New requirment

Fiber Meter 250 60 -190Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 102 102From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 100 80

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 10 10ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

8) JSTU – BOM Variation (1)

Page 38: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 38 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 10 10Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 40 40Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

8) JSTU – BOM Variation (2)

Page 39: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 39 xxx

9) CUET – Drawing of BdREN Room

Page 40: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 40 xxx

9) CUET – Drawing of Power Connectivity

Page 41: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 41 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles  Sft 100 140 40Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 0 -100Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 100 -100Light Set 0 3 3

Fiber Meter 250 150 -100Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 50 -20MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 98 78

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 150 80AC indoor and outdoor unit connection pipe

Copper pipe for connection between AC indoor unit and outdoor unit

Feet216 248 32

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

9) CUET – BOM Variation (1)

Page 42: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 42 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 55 55Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 55 55BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 15 15 Grounding for BdREN equipments Job 1 2 1Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

9) CUET – BOM Variation (2)

Page 43: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 43 xxx

10) CVASU – Drawing of BdREN Room

Page 44: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 44 xxx

10) CVASU – Drawing of Power Connectivity

Page 45: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 45 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 260 160Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 30 -70Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 200 0Light Set 0 3 3

0Fiber Meter 250 250 0

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 120 50MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 30 10

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter 70 330 260

AC indoor and outdoor unit connection pipe

Copper pipe for connection between AC indoor unit and outdoor unit Feet216 296 80

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling of UPS,Generator,AC

Power Cabling, Switch Gear and Protection

10) CVASU – BOM Variation (1)

Page 46: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 46 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 48 48Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 40 40 Grounding for BdREN equipments Job 1 2 1Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

10) CVASU – BOM Variation (2)

Page 47: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 47 xxx

11) RUET – Drawing of BdREN Room

Page 48: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 48 xxx

11) RUET – Drawing of Power Connectivity

Page 49: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 49 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 170 70Floor tiles  Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 30 -70Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 250 50Light Set 0 3 3

Fiber Meter 250 260 10Underground Fiber Laying Meter 0 200 200Areal Cable running with pole and GI wire Meter 0 0 0

Power Cabling, Switch Gear and Protection From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 130 60MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 10 -10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 230 230ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling of UPS,Generator,AC for VC sytems

11) RUET – BOM Variation (1)

Page 50: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 50 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 15 15Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 20 20BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 60 60Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding Permission needs 

to use existing electrical grounding

Grounding For BdREN Equipment

11) RUET – BOM Variation (2)

Page 51: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 51 xxx

12) KUET – Drawing of BdREN Room

Page 52: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 52 xxx

12) KUET – Drawing of Power Connectivity

Page 53: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 53 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 210 110Floor tiles  Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 40 -60Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 230 30Light Set 0 3 3 New requirment

0Fiber Meter 250 250 0

Underground Fiber Laying Meter 0 190 190Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 290 220MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 30 10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 90 20AC indoor and outdoor unit connection pipe

Copper pipe for connection between AC indoor unit and outdoor unit Feet216 576 360

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and

Protection

Power Cabling of UPS,Generator,AC for VC sytems

12) KUET – BOM Variation (1)

Page 54: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 54 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 37 37Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

12) KUET – BOM Variation (2)

Page 55: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 55 xxx

13) NSTU – Drawing of BdREN Room

Page 56: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 56 xxx

13) NSTU – Drawing of Power Connectivity

Page 57: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 57 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 125 25Floor tiles  Sft 100 130 30Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 85 -15Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 410 210Light Set 0 3 3

0Fiber Meter 250 250 0

Underground Fiber Laying Meter 0 200 200Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 205 135MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 20 0

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 108 38

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and

Protection

Power Cabling of UPS,Generator,AC for VC sytems

13) NSTU – BOM Variation (1)

Page 58: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 58 xxx

Types of Work Needed

Items Description Unit Proposed Qty Required Qty Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 55 55Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 55 55BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Copper wire 3no. Wire(pure Copper)Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etcLot 2 2 0Civil works for connecting point at the groundJob 2 2 0Standard Copper Lightning ArrestorNos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 55 55 Grounding for  Job 1 2 1Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

13) NSTU – BOM Variation (2)

Page 59: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 59 xxx

14) KU – Drawing of BdREN Room

Page 60: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 60 xxx

14) KU – Drawing of Power Connectivity

Page 61: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 61 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 210 110Floor tiles  Sft 100 110 10Wall tiles Sft 300 220 -80Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 80 -20Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 350 150

Light Set 0 3 3New requirment

0Fiber Meter 250 80 -170

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 61 61From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 100 80

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 61 61ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and

Protection

Power Cabling of UPS,Generator,AC for VC sytems

14) KU – BOM Variation (1)

Page 62: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 62 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 61 61Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 61 61Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 65 65Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

14) KU – BOM Variation (2)

Page 63: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 63 xxx

15) BMRSTU – Drawing of BdREN Room

Page 64: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 64 xxx

15) BMRSTU– Drawing of Power Connectivity

Page 65: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 65 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 260 160Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 440 240Light Set 0 3 3 New requirment

0Fiber Meter 250 60 -190

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 115 115From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 25 25ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70AC indoor and outdoor unit connection pipe

Copper pipe for connection between AC indoor unit and outdoor unit Feet216 360 144

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

15) BMRSTU – BOM Variation (1)

Page 66: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 66 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 25 25Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

15) BMRSTU – BOM Variation (2)

Page 67: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 67 xxx

17) COU – Drawing of BdREN Room

Page 68: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 68 xxx

17) COU – Drawing of Power Connectivity

Page 69: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 69 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 90 -10Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 420 220Light Set 0 3 3

0Fiber Meter 250 60 -190

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 10 -60MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 50 30

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 50 -20

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

17) COU – BOM Variation (1)

Page 70: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 70 xxx

Types of Work Needed

Items Description Unit Proposed Qty Required Qty Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 50 50Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 50 50Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Copper wire 3no. Wire(pure Copper)Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etcLot 1 1 0Civil works for connecting point at the groundJob 1 1 0Standard Copper Lightning ArrestorNos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 30 30 Grounding for  Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

17) COU – BOM Variation (2)

Page 71: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 71 xxx

18) HSTU – Drawing of BdREN Room

Page 72: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 72 xxx

18) HSTU – Drawing of Power Connectivity

Page 73: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 73 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 180 80Floor tiles  Sft 100 160 60Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 50 -50Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 400 200Light Set 0 3 3Fiber Meter 250 170 -80

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 114 114From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos

22 0

MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 25rm Cable) Meter 20 136 116BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 145 145ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70AC indoor and outdoor unit connection pipe

Copper pipe for connection between AC indoor unit and outdoor unit Feet

216 248 32

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

18) HSTU – BOM Variation (1)

Page 74: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 74 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 20 20Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 20 20BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 70 70Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

Grounding For BdREN Equipment

18) HSTU – BOM Variation (2)

Page 75: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 75 xxx

19) BRUR – Drawing of BdREN Room

Page 76: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 76 xxx

19) BRUR – Drawing of Power Connectivity

Page 77: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 77 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation

Partitioning with 10 mm glass including locking facility Sft 100 120 20Floor tiles  Sft 100 150 50Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 110 10Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 450 250Light Set 0 3 3

Fiber Meter 250 410 160Underground Fiber Laying Meter 0 240 240Areal Cable running with pole and GI wire Meter 0 0 0

Power Cabling, Switch Gear and Protection From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 25rm Cable) Meter 20 210 190

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 385 315

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling of UPS,Generator,AC for VC sytems

19) BRUR – BOM Variation (1)

Page 78: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 78 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 20 20Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 70 70Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

Grounding For BdREN Equipment

19) BRUR – BOM Variation (2)

Page 79: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 79 xxx

20) BU – Drawing of BdREN Room

Page 80: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 80 xxx

20) BU – Drawing of Power Connectivity

Page 81: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 81 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 110 10Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 40 -60Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 420 220Light Set 0 3 3 New requirment

0Fiber Meter 250 60 -190

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 98 28MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 100 80

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 104 34

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and

Protection

Power Cabling of UPS,Generator,AC for VC sytems

20) BU – BOM Variation (1)

Page 82: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 82 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 25 25Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 60 60Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

20) BU – BOM Variation (2)

Page 83: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 83 xxx

21) JKKNIU – Drawing of BdREN Room

Page 84: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 84 xxx

21) JKKNIU – Drawing of Power Connectivity

Page 85: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 85 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 50 -50Replacing existing doors  Set 1 0 -1Painting and distempering interior or exterior walls  Sft 200 600 400Light Set 0 3 3

0Fiber Meter 250 300 50

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 200 200

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 200 130MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 30 10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 190 120AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet

216 276 60

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

21) JKKNIU – BOM Variation (1)

Page 86: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 86 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 70 70Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 70 70BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50 Grounding for BdREN equipments Job 1 2 1Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

21) JKKNIU – BOM Variation (2)

Page 87: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 87 xxx

22) PSTU – Drawing of BdREN Room

Page 88: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 88 xxx

22) PSTU – Drawing of Power Connectivity

Page 89: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 89 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 195 95Floor tiles  Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 30 -70Replacing existing doors  Set 1 -1Painting and distempering interior or exterior walls  Sft 200 420 220Light Set 0 3 3 New requirement

Fiber Meter 250 420 170Underground Fiber Laying Meter 0 350 350Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 260 190MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 40 20

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 220 150

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

22) PSTU – BOM Variation (1)

Page 90: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 90 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 46 46Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 100 100Multipoint reference grounding for BdREN equipments

Job1 2 1

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point 

is shifted from equipment grounding

Grounding For BdREN Equipment

22) PSTU – BOM Variation (2)

Page 91: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 91 xxx

23) BAU – Drawing of BdREN Room

Page 92: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 92 xxx

23) BAU – Drawing of Power Connectivity

Page 93: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 93 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 0 -100Replacing existing doors  Set 1 0 -1Painting and distempering interior or exterior walls  Sft 200 0 -200Light Set 0 0 0

0Fiber Meter 250 275 25

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 50 -20MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 20 0

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 265 195

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

23) BAU – BOM Variation (1)

Page 94: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 94 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 5 5Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 20 20 Grounding for BdREN equipments Job 1 2 1Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

23) BAU – BOM Variation (2)

Page 95: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 95 xxx

24) MBSTU – Drawing of BdREN Room

Page 96: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 96 xxx

24) MBSTU – Drawing of Power Connectivity

Page 97: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 97 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 130 30Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 50 -50Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 700 500Light Set 0 3 3

0Fiber Meter 250 70 -180

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 150 150From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 50 50ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet

216 248 32

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

24) MBSTU – BOM Variation (1)

Page 98: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 98 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 25 25 Grounding for BdREN equipments Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

24) MBSTU – BOM Variation (2)

Page 99: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 99 xxx

25) BOU – Drawing of BdREN Room

Page 100: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 100 xxx

25) BOU – Drawing of Power Connectivity

Page 101: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 101 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles  Sft 100 150 50Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 310 210Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls (with replastaring) Sft 200 420 220Light Set 0 0

Fiber Meter 250 45 -205Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 76 76From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 7 -3Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 10 -10

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 15 15ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet

216 264 48

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

25) BOU – BOM Variation (1)

Page 102: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 102 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 75 75Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 15 15Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 26 26 Grounding for BdREN equipments Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

25) BOU – BOM Variation (2)

Page 103: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 103 xxx

26) NU – Drawing of BdREN Room

Page 104: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 104 xxx

26) NU – Drawing of Power Connectivity

Page 105: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 105 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 280 180Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 600 400Light Set 0 3 3

0Fiber Meter 250 25 -225

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 198 198From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 0 0 0MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 8 -2Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 10 -10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 17 17ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

26) NU – BOM Variation (1)

Page 106: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 106 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 168 168Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 17 17Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 13 13 Grounding for BdREN equipments Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 40 0 -40Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 40 0 -40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 168 168Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 17 17

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

26) NU – BOM Variation (2)

Page 107: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 107 xxx

27) JU – Drawing of BdREN Room

Page 108: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 108 xxx

27) JU – Drawing of Power Connectivity

Page 109: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 109 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 110 10Floor tiles  Sft 100 120 20Wall tiles Sft 300 380 80Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 -100Replacing existing doors  Set 1 2 1Painting and distempering interior or exterior walls  Sft 200 100 -100Light Set 0 3 3

0Fiber Meter 250 60 -190

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 50 50From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 60 40

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 35 35ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

27) JU – BOM Variation (1)

Page 110: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 110 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 31 31Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 35 35Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 40 40Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

27) JU – BOM Variation (2)

Page 111: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 111 xxx

28) DUET – Drawing of BdREN Room

Page 112: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 112 xxx

28) DUET – Drawing of Power Connectivity

Page 113: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 113 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 160 60Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 60 -40Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 650 450Light Set 0 3 3

0Fiber Meter 250 35 -215

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 130 130From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 40 20

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 35 35ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

28) DUET – BOM Variation (1)

Page 114: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 114 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 45 45Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 35 35Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 22 22 Grounding for BdREN equipments Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

28) DUET – BOM Variation (2)

Page 115: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 115 xxx

29) NSU – Drawing of BdREN Room

Page 116: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 116 xxx

29) NSU – Drawing of Power Connectivity

Page 117: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 117 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 80 -20Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 0 -100Replacing existing doors  Set 1 0 -1Painting and distempering interior or exterior walls  Sft 200 0 -200Light Set 0 0 0

0Fiber Meter 0 0 0

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 34 -36MCCB 63Amp circuit breaker (for MDB and BdREN Room SDB) Nos 1 2 1MCCB 100Amp circuit breaker (for MDB) Nos 1 0 -1Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 0 0 0

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

0 0 0

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

29) NSU – BOM Variation (1)

Page 118: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 118 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 34 34Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 80 80 Grounding for BdREN equipments Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 40 0 -40Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 130 130Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding Need permission to 

use existing electrical grounding

Grounding For BdREN Equipment

29) NSU – BOM Variation (2)

Page 119: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 119 xxx

30) BSMMU– Drawing of BdREN Room

Page 120: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 120 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 110 10Floor tiles  Sft 100 130 30Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 75 -25Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 250 50Light Set 0 3 3

Fiber Meter 0 200 200Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 30 30

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) MeterFrom ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) MeterMCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) NosMCCB 100Amp circuit breaker (for MDB) NosExisting/New MDB to ATS (BYA 4 x 16rm Cable) Meter

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) MeterATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet

48 80 32

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Variation can be determined after revisit

Power Cabling of UPS,Generator,AC for VC sytems

30) BSMMU– BOM Variation (1)

Page 121: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 121 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) MeterGrounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) MeterBdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) MeterGrounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) MeterGrounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) MeterBdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) MeterCopper wire 3no. Wire(pure Copper) FeetGI pipe Iron metal FeetBoring Charge 100 feet depth JobAccessories Salt,cole, connecting screw etc LotCivil works for connecting point at the ground JobStandard Copper Lightning Arrestor NosConnecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) MeterMultipoint reference grounding for BdREN equipments JobGrounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) MeterGrounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) MeterBdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) MeterGrounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) MeterGrounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) MeterBdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter

BdREN BOM Variation

Electrical Earthing/Grounding

Variation can be determined after revisit

Grounding For BdREN Equipment

Variation can be determined after revisit

30) BSMMU– BOM Variation (2)

Page 122: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 122 xxx

31) SBAU– Drawing of BdREN Room

Page 123: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 123 xxx

31) SBAU– Drawing of Power Connectivity

Page 124: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 124 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 125 25Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 0 -100Replacing existing doors  Set 1 0 -1Painting and distempering interior or exterior walls  Sft 200 350 150Light Set 0 0 0

Fiber Meter 0 165 165 New requirementUnderground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 0 0 0

UPS Battery bank connectivity

Cable for UPS battery bank connection with UPS (2x) Feet10 200 190

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

0 0 0

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

31) SBAU– BOM Variation (1)

Page 125: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 125 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 10 10BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 30 30 Grounding for BdREN equipments Job 1 2 1Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

31) SBAU– BOM Variation (2)

Page 126: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 126 xxx

32) UGC – Drawing of BdREN Room (DC)

Page 127: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 127 xxx

32) UGC – Drawing of Power Connectivity

Page 128: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 128 xxx

33) JNU – Drawing of BdREN Room

Page 129: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 129 xxx

33) JNU – Drawing of Power Connectivity

Page 130: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 130 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 80 -20Floor tiles  Sft 100 130 30Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 50 -50Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 150 -50Light Set 0 1 1

0Fiber Meter 250 500 250

Underground Fiber Laying Meter 0 15 15Areal Cable running with pole and GI wire Meter 0 365 365

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 360 290MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 20 0

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 460 390AC indoor and outdoor unit connection pipe

Copper pipe for connection between AC indoor unit and outdoor unit

Feet216 256 40

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

33) JNU – BOM Variation (1)

Page 131: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 131 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 25 25Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 45 45 Grounding for BdREN equipments Job 1 2 1Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

33) JNU – BOM Variation (2)

Page 132: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 132 xxx

34) SAU – Drawing of BdREN Room

Page 133: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 133 xxx

34) SAU – Drawing of Power Connectivity

Page 134: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 134 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation

Partitioning with 10 mm glass including locking facility Sft 100 70 -30Floor tiles  Sft 100 140 40Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 40 -60Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 410 210Light Set 0 3 3

0Fiber Meter 250 70 -180

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 60 60From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 30 30ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

34) SAU – BOM Variation (1)

Page 135: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 135 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 82 82Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

34) SAU – BOM Variation (2)

Page 136: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 136 xxx

35) SUST – Drawing of BdREN Room

Page 137: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 137 xxx

35) SUST – Drawing of Power Connectivity

Page 138: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 138 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles  Sft 100 150 50Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 120 20Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 520 320Light Set 0 3 3

0Fiber Meter 250 55 -195

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 93 93From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 8 -2Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 10 -10

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 25 25ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 0 -70

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

35) SUST – BOM Variation (1)

Page 139: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 139 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 25 25Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 70 70Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

35) SUST – BOM Variation (2)

Page 140: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 140 xxx

36) PUST – Drawing of BdREN Room

Page 141: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 141 xxx

36) PUST – Drawing of Power Connectivity

Page 142: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 142 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles  Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 40 -60Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 430 230Light Set 0 3 3

Fiber Meter 250 380 130Underground Fiber Laying Meter 0 300 300Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 50 30

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 400 330AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet

216 248 32

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

36) PUST – BOM Variation (1)

Page 143: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 143 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 49 49Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 80 80Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

One boring point is shifted from equipment grounding

Grounding For BdREN Equipment

36) PUST – BOM Variation (2)

Page 144: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 144 xxx

37) BSMRAU – Drawing of Power Connectivity

Page 145: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 145 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 0 0 0Floor tiles  Sft 0 0 0Wall tiles Sft 0 0 0Supplying and fixing cable trays or ladder Rft 0 0 0Brick works including plastering  Sft 0 0 0Replacing existing doors  Set 0 0 0Painting and distempering interior or exterior walls  Sft 0 0 0Light Set 0 0 0

0Fiber Meter 0 0 0

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 0 0 0MCCB 63Amp circuit breaker (for MDB and VC Room SDB) Nos 1 2 1MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 0 0 0

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

70 80 10

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

37) BSMRAU – BOM Variation (1)

Page 146: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 146 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 15 15BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 0 1 1Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding One boring point is 

shifted from equipment grounding

Grounding For BdREN Equipment

37) BSMRAU – BOM Variation (2)

Page 147: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 147 xxx

38) Rampura PGCB – Drawing or BdREN Rom

Page 148: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 148 xxx

38) Rampura PGCB – Drawing or Power Connectivity

Page 149: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 149 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 0 -100Brick works including plastering  Sft 100 0 -100Replacing existing doors  Set 1 0 -1Painting and distempering interior or exterior walls  Sft 200 0 -200Light Set 0 0 0

0Fiber Meter 0 0 0

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 30 -40MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0UPS Battery bank connectivity

Cable for UPS battery bank connection with UPS (2x) Feet10 200 190

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

0 0 0

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

38) Rampura PGCB – BOM Variation (1)

Page 150: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 150 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 30 30 Grounding for BdREN equipments Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding Need permission to 

use existing electrical grounding

Grounding For BdREN Equipment

38) Rampura PGCB – BOM Variation (2)

Page 151: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 151 xxx

39) Kabirpur PGCB – Drawing of BdREN Room

Page 152: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 152 xxx

39) Kabirpur PGCB – Drawing of Power Connectivity

Page 153: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 153 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 0 -100Brick works including plastering  Sft 100 0 -100Replacing existing doors  Set 1 0 -1Painting and distempering interior or exterior walls  Sft 200 0 -200Light Set 0 0 0

0Fiber Meter 0 0 0

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

0 0 0AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet

48 88 40

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

39) Kabirpur PGCB – BOM Variation (1)

Page 154: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 154 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 30 30 Grounding for BdREN equipments Job 1 1 0Grounding point to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding Need permission to 

use existing electrical grounding

Grounding For BdREN Equipment

39) Kabirpur PGCB – BOM Variation (2)

Page 155: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 155 xxx

40) Ashugonj PGCB – Drawing of BdREN Room

Page 156: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 156 xxx

40) Ashugonj PGCB – Drawing of Power Connectivity

Page 157: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 157 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 0 0 0Floor tiles  Sft 0 0 0Wall tiles Sft 0 0 0Supplying and fixing cable trays or ladder Rft 0 0 0Brick works including plastering  Sft 0 0 0Replacing existing doors  Set 0 0 0Painting and distempering interior or exterior walls  Sft 0 0 0Light Set 0 0 0

Fiber Meter 0 0 0Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for MDB and BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

0 0 0AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet

48 120 72

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

40) Ashugonj PGCB – BOM Variation (1)

Page 158: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 158 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 30 30Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

Grounding For BdREN Equipment

40) Ashugonj PGCB – BOM Variation (2)

Page 159: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 159 xxx

41) Ishwardi PGCB – Drawing of BdREN Room

Page 160: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 160 xxx

41) Ishwardi PGCB – Drawing of Power Connectivity

Page 161: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 161 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 230 130Floor tiles  Sft 100 100 0Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering  Sft 100 0 -100Replacing existing doors  Set 1 1 0Painting and distempering interior or exterior walls  Sft 200 300 100Light Set 0 3 3

Fiber Meter 0 0 0Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 60 -10MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

0 0 0

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

41) Ishwardi PGCB – BOM Variation (1)

Page 162: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 162 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 30 30Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

Grounding For BdREN Equipment

41) Ishwardi PGCB – BOM Variation (2)

Page 163: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 163 xxx

42) Shirajgonj PGCB – Drawing of BdREN Room

Page 164: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 164 xxx

42) Shirajgonj PGCB – Drawing of Power Connectivity

Page 165: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 165 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 0 -100Brick works including plastering  Sft 100 0 -100Replacing existing doors  Set 1 0 -1Painting and distempering interior or exterior walls  Sft 200 820 620Light Set 0 2 2

0Fiber Meter 0 0 0

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0Power Cabling of UPS,Generator,AC for VC sytems

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter

0 0 0UPS Battery bank connectivity

Cable for UPS battery bank connection with UPS (2x) Feet10 220 210

ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter 0 0 0AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet

48 80 32

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

42) Shirajgonj PGCB – BOM Variation (1)

Page 166: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 166 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 30 30Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

Need Permission to use existing electrical grounding

Grounding For BdREN Equipment

42) Shirajgonj PGCB – BOM Variation (2)

Page 167: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 167 xxx

43) Faridpur PGCB – Drawing of BdREN Room

Page 168: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 168 xxx

43) Faridpur PGCB – Drawing of Power Connectivity

Page 169: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 169 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 100 350 250Floor tiles  Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 60 -40Brick works including plastering and painting for closing existing doors or windows

Sft 100 0 -100

Replacing existing doors  Set 1 0 -1Painting and distempering interior or exterior walls  Sft 200 130 -70 (With 50SFT re-plastering)Light Set 0 3 3

Fiber Meter 0 0 0Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 10 -60MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

0 0 0

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

43) Faridpur PGCB – BOM Variation (1)

Page 170: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 170 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 40 40Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

Grounding For BdREN Equipment

43) Faridpur PGCB – BOM Variation (2)

Page 171: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 171 xxx

44) Bogra PGCB – Drawing of BdREN Room

Page 172: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 172 xxx

44) Bogra PGCB – Drawing of Power Connectivity

Page 173: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 173 xxx

Types of Work Needed Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Partitioning with 10 mm glass including locking facility Sft 0 0 0Floor tiles  Sft 0 0 0Wall tiles Sft 0 0 0Supplying and fixing cable trays or ladder Rft 0 0 0Brick works including plastering  Sft 0 0 0Replacing existing doors  Set 0 0 0Painting and distempering interior or exterior walls  Sft 0 0 0Light Set 0 0 0

0Fiber Meter 0 0 0

Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0

0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 50 -20MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10

0UPS Battery bank connectivity

Cable for UPS battery bank connection with UPS (2x) Feet10 120 110

BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter

0 0 0

BdREN BOM Variation

Civil/ Renovation work

Optical fiber

Power Cabling, Switch Gear and Protection

Power Cabling of UPS,Generator,AC for VC sytems

44) Bogra PGCB – BOM Variation (1)

Page 174: Detailed Drawing for Passive and Facility

Copyright © 2014 Samsung SDS All rights reserved | Confidential 174 xxx

Types of Work Needed

Items Description Unit Proposed Qty

Required Qty

Variation Remarks

Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 30 30Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to  BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to  VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0

BdREN BOM Variation

Electrical Earthing/Grounding

Grounding For BdREN Equipment

44) Bogra PGCB – BOM Variation (2)