Copyright © 2014 Samsung SDS All rights reserved | Confidential 2 xxx
Proposal Summary – Civil and Renovation Work
1. Basic Proposal (1)
Item Requirement RFP Ref# Remarks
Partitioning with 10 mm glass including locking facility
100 sft Section VI. 4.2. D
Floor Tiles 100 sft Section VI. 4.2. D
Wall Tiles 300 sft Section VI. 4.2. D
Cable trays and ladder 100 rft Section VI. 4.2. D
Brick Works 100 sft Section VI. 4.2. D
Replacement of Existing Doors
1 door Section VI. 4.2. D
Painting 200 sft Section VI. 4.2. D
Copyright © 2014 Samsung SDS All rights reserved | Confidential 3 xxx
Proposal Summary – Equipment connectivity
1. Basic Proposal (2)
Item Requirement RFP Ref# Remarks
BdREN room to VC Room Fiber connectivity
250 Meter Assumption is made for each site considering both BdREN and VC room will be in the same building and cable running will be through surface conduiting or PVC/ Flexible pipe.
PGCB ODF to Supplier ODF fiber connectivity
Clarification Submission on 26th May 2013 and Contract document 42P clause 5&7
Supplier will provide required number of 42U racks to accommodate DWDM Optical Node, Router, Supplier’s ODF, Rack-mount UPS and ODF to be supplied by last mile connectivity vendor. Supplier will supply 42U rack instead of offered 6U Rack at the same price
A/C outdoor unit connecting pipe with indoor unit
12 Feet Standard Length
Copyright © 2014 Samsung SDS All rights reserved | Confidential 4 xxx
Proposal Summary – Power Cabling
1. Basic Proposal (3)
Item Requirement RFP Ref# Remarks
Generator to ATS connectivity
20 M Consider the Generator with Canopy will be installed beside the building where BdREN and/or VC room is located
ATS to BdREN room’s SDB connectivity
70 M Building existing MDB/DB to BdREN room (presumably located in the same building) average cable distance is assumed as 70M.
ATS to VC room’s SDB connectivity
70 M Building existing MDB/DB to BdREN room (presumably located in the same building) average cable distance is assumed as 70M.
UPS battery bank connection with UPS
5 ft Consider the UPS and Battery bank in the same room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 5 xxx
2. Prerequisites
• Power from the grid to the building MDB should be ready
• Sufficient Space capacity for MCCB should be available at the building MDB
• Sufficient load capacity should be available at the building MDB
• Appropriate grounding should be ready for the Power Equipments
• Appropriate grounding should be ready for the electric system and equipment power supply
Copyright © 2014 Samsung SDS All rights reserved | Confidential 6 xxx
3. Site Wise Variation Summary (1)
Sl. No Site Name Grounding with Distance (B+V) New MDB Power Cable Distance Electrical Equipment (New) Generator - ATS MDB - BdREN Room MDB - VC Room 1 BUET 87M + 90M 87M (revisit) 95M 90M 2 BUTex N125M + 35M 95M + 50M Yes 110M 35M
3 BUP 20M + 30M 30M + 135M Yes 165M 135M
4 DU N55M + N40M 55M+40M Yes 35 M 80M 330M 5 IU N30M + N40M 30M + 40M Yes 60 M 60 M 330M
6 CU 40M + 60M 48M + 80M Yes 96 M 82 M 105 M
7 RU N40M + 30M 30M + 30M Yes 20 M 50 M 30 M8 JSTU N60M + 10M 60M + 10M 100 M 112 M 10M
9 CUET N55M + N55M 55M + 55M Yes 98 M 60M 150 M
10 CVASU N48M + N60M 48M + 60M Yes 30 M 130 M 330 M
11 RUET 15M + 20M 35M + 35M Yes 10 M 140 M 230M 12 Ishwardi (PGCB) 60M 27M 60 M 13 KUET N37M + N30M 37M + 30M 30 M 300 M 90 M
14 Feni (PGCB)
15 NSTU N55M + N55M 55M + 55M Yes 20 M 215 M 108 M
16 KU N61M + 61M 15M + 61M Yes 100 M 71 M 61 M17 BSMRSTU N60M + 25M 60M + 25M 115 M 25 M18 COU N50M + 50M 40M + 50M Yes 50 M 20 M 50 M19 HSTU 20M + 20M 110M + 40M 136 M 124 M 145M
20 Faridpur (PGCB) N40M 24M 10M 21 BRUR 20M + 40M 30M + 40M 210 M 50 M 385M 22 Natore (PGCB)
23 Bogra (PGCB) 50M 60M 50 M
Copyright © 2014 Samsung SDS All rights reserved | Confidential 7 xxx
3. Site Wise Variation Summary (2)
Sl. No Site Name Grounding with Distance (B+V) New MDB Power Cable Distance
Electrical Equipment (New) Generator - ATS MDB - BdREN Room MDB - VC Room
24 BU N25M + 30M 46M + 30M Yes 100 M 108 M 104 M
25 JKKNIU N70M + N70M 70M + 70M Yes 30 M 210 M 190M
26 PSTU N46M + N50M 46M + 50M 40 M 270 M 220 M
27 BAU 5M + N40M 25M + 40M Yes 20 M 60 M 265 M
28 MBSTU N60M + 50M 60M + 50M Yes 150 M 50 M
29 BOU N75M + 15M 75M + 15M Yes 10 M 83 M 15M
30 NU N168M + 17M 168M + 17M Yes 10 M 206 M 17M
31 Kabirpur (PGCB) 40M 65M 40 M
32 JU N31M + 35M 31M + 35M Yes 60 M 60 M 35 M
33 BSMRAU N15M 15M 80M
34 DUET N45M + 35M 45M + 35M Yes 40 M 140 M 35 M
35 NSU 34M 130M 34 M
36 BSMMU
37 SBAU N30M + 10M 30M + 30M Yes 40 M
38 UGC 30M 130M Yes 130 M
39 Tongi (PGCB)
40 Rampura (PGCB) 30M 37M Yes 30 M
41 JNU N25M + N60M 25M + 60M Yes 20 M 370 M 460 M
42 SAU N40M + 30M 20M + 30M Yes 60M 30M
43 Shiraj Ganj (PGCB) 40M 24M 40 M
44 SUST N50M + 25M 50M + 25M Yes 10 M 101 M 25M
45 PUST N49M + N30M 49M + 30M 50 M 50 M 400 M
46 Ashugonj (PGCB) 40M 55M 40 M
Copyright © 2014 Samsung SDS All rights reserved | Confidential 8 xxx
1) BUET – Drawing of BdREN Room (DR)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 9 xxx
1) BUET – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 10 xxx
Note: This site’s BoM variation can be given after revisit this site for equipment earthing and proposed DR design finalization
1) BUET – BOM Variation
Copyright © 2014 Samsung SDS All rights reserved | Confidential 11 xxx
2) BUTex – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 12 xxx
2) BUTex – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 13 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles Sft 100 110 10Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 40 -60Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 275 75Light
Set 0 3 3New requirment
0Fiber Meter 250 130 -120
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 110 40MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 35 -35
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
2) BUTex – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 14 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 125 125Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 1 200 199GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
Grounding For BdREN Equipment
2) BUTex – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 15 xxx
3) BUP – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 16 xxx
3) BUP – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 17 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 250 150Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 30 -70Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 190 -10Light Set 0 3 3 New requirment
0Fiber Meter 250 145 -105
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0Power Cabling, Switch Gear and Protection From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 165 95MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 135 65AC indoor and outdoor unit connection pipe
Copper pipe for connection between AC indoor unit and outdoor unit Feet 216 604 388
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling of UPS,Generator,AC for VC sytems
3) BUP – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 18 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 20 20Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 0 0Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 40 0 -40Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 40 0 -40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 30 30Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 135 135
BdREN BOM Variation
Electrical Earthing/Grounding
Grounding For BdREN Equipment
3) BUP – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 19 xxx
4) DU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 20 xxx
4) DU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 21 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facilitySft 100 130 30
Closing existing window
Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 30 -70Replacing existing doors Set 1 2 1Painting and distempering interior or exterior walls Sft 200 220 20Light Set 0 3 3 New requirment
0Fiber Meter 250 280 30
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 70 0MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB)Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 35 15
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 330 260
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and
Protection
Power Cabling of UPS,Generator,AC for VC sytems
4) DU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 22 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 55 55Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 100 100Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
4) DU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 23 xxx
5) IU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 24 xxx
5) IU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 25 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 110 10 with 50SFT wall re-plasteringReplacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 540 340Light Set 0 4 4 New requirment
Fiber Meter 250 370 120Underground Fiber Laying Meter 0 290 290Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 50 50From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB)Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 60 40
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 330 330ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
5) IU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 26 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 30 30Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
5) IU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 27 xxx
6) CU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 28 xxx
6) CU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 29 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 110 10Floor tiles Sft 100 160 60Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 100 0Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 380 180Light Set 0 3 3
0Fiber Meter 250 155 -95
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 72 2MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 96 76
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 105 35
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
6) CU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 30 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm)Meter 0 25 25 Grounding for BdREN equipments Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding Need permission to
use existing electrical grounding
Grounding For BdREN Equipment
6) CU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 31 xxx
7) RU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 32 xxx
7) RU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 33 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 120 20Floor tiles Sft 100 160 60Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 40 -60Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 440 240Light Set 0 3 3 New requirement
Fiber Meter 250 60 -190Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB)Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 20 0
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 30 -40
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
7) RU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 34 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 40 40Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 25 25Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
7) RU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 35 xxx
8) JSTU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 36 xxx
8) JSTU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 37 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 260 160Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 850 650Light Set 0 3 3 New requirment
Fiber Meter 250 60 -190Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 102 102From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 100 80
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 10 10ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
8) JSTU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 38 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 10 10Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 40 40Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
8) JSTU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 39 xxx
9) CUET – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 40 xxx
9) CUET – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 41 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles Sft 100 140 40Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 0 -100Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 100 -100Light Set 0 3 3
Fiber Meter 250 150 -100Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 50 -20MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 98 78
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 150 80AC indoor and outdoor unit connection pipe
Copper pipe for connection between AC indoor unit and outdoor unit
Feet216 248 32
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
9) CUET – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 42 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 55 55Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 55 55BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 15 15 Grounding for BdREN equipments Job 1 2 1Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
9) CUET – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 43 xxx
10) CVASU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 44 xxx
10) CVASU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 45 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 260 160Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 30 -70Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 200 0Light Set 0 3 3
0Fiber Meter 250 250 0
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 120 50MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 30 10
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter 70 330 260
AC indoor and outdoor unit connection pipe
Copper pipe for connection between AC indoor unit and outdoor unit Feet216 296 80
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling of UPS,Generator,AC
Power Cabling, Switch Gear and Protection
10) CVASU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 46 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 48 48Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 40 40 Grounding for BdREN equipments Job 1 2 1Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
10) CVASU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 47 xxx
11) RUET – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 48 xxx
11) RUET – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 49 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 170 70Floor tiles Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 30 -70Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 250 50Light Set 0 3 3
Fiber Meter 250 260 10Underground Fiber Laying Meter 0 200 200Areal Cable running with pole and GI wire Meter 0 0 0
Power Cabling, Switch Gear and Protection From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 130 60MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 10 -10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 230 230ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling of UPS,Generator,AC for VC sytems
11) RUET – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 50 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 15 15Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 20 20BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 60 60Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding Permission needs
to use existing electrical grounding
Grounding For BdREN Equipment
11) RUET – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 51 xxx
12) KUET – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 52 xxx
12) KUET – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 53 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 210 110Floor tiles Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 40 -60Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 230 30Light Set 0 3 3 New requirment
0Fiber Meter 250 250 0
Underground Fiber Laying Meter 0 190 190Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 290 220MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 30 10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 90 20AC indoor and outdoor unit connection pipe
Copper pipe for connection between AC indoor unit and outdoor unit Feet216 576 360
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and
Protection
Power Cabling of UPS,Generator,AC for VC sytems
12) KUET – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 54 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 37 37Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
12) KUET – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 55 xxx
13) NSTU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 56 xxx
13) NSTU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 57 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 125 25Floor tiles Sft 100 130 30Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 85 -15Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 410 210Light Set 0 3 3
0Fiber Meter 250 250 0
Underground Fiber Laying Meter 0 200 200Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 205 135MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 20 0
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 108 38
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and
Protection
Power Cabling of UPS,Generator,AC for VC sytems
13) NSTU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 58 xxx
Types of Work Needed
Items Description Unit Proposed Qty Required Qty Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 55 55Grounding point to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 55 55BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Copper wire 3no. Wire(pure Copper)Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etcLot 2 2 0Civil works for connecting point at the groundJob 2 2 0Standard Copper Lightning ArrestorNos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 55 55 Grounding for Job 1 2 1Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
13) NSTU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 59 xxx
14) KU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 60 xxx
14) KU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 61 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 210 110Floor tiles Sft 100 110 10Wall tiles Sft 300 220 -80Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 80 -20Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 350 150
Light Set 0 3 3New requirment
0Fiber Meter 250 80 -170
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 61 61From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 100 80
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 61 61ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and
Protection
Power Cabling of UPS,Generator,AC for VC sytems
14) KU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 62 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 61 61Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 61 61Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 65 65Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
14) KU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 63 xxx
15) BMRSTU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 64 xxx
15) BMRSTU– Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 65 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 260 160Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 440 240Light Set 0 3 3 New requirment
0Fiber Meter 250 60 -190
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 115 115From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 25 25ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70AC indoor and outdoor unit connection pipe
Copper pipe for connection between AC indoor unit and outdoor unit Feet216 360 144
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
15) BMRSTU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 66 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 25 25Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
15) BMRSTU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 67 xxx
17) COU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 68 xxx
17) COU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 69 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 90 -10Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 420 220Light Set 0 3 3
0Fiber Meter 250 60 -190
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 10 -60MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 50 30
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 50 -20
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
17) COU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 70 xxx
Types of Work Needed
Items Description Unit Proposed Qty Required Qty Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 50 50Grounding point to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 50 50Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Copper wire 3no. Wire(pure Copper)Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etcLot 1 1 0Civil works for connecting point at the groundJob 1 1 0Standard Copper Lightning ArrestorNos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 30 30 Grounding for Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable)Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable)Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
17) COU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 71 xxx
18) HSTU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 72 xxx
18) HSTU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 73 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 180 80Floor tiles Sft 100 160 60Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 50 -50Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 400 200Light Set 0 3 3Fiber Meter 250 170 -80
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 114 114From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos
22 0
MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 25rm Cable) Meter 20 136 116BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 145 145ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70AC indoor and outdoor unit connection pipe
Copper pipe for connection between AC indoor unit and outdoor unit Feet
216 248 32
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
18) HSTU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 74 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 20 20Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 20 20BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 70 70Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
Grounding For BdREN Equipment
18) HSTU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 75 xxx
19) BRUR – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 76 xxx
19) BRUR – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 77 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation
Partitioning with 10 mm glass including locking facility Sft 100 120 20Floor tiles Sft 100 150 50Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 110 10Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 450 250Light Set 0 3 3
Fiber Meter 250 410 160Underground Fiber Laying Meter 0 240 240Areal Cable running with pole and GI wire Meter 0 0 0
Power Cabling, Switch Gear and Protection From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 25rm Cable) Meter 20 210 190
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 385 315
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling of UPS,Generator,AC for VC sytems
19) BRUR – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 78 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 20 20Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 70 70Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
Grounding For BdREN Equipment
19) BRUR – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 79 xxx
20) BU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 80 xxx
20) BU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 81 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 110 10Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 40 -60Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 420 220Light Set 0 3 3 New requirment
0Fiber Meter 250 60 -190
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 98 28MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 100 80
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 104 34
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and
Protection
Power Cabling of UPS,Generator,AC for VC sytems
20) BU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 82 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 25 25Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 60 60Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
20) BU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 83 xxx
21) JKKNIU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 84 xxx
21) JKKNIU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 85 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 50 -50Replacing existing doors Set 1 0 -1Painting and distempering interior or exterior walls Sft 200 600 400Light Set 0 3 3
0Fiber Meter 250 300 50
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 200 200
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 200 130MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 30 10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 190 120AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet
216 276 60
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
21) JKKNIU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 86 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 70 70Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 70 70BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50 Grounding for BdREN equipments Job 1 2 1Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
21) JKKNIU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 87 xxx
22) PSTU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 88 xxx
22) PSTU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 89 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 195 95Floor tiles Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 30 -70Replacing existing doors Set 1 -1Painting and distempering interior or exterior walls Sft 200 420 220Light Set 0 3 3 New requirement
Fiber Meter 250 420 170Underground Fiber Laying Meter 0 350 350Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 260 190MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 40 20
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 220 150
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
22) PSTU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 90 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 46 46Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm)Meter 0 100 100Multipoint reference grounding for BdREN equipments
Job1 2 1
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point
is shifted from equipment grounding
Grounding For BdREN Equipment
22) PSTU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 91 xxx
23) BAU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 92 xxx
23) BAU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 93 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 0 -100Replacing existing doors Set 1 0 -1Painting and distempering interior or exterior walls Sft 200 0 -200Light Set 0 0 0
0Fiber Meter 250 275 25
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 50 -20MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 20 0
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 265 195
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
23) BAU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 94 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 5 5Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 20 20 Grounding for BdREN equipments Job 1 2 1Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
23) BAU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 95 xxx
24) MBSTU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 96 xxx
24) MBSTU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 97 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 130 30Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 50 -50Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 700 500Light Set 0 3 3
0Fiber Meter 250 70 -180
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 150 150From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 50 50ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet
216 248 32
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
24) MBSTU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 98 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 25 25 Grounding for BdREN equipments Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
24) MBSTU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 99 xxx
25) BOU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 100 xxx
25) BOU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 101 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles Sft 100 150 50Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 310 210Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls (with replastaring) Sft 200 420 220Light Set 0 0
Fiber Meter 250 45 -205Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 76 76From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 7 -3Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 10 -10
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 15 15ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet
216 264 48
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
25) BOU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 102 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 75 75Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 15 15Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 26 26 Grounding for BdREN equipments Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
25) BOU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 103 xxx
26) NU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 104 xxx
26) NU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 105 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 280 180Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 600 400Light Set 0 3 3
0Fiber Meter 250 25 -225
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 198 198From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 0 0 0MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 8 -2Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 10 -10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 17 17ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
26) NU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 106 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 168 168Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 17 17Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 13 13 Grounding for BdREN equipments Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 40 0 -40Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 40 0 -40BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 168 168Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 17 17
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
26) NU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 107 xxx
27) JU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 108 xxx
27) JU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 109 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 110 10Floor tiles Sft 100 120 20Wall tiles Sft 300 380 80Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 -100Replacing existing doors Set 1 2 1Painting and distempering interior or exterior walls Sft 200 100 -100Light Set 0 3 3
0Fiber Meter 250 60 -190
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 50 50From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 60 40
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 35 35ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
27) JU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 110 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 31 31Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 35 35Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 40 40Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
27) JU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 111 xxx
28) DUET – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 112 xxx
28) DUET – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 113 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 160 60Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 60 -40Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 650 450Light Set 0 3 3
0Fiber Meter 250 35 -215
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 130 130From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 40 20
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 35 35ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
28) DUET – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 114 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 45 45Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 35 35Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 22 22 Grounding for BdREN equipments Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
28) DUET – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 115 xxx
29) NSU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 116 xxx
29) NSU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 117 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 80 -20Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 0 -100Replacing existing doors Set 1 0 -1Painting and distempering interior or exterior walls Sft 200 0 -200Light Set 0 0 0
0Fiber Meter 0 0 0
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 34 -36MCCB 63Amp circuit breaker (for MDB and BdREN Room SDB) Nos 1 2 1MCCB 100Amp circuit breaker (for MDB) Nos 1 0 -1Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 0 0 0
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
0 0 0
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
29) NSU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 118 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 34 34Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 80 80 Grounding for BdREN equipments Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 40 0 -40Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 130 130Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding Need permission to
use existing electrical grounding
Grounding For BdREN Equipment
29) NSU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 119 xxx
30) BSMMU– Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 120 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 110 10Floor tiles Sft 100 130 30Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 75 -25Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 250 50Light Set 0 3 3
Fiber Meter 0 200 200Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 30 30
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) MeterFrom ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) MeterMCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) NosMCCB 100Amp circuit breaker (for MDB) NosExisting/New MDB to ATS (BYA 4 x 16rm Cable) Meter
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) MeterATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet
48 80 32
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Variation can be determined after revisit
Power Cabling of UPS,Generator,AC for VC sytems
30) BSMMU– BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 121 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) MeterGrounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) MeterBdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) MeterGrounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) MeterGrounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) MeterBdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) MeterCopper wire 3no. Wire(pure Copper) FeetGI pipe Iron metal FeetBoring Charge 100 feet depth JobAccessories Salt,cole, connecting screw etc LotCivil works for connecting point at the ground JobStandard Copper Lightning Arrestor NosConnecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) MeterMultipoint reference grounding for BdREN equipments JobGrounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) MeterGrounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) MeterBdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) MeterGrounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) MeterGrounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) MeterBdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter
BdREN BOM Variation
Electrical Earthing/Grounding
Variation can be determined after revisit
Grounding For BdREN Equipment
Variation can be determined after revisit
30) BSMMU– BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 122 xxx
31) SBAU– Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 123 xxx
31) SBAU– Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 124 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 125 25Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 0 -100Replacing existing doors Set 1 0 -1Painting and distempering interior or exterior walls Sft 200 350 150Light Set 0 0 0
Fiber Meter 0 165 165 New requirementUnderground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 0 0 0
UPS Battery bank connectivity
Cable for UPS battery bank connection with UPS (2x) Feet10 200 190
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
0 0 0
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
31) SBAU– BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 125 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 10 10BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 30 30 Grounding for BdREN equipments Job 1 2 1Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
31) SBAU– BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 126 xxx
32) UGC – Drawing of BdREN Room (DC)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 127 xxx
32) UGC – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 128 xxx
33) JNU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 129 xxx
33) JNU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 130 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 80 -20Floor tiles Sft 100 130 30Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 50 -50Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 150 -50Light Set 0 1 1
0Fiber Meter 250 500 250
Underground Fiber Laying Meter 0 15 15Areal Cable running with pole and GI wire Meter 0 365 365
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 360 290MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 20 0
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 460 390AC indoor and outdoor unit connection pipe
Copper pipe for connection between AC indoor unit and outdoor unit
Feet216 256 40
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
33) JNU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 131 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 25 25Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 60 60BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 45 45 Grounding for BdREN equipments Job 1 2 1Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
33) JNU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 132 xxx
34) SAU – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 133 xxx
34) SAU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 134 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation
Partitioning with 10 mm glass including locking facility Sft 100 70 -30Floor tiles Sft 100 140 40Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 40 -60Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 410 210Light Set 0 3 3
0Fiber Meter 250 70 -180
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 60 60From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 30 30ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
34) SAU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 135 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 82 82Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
34) SAU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 136 xxx
35) SUST – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 137 xxx
35) SUST – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 138 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles Sft 100 150 50Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 120 20Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 520 320Light Set 0 3 3
0Fiber Meter 250 55 -195
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 93 93From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 0 -70MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 8 -2Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 10 -10
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 25 25ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 0 -70
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
35) SUST – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 139 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 25 25Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 70 70Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
35) SUST – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 140 xxx
36) PUST – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 141 xxx
36) PUST – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 142 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 100 0Floor tiles Sft 100 120 20Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 40 -60Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 430 230Light Set 0 3 3
Fiber Meter 250 380 130Underground Fiber Laying Meter 0 300 300Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for BdREN Room SDB and VC Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 1 1 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 10 0Generator to ATS Connectivity (4 x 16rm Cable) Meter 20 50 30
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 400 330AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet
216 248 32
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
36) PUST – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 143 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 49 49Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 200 200 0GI pipe Iron metal Feet 10 10 0Boring Charge 100 feet depth Job 2 2 0Accessories Salt,cole, connecting screw etc Lot 2 2 0Civil works for connecting point at the ground Job 2 2 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 80 80Multipoint reference grounding for BdREN equipments Job 1 2 1Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
One boring point is shifted from equipment grounding
Grounding For BdREN Equipment
36) PUST – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 144 xxx
37) BSMRAU – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 145 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 0 0 0Floor tiles Sft 0 0 0Wall tiles Sft 0 0 0Supplying and fixing cable trays or ladder Rft 0 0 0Brick works including plastering Sft 0 0 0Replacing existing doors Set 0 0 0Painting and distempering interior or exterior walls Sft 0 0 0Light Set 0 0 0
0Fiber Meter 0 0 0
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 0 0 0MCCB 63Amp circuit breaker (for MDB and VC Room SDB) Nos 1 2 1MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 0 0 0
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
70 80 10
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
37) BSMRAU – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 146 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 15 15BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 50 50Multipoint reference grounding for BdREN equipments Job 0 1 1Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding One boring point is
shifted from equipment grounding
Grounding For BdREN Equipment
37) BSMRAU – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 147 xxx
38) Rampura PGCB – Drawing or BdREN Rom
Copyright © 2014 Samsung SDS All rights reserved | Confidential 148 xxx
38) Rampura PGCB – Drawing or Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 149 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 0 -100Brick works including plastering Sft 100 0 -100Replacing existing doors Set 1 0 -1Painting and distempering interior or exterior walls Sft 200 0 -200Light Set 0 0 0
0Fiber Meter 0 0 0
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 30 -40MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0UPS Battery bank connectivity
Cable for UPS battery bank connection with UPS (2x) Feet10 200 190
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
0 0 0
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
38) Rampura PGCB – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 150 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 30 30Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 30 30 Grounding for BdREN equipments Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding Need permission to
use existing electrical grounding
Grounding For BdREN Equipment
38) Rampura PGCB – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 151 xxx
39) Kabirpur PGCB – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 152 xxx
39) Kabirpur PGCB – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 153 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 0 -100Brick works including plastering Sft 100 0 -100Replacing existing doors Set 1 0 -1Painting and distempering interior or exterior walls Sft 200 0 -200Light Set 0 0 0
0Fiber Meter 0 0 0
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
0 0 0AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet
48 88 40
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
39) Kabirpur PGCB – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 154 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to Grounding point) (BYA 1 x 6 rm) Meter 0 30 30 Grounding for BdREN equipments Job 1 1 0Grounding point to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding Need permission to
use existing electrical grounding
Grounding For BdREN Equipment
39) Kabirpur PGCB – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 155 xxx
40) Ashugonj PGCB – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 156 xxx
40) Ashugonj PGCB – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 157 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 0 0 0Floor tiles Sft 0 0 0Wall tiles Sft 0 0 0Supplying and fixing cable trays or ladder Rft 0 0 0Brick works including plastering Sft 0 0 0Replacing existing doors Set 0 0 0Painting and distempering interior or exterior walls Sft 0 0 0Light Set 0 0 0
Fiber Meter 0 0 0Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for MDB and BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
0 0 0AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet
48 120 72
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
40) Ashugonj PGCB – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 158 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 30 30Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
Grounding For BdREN Equipment
40) Ashugonj PGCB – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 159 xxx
41) Ishwardi PGCB – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 160 xxx
41) Ishwardi PGCB – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 161 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 230 130Floor tiles Sft 100 100 0Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 65 -35Brick works including plastering Sft 100 0 -100Replacing existing doors Set 1 1 0Painting and distempering interior or exterior walls Sft 200 300 100Light Set 0 3 3
Fiber Meter 0 0 0Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 60 -10MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
0 0 0
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
41) Ishwardi PGCB – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 162 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 30 30Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
Grounding For BdREN Equipment
41) Ishwardi PGCB – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 163 xxx
42) Shirajgonj PGCB – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 164 xxx
42) Shirajgonj PGCB – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 165 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 0 -100Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 0 -100Brick works including plastering Sft 100 0 -100Replacing existing doors Set 1 0 -1Painting and distempering interior or exterior walls Sft 200 820 620Light Set 0 2 2
0Fiber Meter 0 0 0
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 40 -30MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0Power Cabling of UPS,Generator,AC for VC sytems
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter
0 0 0UPS Battery bank connectivity
Cable for UPS battery bank connection with UPS (2x) Feet10 220 210
ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter 0 0 0AC indoor and outdoor unit connection pipe Copper pipe for connection between AC indoor unit and outdoor unit Feet
48 80 32
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
42) Shirajgonj PGCB – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 166 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 30 30Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
Need Permission to use existing electrical grounding
Grounding For BdREN Equipment
42) Shirajgonj PGCB – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 167 xxx
43) Faridpur PGCB – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 168 xxx
43) Faridpur PGCB – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 169 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 100 350 250Floor tiles Sft 100 0 -100Wall tiles Sft 300 0 -300Supplying and fixing cable trays or ladder Rft 100 60 -40Brick works including plastering and painting for closing existing doors or windows
Sft 100 0 -100
Replacing existing doors Set 1 0 -1Painting and distempering interior or exterior walls Sft 200 130 -70 (With 50SFT re-plastering)Light Set 0 3 3
Fiber Meter 0 0 0Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 10 -60MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
0 0 0
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
43) Faridpur PGCB – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 170 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 40 40Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 100 100 0GI pipe Iron metal Feet 5 5 0Boring Charge 100 feet depth Job 1 1 0Accessories Salt,cole, connecting screw etc Lot 1 1 0Civil works for connecting point at the ground Job 1 1 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 40 40Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
Grounding For BdREN Equipment
43) Faridpur PGCB – BOM Variation (2)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 171 xxx
44) Bogra PGCB – Drawing of BdREN Room
Copyright © 2014 Samsung SDS All rights reserved | Confidential 172 xxx
44) Bogra PGCB – Drawing of Power Connectivity
Copyright © 2014 Samsung SDS All rights reserved | Confidential 173 xxx
Types of Work Needed Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Partitioning with 10 mm glass including locking facility Sft 0 0 0Floor tiles Sft 0 0 0Wall tiles Sft 0 0 0Supplying and fixing cable trays or ladder Rft 0 0 0Brick works including plastering Sft 0 0 0Replacing existing doors Set 0 0 0Painting and distempering interior or exterior walls Sft 0 0 0Light Set 0 0 0
0Fiber Meter 0 0 0
Underground Fiber Laying Meter 0 0 0Areal Cable running with pole and GI wire Meter 0 0 0
0From ATS/MDB to BdREN room SDB (BYA 4X16rm Cable) Meter 0 0 0From ATS/MDB to BdREN room SDB (BYA 4X6rm Cable) Meter 70 50 -20MCCB 63Amp circuit breaker (for MDB & BdREN Room SDB) Nos 2 2 0MCCB 100Amp circuit breaker (for MDB) Nos 0 0 0Existing/New MDB to ATS (BYA 4 x 16rm Cable) Meter 10 0 -10
0UPS Battery bank connectivity
Cable for UPS battery bank connection with UPS (2x) Feet10 120 110
BdREN Room SDB to VC Room SDB (BYM 4 x 16rm Cable) Meter 0 0 0ATS/MDB to VC Room SDB (BYM 4 x 10rm Cable) Meter
0 0 0
BdREN BOM Variation
Civil/ Renovation work
Optical fiber
Power Cabling, Switch Gear and Protection
Power Cabling of UPS,Generator,AC for VC sytems
44) Bogra PGCB – BOM Variation (1)
Copyright © 2014 Samsung SDS All rights reserved | Confidential 174 xxx
Types of Work Needed
Items Description Unit Proposed Qty
Required Qty
Variation Remarks
Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 50 50Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Copper wire 3no. Wire(pure Copper) Feet 0 0 0GI pipe Iron metal Feet 0 0 0Boring Charge 100 feet depth Job 0 0 0Accessories Salt,cole, connecting screw etc Lot 0 0 0Civil works for connecting point at the ground Job 0 0 0Standard Copper Lightning Arrestor Nos 0 0 0Connecting Cable(Lightning arrestor to grounding point) (BYA 1 x 6 rm) Meter 0 30 30Multipoint reference grounding for BdREN equipments Job 1 1 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 10 rm Cable) Meter 0 0 0Grounding point/MDB to BdREN Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0Grounding point/MDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0BdREN Room SDB to VC Room SDB (BYA 1 x 16 rm Cable) Meter 0 0 0
BdREN BOM Variation
Electrical Earthing/Grounding
Grounding For BdREN Equipment
44) Bogra PGCB – BOM Variation (2)