20
Development of Organic Waste Treatment Facilities, Phase 2 發展第二期有機資源回收中心 Environmental Impact Assessment Executive Summary 環境影響評估報告-行政摘要 August 2013 二零一三年八月 Environmental Protection Department 環境保護署

Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

Development of Organic Waste Treatment Facilities, Phase 2

發展第二期有機資源回收中心

Environmental Impact Assessment – Executive Summary

環境影響評估報告-行政摘要

August 2013

二零一三年八月

Environmental Protection Department

環境保護署

Page 2: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

Mott MacDonald, 20/F AIA Kowloon Tower, Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong

t +852 2828 5757 f +852 2827 1823, W www.mottmac.com

3/F., West Wing, 88 Victoria Road, Kennedy Town, Hong Kong 香港堅尼地城域多利道 88號 3樓西翼

Development of Organic Waste Treatment Facilities, Phase 2

發展第二期有機資源回收中心

Environmental Impact Assessment – Executive Summary

環境影響評估報告-行政摘要

August 2013 二零一三年八月

Environmental Protection Department 環境保護署

Page 3: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

Development of Organic Waste Treatment Facilities, Phase 2

EIA Executive Summary

Chapter Title Page

1. Introduction 1

2. Project Description 2

2.1 Need for the Project _________________________________________________________________ 2 2.2 Project Location and Scale ____________________________________________________________ 2 2.3 Layout and Facilities _________________________________________________________________ 2 2.4 Consideration of Alternatives __________________________________________________________ 3 2.5 Implementation Programme ___________________________________________________________ 6

3. Summary of the Environmental Impact Assessment 7

3.1 Air Quality Impact ___________________________________________________________________ 7 3.2 Hazard to Life ______________________________________________________________________ 9 3.3 Noise Impact ______________________________________________________________________ 10 3.4 Water Quality Impact _______________________________________________________________ 10 3.5 Waste Management Implications ______________________________________________________ 11 3.6 Ecological Impact __________________________________________________________________ 12 3.7 Fisheries Impact ___________________________________________________________________ 12 3.8 Landscape and Visual Impact _________________________________________________________ 12 3.9 Cultural Heritage Impact _____________________________________________________________ 13

4. Environmental Monitoring and Audit 14

5. Conclusion 15

Tables

Table 2.1: Main Project Facilities and Systems _____________________________________________________ 3 Table 2.2: Summary of Assessment Results for Site Selection _________________________________________ 4 Table 2.3: Indicative Milestones for Key Project Stages ______________________________________________ 6 Table 3.1: Construction dust modelling results summary ______________________________________________ 7 Table 3.2: Summary of operation modelling results against the current AQOs _____________________________ 8 Table 3.3: Summary of operation modelling results against the new AQOs _______________________________ 8

Figures

Figure 1 Location of the Project

Figure 2 Preliminary Site Layout

Content

Page 4: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

1

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

The Government has carried out a number of waste management studies and projects focused on organic

waste in recent years, including:

“Organic Waste Generation and Management Study – Major Generators of Food Waste and Yard

Waste”;

“Pilot Plant Development of Biodegradable Waste Treatment Facilities – Investigation”; and

“Pilot Composting Facility at the Kowloon Bay Waste Recycling Centre”.

In 2008, building on these studies, the Environmental Protection Department (EPD) initiated a Feasibility

Study and Environmental Impact Assessment (EIA) for an Organic Waste Treatment Facility (OWTF) at Siu

Ho Wan, Lantau1. The plant was designed to receive and treat 200 tonnes per day of source separated

organic waste (mostly food waste).

Following the Government’s review of the Policy Framework action agenda in 2011, a decision was taken

to further address Hong Kong’s waste issues through a comprehensive waste management strategy. This

included the implementation of a Project to investigate the feasibility for providing an additional OWTF at

Sha Ling, North District to receive and process 300 tonnes per day of source separated food waste

generated from the commercial and industrial (C&I) sectors.

The May 2013 Environment Bureau Planning Strategy Report, ‘Hong Kong: Blueprint for Sustainable Use

of Resources 2013-2022’ notes that further development of landfill sites is highly constrained by issues of

land availability, the high opportunity costs of developing land, and planning constraints/local opposition.

The Report states that waste related technologies that generate energy will be adopted and identifies

OWTF as one of the options for implementation.

The Organic Waste Treatment Facilities, Phase 2 (hereafter as the ‘Project’) is proposed to be constructed

and operated in Sha Ling, North District (see Figure 1). The purpose of this Project is to identify and adopt

proven biological treatment technologies to recover reusable materials and energy, such as compost, heat,

electricity and biogas from source-separated organic waste.

The Project is a Designated Project under the Environmental Impact Assessment Ordinance (EIAO):

- Item G.4 of Part I, Schedule 2 of the EIAO: “A waste disposal facility (excluding any refuse collection

point), or waste disposal activities, for (a) refuse; or (b) chemical, industrial or special wastes”.

An Environmental Impact Assessment (EIA) study was conducted in accordance with EIA Study Brief (No.

ESB-226/2011) to provide information on the nature and extent of environmental impacts arising from the

construction and operation of the proposed Project and related activities taking place concurrently.

This Executive Summary presents the key findings of the Environmental Impact Assessment (EIA) for the

Project as required under the EIAO.

_________________________

1 Identified as the Organic Waste Treatment Facility - Phase 1

1. Introduction

Page 5: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

2

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

2.1 Need for the Project

The Hong Kong Government recognises a pressing need to pursue more sustainable alternatives to

present waste treatment and disposal practices in Hong Kong. Continuation of the current disposal system

in Hong Kong is not considered to be a sustainable option as a result of diminishing landfill capacity, and in

light of social, economic and environmental issues. According to the Environment Bureau’s recently

published Planning Strategy Report, ‘Hong Kong: Blueprint for Sustainable Use of Resources 2013-2022’,

Hong Kong’s three major landfill facilities are expected to reach capacity by 2015 (South East New

Territories Landfill (SENT)), 2017 (North East New Territories Landfill (NENT)) and 2019 (West New

Territories Landfill (WENT)). Further expansion of existing facilities or the development of new landfill sites

is highly constrained by issues of land availability, the high opportunity costs of developing land, and

planning constraints/local opposition.

In December 2005, EPD published ‘A Policy Framework for the Management of Municipal Solid Waste in

Hong Kong (2005-2014)’ (Policy Framework), setting out policy tools and initiatives to be implemented for

the sustainable management of municipal solid waste (MSW) in Hong Kong. The Policy Framework

targeted an increase in recovery rates to 50%, and reduction in the total amount of MSW disposed of in

landfills to less than 25% by 2014. Achieving these targets requires reduced reliance on landfill through the

application of new waste treatment technologies. An Advisory Group on Waste Management Facilities was

subsequently set up to investigate the most appropriate treatment and disposal solutions. The Group

recommended the development of OWTFs as part of an integrated strategy for recovering organic wastes

from the C&I Sector. Investment in the OWTFs is also a Key Action highlighted in the Government’s Hong

Kong Blueprint for Sustainable Use of Resources 2013-2022 published in May 2013.

The OWTFs are to be developed in two phases, with Phase 1 located at Siu Ho Wan in Northern Lantau

Island, and Phase 2 (this Project) at Sha Ling, Northern New Territories, on the site of the former Sha Ling

Livestock Waste Composting Plant (SLCP). The two phases of OWTF facilities are planned to use

anaerobic digestion with composting to treat a combined 500 tonnes of organic waste daily, 300 tonnes of

which will be treated at this Project. The OWTF projects will reduce the volume of material requiring

disposal, and together could reduce the quantity of C&I waste requiring landfill by more than 15%, at

present rates.

This Project is important, not only to mitigate the depletion of available landfill space, but also in order to

conserve resources through the recovery of compost and biogas that would be otherwise unused.

Compost (or other soil improvement products) can be used as a sustainable input for landscaping, farming

and horticulture, while biogas is a source of renewable energy. The Project will therefore represent a

valuable contributor to Hong Kong Government’s climate change and energy security objectives.

2.2 Project Location and Scale

The Project is located at Sha Ling in the North District, within the Frontier Closed Area (see Figure 1). The

Site has an area of around 2.5 hectares, of which roughly 1.5 hectares has been previously developed. The

former SLCP currently occupies the site; although this facility was decommissioned in 2010.

2.3 Layout and Facilities

The preliminary design includes the following main elements listed in Table 2.1 and shown in Figure 2:

2. Project Description

Page 6: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

3

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

Table 2.1: Main Project Facilities and Systems

Aspect System / facility

Main structure Waste reception and preparation areas

Administration area

Environmental Education Centre

Pre-treatment system

Composting Composting tunnels

Maturation, treatment / storage area

Anaerobic Digestion Buffer Tank

Digesters

Separator/ Dewatering Unit

Hygieneisation Unit

Biogas Use Gas Cleaning

Gas Holders

Compressors

Flare stack

Combined Heat and Power Unit

Boiler

Heat exchangers

Water and waste water

systems

Water supply system

Wastewater Treatment Plant

Effluent retention tank

Drainage system

Emissions/Odour Treatment

CHP Exhaust treatment system

Odour treatment system

Chimney

Ancillary Facilities Weighbridge

Vehicle Washing Facilities

Maintenance Workshop and Utility Area

Continuous Emission Monitoring System

Power Supply System

Instrumentation, Control and Monitoring System

Security / registration

The preliminary design is based on the best available information. The assessment adopts a conservative

approach wherever possible in terms of the design options presented.

2.4 Consideration of Alternatives

2.4.1 Site Selection

In 2006, EPD conducted a site selection study in conjunction with PlanD to identify appropriate facilities for

treating organic wastes. A long list of 33 alternative sites was produced by compiling the feasible sites

proposed by EPD after preliminary screening, and feasible sites as recommended by PlanD. The Specific

Site Selection stage evaluated the revised long listed sites by applying a scoring system to generate a

shortlist comprising the most feasible sites for development of large scale OWTFs (using various biological

treatment processes). A ranking system was also developed to prioritize the suitability of sites under

evaluation.

Page 7: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

4

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

The assessment was undertaken by EPD to determine which of the sites would be appropriate for the

development of large-scale OWTF, based on the following criteria:

Environmental impact (Air, Noise, Visual and Landscape, Water Quality and Drainage, and Ecology);

Engineering feasibility (e.g. accessibility, site constraints, time availability, etc.);

Financial viability (e.g. capital cost and operational cost);

Operability (e.g. proximity to users/producers, waste disposal and wastewater treatment, etc.); and

Social issues (e.g. compatible with broad planning intention for site and surrounding landuse, etc.).

A score from 1 to 5 representing the suitability (from low to high) for OWTF development against the

respective criteria for composting, Anaerobic Digestion and a combination of both technologies were

awarded for each site. The highest scoring four sites were recommended for further assessment, as

follows:

Siu Ho Wan, North Lantau

Sha Ling Livestock Waste Composting Plant (SLCP), Sheung Shui;

EcoPark Phase II, Tuen Mun; and

Tseung Kwan O Area 137, Tseung Kwan O.

A summary of the results of the evaluation is provided in Table 2.2 below.

Table 2.2: Summary of Assessment Results for Site Selection

Potential Site Environmental Engineering Feasibility

Financial Operability Social Issues

Siu Ho Wan *** *** *** *** ***

Sha Ling Livestock Waste Composting Plant

** ** * ** **

EcoPark Phase II ** * ** * *

TKO Area 137 * * ** * *

Source: EPD (2010) Pilot Plant Development of Biodegradable Waste Treatment Facilities (BWTF) – Investigation Final Report

Note: * Less Preferable, ** Preferable, *** Highly Preferable

Results of the assessment indicated that the Siu Ho Wan site is the most suitable for the development of

OWTF, followed by the SLCP site. These two sites are considered more favourable in view of their

relatively low environmental impacts, high engineering feasibility and operability, and less social issues.

The Siu Ho Wan site was chosen for the development of OWTF Phase 1 and the former Sha Ling

Livestock Waste Composting Plant (SLCP) site was selected for the OWTF 2. The EIA Report for the

Phase 1 project was approved by the Director of Environmental Protection on 24 February 2010, and the

preparation works for the project are underway.

As shown in Table 2.2 above, from the remaining sites, both the EcoPark Phase 2 and Sha Ling sites were

found to be ‘preferable’ in terms of environmental impact. However, initial consultation with PlanD

suggested that the development of large scale OWTF would not qualify as one of the twelve approved

categories of recycling process activities assessed under the EIA designated for the EcoPark (Phase II)

site. The Tseung Kwan O Area 137 site was considered to be ‘less preferable’ in terms of environmental

impact in the assessment (due to potential water quality issues), and despite having a large enough

available area, uncertainties about the site in terms of its availability and suitability of its neighbouring land

Page 8: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

5

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

uses, let to this site being recommended only as a ‘fall-back’ option for the development of large-scale

OWTF.

The Sha Ling site is remote and does not have a large population nearby (and associated air, noise and

visual sensitive receivers). The site was used previously as a composting plant and does not encroach into

any environmental sensitive areas. From a rigorous consideration of alternative layout (see Section 2.4.2),

the OWTF 2 could be constructed within the previously developed area of SLCP to avoid felling of large

number of trees. The visual envelop is mostly confined by the ridgeline of nearby hills with few visual

sensitive receivers. Hence, there are no major environmental constraints for the development of OWTF 2 at

Sha Ling. In addition, the SLCP site falls within an area zoned “Government, Institution or Community

(G/IC)” on the Outline Zoning Plan (OZP) and PlanD has no in principal objection to the development of

OWTF at Sha Ling.

2.4.2 Optimisation of Layout

Different layouts of the facilities have been drawn up and considered. The layout of the facilities on the

OWTF 2 Project site has been optimised to maximise environmental benefits. In order to minimise the

footprint of the OWTF 2 project, the original concept design was reworked to occupy a smaller area. This

was achieved by reducing the number of digestion tanks from 5 to 3, changing the road layout, and altering

the configuration of key structures. In this way, the OWTF 2 site occupies the same area as the former

SLCP facility, minimising disturbance around the site, including vegetated areas. These design changes

have led to a reduction in the number of trees proposed to be felled from 153 trees in the original

preliminary layout to around 14 trees in the latest amendment (a 91% reduction).

Other design optimisations included the inclusion of green roofs, vertical greening, and landscape

screening to minimise visual impacts, reduce stormwater runoff, and increase amenity value for those

working at the site.

2.4.3 Alternative Organic Waste Treatment Options

As part of the Project alternative organic waste treatment technologies were appraised in order to

determine the most suitable option for adoption.2 These alternative organic waste treatment technologies

included:

Incineration;

Pyrolysis/gasification;

Anaerobic digestion;

Composting;

Conversion to solid biofuel

Conversion to liquid biofuel; and

Conversion to animal/fish feed.

From the above options, Anaerobic Digestion with biogas generation and composting of digestate was

selected as the preferred treatment option. This option was found to be the most suitable for the high

moisture content biodegradable organic waste in Hong Kong. It also has the greatest potential

_________________________

2 Working Paper 1 - Technology Evaluation and Key Elements of the OWTF

Page 9: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

6

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

environmental benefits in terms of diverting waste from landfill, and recovery of energy and resources from

waste through production of compost / soil improvement products and renewable energy from biogas.

Composting is recommended to take place in enclosed tunnels provided with mechanical aeration. This will

allow effective control of the process and minimise impacts on air quality (dust and odour), noise and

impacts associated with vermin.

Two potential biogas use options have been identified. They are: Option A - onsite generation of electricity

and heat for use in on-site processes and facilities, with export of surplus electricity to the CLP network;

and Option B - export of biogas directly to the Towngas grid via a connection to the existing NENT Landfill

gas pipeline. With Option B there are two sub-options of biogas export:Option B(i) - with no onsite power

production; and Option B(ii) - with onsite power generation. The environmental performance between the

options is considered to be similar across the options. However, minor environmental benefits for

Landscape and Air Quality impacts may be achieved for Options B (i) and B (ii) over Option A. Either of the

options may be adopted for the Project and the chosen biogas utilisation option will be confirmed at later

stage of the Project. However, both cases are considered in the EIA with the worst case scenario assumed

for each assessment, as a conservative approach.

2.5 Implementation Programme

It is anticipated that the construction works of the proposed OWTF 2 will commence in mid-2015 and be

fully completed by 2017. The construction stages and provisional project program are shown in Table 2.3.

Table 2.3: Indicative Milestones for Key Project Stages

Description Tentative Date

Tender Phase 2014

Construction Start 2015

Construction End 2017

Operation Start 2017

Page 10: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

7

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

3.1 Air Quality Impact

Potential air quality impacts associated with the construction and operational phase of the proposed Project

have been assessed in the EIA report. Representative Air Sensitive Receivers (ASRs) within 500 m of the

subject site have been identified and the worst case impacts on these receivers assessed. Suitable

mitigation measures, where necessary, have been recommended to protect the sensitive receivers and to

achieve compliance with legislative criteria and guidelines.

With the Government’s on-going and planned programmes to tackle various air pollution issues in Hong

Kong, it is anticipated that the future background air quality will improve. To predict the future background

air pollutant concentration, the Pollutants in the Atmosphere and the Transport over Hong Kong (PATH)

model, has been used. PATH background concentrations of the relevant pollutants for year 2020 and TSP

background level recorded in EPD’s Air Quality Monitoring Station have been adopted.

3.1.1 Construction Phase

Dust generated from construction activities is the primary concern during the construction phase. The air

quality model Fugitive Dust Model (FDM) was used to predict the air pollutant concentrations due to open

dust source impacts. With the implementation of the recommended mitigation measures as well as relevant

best practices stipulated in the Air Pollution Control (Construction Dust) Regulation, it has been assessed

(see Table 3.1) that there would be no exceedance of the hourly, daily or annual Total Suspended

Particulates criteria at any of the ASRs.

Table 3.1: Construction dust modelling results summary

Pollutant Averaging Period Current Criteria (µg/m3) Maximum concentration range for all ASR

(µg/m3)

Total Suspended Particulate (TSP)

1 hour 500 86 to 421

24 hour 260 70 to 128

Annual 80 68 to 79

Mitigation measures for dust control and relevant best practices as stipulated in the Air Pollution Control

(Construction Dust) Regulation were recommended to reduce dust impacts during construction phase. The

dust control measures are highlighted as:

Watering eight times per day, or once every 1.5 hours, at all active works areas in order to achieve a

dust suppression efficiency of 87.5%; and

All the stockpiles should be at least 80% covered with impervious sheeting to reduce windblown dust.

3.1.2 Operation Phase

The major sources of air pollution during the operation phase include, but are not limited to: emissions from

the burning of generated biogas in a combined heat and power (CHP) plant; emissions from an odour

treatment unit, which is used to treat odorous emissions, and; emissions from flaring, under equipment

outages emergency.

3. Summary of the Environmental Impact Assessment

Page 11: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

8

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

During the operation phase, and with emission control equipment in place, all the assessed ASRs would be

in compliance with the relevant current and new AQOs and other relevant criteria for all emissions

modelled in this EIA. Table 3.2 indicates compliance of the emission standards against the Air Quality

Objectives (AQOs) as of January 2013 and Table 3.3 against the AQOs as of January 2014,.

Table 3.2: Summary of operation modelling results against the current AQOs

Pollutant Averaging Period Current AQO (µg/m3) Maximum concentration range for all ASR (µg/m3)

Nitrogen dioxide (NO2) 1 hour 300 155.0 to 187.3

24 hour 150 78.4 to 92.3

Annual 80 20.5 to 29.1

Respirable Suspended Particulate (RSP/PM10)

24 hour 180 121.0 to 126.9

Annual 55 43.0 to 43.6

Total Suspended Particulate (TSP/Dust)

1 hour 500(1) 68.0 to 206.3

24 hour 260 68.0 to 89.0

Annual 80 68.0 to 68.9

Carbon Monoxide (CO) 1 hour 30,000 2278.1 to 2280.4

8 hour 10,000 1458.7 to 1461.3

Sulphur Dioxide (SO2) 1 hour 800 65.9 to 66.7

24 hour 350 27.1 to 27.9

Annual 80 6.5 to 6.6

Odour 5 second 5(2) 0.00 to 1.59

Volatile Organic Compounds (VOC) 1 hour 60000(3) 2.5 to 9423.2

Hydrogen Chloride (HCl) 1 hour 2100(3) 0.3 to 5.8

Annual 20(3) 0.001 to 0.031

Hydrogen Fluoride (HF) 1 hour 240(3) 0.00 to 0.58

Annual 14(3) 0.0001 to 0.0031

1. EIAO-TM

2. Unit is OU/m3

3. Refer to Table 3.3 of the EIA Report

Table 3.3: Summary of operation modelling results against the new AQOs

Pollutant Averaging Period New AQO (µg/m3) Maximum concentration range for all ASR (µg/m3)

Nitrogen dioxide (NO2) 1 hour 200 155.0 to 187.3

Annual 40 20.5 to 29.1

Respirable Suspended Particulate (RSP/PM10)

24 hour 100 121.0 to 126.9(4)

Annual 50 43.0 to 43.6

Fine Suspended Particulate (FSP/PM2.5)

24 hour 75 90.7 to 96.6(4)

Annual 35 32.3 to 32.8

Total Suspended Particulate (TSP/Dust)

1 hour 500(1) 68.0 to 206.3

Carbon Monoxide (CO) 1 hour 30,000 2278.1 to 2280.4

8 hour 10,000 1458.7 to 1461.3

Sulphur Dioxide (SO2) 10 minute 500 161.5 to 163.3

24 hour 125 27.1 to 27.9

Page 12: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

9

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

Pollutant Averaging Period New AQO (µg/m3) Maximum concentration range for all ASR (µg/m3)

Odour 5 second 5(2) 0.00 to 1.59

Volatile Organic Compounds (VOC) 1 hour 60000(3) 2.5 to 9423.2

Hydrogen Chloride (HCl) 1 hour 2100(3) 0.3 to 5.8

Annual 20(3) 0.001 to 0.031

Hydrogen Fluoride (HF) 1 hour 240(3) 0.00 to 0.58

Annual 14(3) 0.0001 to 0.0031

1. TM-EIAO

2. Unit is OU/m3

3. Refer to Table 3.3 of the EIA Report

4. Maximum predicted exceedance for all ASR is 2 per year. Maximum allowable exceedances per year is 9. Therefore, 24 hour

average RSP and FSP are compliant.

Recommended mitigation measures during operation phase include an exhaust treatment system and

stack for the CHP and odour treatment unit and all processes that might generate odour taking place within

enclosed facilities under negative pressure. Indoor air will be collected and treated to remove odours and

dust prior to venting through the flue stack. Odour treatment assumed and was assessed based on the

adoption of an Ultraviolet Light-C (UV-C) and ozone treatment system with second stage active carbon

filters. For the CHP, the preliminary design incorporates a combination of thermal and catalytic treatment

processes to remove pollutants from the exhaust gasses from the CHP. It is proposed that both the odour

treatment unit and the CHP emissions are directed to a flue to aid dispersion and minimise effects on

ASRs.

3.2 Hazard to Life

A hazard assessment has been carried out to evaluate the biogas risk to existing, committed and planned

off-site population due to the generation, transfer, storage and use of biogas during operation of the

Project.

Hazardous scenarios associated with the operations of the Project have been identified and assessed. A

quantitative risk assessment has been conducted to determine the impact of the identified hazardous

scenarios on the surrounding existing and proposed populations during the operation phase of the Project

in terms of individual and societal risks. The maximum individual risk remains below 1x10-5

per year at the

site boundary and hence meets the Hong Kong Government Risk Guidelines (HKRG) requirements. For

the societal risk, the potential loss of life (PLL) for the 2017 scenario and the 2017 scenario with proposed

developments are 6.42 x 10-6

per year and 8.48 x 10-6

per year respectively. Therefore the societal risk for

both scenarios are low and within the acceptable region as identified in HK EIAO Societal Risk Guideline.

Therefore, the assessment concludes that the risks due to operation of the Project are acceptable under

the individual and societal risk criteria set out in Annex 4 of the Environmental Impact Assessment

Ordinance Technical Memorandum (EIAO-TM).

The risks for both scenarios are within the acceptable region and therefore no mitigation measures are

necessary. Nevertheless, “Good Practices” and “recommended design measures” for the safe operation of

the Project are recommended to be carried out as far as reasonably practicable. Key recommended

measures are:

Safety markings and crash barriers will be provided to the aboveground piping, digesters and the gas

holder near the entrance;

Page 13: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

10

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

The process plant building should be provided with an adequate number of gas detectors distributed

over areas of potential leak sources to provide adequate coverage; and

A 10m high boundary wall with fire resistance should be provided in the vicinity of the digester tanks,

gasholders and gas purification equipment.

3.3 Noise Impact

3.3.1 Construction Phase

The potential source of noise impact during the construction phase of the Project would be from the use of

Powered Mechanical Equipment (PME) for various construction activities, including demolition and removal

of the existing above ground structures of the SLCP and construction of proposed superstructure. PME

likely to be used at the Project site includes breakers, cranes, lorries and other vehicles, air compressors

and generators. A total of four representative noise sensitive receivers (NSRs) were identified for the

construction phase assessment. The prediction results indicate that the noise impact of unmitigated

construction activities from the project would cause exceedance of the relevant daytime construction noise

criterion of 75 dB(A) at most of the NSRs. Mitigation measures are therefore required to alleviate the noise

impacts generated during the construction phase. Recommended mitigation measures include:

good site practise to limit noise emissions at source ;

selection of quieter plant; and

use of movable noise barrier, enclosure and noise insulation fabric.

With the implementation of the mitigation measures, the construction noise levels at all representative

NSRs are predicted to between 63 dB(A) and 75 dB (A), which comply with the noise standards stipulated

in the EIAO-TM. Significant and residual construction noise impacts are therefore not anticipated in this

Project.

3.3.2 Operation Phase

During operation of the Project, potential noise impact from the operation of proposed fixed plant including

shredders, screw pumps, mixers, power supply systems, etc. are anticipated. Noise impact from planned

fixed plant can be effectively mitigated by implementing noise control measures at source during the

detailed design stage. In this study quantitative impact assessment has concluded that with the adoption of

the proposed maximum permissible Sound Power Levels at the proposed ventilation openings of 84 to 90

dB(A) during day-time, 80 to 84 dB(A) during evening and 79 to 81 dB(A) during night-time, the fixed plant

impact noise levels at all selected NSRs comply with the relevant noise criteria. Therefore, significant fixed

plant noise impact on the existing and planned NSRs is not anticipated.

3.4 Water Quality Impact

Water quality impact assessment has been carried out for areas within 500m of the Project site boundary

and other areas in the vicinity that might be impacted by the Project. Four fish ponds and two watercourses

were identified as inland water sensitive receivers.

The Project is located within the Deep Bay Water Control Zone. Effluent treatment is required prior to

discharge into the water courses in the Deep Bay Area, in order to meet the criteria of “no net increase in

pollution load requirement”. In practical terms this means that projects must either discharge to an existing

Page 14: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

11

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

sewer system or be designed so that any discharge does not result in additional pollution load on Deep

Bay. The project proposes to adopt on site treatment prior to transfer into the existing sewerage network.

During the construction phase, potential water quality impact could be generated from site run-off, sewage

from workforce, and discharge of wastewater from various construction activities. With the implementation

of the mitigation measures, no adverse water quality impact on the water sensitive receivers from the

construction works for the Project is anticipated.

Sewage effluent from operation of the Project and all wastewater generated within the Project site,

including dewatered digestate from digesters and other process wastewater, will be collected and treated in

an on-site wastewater treatment plant to meet the standards identified in the Technical Memorandum

standard for discharge to the public sewer. The effluent will be transferred to the Shek Wu Hui Sewage

Treatment Works via a new sewer connection to the existing NENT sewerage network. Adverse water

quality impact on the water sensitive receivers is therefore not expected..

3.5 Waste Management Implications

Waste types likely to be generated during the construction phase of the Project could include approximately

25,000 m3

excavated materials (from site formation and foundation works) of which 4,500 m3 could be

reused on site, approximately 4,000 m3 C&D materials (from mixture of topsoil and dead vegetative

material and surplus concrete or grouting mixes), chemical waste (from maintenance of construction plant

and equipment) and approximately 39 kg per day of general refuse (from the construction workforce).

Provided that waste is handled, transported and disposed of using approved methods and that the good

site practices are followed, adverse environmental impacts would not be expected during the construction

phase.

During the operation phase of the Project, waste types to be generated could include 23 tonnes per day of

wastes generated from pre-treatment processes (from pre-treatment sorting of organic waste feedstock),

15 tonnes per year of chemical wastes (from maintenance of mechanical equipment) and general refuse

(from visitors and on-site staff). Provided that waste is handled, transported and disposed of using

approved methods and that the good site practices are followed, adverse environmental impacts would not

be anticipated during the operation phase.

Recommended mitigation measures for waste management are:

Good site practices such as staff training in proper waste management and chemical handling

procedures; providing sufficient waste disposal points; and employing licensed waste collectors.

Waste reduction measures such as sorting demolition debris and excavated materials from demolition

works to recover reusable/recyclable portions; and segregating and storing different types of waste in

different containers, skips or stockpiles to enhance reuse or recycling of materials and their proper

disposal.

Preparing and implementing an Environmental Management Plan describing arrangements for

avoidance, reuse, recovery, recycling, storage, collection, treatment and disposal of different categories

of waste to be generated from construction activities.

Potential sources of land contamination in the operation phase have been reviewed. It is estimated that a

limited amount of chemicals would be used or chemical wastes generated during the operation. Good

practices and response procedures for contamination prevention have been identified. With the

Page 15: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

12

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

implementation of recommended practices and procedures, the potential for contamination due to

operation of the Project is expected to be minimal.

3.6 Ecological Impact

The Project Area comprises an existing developed concrete platform and plantation habitats adjacent to

some village development. In general, the area is not ecologically significant owing to the relatively low

ecological value of the habitats. The 14 trees proposed to be felled include 2 individuals of Acacia

auriculiformis, 3 individuals of Acacia confusa and 9 individuals of Musa x paradisiaca, which are all exotic

tree species of low ecological value. With the limited ecological value of the habitat, the ecological

significance due to the felling of 14 trees of low ecological value during construction phase is considered to

be minor. Overall, the ecological impact of loss of a very small area of plantation habitat within the Project

Area is therefore considered as minor.

Indirect impact on off-site habitat is also not considered to be significant due to lack of important ecological

resources. No ecological impact has been identified from the operation of the Project as all potential air

quality, noise and water quality impacts will be controlled to environmentally acceptable levels.

For precautionary purposes, erection of a temporary protective fence along the plantation area where trees

and vegetation would be retained within the Project Area is recommended during construction phase.

3.7 Fisheries Impact

A review and ground truthing exercise was conducted for fisheries impact and identified no commercial fish

culture resources or activities within the immediate area. With the recommended water quality control

measures and good site practice in place, the Project is unlikely to have any direct or indirect impacts on

existing ponds or related activities within the immediate area. Therefore, no fisheries impact arising from

construction and operation of the Project is anticipated and no fisheries-specific mitigation measures are

required.

3.8 Landscape and Visual Impact

3.8.1 Potential Impact on Existing Trees

There are approximately 458 trees within or in close proximity of the Project. None of the trees are

registered as Old and Valuable Tree (OVT). Approximately 441 trees are proposed to be retained in-situ;

approximately 14 are proposed to be felled due to unavoidable conflict with the proposed works and

transplantation is considered unsuitable; the remaining 3 trees are dead and in conflict with the proposed

works and are therefore proposed to be removed. Tree planting to compensate for the loss of existing

trees in terms of both quality and quantity as stipulated in ETWB TC(Works) No. 3/2006 is proposed and

incorporated into the landscape design within the Project site. The overall potential impact on trees is

considered negligible.

3.8.2 Landscape and Visual Impact

Sources of landscape and visual impacts will arise from removal of vegetation and demolition and

construction work associated with the proposed Project. With the implementation of mitigation measures,

the anticipated landscape and visual impacts are generally insubstantial, with slight negative impact

expected for some landscape resources, landscape character areas and visual sensitive receivers.

Page 16: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

13

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

However, since the duration of the impact is only limited to the construction phase with a small area, such

residual impact is therefore considered acceptable. Overall, in terms of Annex 10, Clause 1.1 (c) of the

EIAO-TM, the landscape and visual impacts are acceptable with mitigation measures.

3.8.3 Mitigation Measures

Landscape and visual mitigation measures for construction phase are highlighted as follows:

Existing trees are retained whenever possible and protected during construction.

The construction site activities are carefully controlled to minimise impact such as light, noise, tree

felling and eyesores.

Landscape and visual mitigation measures for operation phase are highlighted as follows:

Amenity / compensatory planting will be utilised throughout the site

Vertical and rooftop greening will maximise green space and soften hard structures

3.9 Cultural Heritage Impact

3.9.1 Archaeology

A desk-based review identified that the proposed site area has no archaeological potential. Some

archaeological potential exists in the wider assessment area, but these areas with archaeological potential

would not be impacted by the proposed Project. If associated works are proposed within the identified

potential area of archaeological interest within the AA in the detailed design phase, an archaeological

investigation would be required prior to commencement of works. The scope and methodology of

archaeological investigation would need to be agreed with the Antiquities and Monuments Office (AMO)

prior to implementation.

At this stage there is no need for mitigation as no impacts are expected.

It is noted however that if antiquities or supposed antiquities are discovered in the course of excavation

works, the project proponent must arrange a temporary suspension of works in the affected area and notify

AMO immediately of the discovery. Course for further action would be agreed with AMO prior to

continuation of the works. Sufficient resource as well as time for conducting necessary archaeological

works should be provided by the project proponent if so required.

3.9.2 Built Heritage

No mitigation measures have been identified to be necessary for built heritage resources during the

construction and operation phases in the Built Heritage Impact Assessment. The construction and

operation of the proposed OWTF 2 will not cause any insurmountable adverse impacts and no cumulative

impacts will occur as a result of this Project.

Page 17: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

14

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

An environmental monitoring and audit (EM&A) programme will be implemented during the construction

and operation of the Project to check the effectiveness of the recommended mitigation measures and

compliance with relevant statutory requirements. Details of the EM&A works have been specified in an

EM&A Manual. The EM&A Manual contains details of the proposed EM&A requirements, implementation

schedule of the environmental protection / mitigation measures, EM&A reporting procedures and complaint

handling procedures.

4. Environmental Monitoring and Audit

Page 18: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

297677/ENL/03/18.03/E Sep 2013 P:\Hong Kong\ENL\PROJECTS\297677 OWTF2\03 Deliverables\18 EIA\03 Executive Summary\Rev E (Revised Final)\ES Reve.Docx

15

Development of Organic Waste Treatment Facilities, Phase 2 EIA Executive Summary

This EIA study has identified and assessed the potential environmental impacts that may arise from

construction and operation of the Project in accordance with the guidelines of the EIAO-TM and the EIA

Study Brief. Based on the results of the assessments of the worst case scenario. The EIA study concludes

that with implementation of the recommended mitigation measures, the potential impacts arising from the

Project are considered to be environmentally acceptable and the Project would be in compliance with the

environmental legislation and standards. No significant adverse residual impacts from the Project are

anticipated. A comprehensive environmental monitoring and audit programme will be implemented to check

the implementation of mitigation measures and environmental compliance.

5. Conclusion

Page 19: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

q…

TS

TS

TS

TS

TS

TS

TS TS

TS

TS

TS

TS

TSTS

TSTS

Temple

TS

TS

TSTS

TS

TS

TS

TSTS

TSTS

TSTS

TSTS

TS

RRTS

TS

TSRTS

R

TS

RTS

TS

TSTS

TSTS

TS TSTS

TS TS

TS

CUL

CUL

WT

CUL

CUL

CUL

CUL

GG

G

G

G

G

G

GG

G

G

W

W

W

PO

PO

PO

80.979.8

7.5

79.9

25.6

13.1

8.9

12.7

41.4

10.2

8.942.8

9.2 12.5

12.1

13.1

44.1

11.4

9.3

13.712.5

13.412.8

13.6

15.8 18.9

10.9

12.7

18.2

21.9

10.2 10.7

23.615.7

13.5

12.8

15.5

16.5

19.8

13.417.2

14.1

12.9 22.812.4

13.118.0

18.613.7 22.1

22.6

16.511.1

22.5 20.7 18.120.428.4

17.919.3

18.8

15.1

12.921.916.1 16.6

16.8

18.112.6

14.2

19.8 14.915.7 16.7

16.814.814.2

11.512.120.516.2

16.9

14.913.0

12.5 16.5

16.9

13.715.0 13.7

16.719.9

18.116.1

12.917.1

16.520.3 18.214.616.4

16.9

18.816.718.5

15.8 18.613.5

12.0

13.719.3

17.612.7

13.313.2

13.113.1 18.5

13.7 16.620.3

16.3

13.7

13.5

21.0

12.8

17.0

14.816.2

17.316.8 12.2

17.115.8 16.213.6

H E

L

E

L

H

H

LE

E

L

L

L

L

L

LL

L

L

E

LH L

E

E

ETE

L

EL

E

EE

EE

H

E

LL

EE

EE

EETL

ET EE

E

E

EH

L E

E

LEL

E

E

E

H

EE

EEL

E

EL EE E

H

EE

E

FB

TS

TS

TS

Ó„Graves

WT

WT

G

G

G

G

G

G

G

G

G

G

G

G

G

G

U

G

GGG

GG

GGG G

G

G

G

G

37.7

72.877.2

75.5

74.8

86.1

59.547.7

53.4

85.0

52.4

58.1

49.0

72.6

72.7

71.1

55.0

68.2

55.1

52.5

26.351.9

67.8

21.523.0

28.7

67.9

79.7

27.9

22.4

21.4

22.933.7

22.4

23.4

28.0

24.820.0

27.0

67.029.0

27.618.1

19.7

24.5

E

E

E

E

E

E

EE

EE

L

L

L

ETL

L

LL

L

L

LL

L

L

LL

L

L

RTS TSTS

TS

R

TSTS

TS

TSTS

TS

TSTSTS

TS

TS

TS

TS

TSTS TS

TS

TS TS

TS

TSTS

TS

TS

TS

TSTS

TSTS

TS

TSTS

TS

TS

TSTSTS

TS

TSTS TS

TS

TS

TSTS

RTS

TS

TS

TSTS

TS

TS

TS

TS TS

RTS

TS

TSTSTS

TS

R

TS

TS

TS

TS

TS

TS

TS

TS

TS

TSTS

TS

TS

TS

TS

TS

TS

TSTS

TSTS

TS

TS

TS

ôÀÒ„OF¤›ÀV‚bflo

µ˜ü⁄⁄¶‘`¡‡[”µ˜î

Environmental Protection DepartmentSha Ling Livestock Waste

Composting Plant

SHA LING

Police Dog Unit And Force Search Unit Training School

'°Þ

'°Þ

'°Þ

WT

BurialUrns

BurialUrns

SHR

CUL

CUL

CUL

CUL

CUL

CUL

CULCUL

GG

GG

G

G

G

G

G

G

G

G

G

G

W

W

PO

PO

PO

PO

PO

PO

PO

PO

12.1

17.7

25.620.715.4

13.0 18.614.9

38.413.1

17.5

13.338.4

25.3

16.0

17.4

16.316.5

18.212.6

12.2 15.212.1

38.1

20.5

13.4 17.638.4

13.8

11.938.4

10.5

24.4

38.9

17.2

15.5

37.317.1

18.538.612.1

10.3

35.7

38.827.820.2

12.0

19.8

14.0

38.4 28.8

20.8

11.5

18.2

30.721.8

12.3 21.238.7

25.219.2

38.3

29.316.9

25.3

38.0

20.9

21.8

18.512.1

22.6

21.421.528.0

31.5 26.823.1

45.0

16.128.7

23.025.1

20.7

28.937.7

15.3

37.5

37.4

27.723.7

36.4

25.0

15.4 37.1

22.3

19.1

15.737.536.8

22.6

34.7

30.3

15.5

24.8

23.330.7

37.4

25.3

30.6

31.7

24.433.6

37.3

22.325.8

33.7

35.6

41.8

25.7 26.0

25.9

25.6

26.6

36.5

29.227.2

27.8

27.1

25.5 47.0

25.8

23.6

40.3

40.226.0 27.9

27.8

29.428.3

25.5

25.5

46.2 49.3

25.6

29.847.6

47.1

31.525.3

25.444.5

33.9

79.025.7

42.9

52.677.5

25.420.1

35.9

19.252.5

26.9

E

H

E

L

E

LL

E

L

L

E

L

L

EL

E L

H

LH

LL

L

E EE

LL

L

E

LL

LE

EL

L

L

L

EELH

L LE

E

E

L

E

L

LL E

EL EEE

EE H

E

LE

EL

E

EE

E

E E L LH

ELL

L

EEE

L

ETLEET

EEET

EL

E E

E

EL

E

L

L

EE

EE

EL

E

EL

E

EL

E

EEE

L

E

L

E

L

E

E

EL

E

E

L

E

L

L

d“Track

i¾Þ

TS

TS TS TSTS

TSTS

TS

RTS

TS

TS

R

RR

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TSTSTS

R

TS

TS

TSPigsty

TS

TS

TSTS TS

m‰v

Ó„

G

CUL

CUL

CUL

CUL

WT

Graves

G

G

G

G

G

G

G

G

G

G

G

G

G

G

PO

PO

19.9

18.7

21.8 69.6

70.219.3 20.2

24.024.7

25.1

22.9

18.9

20.3

21.7

26.0

66.0

16.5

26.323.2

18.9

63.9

23.5

17.6 27.9

31.9

64.4

19.118.3

18.5

32.518.1

21.1

18.2

23.1

35.2

18.7

18.5

18.764.2

23.7

18.6

22.5

25.1

25.619.0 22.9

18.9

24.9

27.7

21.9

64.764.4

62.0

21.220.121.6

26.3

23.9

63.9

20.3

26.624.3

28.4

26.7

28.521.2 40.2

26.4

26.3

41.3

51.222.5

42.5

23.6

30.653.0

30.950.0

24.3

39.5

25.3

27.122.6

25.151.933.9

46.4

47.2

38.9

25.5

27.7

26.2

23.9

33.4

33.6

26.9

30.2

24.0

28.6

51.5

24.7

33.3

24.6

52.0

40.7

29.5

42.5

34.6

ETET

L EL L

E

E

E

E

E

EET

ET

ETET

E

E

E

ET

ET

E

E

E

EE

E

E

E

EE

E

EE

E

FP

HY

HY

AT

AT

AFK

1:1500 PRE P1

MING

P1 HYJUN 13 MING FIRST ISSUE AFK

843000 N

PROPOSED SITE AREA

0 15

1 : 1 500

75m604530

POLICE DOG UNIT AND

FORCE SEARCH UNIT

TRAINING SCHOOL

SAN UK LING

HOLDING CENTRE

SITE ACCESS

LOCATION OF THE PROJECT

FIGURE 1

�� �îv �M

�W

ìd �p� �å]

°eK\”]c

f�‹r��=~

�dåg���

RIFLE RANGE

ô} �v

å] �0W �œ

Key to symbols

App�dCh�k�dDescriptionDrawnDateRev

RevStatus

Drawing Number

Scale at A1

Eng check

Approved

Coordination

Dwg check

Drawn

Designed

Title

Notes

Client

Reference drawings

J:\297677\REPORT\ENV\ES\130628\FIG 1.dgn DATE:27/06/2013 TIME: 12:07:46 USER: yim42169

Project

Environmental Protection DepartmentThe Government of the Hong Kong

Special Administrative Region

AGREEMENT NO. CE34/2011(EP)

DEVELOPMENT OF ORGANIC WASTE TREATMENT

FACILITIES PHASE 2 - FEASIBILITY STUDY

�T�}Ł}_� �C�E�3�4�

|vU\,{�N�gg_j˙��nÞV6

�� �/n �yr �%R �L

°t ��X �Ý

Page 20: Development of Organic Waste Treatment Facilities, Phase 2 發展 … › eia › register › report › eiareport › eia... · 2013-10-03 · Development of Organic Waste Treatment

G

WPO17.3

17.1 16.2

18.1

19.7

TS

TS

TS

TS

ôÀÒ„OF¤›ÀV‚bflo

Environmental Protection DepartmentSha Ling Livestock Waste

Composting Plant

'°Þ

'°Þ

'°Þ

WT

BurialUrns

BurialUrns

G

G

G

W

W

PO

PO

17.7

25.6

18.6

38.4

38.4

25.3

16.0

16.5

38.1

20.5

17.638.4

38.4

24.4

38.9

37.317.1

38.6

35.7

38.827.8

38.4 28.8

20.8

30.721.8

38.7

19.2

38.3

29.3

25.3

38.0

20.9

21.4

28.0

26.8

23.025.1

28.937.7

37.5

E

E

L

L

L

E

L

L

LL

L

E

L

LL

EL

E

E

L

E

E

E L L

L

E

ETE

E

TS

TS

TS

TS

TS

TS

TS

CUL

CUL

CUL

PO

19.9

18.7

19.3

16.5

18.9

17.6

18.318.5

18.1

18.2

23.1

18.5

18.7

23.7

18.6

25.619.0

18.9

21.9

21.220.121.6

23.9

20.3

24.3

28.4

28.5

E

E

E

E

E

E

0 10 20 25m

1 : 500 SCALE BAR

155

843200 N

843000 N

P1 HYJUN 13 MING FIRST ISSUE AFK

8

8

8

5

23

14

15

16

WEIGH

BRIDGES

1 / 2

3 / 4

11 / 12

9

10

18

16

6/7

13

13

13

PROPOSED SITE AREA

ìd �p� �å]

PRELIMINARY SITE LAYOUT

FIGURE 2

MING

P3PRE1:1500

AFK

AT

AT

HY

HY

�W

�R �ek �å] �0

˚���

Kj

12

AREA (m )2

-

CHP / BOILER

COMPONENT

1

No.

RECEPTION

2

5

8

9

10

13

14

15

16

18

-

-

-

-

522PREPARATION

PRETREATMENT 474

BUFFER TANK

SEPARATOR (UPPER LEVEL) 156

COMPOSTING SYSTEM

WASTE WATER TREATMENT 729

DIGESTER TANKS

FLARE

GAS CLEANING SYSTEM 105

3204

4

5

12

4

-

-

20

HEIGHT (m)

10

16.5

10.5

STACK23 - 30

25

GAS HOLDER 1

- 10.5GAS HOLDER 2

3/4

11/12

50 46/7 HEAT EXCHANGERS

12

Ł} P} b�Mz �(�

-

-

-

-

4

-

-

-

18

-

DIA.(m)

11.3

-

-

10

10

ôv�_ � Ø�ƒ^ �

¥c �6

�n ��

Ø} �]

–q �⁄N

[� ��u

�R �â� �hV

�X �¥�

al �4l

�W �R{ ��

#l �Ô� �Łm

#l �Ô� �2Q

#l �Ô� �2Q

Yq

–q �ß� �o� �"

HYGIENISATION

HYP2 AFKMINGAUG 13 GENERAL REVISION

96 / 60

�_ ��P �ˆ

�� �U

GENERAL REVISIONSEP 13 MING AFKP3 HY

Key to symbols

App�dCh�k�dDescriptionDrawnDateRev

RevStatus

Drawing Number

Scale at A1

Eng check

Approved

Coordination

Dwg check

Drawn

Designed

Title

Notes

Client

Reference drawings

J:\297677\REPORT\ENV\ES\130911\FIG 2.dgn DATE:11/09/2013 TIME: 11:55:12 USER: yim42169

Project

Environmental Protection DepartmentThe Government of the Hong Kong

Special Administrative Region

AGREEMENT NO. CE34/2011(EP)

DEVELOPMENT OF ORGANIC WASTE TREATMENT

FACILITIES PHASE 2 - FEASIBILITY STUDY

�T�}Ł}_� �C�E�3�4�

|vU\,{�N�gg_j˙��nÞV6

�� �/n �yr �%R �L

°t ��X �Ý