Proposed Solution
POS (Point of Sale)
Duchess FashionsTokyo Square, Japan Garden City.
8/18/2019 Duchess Fashons POS (2)
2/12
2 | P a g e
Table of Contents
1. Purpose ........................................................................................................................... 3
2. System Context ........................................................................................................... 3
3. System-Wide Requirements ................................................................................... 4
4. Technical Architecture ............................................................................................... 4
5. Development Tools ..................................................................................................... 5
6. Required Infrastructure ............................................................................................ 5
6.1. Network ....................................................................................................................... 5
6.2. Server (Minimum Requirements)...................................................................... 6
7. System Documentation ............................................................................................ 6
8. Product Support ........................................................................................................... 6
8.1. Support and Service plan ..................................................................................... 6
8.2. Support Schedule .................................................................................................... 6
8.3. Support Methods ..................................................................................................... 6
9. Installation, Testing and Implementation ......................................................... 6
10. Training Plan ............................................................................................................. 7
10.1. System Administration Training .................................................................... 7
10.2. Maintenance Training ......................................................................................... 7
10.3. User Training ......................................................................................................... 7
11. Terms and Conditions ............................................................................................ 7
12. Enhancements .......................................................................................................... 9 13. Warranty ..................................................................................................................... 9
14. Delivery of Product ................................................................................................. 9
15. Financial Proposal.................................................................................................. 10
16. Payment Mode ........................................................................................................ 11
Search us ........................................................................................................................... 12
8/18/2019 Duchess Fashons POS (2)
3/12
3 | P a g e
1. Purpose
The POS for Duchess Fashions is an integrated set of functions that enable thecompany to conduct of its business. The various modules are used by different
groups.
2. System Context
The POS system will be a Desktop system. All data will reside on a central server.Report reside also an online server.
Figure: Context Diagram
Warehouse
Customers
Database
Retail Shop
8/18/2019 Duchess Fashons POS (2)
4/12
4 | P a g e
3. System-Wide Requirements
The system must support the following non-functional requirements.
99% uptime
Response time – 1 second page load Hi performance Network
Hi performance System Machines
Hi-speed Internet connectivity (dedicated)
Stable system backup storage
Necessary software backup etc.
4. Technical Architecture
The following technical architecture illustrates the layered architecture that will be
used to implement the integrated solution.
The implementation will be accomplished through a standard model-view controller(MVC) which enables abstraction between the key components of the user interface,
the business logic and the data. This approach reduces the time and effort to modify
the system as requirements change.
8/18/2019 Duchess Fashons POS (2)
5/12
5 | P a g e
Figure: Model-View-Controller Architecture
5. Development Tools
The C# languages and SQL Server with necessary libraries and components will beused to develop the system.
6. Required Infrastructure
6.1. Network
Duchess will provide the all necessary POS Equipment’s and infrastructure to enableconnectivity between client workstations and the central system server. The
communication channel provided will enable transmission control protocol accessfrom all sectors to the server either through local area network connections or
through virtual private network connections.
8/18/2019 Duchess Fashons POS (2)
6/12
6 | P a g e
6.2. Server (Minimum Requirements)
The following describes the requirements for the server machine:
Hardware Data Storage Device
Backup Data Storage Device Operating System Windows 2008 Server Enterprise or
above version
Web Server Internet Information Services (IIS)
Database System SQL Server 2008 or above
7. System Documentation
All the application software shall be backed by system operational documentationand any elaborate technical documentation will be satisfied by MASHTECH
Bangladesh as requested.
8. Product Support
8.1. Support and Service plan
System support will be provided for a 6 months, commencing on the productionimplementation date of the software. This includes troubleshooting of the delivered
only software, not hardware or operating systems or any other equipment or
application.
The following support will be provided under the plan:
Response as early as possible.
Contact person for support service – One dedicated support contact
Version / Upgrade continue provide.
8.2. Support Schedule
Support of the POS system shall be provided working day per week during the hours
of 10.00 AM to 3.00 PM local time.
8.3. Support Methods
Telephone support is available during the support schedule as needed. There will be
one dedicated contact to initiate support process. On-site support will be providedthe day following a support request.
9. Installation, Testing and ImplementationPrior to production implementation the system software will be delivered and
installed by MASHTECH Bangladesh on the Duchess Fashions server. Individualsidentified by Duchess Fashions will test the system and validate the functionality
outlined in this document within 3 business days. Once this testing is complete, alldefects will be reported to the representative from MASHTECH Bangladesh. Defects
will be resolved and a final installation will take place at Duchess Fashions.
8/18/2019 Duchess Fashons POS (2)
7/12
7 | P a g e
10. Training Plan
10.1.System Administration Training
System raining will be provided for a total of 3 full consecutive days. It is Duchess
Fashions responsibility to identify attendees and to make them available for the
entirety of each training day. Training will be conducted at the location of the serverfacility. The training schedule will be mutually agreed to between MASHTECH
Bangladesh and the Duchess Fashions 2(Two) weeks before production
implementation.
10.2.Maintenance Training
Training regarding maintenance functions will be provided for a total of 2 fullconsecutive days. It is Duchess Fashion’s responsibility to identify attendees and tomake them available for the entirety of each training day. Training will be conducted
at the location of the server facility. The training schedule will be mutually agreed to
between MASHTECH Bangladesh and Duchess Fashions 2 weeks before productionimplementation.
10.3.User Training
Training for system users will be provided for a total of 5 full consecutive days with
each training session lasting for a single day. It is Duchess Fashion’s responsibility toidentify attendees for each session and to make them available for the entirety of
that training day. Training will be conducted at the Duchess Fashions. The training
schedule will be mutually agreed to between MASHTECH Bangladesh and DuchessFashions 2 weeks before production implementation.
11. Terms and Conditions
Delivery The production implementation will commence 12 weeks
after the final agreement has been signed, at which time
the software will be delivered as well. Training willcommence after production implementation is completed.
Acceptance period Project completion and project acceptance will occur by
either written acceptance from the Duchess Fashions
Responsible person or after 90 working days following the
completion of User Training, assuming no problems orissued are communicated to MASHTECH Bangladesh by the
Duchess Fashons Responsible Person.
Scope The scope of the work will be limited to that defined in thisdocument. Any changes to the functionality of the system or
other MASHTECH Bangladesh support will be considered as
a change request to this document. It must be submitted inwriting by the Duchess Fashions Responsible Persons to
MASHTECH Bangladesh, at which point the request will be
8/18/2019 Duchess Fashons POS (2)
8/12
8 | P a g e
evaluated with potential impacts to the cost and/or scheduleof the project.
Confidentiality Both parties agree to not release any information,
intellectual property or software provided by the other party
to another other entity.
Offer validity this technical proposal will remain valid for up to 1 monthfrom submission.
8/18/2019 Duchess Fashons POS (2)
9/12
9 | P a g e
12. Enhancements
Any changes requested to the system by Duchess Fashions not described in this
document will be considered enhancements and thus outside of the scope of thisagreement and the associated pricing. These requests may be submitted by theResponsible Person to MASHTECH Bangladesh. In turn, MASHTECH Bangladesh willprovide a written statement of work, proposed schedule and cost estimate for review
and acceptance Duchess Fashions.
13. Warranty
This contract includes a one year warranty commencing on the production
implementation date of the software. During this time period, if any defects areidentified in the software that was provided in the course of satisfying the statement
of work described in this document, MASHTECGH Bangladesh will incur the cost ofsystem changes and upgrades at the Duchess Fashions server facility.
14. Delivery of Product
SL Description of Item Quantity ofunits required
Point of delivery
1.
1. Store Inventory & Pricing Management
2. Retail Shop Inventory Management
3. POS System4. Invoice and Report
1 Duchess
Fashions
8/18/2019 Duchess Fashons POS (2)
10/12
10 | P a g e
15. Financial Proposal
Financial offer will remain valid for 30 days from the date of submission.
1. Store Inventory Pricing Management
Items No Description Total (Taka)
1 Requirement Analysis 15,000.00
2 System Design 30,000.00
3 Coding 30,000.00
4 Documentation 3,000.00
5 Test 5,000.00
6 Setup & Installation 2,000.00
7 Training 5,000.00
Total 90,000.00
1. Retails Shop Inventory Management
Items No Description Total (Taka)
1 Requirement Analysis 10,000.00
2 System Design 30,000.00
3 Coding 20,000.00
4 Documentation 2,000.00
5 Test 3,000.00
6 Setup & Installation 2,000.00
7 Training 3,000.00
Total 70,000.00
1. POS Systems
Items No Description Total (Taka)
1 Requirement Analysis 8,000.00
2 System Design 20,000.00
3 Coding 14,000.00
4 Documentation 2,000.00
5 Test 2,000.00
6 Setup & Installation 2,000.00
7 Training 2,000.00
Total 50,000.00
8/18/2019 Duchess Fashons POS (2)
11/12
11 | P a g e
16. Payment Mode
Description of Item Part-1 Part-2
Store Inventory & PricingManagement
Item: 1,2,3 Item: 4,5,6,7
Retail Shop Inventory Management Item: 1,2,3 Item: 4,5,6,7
POS System Item: 1,2,3 Item: 4,5,6,7
Invoice and Report Item: 1,2 Item: 3
1. Invoice and Report
Items No Description Total (Taka)
1 Requirement Analysis 10,000.00
2 System Design 10,000.00
3 Coding 10,000.00
4 Training 5,000.00
Total 35,000.00
8/18/2019 Duchess Fashons POS (2)
12/12
12 | P a g e
Search us Shafique Mohammod Mostafaa
Mobile: 01710908295
Email: [email protected]
mailto:[email protected]:[email protected]:[email protected]:[email protected]