17
Contents: SecƟon Page 1) Required tools and equipment 1 2) UƟlity power outlet vericaƟon 2 3) Unboxing components and inventory 3 4) Rack installaƟon versus oor installaƟon 4 5) 4Post Rack InstallaƟon 57 6) 2Post Rack InstallaƟon 810 7) Floor InstallaƟon 11 8) Component cabling 12 9) Powerup / operaƟonal vericaƟon 1314 10) BaƩery cabinet (Firmware) conguraƟon 15 11) Network interface (Webcard) conguraƟon 16 EmersonLiebert 3kVA UPS InstallaƟon Guide Rev. 11.17.14

Emerson Liebert 3kVA UPS Installation Guide11!17!14

Embed Size (px)

DESCRIPTION

Installation and configuration of the Emerson Liebert GXT3 series 3kVA UPS units. Includes rack and floor installation, cabling with external batteries, and startup. Provided by Telmon, Inc.

Citation preview

  • Contents: Secon Page1) Requiredtoolsandequipment 1

    2) Ulitypoweroutletverificaon 2

    3) Unboxingcomponentsandinventory 3

    4) Rackinstallaonversusfloorinstallaon 4

    5) 4PostRackInstallaon 57

    6) 2PostRackInstallaon 810

    7) FloorInstallaon 11

    8) Componentcabling 12

    9) Powerup/operaonalverificaon 1314

    10) Baerycabinet(Firmware)configuraon 15

    11) Networkinterface(Webcard)configuraon 16

    EmersonLiebert3kVAUPSInstallaonGuide

    Rev.11.17.14

  • 1

    Liebert3kVAUPSInstallaonGuide

    Requiredtoolsandequipment

    Thisguide,printedinCOLORoronaLaptop/TabletDONOTviewonasmartphone!BasichandtoolsDrill/Driverwith1/4drillbitandPhilips#2and#3driverbits

    WindowslaptopwithchargerandCDROMdriveOnboardserialportorUSB>Serialadapter/workingwithdriversinstalledSerialcommunicaonsoware(Hyperterm,PuTTy,etc.)DigitalcameraCellularphonewithcharger

    Tools:

    Equipment:

    TosuccessfullycompleteaLiebertUPSinstallaon,thetoolsandequipmentlistedbelowarerequired.ContacttheTelmonPMifanyoftheseitemsarenotavailableBEFOREbeginninginstallaonprocedures.

  • 2

    Liebert3kVAUPSInstallaonGuide

    Utilitypoweroutletveriication

  • 3

    Liebert3kVAUPSInstallaonGuide

    Unboxingcomponentsandinventory

    AcompleteUPSunitiscomprisedofasmanyasadozenseparatecomponentsthatareassembledtocreateacompletepowersoluon.Itisimperavethateachitemisunboxedandinventoriedinanorganizedmannertopreventlostitemsandtoensurethesuccessandeaseofinstallaon.

    Moveallcomponentstoinstallaonarea:transportallboxescontainingUPScomponentstoalocaonneartheinstallaonsite.TheUPSmanufacturernameEmersonLiebertshouldbevisibleonmostorallofthecomponentpackaging.

    Unboxandinventoryallitems:ItisimportanttoremainorganizedwhenunboxingtheUPScomponents.OfparcularinterestaretheincludedcablesandCDROMdisc.Besuretosettheseitemsaside,astheywillbeneededduringtheconfiguraonsteps.

    Componentsofa3kVAUPSInstallaon:markeachitemaeritisunboxed:ifanyitemsaremissing,contactTelmonPM

    GXT33kVAMainUPSController

    Qty3,GXT372VExternalBaeryCabinets

    MicroPODExternalBypassUnit(PDU)

    RM120PowerStrip

    NIC/WebcardRackMountBrackets

    CDROM/SerialCable/BaeryCables

  • 4

    Liebert3kVAUPSInstallaonGuide

    Rackinstallationversusloorinstallation

  • 5

    Liebert3kVAUPSInstallaonGuide

    4PostRackInstallation: Step1brackets

    3kVAUPSandbaerycabinetsshowingbracketlocaons.

  • 6

    Liebert3kVAUPSInstallaonGuide

    4PostRackInstallation: Step1brackets,cont.

    1:Slidetwopartsofbrackettogetherandplacebetweenrackrailstodeterminelength

    2:Place4oftheprovidedscrewsintothebracketattheappropriateslotstoholdthetwopartstogether,butDONOTghten.BesurethattherectangularholefacestheFRONToftherackwheninstalling.

    3:Usingthechartsprovidedonpage2anda1/4drillbit(orstepdrill),enlargetheholesofthevercalracksupportrailsattheINSIDEfaces.Enlargetheholesatboththefrontandbackoftherack.

    4:Installaminimumof(2)screwsinboththefrontandrearofeachbracket,securingittotherackrails.Tightenthe4smallscrewsthatsecurethebrackethalvestogether.Repeattheabovestepsforeachbracketinall,afullUPSinstallaonwillhave4bracketpairs.ThereisonepairofbracketsforeachUPScabinet.

    NOTE:UPSbracketholespacingwillplacethecenterofeachbracketatamarkontherackdenongoneUspace.TheedgesofthemounngtabwillNOTalignasexpectedwithUlocaons.

  • 7

    Liebert3kVAUPSInstallaonGuide

    4PostRackInstallation: Step2Components

    NOTE:WheninstallingtheinnerslideontheUPScabinets,besuretofacethetaperedendwithlockingtabtowardtheREARofthecabinet.

    InstallinnersliderailsandfronthandlesoneachUPScabinet.Eachofthe4UPScabinetsrequires2innersliderailsand2fronthandles.

    RailInstall HandleInstall

    Installthe4UPScabinetsintotherack.UPScabinetsareinstalledbyengagingtheinnerrailswiththerackmountedslides.Startattheboomoftherackandinstalleachofthe3baerycabinetsintothepreviouslyinstalledslides.InstallthemainUPScabinetatthetopoftheUPSstack.SecuretheUPScomponentstotherackbyinstallingrackscrewsthroughthemounngholesinthecabinethandles.

    UPS

  • 8

    Liebert3kVAUPSInstallaonGuide

    2PostRackInstallation: Step1Brackets

  • 9

    Liebert3kVAUPSInstallaonGuide

    2PostRackInstallation: Step1Brackets,cont.

  • 10

    Liebert3kVAUPSInstallaonGuide

    2PostRackInstallation: Step2Components

  • 11

    Liebert3kVAUPSInstallaonGuide

    FloorInstallation

  • 12

    Liebert3kVAUPSInstallaonGuide

    ComponentCabling

    InstalltheMicroPODexternalbypassunitandRM120powerstrip.TheMicroPODshouldbeinstalledattheBACKoftherackwithoutletsfacingforward.ThiscomponentshipswithmounngbracketsitshouldbeposionedjustabovethetopoftheUPSatthebackoftherack.TheRM120powerstripshouldbeinstalledatthefrontoftherackataboutmidrack.ThisunitshouldbeposionedwiththedisplayandswitchfacingtheFRONToftherack.

    Connectcomponentcabling.Connectallcablesasshownbelow,starngwiththeexternalbaeryandUPStoMicroPODconnecons.ConnecttheUlitycordtothewalloutletLAST.

  • 13

    Liebert3kVAUPSInstallaonGuide

    Powerup/operationalveriication

  • 14

    Liebert3kVAUPSInstallaonGuide

    Powerup/operationalveriicationcont.

    DONOTUSETHEOUTLETSONTHEBACKOFTHEUPS!

  • 15

    Liebert3kVAUPSInstallaonGuide

    Batterycabinet(irmware)coniguration

  • 16

    Liebert3kVAUPSInstallaonGuide

    Networkinterface(Webcard)coniguration