34
EMORY UNIVERSITY, ATWOOD CHEMISTRY BUILDING ADDITION & RENOVATION

Emory Chemistry Addition Project Photography

Embed Size (px)

DESCRIPTION

 

Citation preview

  • EMORY UNIVERSITY,ATWOOD CHEMISTRY BUILDING

    ADDITION & RENOVATION

  • Cooper Carry began multi-phased renovations and additions to the Chemistry Center in 1996. This latest phase of this projecta 70,000 square foot addition and 40,000 square foot renovation is currently under construction and scheduled for completion in 2015. The building is designed to create a new front door for Emorys multidisciplinary chemistry based research programs. Teaching and research space will be inte-grated with a shared focus on the buildings common space. Undergraduate students will be connected to meaningful active research activities. Labs will feature open plans, significant day lighting and plug and play laboratory furniture to reduce the time and cost associated with reconfiguration as needs change.

    During this phase of construction, research and classroom activities are continuing their normal operations. This has required careful coordination with the engineering and construction management teams, to phase and execute with limited disrup-tion of the ongoing activities.

    The project is designed to achieve LEED-NC Gold.

    EMORY UNIVERSITYCHEMISTRY ADDITION

    Atlanta, Georgia

  • 191 Peachtree Street, N.E.Suite 2400Atlanta, GA 30303-1770phone: 404-237-2000

    Cooper Carry

    75 Broad Street Suite 2210New York, NY 10004phone: 212-691-0271

    625 North Washington StreetSuite 200Alexandria, VA 22314phone: 703-519-6152

    For more information please contact [email protected] or visit our website at www.coopercarry.com

    Cooper Carry, inc. 2015

  • atlanta new york washington

    coopercarry.com