Rencana Anggaran Biaya Daftar Harga BarangNoNama MaterialSatuanHarga Satuan (Rp)

1MCB Schneider Domae 32 ABh34.000

2MCB Schneider Domae 10 ABh34.000

3Box MCB Bh38.000

4Sakelar Tunggal BrocoBh7.000

5Sakelar Seri BrocoBh15.000

6Stop Kontak Broco GracioBh11.500

7Stop Kontak AC PanasonicBh50.000

8Fitting Plafon Persegi BrocoBh9.000

9Variasi lampu tamanBh70.000

10Lampu Philips 5 WattBh23.000

11Lampu Philips 10 WattBh26.000

12Lampu Philips 12 WattBh27.000

13Lampu Philips 15 WattBh31.000

14Lampu Philips 20 WattBh28.000

15Lampu Philips 25 WattBh36.000

16Lampu Philips 50 WattBh115.000

17Kotak Hubung T-dos ClipsalBh4.500

18Inbowdoss PanasonicBh2.000

19Klem Pipa 5/8"Bh500

20Elbow PVC 5/8Bh8.500

21Isolasi UnibelBh8.000

22Arde Pancang 15 mm2Meter16.000

23Pipa Galvanis 5/8Meter37.500

24Pipa PVC 5/8Btg10.000

25Kabel NYA 2,5 mm2 Merah Meter2.300

26Kabel NYA 2,5 mm2 Biru Meter2.300

27Kabel NYA 2,5 mm2 Kuning Hijau Meter2.300

28Kabel NYY 2 x 2,5 mm2 Meter11.000

29Kawat BC 6 mm2Meter6.500

Biaya Material`NoNama MaterialSatuanHarga Satuan(Rp)Volume1 unitRumahHargaTotal(Rp)

1MCB Schneider Domae 32 ABh34.000134.000

2MCB Schneider Domae 10 ABh34.0003102.000

3Box MCB Bh38.000276.000

4Sakelar Tunggal BrocoBh7.000856.000

5Sakelar Seri BrocoBh15.0008120.000

6Stop Kontak Broco GracioBh11.50030345.000

7Stop Kontak AC PanasonicBh50.0008400.000

8Fitting Plafon Persegi BrocoBh9.00034306.000

9Variasi lampu tamanBh70.0005350.000

10Lampu Philips 5 WattBh23.0005115.000

11Lampu Philips 10 WattBh26.0004104.000

12Lampu Philips 12 WattBh27.00029783.000

13Lampu Philips 15 WattBh31.000262.0000

14Lampu Philips 20 WattBh28.000128.000

15Lampu Philips 25 WattBh36.0004144.000

16Lampu Philips 50 WattBh115.0001115.000

17Kotak Hubung T-dos ClipsalBh4.50074333.000

18Inbowdoss PanasonicBh2.00053106.000

19Klem Pipa 5/8"Bh500500250.000

20Elbow PVC 5/8Bh8.50041348.500

21Isolasi UnibelBh8.000864.000

22Arde Pancang 15 mm2Meter16.0001.524.000

23Pipa Galvanis 5/8Meter37.50011,5431.250

24Pipa PVC 5/8Btg10.00035350.000

25Kabel NYA 2,5 mm2 Merah Meter2.300108248.400

26Kabel NYA 2,5 mm2 Biru Meter2.300104239.200

27Kabel NYA 2,5 mm2 Kuning Hijau Meter2.30046105.800

28Kabel NYY 3 x 2,5 mm2 Meter11.00036396.000

29Kawat BC 6 mm2Meter6.5001597.500

Biaya Total Material6.133.650

Biaya Pekerja (buruh)

Perhitungan jam kerja untuk melaksanakan pemasangan dan kabel untuk 1 Unit RumahNoNama MaterialVolume 1 Unit RumahSatuanWaktu Pemasangan (jam)Jumlah Waktu Pemasangan (jam)

1Pipa PVC 5/8"105Meter0.4345.15

2Pipa Galvanis 5/8"11.5Meter0.434.945

3Kotak sambung, saklar, atau stop kontak128Bh0.451.2

4Kabel NYA 2.5 mm2 Merah108Meter0.038.64

5Kabel NYA 2.5 mm2 Biru104Meter0.033.12

6Kabel NYA 2.5 mm2 Kuning46Meter0.031.38

7Kabel NYY 2 x 2.5 mm236Meter0.4315.48

Total Waktu Pemasangan129.915

Apabila pekerja untuk tukang listrik adalah Rp. 7.500 per jam, maka biaya pelaksanaan atau biaya pekerja adalah :Untuk Biaya Pekerja untuk 1 Unit rumah := 129.915 x Rp. 7500 = Rp 974.363

Biaya Keseluruhan Proyek

Biaya Keseluruhan Proyek 1 Unit Rumah :

Biaya MaterialRp. 6.133.650Biaya Pekerja (buruh) Rp. 974.363

Biaya Peralatan ditaksir Rp. 2.000.000

Jumlah Rp. 9.108.013Biaya Tak terduga di taksir 10%Rp. 910.801

Total Biaya Rp. 10.018.814Keuntungan 10% dari total biaya Rp. 1.001.881

Jumlah biaya keseluruhan proyek Rp. 11.020.692PPN 10%Rp. 1.102.062TotalRp. 12.122.757DibulatkanRp. 12.123.000