METRADO ESTRUCTURA ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL 03.00.00 MOVIMIENTO DE TIERRAS 03.02.00 ESCAVACIÓN CIMIENTOS CORRIDOS 03.02.01 CORTE DE TERRENO HASTA 0.40 M TERRENO NORMAL EN ZONA 1, ADMINISTRACION 1 10.6 6.26 0.10 6.64 EN RAMPAS 1 7.82 5.30 0.25 10.36 RAMPA ENTRE ZONA, LABORATORIOS Y ZONA 3, SSHH 1 2.80 1.80 0.23 1.16 03.02.02 EXCAV. ZANJA P/CIMIENTO MAT. SUEL. H=1.00 a 1.50 M ZONA 1 ADMINISTRACION EJE 1 1 5.4 0.8 1 4.32 EJE 2 1 3.1 0.8 1 2.48 EJE 3 1 5.4 0.8 1 4.32 EJE A Y C 2 0.91 0.8 1 1.46 2 1.27 0.7 1 1.78 2 1.45 0.7 1 2.03 EJE B 1 2.96 0.8 1 2.37 1 2.22 0.8 1 1.78 ZONA 2 LABORATORIOS EJE 4, 7, 11 Y 12 4 5.7 0.8 1 18.24 EJE D Y F 2 10.2 0.65 1 13.26 EJE E 1 1.075 0.65 1 0.70 ZONA 3 SS HH. EJE 13, 14 Y 15 3 7.925 0.8 1 19.02 EJE G Y J 2 4.83 0.8 1 7.73 EJE H 1 4.83 0.55 1 2.66 ENTRE EJE 13 Y 14 1 1.325 0.55 1 0.73 1 3.125 0.5 1 1.56 ENTRE EJE 14 Y 15 1 2.075 0.5 1 1.04 ENTRE EJE H e I 5 0.9 0.5 1 2.25 ENTRE EJE I Y J 1 0.625 0.5 1 0.31 ZONA 4 CISTERNA Y TANQUE ELEVADO EJE 16 Y 17 2 0.225 0.55 1 0.25 EJE M 1 1.9 0.55 1 1.05 ACCESO PRINCIAPAL EN GRADAS 1 3.625 0.4 0.5 0.73 1 0.48 0.4 0.5 0.10 EN RAMPA 1 9.4 0.4 0.5 1.88 1 0.48 0.4 0.5 0.10 EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 4.8 0.5 1 2.40 EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 14.77 0.5 1 7.39 EN SARDINELES EN VEREDAS DE ZONA 1 2 10 0.15 0.4 1.20 2 8.725 0.15 0.4 1.05 EN VEREDAS DE ZONA 2 2 9.65 0.15 0.4 1.16 2 25.2 0.15 0.4 3.02 EN VEREDAS EN ZONA 3 2 10.25 0.15 0.4 1.23 2 9.1 0.15 0.4 1.09 EN VEREDA DE ZONA 4 2 5.5 0.15 0.4 0.66 2 5.2 0.15 0.4 0.62 EN VEREDA DE ACCESO PRINCIPAL 2 1.48 0.15 0.4 0.18 2 6.7 0.15 0.4 0.80 2 3.23 0.15 0.4 0.39 1 13.078 0.15 0.4 0.78 1 8.65 0.15 0.4 0.52 1 6.31 0.15 0.4 0.38 1 11.56 0.15 0.4 0.69 1 2.82 0.15 0.4 0.17 2 6.98 0.15 0.4 0.84 EN VEREDAS ENTRE ZONA 4 Y 6 1 2.55 0.15 0.4 0.15 1 2.23 0.15 0.4 0.13 1 1.64 0.15 0.4 0.10 PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMB UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO:

Estructuras, Arquitectura, Sanitarias, Electricas

Embed Size (px)

DESCRIPTION

Estructuras, Arquitectura, Sanitarias, Electricas

Citation preview

METRADOESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

03.00.00 MOVIMIENTO DE TIERRAS

03.02.00 ESCAVACIÓN CIMIENTOS CORRIDOS

03.02.01 CORTE DE TERRENO HASTA 0.40 M TERRENO NORMAL 18.16 M3

EN ZONA 1, ADMINISTRACION 1 10.6 6.26 0.10 6.64

EN RAMPAS 1 7.82 5.30 0.25 10.36

RAMPA ENTRE ZONA, LABORATORIOS Y ZONA 3, SSHH 1 2.80 1.80 0.23 1.16

03.02.02 EXCAV. ZANJA P/CIMIENTO MAT. SUEL. H=1.00 a 1.50 M 134.33 M3

ZONA 1 ADMINISTRACION

EJE 1 1 5.4 0.8 1 4.32

EJE 2 1 3.1 0.8 1 2.48

EJE 3 1 5.4 0.8 1 4.32

EJE A Y C 2 0.91 0.8 1 1.46

2 1.27 0.7 1 1.78

2 1.45 0.7 1 2.03

EJE B 1 2.96 0.8 1 2.37

1 2.22 0.8 1 1.78

ZONA 2 LABORATORIOS

EJE 4, 7, 11 Y 12 4 5.7 0.8 1 18.24

EJE D Y F 2 10.2 0.65 1 13.26

EJE E 1 1.075 0.65 1 0.70

ZONA 3 SS HH.

EJE 13, 14 Y 15 3 7.925 0.8 1 19.02

EJE G Y J 2 4.83 0.8 1 7.73

EJE H 1 4.83 0.55 1 2.66

ENTRE EJE 13 Y 14 1 1.325 0.55 1 0.73

1 3.125 0.5 1 1.56

ENTRE EJE 14 Y 15 1 2.075 0.5 1 1.04

ENTRE EJE H e I 5 0.9 0.5 1 2.25

ENTRE EJE I Y J 1 0.625 0.5 1 0.31

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 Y 17 2 0.225 0.55 1 0.25

EJE M 1 1.9 0.55 1 1.05

ACCESO PRINCIAPAL

EN GRADAS 1 3.625 0.4 0.5 0.73

1 0.48 0.4 0.5 0.10

EN RAMPA 1 9.4 0.4 0.5 1.88

1 0.48 0.4 0.5 0.10

EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 4.8 0.5 1 2.40

EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 14.77 0.5 1 7.39

EN SARDINELES

EN VEREDAS DE ZONA 1 2 10 0.15 0.4 1.20

2 8.725 0.15 0.4 1.05

EN VEREDAS DE ZONA 2 2 9.65 0.15 0.4 1.16

2 25.2 0.15 0.4 3.02

EN VEREDAS EN ZONA 3 2 10.25 0.15 0.4 1.23

2 9.1 0.15 0.4 1.09

EN VEREDA DE ZONA 4 2 5.5 0.15 0.4 0.66

2 5.2 0.15 0.4 0.62

EN VEREDA DE ACCESO PRINCIPAL 2 1.48 0.15 0.4 0.18

2 6.7 0.15 0.4 0.80

2 3.23 0.15 0.4 0.39

1 13.078 0.15 0.4 0.78

1 8.65 0.15 0.4 0.52

1 6.31 0.15 0.4 0.38

1 11.56 0.15 0.4 0.69

1 2.82 0.15 0.4 0.17

2 6.98 0.15 0.4 0.84

EN VEREDAS ENTRE ZONA 4 Y 6 1 2.55 0.15 0.4 0.15

1 2.23 0.15 0.4 0.13

1 1.64 0.15 0.4 0.10

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

1 1.98 0.15 0.4 0.12

2 12.2 0.15 0.4 1.46

EN CANALES PLUVIALES

EN ZONA 1 2 10.6 0.3 0.15 0.95

2 9.625 0.3 0.15 0.87

EN ZONA 2 2 10.6 0.3 0.15 0.95

2 26.1 0.3 0.15 2.35

ZONA 3 SS HH. 2 10.975 0.3 0.15 0.99

2 9.25 0.3 0.15 0.83

EN BUZONES PLUVIALES 3 0.8 0.8 1 1.92

EN MESAS DE TRABAJO LABORATORIO DE FISICA 16 0.4 1.05 0.3 2.02

EN DADOS DE CONCRETO EN MESAS DE CONCRETO 15 0.4 0.4 2 4.80

03.03.00 EXCAVACION PARA ZAPATAS Y SIMILARES

03.03.02 EXCAVACIÓN PARA ZAPATA MAT. SUELTO H=1.40 m 127.52 M3

EN ZONA 1 ADMINISTRACIÓN

ZAPATA 1 4 1.4 1.2 1.6 10.75

ZAPATA 2 2 1.4 1.2 1.6 5.38

EN ZONA 2 LABORATORIOS

ZAPATA 3 8 1.4 1.05 1.6 18.82

ZAPATA 4 10 1.7 1.65 1.6 44.88

EN ZONA 4 CISTERNA Y TANQUE ELEVADO

ZAPATA 5 2 1 1 2.5 5.00

ZAPATA 6 4 1.2 1.2 2.5 14.40

ZAPTA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 1.37 16.97

1 2.3 1.4 1.37 4.41

ZAPATA 7 3 1.2 1.2 1.6 6.91

03.12.00 EXCAVACION MASIVA

03.12.01 EXCAVACION MASIVA H=1 M C/TRACTOR 523.85 M3

ZONA 3, SSHH 1 12.40 10.00 0.55 68.20

ZONA 4, CISTERNA Y TANQUE ELEVADO 1 7.34 5.50 0.65 26.24

EXCAVACION PARA TANQUE CISTERNA 1 3.40 1.50 1.9 9.69

EN ZONA 2, LABORATORIOS 1 21.16 10.60 0.36 80.75

RAMPA ZONA 3, SSHH Y ZONA4 CISTERNA 1 5.65 4.22 0.74 17.64

RAMPA ENTRE ZONA 4,CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 9.85 1.70 1.78 29.81

1 9.85 1.70 1.17 19.59

LOSA DEPORTIVA 1 31.30 18.10 0.48 271.93

03.21.00 RELLENO CON MATERIAL PROPIO

03.21.01 RELLENO CON MATERIAL PROPIO MANUAL 74.91 M3

ZONA1 AREA

ZAPATA 1 4 0.7 0.9 2.52

4 0.21 0.9 0.76

4 0.34 0.4 0.54

ZAPATA 2 2 0.38 0.9 0.68

2 0.46 0.9 0.83

2 0.38 0.4 0.30

EN EJE 1 Y 3 2 1.485 0.4 1.19

2 1.42 0.4 1.14

EJE 2 2 2.3 0.275 0.4 0.51

EJE A Y C 4 3.62 0.275 0.4 1.59

EJE B 2 5.98 0.275 0.4 1.32

ZONA 2 AREA

ZAPATA 3 8 1.15 0.9 8.28

ZAPATA 4 10 2.22 0.9 19.98

EJE 4, 7, 11 Y 12 8 5.7 0.275 0.4 5.02

EJE D Y F 4 10.2 0.25 0.4 4.08

ZONA 3

EJE 13, 14 Y 15 6 7.925 0.275 0.4 5.23

EJE G,H Y J 6 6.75 0.275 0.4 4.46

ENTRE EJE 13 Y 14 2 1.325 0.2 0.4 0.21

2 3.125 0.175 0.4 0.44

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

ENTRE EJE 14 Y 15 2 2.075 0.175 0.4 0.29

ZONA 4 AREA

ZAPATA 5 2 0.78 1.9 2.96

ZAPATA 6 4 1.18 1.9 8.97

ZAPATA 7 3 1.34 0.9 3.62

03.31.00 REFINE NIVELACIÓN Y COMPACTACIÓN DEL TERRENO

03.31.01 NIVELACIÓN APISONADO MANUAL 1393.09 M2

ZONA 1 ADMINISTRACIÓN 1 10.60 9.63 102.08

ZONA 2 LABORATOIOS 1 26.10 10.61 276.92

ZONA 3 SSHH 1 10.98 9.95 109.25

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 5.50 5.50 30.25

VEREDAS ACCESO PRINCIPAL 1 15.28 1.20 18.34

1 6.68 3.30 22.04

1 17.58 5.30 93.17

VEREDAS DE ACCESO A ZONA 7, AUDITORIO 1 6.70 2.40 16.08

1 6.35 2.55 16.19

VEREDA DE ACCESO A ZONA 1, AADMINISTRACIÓN 1 3.30 4.00 13.20

VEREDA DE ACCESO A ZONA 2, LABORATORIOS 1 8.32 2.40 19.97

RAMPA DE ACCESO A ZONA 3, SSHH 1 3.10 1.80 5.58

VEREDA ENTRE ZONA 3, SSHH Y ZONA 5, LOSA DEPORTIVA 1 9.70 1.43 13.82

1 4.23 2.50 10.56

1 3.38 3.15 10.63

1 1.70 1.23 2.09

RAMPA ENTRE ZONA 4, CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 11.70 3.60 42.12

GRADAS EN ZONA 4 1 2.70 2.60 7.02

VEREDA ENTRE ZONA 4 CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 4.75 4.35 20.66

VEREDA DE ACCESO POSTERIOR 1 12.25 1.20 14.70

LOSA DEPORTIVA 1 18.10 30.10 544.81

2 3.00 0.60 3.60

03.35.00 BASE

03.35.01 BASE GRANULAR E= 0.2m COMPACTADO CON PLANCHA 548.41 M2

1 18.1 30.1 544.81

2 3 0.6 3.60

03.85.00 ELIMINACION DE MATERIAL EXCEDENTE

03.85.02 ELIMINACION MATERIAL EXCEDENTE 25% DE ESPONJAMIENTO 887.97 M3

DE EXCAVACIÓN MASIVA 1.25 523.85 654.82

DE EXCAVACION PARA ZAPATAS 1.25 127.52 159.40

DE EXCAVACIÓN PARA CIMIENTOS 1.25 134.33 167.91

DE CORTE DE TERRENO 1.25 18.16 22.70

DE RRELLENO CON MATERIAL PROPIO -1.56 74.91 -116.85

04.00.00 OBRAS DE CONCRETO SIMPLE

04.01.25 CONCRETO PARA CIMIENTO CORRIDO 1:10 (C:H) + 30% PG 74.18 M3

ZONA 1 ADMINISTRACION

EJE 1 1 5.95 0.8 0.6 2.86

EJE 2 1 2.73 0.8 0.6 1.31

EJE 3 1 5.95 0.8 0.6 2.86

EJE A Y C 2 0.8 0.8 0.6 0.77

2 1.925 0.7 0.6 1.62

2 2.25 0.7 0.6 1.89

EJE B 1 6.025 0.8 0.6 2.89

ZONA 2 LABORATORIOS

EJE 4, 7, 11 Y 12 4 6.25 0.8 0.6 12.00

EJE D Y F 2 17.1 0.65 0.6 13.34

EJE E 1 1.625 0.65 0.6 0.63

ZONA 3 SS HH.

EJE 13, 14 Y 15 3 7.925 0.8 0.6 11.41

EJE G Y J 2 5.95 0.8 0.6 5.71

EJE H 1 5.95 0.55 0.6 1.96

ENTRE EJE 13 Y 14 1 1.8 0.55 0.6 0.59

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

1 3.125 0.5 0.6 0.94

ENTRE EJE 14 Y 15 1 2.075 0.5 0.6 0.62

ENTRE EJE H e I 5 0.9 0.5 0.6 1.35

ENTRE EJE I Y J 1 0.625 0.5 0.6 0.19

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 Y 17 2 1 0.55 0.6 0.66

EJE M 1 2.7 0.55 0.6 0.89

ACCESO PRINCIAPAL

EN GRADAS 1 3.625 0.4 0.3 0.44

1 0.48 0.4 0.3 0.06

EN RAMPA 1 9.4 0.4 0.3 1.13

1 0.48 0.4 0.3 0.06

EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 4.8 0.5 0.6 1.44

EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 14.77 0.5 0.6 4.43

EN MESAS DE TRABAJA LABORATORIO

16 1.05 0.4 0.3 2.02

4 0.25 0.4 0.3 0.12

04.03.07 SOLADO PARA ZAPATAS C:H 1:12 E=4” 77.58 M2

EN ZONA 1 ADMINISTRACIÓN

ZAPATA 1 4 1.4 1.2 6.72

ZAPATA 2 2 1.4 1.2 3.36

EN ZONA 2 LABORATORIOS

ZAPATA 3 8 1.4 1.05 11.76

ZAPATA 4 10 1.7 1.65 28.05

EN ZONA 4 CISTERNA Y TANQUE ELEVADO

ZAPATA 5 2 1 1 2.00

ZAPATA 6 4 1.2 1.2 5.76

ZAPATA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 12.39

1 2.3 1.4 3.22

ZAPAT 7 3 1.2 1.2 4.32

04.07.13 CONCRETO DE SOBRE CIMIENTO 1:8 (C:H) + 25% PM 15.11 M3

ZONA 1 ADMINISTRACION

EJE 1 1 5.95 0.25 0.6 0.89

EJE 2 1 1.725 0.25 0.6 0.26

EJE 3 1 5.95 0.25 0.6 0.89

EJE A Y C 2 0.8 0.25 0.6 0.24

2 1.925 0.15 0.6 0.35

1 0.925 0.15 0.6 0.08

1 1.75 0.15 0.6 0.16

EJE B 1 5.025 0.25 0.6 0.75

ZONA 2 LABORATORIOS

EJE 4, 7, Y 12 3 6.25 0.25 0.6 2.81

EJE 11 1 4.15 0.25 0.6 0.62

EJE D 1 10.8 0.15 0.6 0.97

EJE F 1 13.699 0.15 0.6 1.23

EJE E 1 1.625 0.15 0.6 0.15

ZONA 3 SS HH.

EJE 13, 14 Y 15 3 6.375 0.25 0.6 2.87

EJE G 1 2.9 0.25 0.6 0.44

EJE J 1 3.45 0.25 0.6 0.52

EJE H 1 6.25 0.15 0.6 0.56

ENTRE EJE 13 Y 14 1 1.8 0.15 0.6 0.16

3 0.35 0.15 0.6 0.09

ENTRE EJE 14 Y 15 2 0.35 0.15 0.6 0.06

ENTRE EJE H e I 5 1.35 0.15 0.6 0.61

ENTRE EJE I Y J 1 0.625 0.15 0.6 0.06

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 Y 17 1 1 0.15 0.6 0.09

EJE M 1 2.7 0.15 0.6 0.24

04.07.91 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTO 146.58 M2

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

ZONA 1 ADMINISTRACION

EJE 1 2 5.95 0.6 7.14

EJE 2 2 1.725 0.6 2.07

EJE 3 2 5.95 0.6 7.14

EJE A Y C 4 0.8 0.6 1.92

4 1.925 0.6 4.62

2 0.925 0.6 1.11

2 1.75 0.6 2.10

EJE B 2 5.025 0.6 6.03

ZONA 2 LABORATORIOS

EJE 4, 7, Y 12 6 6.25 0.6 22.50

EJE 11 2 4.15 0.6 4.98

EJE D 2 10.8 0.6 12.96

EJE F 2 13.699 0.6 16.44

EJE E 2 1.625 0.6 1.95

ZONA 3 SS HH.

EJE 13, 14 Y 15 6 6.375 0.6 22.95

EJE G 2 2.9 0.6 3.48

EJE J 2 3.45 0.6 4.14

EJE H 2 6.25 0.6 7.50

ENTRE EJE 13 Y 14 2 1.8 0.6 2.16

6 0.35 0.6 1.26

ENTRE EJE 14 Y 15 4 0.35 0.6 0.84

ENTRE EJE H e I 10 1.35 0.6 8.10

ENTRE EJE I Y J 2 0.625 0.6 0.75

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 Y 17 2 1 0.6 1.20

EJE M 2 2.7 0.6 3.24

04.08.56 CONCRETO 175 kg/cm2 GRADAS Y RAMPAS 7.13 M3

ZONA 1 ADMINISTRACIÓN Y ACCESO

GRADAS 3 1.00 1.00 0.1 0.30

3 2.50 0.25 0.25 0.47

RAMPA 1 7.00 1.05 0.1 0.74

GRADAS ENTRE ZONA 2 Y ZONA 5 6 1.6 0.5 0.2 0.96

RAMPA ENTRE ZONA 2 Y ZONA 3 1 3.1 1.5 0.1 0.47

GRADAS ENTRE ZONA 3 Y ZONA 4 4 1 0.25 0.2 0.20

GRADAS ENTRE ZONA 4 Y ZONA 6 9 2.4 0.25 0.25 1.35

RAMPA ENTRE ZONA 4 Y ZONA 6 2 7.25 1.4 0.1 2.03

1 0.75 3.2 0.1 0.24

1 0.2 1.5 0.1 0.03

2 1.767 0.1 0.35

04.08.58 ENCOFRADO Y DESENCOFRADO NORMAL GRADAS 10.83 M2

ZONA 1 ADMINISTRACION Y ACCESO

EN GRADAS DE ACCESO 3 1.05 0.127 0.40

3 2.5 0.127 0.95

EN GRADAS ENTRE ZONA 2 Y ZONA 5 4 1.5 0.4 2.40

8 1.8 0.125 1.80

GRADAS ENTRE ZONA 3 Y ZONA 4 2 0.75 0.4 0.60

4 1 0.125 0.50

GRADAS ENTRE ZONA 4 Y ZONA 6 10 2.4 0.174 4.18

04.08.91 CONCRETO 175 kg/cm2 LOSA DEPORTIVA 85.07 M3

1 18.1 30.1 0.15 81.72

2 18.1 0.175 0.2 1.27

2 29.75 0.175 0.2 2.08

04.08.92 ENCOFRADO Y DESENCOFRADO NORMAL LOSA DEPORTIVA 80.75 M2

2 18.1 0.5 18.10

2 30.1 0.5 30.10

3 30.1 0.15 13.55

7 18.1 0.15 19.01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

04.09.05 FALSO PISO DE 4” CON MEZCLA 1:8 C:H 232.88 M2

ZONA 1 ADMINISTRACIÓN

SECRETARIA 1 3.125 2.775 8.67

1 1 0.15 0.15

1 2.25 0.1 0.23

DIRECCION 1 3.5 3.125 10.94

1 1.925 0.1 0.19

1 1 0.25 0.25

SALA DE PROFESORES 1 6.51 2.975 19.37

1 2.775 0.15 0.42

1 2.25 0.1 0.23

1 3.5 0.15 0.53

1 1.925 0.1 0.19

ZONA 2 LABORATORIOS

ALMACEN 1 3.125 1.65 5.16

1 0.8 0.25 0.20

ARCHIVO 1 3.225 1.625 5.24

1 0.8 0.25 0.20

LABORATORIO DE FISICA Y QUIMICA 1 12.875 5.5 70.81

2 1.625 0.5 1.63

6 3.5 0.5 10.50

2 1.2 0.15 0.36

1 3.025 0.1 0.30

LABORATORIO DE COMPUTO 1 8 5.5 44.00

6 2.5 0.5 7.50

1 2.05 0.1 0.21

1 1.2 0.15 0.18

ZONA 3

SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63

1 1 0.25 0.25

SS.HH ALUMNOS 1 4.925 1.625 8.00

5 1.35 0.9 6.08

5 0.7 0.15 0.53

1 1.663 1.5 2.49

1 0.6 0.15 0.09

1 1.5 1.012 1.52

1 4.925 1.625 8.00

1 1.775 1.5 2.66

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3 1.3 3.90

1 2.7 0.1 0.27

1 1 0.25 0.25

04.09.58 CONCRETO 175 kg/cm2 EN SARDINEL 17.73 M3

ZONA 1 ADMINISTRACIÓN Y ACCESO

SARDINELES EN ACCESO PRINCIPAL 2 1.48 0.15 0.4 0.18

2 6.7 0.15 0.4 0.80

2 3.23 0.15 0.4 0.39

1 13.078 0.15 0.4 0.78

1 8.65 0.15 0.4 0.52

1 6.31 0.15 0.4 0.38

1 11.56 0.15 0.4 0.69

1 2.82 0.15 0.4 0.17

2 8.2 0.15 0.4 0.98

EN ADMINISTRACIÓN 2 10 0.15 0.4 1.20

2 9.25 0.15 0.4 1.11

ZONA 2 LABORATORIOS 2 10 0.15 0.4 1.20

2 25.2 0.15 0.4 3.02

2 3.1 0.15 0.4 0.37

ZONA 3 SS.HH. 2 10.37 0.15 0.4 1.24

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

2 9.1 0.15 0.4 1.09

1 1.43 0.15 0.4 0.09

1 1.75 0.15 0.4 0.11

ZONA 4 CISTERNA Y TANQUE ELEVADO 2 5.5 0.15 0.4 0.66

2 5.2 0.15 0.4 0.62

ENTRE ZONA 4 Y ZONA 6 1 1.45 0.15 0.4 0.09

1 1.38 0.15 0.4 0.08

1 2.55 0.15 0.4 0.15

1 2.23 0.15 0.4 0.13

1 1.64 0.15 0.4 0.10

1 1.98 0.15 0.4 0.12

2 12 0.15 0.4 1.44

04.09.91 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINEL 236.39 M2

ZONA 1 ADMINISTRACIÓN Y ACCESO

SARDINELES EN ACCESO PRINCIPAL 4 1.48 0.4 2.37

4 6.7 0.4 10.72

4 3.23 0.4 5.17

2 13.078 0.4 10.46

2 8.65 0.4 6.92

2 6.31 0.4 5.05

2 11.56 0.4 9.25

2 2.82 0.4 2.26

4 8.2 0.4 13.12

EN ADMINISTRACIÓN 4 10 0.4 16.00

4 9.25 0.4 14.80

ZONA 2 LABORATORIOS 4 10 0.4 16.00

4 25.2 0.4 40.32

4 3.1 0.4 4.96

ZONA 3 SS.HH. 4 10.37 0.4 16.59

4 9.1 0.4 14.56

2 1.43 0.4 1.14

2 1.75 0.4 1.40

ZONA 4 CISTERNA Y TANQUE ELEVADO 4 5.5 0.4 8.80

4 5.2 0.4 8.32

ENTRE ZONA 4 Y ZONA 6 2 1.45 0.4 1.16

2 1.38 0.4 1.10

2 2.55 0.4 2.04

2 2.23 0.4 1.78

2 1.64 0.4 1.31

2 1.98 0.4 1.58

4 12 0.4 19.20

04.10.58 CONCRETO 175 kg/cm2 EN CANAL PLUVIAL 8.36 M3

ZONA 1 ADMINISTRACION 2 10.6 0.1 0.55 1.17

2 9.625 0.1 0.55 1.06

EN ZONA 2 LABORATORIOS 2 26.1 0.1 0.55 2.87

2 10.6 0.1 0.55 1.17

ZONA 3 SS.HH. 1 19.87 0.1 0.55 1.09

1 18.35 0.1 0.55 1.01

04.10.91 ENCOFRADO Y DESENCOFRADO NORMAL EN CANAL PLUVIAL 60.83 M2

ZONA 1 ADMINISTRACION 2 10.6 0.4 8.48

2 9.625 0.4 7.70

EN ZONA 2 LABORATORIOS 2 26.1 0.4 20.88

2 10.6 0.4 8.48

ZONA 3 SS.HH. 1 19.87 0.4 7.95

1 18.35 0.4 7.34

05.00.00 OBRAS DE CONCRETO ARMADO

05.01.00 CIMIENTO CORRIDO REFORZADO

05.01.59 CONCRETO F’C 175 KG/CM2 SOBRECIMIENTO REFORZADO 5.26 M3

EN ACCESO PRINCIPAL

EN GRADAS 1 3.5 0.15 0.3 0.16

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

1 2.5 0.15 0.127 0.05

1 1.35 0.15 0.127 0.03

1 0.6 0.15 0.58 0.05

EN RAMPA 1 9.276 0.15 0.39 0.54

EN GRADAS ENTRE ZONA 4 Y 6 1 4.523 0.2 0.5 0.45

EN RAMPA ENTRE ZONA 4 Y 6 1 14.77 0.2 0.885 2.61

1 7.25 0.2 0.94 1.36

05.01.92 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO REFORZADO 55.31 M2

EN ACCESO PRINCIPAL

EN GRADAS 2 3.5 0.3 2.10

2 2.5 0.127 0.64

2 1.35 0.127 0.34

2 0.6 0.58 0.70

EN RAMPA 2 9.276 0.39 7.24

EN GRADAS ENTRE ZONA 4 Y 6 2 4.523 0.5 4.52

EN RAMPA ENTRE ZONA 4 Y 6 2 14.77 0.885 26.14

2 7.25 0.94 13.63

05.01.95 ACERO FY=4200 KG/CM2 PARA SOBRECIMIENTO REFORZADO 577.59 KG

1 577.59 577.59

05.02.00 ZAPATAS

05.02.59 CONCRETO F’C 210 KG/CM2 PARA ZAPATAS 46.55 M3

EN ZONA 1 ADMINISTRACIÓN

ZAPATA 1 4 1.4 1.2 0.6 4.03

ZAPATA 2 2 1.4 1.2 0.6 2.02

EN ZONA 2 LABORATORIOS

ZAPATA 3 8 1.4 1.05 0.6 7.06

ZAPATA 4 10 1.7 1.65 0.6 16.83

EN ZONA 4 CISTERNA Y TANQUE ELEVADO

ZAPATA 5 2 1 1 0.6 1.20

ZAPATA 6 4 1.2 1.2 0.6 3.46

ZAPATA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 0.6 7.43

1 2.3 1.4 0.6 1.93

ZAPATA 7 3 1.2 1.2 0.6 2.59

05.02.95 ACERO FY=4200 KG/CM2 PARA ZAPATAS 1 1,286.88 1286.88 1286.88 KG

05.06.00 TABIQUE Y PLACA

05.06.59 CONCRETO F’C 210 KG/CM2 PARA PLACA 3.91 M3

EN MURO DE CONTENCIÓN 1 9.25 0.2 1.56 2.89

1 2.5 0.2 2.04 1.02

05.06.92 ENCOFRADO Y DESENCOFRADO EN PLACAS 39.06 M2

EN MURO DE CONTENCIÓN 2 9.25 1.56 28.86

2 2.5 2.04 10.20

05.06.95 ACERO FY=4200 KG/CM2 EN PLACAS 420.94 KG

1 420.94 420.94

05.08.00 COLUMNAS

05.08.59 CONCRETO F’C 210 KG/CM2 PARA COLUMNAS 41.46 M3

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C-1 EN EJE 1 Y 3 4 0.4 0.25 4.64 1.86

4 0.35 0.25 4.05 1.42

COLUMNA C-2 EN EJE 2 2 0.6 0.25 4.05 1.21

COLUMNA C-3 EN EJE 1 Y 3 2 0.25 0.25 5.66 0.71

COLUMNA C-3 EN RESTO 5 0.25 0.25 4.05 1.27

COLUMNEA CA-1 9 0.15 0.15 1.55 0.31

COLUMNA C-10 3 0.1257 4.5 1.70

ZONA 2 LABORATORIOS

COLUMNA C-4 EN EJE 4 Y 12 4 0.6 0.25 4.64 2.78

COLUMNA C-4 EN RESTO 4 0.6 0.25 4.05 2.43

COLUMNA C-5 10 1.3 0.25 4.05 13.16

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

COLUMNA C-3 EN EJE 4 Y 12 2 0.25 0.25 5.66 0.71

COLUMNA C-3 EN RESTO 4 0.25 0.25 4.05 1.01

COLUMNETA CA-2 16 0.15 0.15 2.65 0.95

COLUMNETA CA-3 19 0.15 0.15 1.85 0.79

ZONA 3 SS.HH.

COLUMNA C-6 EN EJE 13 Y 15 4 0.25 0.25 5.17 1.29

COLUMNA C-6 EN RESTO 7 0.25 0.25 4.05 1.77

COLUMNA C-7 4 0.55 0.25 4.64 2.55

EN ZONA 4 CISTERNA Y TANQUE ELEVADO

COLUMNA C-8 2 0.25 0.25 7.9 0.99

COLUMNA C-9 4 0.55 0.25 7.9 4.35

COLUMNETA CA-4 1 0.15 0.15 1.55 0.03

COLUMNETAS EN PARAPETO

LOSA 2 8 0.15 0.15 0.9 0.16

05.08.92 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 398.62 M2

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C.1 4 1 4.64 18.56

4 0.75 4.64 13.92

COLUMNA C-2 2 2 4.05 16.20

COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83

COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19

COLUMNA C-10 3 1.257 4.5 16.96

COLUMNETA CA-1 9 0.3 1.55 4.19

ZONA 2 LABORATORIOS

COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91

COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77

2 1.45 4.05 11.75

COLUMNA C-5 10 2.55 4.05 103.27

COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83

1 0.35 5.66 1.98

COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07

1 0.35 4.05 1.42

1 0.5 4.05 2.03

COLUMNETA CA-2 16 0.45 2.65 19.08

COLUMNETA CA-3 19 0.45 1.85 15.82

ZONA 3 SS.HH.

COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62

1 0.5 5.17 2.59

1 0.35 5.17 1.81

COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11

1 0.25 4.05 1.01

2 0.5 4.05 4.05

1 0.2 4.05 0.81

COLUMNA C-7 3 1.35 4.64 18.79

1 1.1 4.64 5.10

EN ZONA 4 CISTERNA Y TANQUE ELEVADO

COLUMNA C-8 2 0.8 7.9 12.64

COLUMNA C-9 2 1.3 7.9 20.54

2 1.45 7.9 22.91

COLUMNETA CA-4 1 0.45 1.55 0.70

COLUMNETAS EN PARAPETO

LOSA 2 16 0.15 0.9 2.16

05.08.95 ACERO FY=4200 KG/CM2 EN COLUMNAS 1 7,020.06 7020.06 7020.06 KG

05.08.96 JUNTAS DE TECNOPORTE E=1" 11.30 M2

ZONA 1 ADMINISTRACIÓN 7 0.15 1.55 1.63

ZONA 2 LABORATORIOS 12 0.15 2.65 4.77

16 0.15 1.85 4.44

ZONA 4 CISTENA Y TANQUE ELEVADO

COLUMNETAS CA-4 2 0.15 1.55 0.46

05.09.00 VIGAS Y DINTELES

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

05.09.59 CONCRETO F’C 210 KG/CM2 PARA VIGAS 14.78 M3

ZONA 1 ADMINISTRACION

EJE 1 Y 3 4 2.98 0.25 0.3 0.89

4 3.098 0.25 0.3 0.93

EN EJE 2 1 2.725 0.25 0.3 0.20

EN EJE A 1 4.97 0.25 0.3 0.37

EN EJE B 1 6.02 0.25 0.3 0.45

EN EJE C 1 4.97 0.25 0.3 0.37

EN ACCESO PRINCIPAL - VIGA "S" 1 5.41 0.12 0.6 0.39

VIGUETAS SOLERAS

EN EJE A 1 2.5 0.15 0.15 0.06

EN EJE C 1 3.325 0.15 0.15 0.07

ZONA 2 LABORATORIOS

EN EJE 4 Y 12 4 3.13 0.25 0.3 0.94

4 3.25 0.25 0.3 0.98

EN EJE 7 2 3.13 0.25 0.3 0.47

EN EJE 11 1 5.76 0.25 0.3 0.43

EN EJE D Y F 2 17.11 0.25 0.3 2.57

EN EJE E 1 1.625 0.25 0.3 0.12

VIGUETAS SOLERAS

EJE D 1 11.8 0.15 0.15 0.27

EJE F 1 13.7 0.15 0.15 0.31

ZONA 3 SS.HH

EJE 13 Y 15 2 6.08 0.25 0.3 0.91

2 6.71 0.25 0.3 1.01

EJE 14 1 6.08 0.25 0.3 0.46

EJE G 1 5.71 0.25 0.3 0.43

EJE H 1 6.25 0.25 0.3 0.47

VP 110 1 1.7 0.15 0.3 0.08

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 Y 17 -LOSA 1 2 2.45 0.25 0.3 0.37

EJE K Y M - LOSA 1 2 2.7 0.25 0.3 0.41

EJE 16 Y 17 -LOSA 2 2 2.45 0.25 0.3 0.37

EJE K Y M - LOSA 2 2 2.7 0.25 0.3 0.41

VIGUETAS SOLERAS

EJE 16 1 0.65 0.15 0.15 0.01

EN PARAPETO 1 2.3 0.15 0.15 0.05

05.09.92 ENCOFRADO Y DESENCOFRADO EN VIGAS 138.97 M2

ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL

EJE 1 Y 3 8 2.85 0.3 6.84

4 6.2 0.3 7.44

EJE 2 2 1.73 0.3 1.04

1 1 0.85 0.85

EJE A Y C 4 0.8 0.3 0.96

2 1.92 0.85 3.26

2 2.25 0.85 3.82

EJE B 2 3.5 0.3 2.10

2 1.52 0.3 0.91

1 1 0.85 0.85

VIGUETAS SOLERAS

EN EJE A 2 2.5 0.15 0.75

EN EJE C 2 3.325 0.15 1.00

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.13 0.3 7.51

4 6.5 0.3 7.80

EJE 7 4 3.125 0.3 3.75

EJE 11 4 2.08 0.3 2.50

2 0.8 0.85 1.36

EJE D 2 17.98 0.85 30.57

EJE E 2 1.625 0.3 0.98

VIGUETAS SOLERAS

EJE D 2 11.8 0.15 3.54

EJE F 2 13.7 0.15 4.11

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

ZONA 3 SS.HH.

EJE 13 Y 15 4 6.08 0.3 7.30

4 6.71 0.3 8.05

EJE 14 2 6.375 0.3 3.82

EJE G 2 3.51 0.3 2.11

1 3.2 0.85 2.72

EJE H 2 6.25 0.3 3.75

EJE J 2 2.64 0.3 1.58

1 2.8 0.85 2.38

ENTRE EJE 13 Y 14 2 1.8 0.3 1.08

ZONA 4 CISTERNA Y TANQUE ELEVADO

EN EJE 16 Y 17 LOSA 1 4 1.45 0.3 1.74

2 1 0.85 1.70

EN EJE K Y M LOSA 1 4 2.7 0.3 3.24

EN EJE 16 Y 17 LOSA 2 4 1.45 0.3 1.74

2 1 0.85 1.70

EN EJE K Y M LOSA 2 4 2.7 0.3 3.24

VIGUETAS SOLERAS

EJE 16 2 0.65 0.15 0.20

EN PARAPETO 2 2.3 0.15 0.69

05.09.95 ACERO FY=4200 KG/CM2 EN VIGAS 1 2,266.96 2266.96 2266.96 KG

05.10.00 LOSAS

05.10.59 CONCRETO F’C 210 KG/CM2 PARA LOSA 2.70 M3

ZONA 4 CISTERNA Y TANQUE ELEVADO

LOSA 1 Y 2 2 3.00 3.00 0.15 2.70

05.10.92 ENCOFRADO Y DESENCOFRADO EN LOSA 18.00 M2

ZONA 4 CISTERNA Y TANQUE ELEVADO

LOSA 1 Y 2 2 3.00 3.00 18.00

05.10.95 ACERO FY=4200 KG/CM2 EN LOSA 1 608.84 608.84 608.84 KG

05.14.00 CISTERNA

05.14.59 CONCRETO F’C 210 KG/CM2 PARA CISTERNA 5.89 M3

EN MUROS 2 1.9 0.2 1.55 1.18

2 3.00 0.2 1.55 1.86

EN LOSA DE FONDO 1 1.25 2.5 0.2 0.63

1 1.65 2.5 0.2 0.83

1 1.1 0.6 0.2 0.13

2 0.3 1 0.2 0.12

2 1.5 0.3 0.2 0.18

LOSA DE TAPA 1 3.4 1.9 0.15 0.97

05.14.92 ENCOFRADO Y DESENCOFRADO EN CISTERNA 37.49 M2

EN MUROS 2 1.5 1.55 4.65

2 3 1.55 9.30

2 1.9 1.7 6.46

2 3.4 1.7 11.56

EN LOSA DE FONDO 2 0.6 0.3 0.36

2 1.1 0.3 0.66

LOSA DE TECHO 1 1.5 3 4.50

05.14.95 ACERO FY=4200 KG/CM2 EN CISTERNA 1 605.01 605.01 605.01 KG

05.15.58 CONCRETO 175 kg/cm2 EN SUMIDERO PLUVIAL 1.05 M3

ZONA 1 ADMINISTRACION 4 0.65 0.85 0.1 0.22

2 0.8 0.8 0.1 0.13

ZONA 2 LABORATORIOS 4 0.65 0.85 0.1 0.22

2 0.8 0.8 0.1 0.13

ZONA 3 SS.HH. 4 0.65 0.85 0.1 0.22

2 0.8 0.8 0.1 0.13

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

05.15.92 ENCOFRADO Y DESENCOFRADO NORMAL EN SUMIDERO PLUVIAL 7.20 M2

ZONA 1 ADMINISTRACION 4 0.6 0.85 2.04

1 0.6 0.6 0.36

ZONA 2 LABORATORIOS 4 0.6 0.85 2.04

1 0.6 0.6 0.36

ZONA 3 SS.HH. 4 0.6 0.85 2.04

1 0.6 0.6 0.36

05.15.95 ACERO FY=4200 KG/CM2 EN SUMIDERO PLUVIAL 1 103.46 103.46 103.46 KG

05.16.58 CONCRETO 175 kg/cm2 EN MESAS DE TRABAJO 4.99 M3

EN LOSA SUPERIOR DE MESA DE TRABAJO LABORATORIO DE FISICA 4 3.6 1 0.1 1.44

16 0.8 0.15 0.8 1.54

4 0.5 0.15 0.8 0.24

4 0.5 0.1 0.2 0.04

EN MESA DE CONCRETO LABORATORIO DE FISICA 5 3.5 0.6 0.1 1.05

15 0.15 0.15 0.95 0.32

15 0.4 0.4 0.2 0.48

-2 1.099 0.549 0.1 -0.12

05.16.92 ENCOFRADO Y DESENCOFRADO NORMAL EN MESA DE TRABAJO 59.27 M2

4 3.6 1 14.40

8 3.6 0.1 2.88

8 1 0.1 0.80

8 0.4 0.2 0.64

12 0.5 0.2 1.20

24 0.8 0.8 15.36

8 0.8 0.6 3.84

8 0.5 0.8 3.20

8 0.5 0.6 2.40

32 0.15 0.8 3.84

EN MESA DE CONCRETO LABORATORIO DE FISICA 5 3.5 0.6 10.50

5 3.5 0.1 1.75

-15 0.15 0.15 -0.34

-2 1.099 0.549 -1.21

05.16.95 ACERO FY=4200 KG/CM2 EN MESAS DE TRABAJO 514.93 KG

1 514.93 514.93

07.00.00 ESTRUCTURA DE MADERA DE TECHO

07.01.01 TIJERALES TIPO 1 33.00 UND

33 33.00

07.01.02 COLOCACION Y ANCLAJE DE TEJERALES 33.00 UND

33 33.00

07.01.03 CORREAJE DE MADERA 2" x 3" 480.90 M

EN ZONA 1 12 7.875 94.50

EN ZONA 2 12 24.35 292.20

EN ZONA 3 12 7.85 94.20

07.01.05 FRISO DE MADERA DE 1" x 12" 80.15 M

EN ZONA 1 2 7.875 15.75

EN ZONA 2 2 24.35 48.70

EN ZONA 3 2 7.85 15.70

07.01.06 FRISO DE MAREDA DE 1" x 4" 78.10 M

EN ZONA 1 2 13.017 26.03

EN ZONA 2 2 13.017 26.03

EN ZONA 3 2 13.017 26.03

08.00.00 COBERTURAS

08.01.01 COBERTURA CON PLANCHA DE TEJA ANDINA 513.05 M2

EN ZONA 1 1 8.025 6.63 53.21

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

1 8.025 6.03 48.39

EN ZONA 2 1 24.5 6.63 162.44

1 24.5 6.03 147.74

EN ZONA 3 1 8.00 6.63 53.04

1 8.00 6.03 48.24

08.01.02 CUMBRERA ARTICULADA DE TEJA ANDINA 40.53 M

EN ZONA 1 1 8.025 8.03

EN ZONA 2 1 24.5 24.50

EN ZONA 3 1 8.00 8.00

08.02.00 PRUEBAS Y ENSAYOS

08.02.01 PRUEBA DE CALIDAD DE CONCRETO 40.00 UND

40 40.00

08.02.02 DISEÑO DE MEZCLAS 6.00 UND

6 6.00

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.01.95 ACERO FY=4200 KG/CM2 PARA SOBRECIMIENTO REFORZADO

EN ACCESO PRINCIPAL LONGITUDINAL Ø 3/8" 3.385 2 1 6.77

Ø 3/8" 1.40 1 1 1.40

Ø 3/8" 0.64 3 1 1.92

VERTICALES Ø 3/8" 0.58 5 1 2.90

Ø 3/8" 0.71 5 1 3.55

Ø 3/8" 0.84 12 1 10.08

EN RAMPA DE ACCESO PRINCIPAL LONGITUDINAL Ø 3/8" 9.88 2 1 19.76

VERTICALES Ø 3/8" 0.74 50 1 37.00

ENTRE ZONA 4 Y ZONA 6 LONGITUDINAL Ø 3/8" 4.52 6 2 54.24

VERTICALES Ø 3/8" 1.21 23 2 55.66

EN RAMPA ENTRE ZONA 4 Y ZONA 6 LONGITUDINAL Ø 3/8" 21.54 16 1 344.64

VERTICALES Ø 3/8" 2.12 108 2 457.92

TOTAL (ML) 0.00 0.00 0.00 0.00 995.84 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 0.00 577.59 0.00

577.59

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.02.95 ACERO FY=4200 KG/CM2 PARA ZAPATAS

ZAPATA 1 LONGITUDINAL Ø 5/8" 2.225 6 4 53.40

TRANSVERSAL Ø 5/8" 1.03 6 4 24.60

ZAPATA 2 LONGITUDINAL Ø 5/8" 2.225 6 2 26.70

TRANSVERSAL Ø 5/8" 1.03 6 2 12.30

ZAPATA 7 LONGITUDINAL Ø 5/8" 1.025 6 3 18.45

TRANSVERSAL Ø 5/8" 1.025 6 3 18.45

ZAPATA 3 LONGITUDINAL Ø 5/8" 1.25 5 8 50.00

TRANSVERSAL Ø 5/8" 0.90 6 8 43.20

ZAPATA 4 LONGITUDINAL Ø 5/8" 1.525 8 10 122.00

TRANSVERSAL Ø 5/8" 1.475 8 10 118.00

ZAPATA 5 LONGITUDINAL Ø 5/8" 0.825 5 2 8.25

TRANSVERSAL Ø 5/8" 0.825 5 2 8.25

ZAPATA 6 LONGITUDINAL Ø 5/8" 1.025 6 4 24.60

TRANSVERSAL Ø 5/8" 1.025 6 4 24.60

ZAPATA 8 MURO DE CONTENCION LONGITUDINAL Ø 5/8" 10.1 14 1 141.40

TRANSVERSAL Ø 5/8" 1.25 52 1 65.00

LONGITUDINAL Ø 5/8" 2.15 14 1 30.10

TRANSVERSAL Ø 5/8" 1.25 12 1 15.00

TOTAL (ML) 0.00 0.00 804.30 0.00 0.00 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 1,286.88 0.00 0.00 0.00

1,286.88

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.06.95 ACERO FY=4200 KG/CM2 EN PLACAS

EN MURO DE CONTENCIÓN LONGITUDINAL Ø 3/8" 11.95 24 1 286.80

VERTICALES Ø 1/2" 2.60 48 2 249.60

TOTAL (ML) 0.00 0.00 0.00 249.60 286.80 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 254.59 166.34 0.00

420.94

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.08.95 ACERO FY=4200 KG/CM2 EN COLUMNAS

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C-1 LONGITUDINAL Ø 5/8" 5.425 6 4 130.20

Ø 5/8" 5.08 4 4 81.20

ESTRIBOS Ø 3/8" 1.13 30 4 135.60

Ø 3/8" 1.55 27 4 167.40

COLUMNA C-2 LONGITUDINAL Ø 5/8" 5.075 10 2 101.50

ESTRIBOS Ø 3/8" 1.13 27 2 61.02

Ø 3/8" 1.55 27 2 83.70

COLUMNA C-3 EJE 1 Y 3 LONGITUDINAL Ø 5/8" 6.34 4 2 50.72

ESTRIBOS Ø 3/8" 0.85 38 2 64.60

COLUMNA C-3 RESTO LONGITUDINAL Ø 5/8" 5.075 4 5 101.50

ESTRIBOS Ø 3/8" 0.85 27 5 114.75

COLUMNA C-10 LONGITUDINAL Ø 5/8" 5.525 8 3 132.60

ESTRIBOS Ø 3/8" 1.3 33 3 128.70

COLUMNETAS CA-1 LONGITUDINAL Ø 3/8" 2.125 4 9 76.50

ESTRIBOS Ø 1/4" 0.54 9 9 43.74

ZONA 2 LABORATORIOS

COLUMNA C-3 EN EJE 4 Y 12 LONGITUDINAL Ø 5/8" 6.34 4 2 50.72

ESTRIBOS Ø 3/8" 0.85 38 2 64.60

COLUMNA C-3 RESTO LONGITUDINAL Ø 5/8" 5.075 4 4 81.20

ESTRIBOS Ø 3/8" 0.85 27 4 91.80

COLUMNA C-4 EN EJE 4 Y 12 LONGITUDINAL Ø 5/8" 5.43 4 4 86.80

LONGITUDINAL Ø 5/8" 5.08 4 4 81.20

ESTRIBOS Ø 3/8" 1.21 30 4 145.20

ESTRIBOS Ø 3/8" 1.21 27 4 130.68

COLUMNA C-4 RESTO LONGITUDINAL Ø 5/8" 5.08 8 4 162.40

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

ESTRIBOS Ø 3/8" 1.21 27 8 261.36

COLUMNA C-5 LONGITUDINAL Ø 5/8" 5.08 14 8 568.40

LONGITUDINAL Ø 1/2" 5.08 4 8 162.40

ESTRIBOS Ø 3/8" 1.95 27 8 421.20

ESTRIBOS Ø 3/8" 1.83 27 8 395.28

ESTRIBOS Ø 3/8" 0.9 27 8 194.40

ESTRIBOS Ø 3/8" 0.65 27 8 140.40

COLUMNA C-5 -1 LONGITUDINAL Ø 5/8" 5.08 20 2 203.00

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

ESTRIBOS Ø 3/8" 1.95 27 2 105.30

ESTRIBOS Ø 3/8" 1.83 27 2 98.82

ESTRIBOS Ø 3/8" 0.9 27 2 48.60

ESTRIBOS Ø 3/8" 0.65 27 2 35.10

COLUMNETAS CA -2 LONGITUDINAL Ø 3/8" 2.20 4 16 140.80

ESTRIBOS Ø 1/4" 0.54 13 16 112.32

COLUMNETA CA-3 LONGITUDINAL Ø 3/8" 3.13 4 19 237.50

ESTRIBOS Ø 1/4" 0.54 17 19 174.42

ZONA 3 SS HH.

COLUMNA C-6 EJE 13 Y 15 LONGITUDINAL Ø 5/8" 5.68 4 4 90.80

ESTRIBOS Ø 3/8" 0.85 34 4 115.60

COLUMNA C-6 RESTO LONGITUDINAL Ø 5/8" 5.08 4 7 142.10

ESTRIBOS Ø 3/8" 0.85 27 7 160.65

COLUMNA C-7 LONGITUDINAL Ø 5/8" 5.43 8 4 173.60

ESTRIBOS Ø 3/8" 1.15 30 8 276.00

COLUMNA C-8 LONGITUDINAL Ø 5/8" 8.93 4 2 71.40

ESTRIBOS Ø 3/8" 0.85 55 2 93.50

COLUMNA C-9 LONGITUDINAL Ø 5/8" 8.93 8 4 285.60

ESTRIBOS Ø 3/8" 1.15 55 8 506.00

COLUMNETA CA-4 LONGITUDINAL Ø 3/8" 2.05 4 2 16.40

ESTRIBOS Ø 1/4" 0.54 12 2 12.96

TOTAL (ML) 0.00 0.00 2,594.94 162.40 4,511.46 343.44

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 4,151.90 165.65 2,616.65 85.86

7,020.06

CANT DE ELEMENTOS

Nº DE VECES

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.09.95 EJE D

ACERO FY=4200 KG/CM2 EN VIGAS

ZONA 1 ADMINISTRACION

VP - 101- 103 LONGITUDINAL Ø 1/2" 7.24 2 2 28.96

LONGITUDINAL Ø 1/2" 7.14 2 2 28.56

ESTRIBOS Ø 3/8" 0.95 52 2 98.80

LONGITUDINAL INC Ø 1/2" 7.62 2 2 30.48

LONGITUDINAL INC Ø 1/2" 4.26 2 2 17.04

LONGITUDINAL INC Ø 1/2" 4.3 2 2 17.20

ESTRIBOS Ø 3/8" 0.95 53 2 100.70

VP - 102 LONGITUDINAL Ø 1/2" 3.87 2 1 7.74

LONGITUDINAL Ø 1/2" 3.77 2 1 7.54

ESTRIBOS Ø 3/8" 0.95 28 2 53.20

VS - 101 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08

ESTRIBOS Ø 3/8" 0.95 50 1 47.50

VS -102 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08

ESTRIBOS Ø 3/8" 0.95 56 1 53.20

VS - 103 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08

ESTRIBOS Ø 3/8" 0.95 48 1 45.60

V"S" PUERTA PRINCIPAL LONGITUDINAL Ø 1/2" 6.82 4 1 27.28

LONGITUDINAL Ø 3/8" 6.71 4 1 26.84

ESTRIBOS Ø 3/8" 1.40 48 1 67.20

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

VIGUETA SOLERA LONGITUDINAL Ø 3/8" 2.18 4 1 8.72

ESTRIBOS Ø 1/4" 0.55 20 1 11.00

LONGITUDINAL Ø 3/8" 1.52 4 1 6.08

ESTRIBOS Ø 1/4" 0.55 14 1 7.70

LONGITUDINAL Ø 3/8" 2.18 4 1 8.72

ESTRIBOS Ø 1/4" 0.55 17 1 9.35

LONGITUDINAL Ø 3/8" 2.50 4 1 10.00

ESTRIBOS Ø 1/4" 0.55 20 1 11.00

ZONA 2 LABORATORIOS

VP - 104 - 107 LONGITUDINAL Ø 1/2" 7.24 4 2 57.92

LONGITUDINAL INC Ø 1/2" 7.62 2 2 30.48

LONGITUDINAL INC Ø 1/2" 4.26 2 2 17.04

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

LONGITUDINAL INC Ø 1/2" 4.3 2 2 17.20

ESTRIBOS Ø 3/8" 0.95 53 2 100.70

ESTRIBOS Ø 3/8" 0.95 53 2 100.70

VP - 105 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 54 1 51.30

VP - 106 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 60 1 57.00

VS-104 Y 105 LONGITUDINAL Ø 1/2" 23.74 4 2 189.92

ESTRIBOS Ø 3/8" 0.95 168 2 319.20

VS -106 LONGITUDINAL Ø 1/2" 2.37 4 1 9.48

ESTRIBOS Ø 3/8" 0.95 17 1 16.15

VIGUETA SOLERA LONGITUDINAL Ø 3/8" 2.13 4 2 17.04

ESTRIBOS Ø 1/4" 0.55 17 2 18.70

LONGITUDINAL Ø 3/8" 2.20 4 2 17.60

ESTRIBOS Ø 1/4" 0.55 17 2 18.70

LONGITUDINAL Ø 3/8" 1.13 4 1 4.52

ESTRIBOS Ø 1/4" 0.55 8 1 4.40

LONGITUDINAL Ø 3/8" 2.30 4 1 9.20

ESTRIBOS Ø 1/4" 0.55 18 1 9.90

LONGITUDINAL Ø 3/8" 2.13 4 1 8.52

ESTRIBOS Ø 1/4" 0.55 17 1 9.35

LONGITUDINAL Ø 3/8" 3.30 4 1 13.20

ESTRIBOS Ø 1/4" 0.55 28 1 15.40

LONGITUDINAL Ø 3/8" 3.20 4 4 51.20

ESTRIBOS Ø 1/4" 0.55 27 4 59.40

LONGITUDINAL Ø 3/8" 1.10 4 1 4.40

ESTRIBOS Ø 1/4" 0.55 8 1 4.40

CANT DE ELEMENTOS

Nº DE VECES

LONGITUDINAL Ø 3/8" 1.33 4 1 5.32

ESTRIBOS Ø 1/4" 0.55 10 1 5.50

LONGITUDINAL Ø 3/8" 1.53 4 1 6.12

ESTRIBOS Ø 1/4" 0.55 12 1 6.60

ZONA 3 SS.HH.

VP-108 Y 110 LONGITUDINAL Ø 1/2" 7.62 4 2 60.96

LONGITUDINAL INC Ø 1/2" 8.04 2 2 32.16

LONGITUDINAL INC Ø 1/2" 4.76 2 2 19.04

LONGITUDINAL INC Ø 1/2" 4.32 2 2 17.28

ESTRIBOS Ø 3/8" 0.95 59 2 112.10

ESTRIBOS Ø 3/8" 0.95 66 2 125.40

VP -109 LONGITUDINAL Ø 1/2" 7.62 4 1 30.48

ESTRIBOS Ø 3/8" 0.95 62 1 58.90

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

VS - 107 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 54 1 51.30

VS - 108 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 56 1 53.20

VS -109 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 54 1 51.30

VS - 110 LONGITUDINAL Ø 1/2" 2.44 4 1 9.76

ESTRIBOS Ø 3/8" 0.70 17 1 11.90

ZONA 4 CISTERNA Y TANQUE ELEVADO

VP -111 Y 112 LONGITUDINAL Ø 1/2" 3.74 4 2 29.92

ESTRIBOS Ø 3/8" 0.95 27 2 51.30

VP - 113 - 114 LONGITUDINAL Ø 1/2" 3.74 4 2 29.92

ESTRIBOS Ø 3/8" 0.95 24 2 45.60

VP -201 Y 202 LONGITUDINAL Ø 1/2" 3.74 4 2 29.92

ESTRIBOS Ø 3/8" 0.95 24 2 45.60

VP - 203 - 204 LONGITUDINAL Ø 1/2" 3.74 4 2 29.92

ESTRIBOS Ø 3/8" 0.95 24 2 45.60

VIGUETA SOLERA LONGITUDINAL Ø 3/8" 1.25 4 1 5.00

ESTRIBOS Ø 1/4" 0.55 9 1 4.95

VIGUETA SOLERA PARAPETO TQUE. ELEV. LONGITUDINAL Ø 3/8" 3.72 4 3 44.64

ESTRIBOS Ø 1/4" 0.55 33 3 54.45

VIGUETA SOLERA LONGITUDINAL Ø 3/8" 2.71 4 1 10.84

ESTRIBOS Ø 1/4" 0.55 25 1 13.75

TOTAL (ML) 0.00 0.00 0.00 1,008.24 2,021.41 264.55

CANT DE ELEMENTOS

Nº DE VECES

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 1,028.40 1,172.42 66.14

2,266.96

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.10.95 ACERO FY=4200 KG/CM2 EN LOSA

LOSA 1 CISTERNA TANQUE ELEVADO ARMADURA SUPERIOR Ø 3/8" 7.75 11 2 170.50

ARMADURA INFERIOR Ø 1/2" 7.75 13 2 201.50

LOSA 2 CISTERNA TANQUE ELEVADO ARMADURA SUPERIOR Ø 3/8" 7.75 11 2 170.50

ARMADURA INFERIOR Ø 1/2" 7.75 13 2 201.50

TOTAL (ML) 0.00 0.00 0.00 403.00 341.00 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 411.06 197.78 0.00

608.84

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.14.95 ACERO FY=4200 KG/CM2 EN CISTERNA

EN MUROS HORIZONTAL Ø 3/8" 2.2 18 2 79.20

HORIZONTAL Ø 3/8" 3.7 18 2 133.20

VERTICAL Ø 3/8" 4.35 10 4 174.00

VERTICAL Ø 3/8" 4.35 18 4 313.20

EN LOSA INFERIOR LONGITUDINAL Ø 3/8" 1.48 10 2 29.60

LONGITUDINAL Ø 3/8" 1.75 10 1 17.50

LONGITUDINAL Ø 3/8" 2.55 10 1 25.50

LONGITUDINAL Ø 3/8" 1.87 10 2 37.40

TRANSVERSAL Ø 3/8" 1.18 5 4 23.60

TRANSVERSAL Ø 3/8" 1.25 5 1 6.25

TRANSVERSAL Ø 3/8" 2.05 5 1 10.25

TRANSVERSAL Ø 3/8" 2.5 16 2 80.00

LOSA DE TECHO LONGITUDINAL Ø 3/8" 2.57 3 2 15.42

LONGITUDINAL Ø 3/8" 3.72 5 2 37.20

TRANSVERSAL Ø 3/8" 2.25 12 2 54.00

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

TRANSVERSAL Ø 3/8" 0.85 4 2 6.80

TOTAL (ML) 0.00 0.00 0.00 0.00 1,043.12 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 0.00 605.01 0.00

605.01

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.15.95 ACERO FY=4200 KG/CM2 EN SUMIDERO PLUVIAL

MUROS HORIZONTAL Ø 3/8" 1.5 5 12 90.00

VERTICAL Ø 3/8" 0.85 16 3 40.80

ACERO DE LOSA DE FONDO HORIZONTAL Ø 3/8" 1.05 5 3 15.75

TRANSVERSAL Ø 3/8" 1.05 5 3 15.75

EN TAPA HORIZONTAL Ø 3/8" 0.67 4 3 8.04

TRANSVERSAL Ø 3/8" 0.67 4 3 8.04

Ø 3/8"

TOTAL (ML) 0.00 0.00 0.00 0.00 178.38 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 0.00 103.46 0.00

103.46

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.16.95 ACERO FY=4200 KG/CM2 EN MESAS DE TRABAJO

LOSA SUPERIOR LONGITUDINAL Ø 3/8" 3.54 6 4 84.96

TRANSVERSAL Ø 3/8" 0.94 16 4 60.16

TRANSVERSAL Ø 3/8" 0.25 4 4 4.00

EN MUROS VERTICAL Ø 3/8" 1.55 5 32 248.00

HORIZONTAL Ø 3/8" 0.84 6 32 161.28

VERTICAL Ø 3/8" 1.55 3 8 37.20

HORIZONTAL Ø 3/8" 0.7 5 8 28.00

EN CUBA LONGITUDINAL Ø 3/8" 0.89 5 4 17.80

TRANSVERSAL Ø 3/8" 1 4 4 16.00

MESA DE CONCRETO LONGITUDINAL Ø 3/8" 3.44 4 5 68.80

TRANSVERSAL Ø 3/8" 0.54 18 5 48.60

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

COLUMNETA VERTICAL Ø 3/8" 1.35 4 15 81.00

ESTRIBOS Ø 1/4" 0.55 9 15 74.25

TOTAL (ML) 0.00 0.00 0.00 0.00 855.80 74.25

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 0.00 496.36 18.56

514.93

METRADOARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

09.00.00 ALBAÑILERIA

09.01.00 MUROS DEL LADRILLO DE ARCILLA K.K.

09.01.01 MURO DE LADRILLO K.K. DE SOGA MEXCLA C:A 1.5 110.73 M2

ZONA 1 ADMINISTRACION

EJE A 1 2.5 0.8 2.00

EJE C 1 3.475 0.8 2.78

ZONA 2 LABORATORIOS

EJE D 1 10.8 1.9 20.52

EJE F 1 13.7 1.1 15.07

EJE E 1 0.625 2.65 1.66

ZONA 3 SS.HH.

ENTRE EJE 13 Y 14 1 1.8 2.65 4.77

EJE H 1 6.25 2.65 16.56

DIVISORES DE BAÑOS 5 1.5 1.75 13.13

5 0.2 1.75 1.75

1 0.9 1.75 1.58

ZONA 4 CISTERNA Y TANQUE ELEVADO

EN EJE 16 Y 17 2 1.45 2.65 7.69

EJE K Y M 2 2.7 2.65 14.31

EN PARAPETO DE LOSA 2 1 11.9 0.75 8.93

09.01.02 MURO DE LADRILLO K.K. DE CABEZA MEXCLA C:A 1.5 207.92 M2

ZONA 1 ADMINISTRACION

EJE 1 Y 3 4 2.975 2.65 31.54

4 2.98 0.83 9.89

EJE 2 1 1.725 2.65 4.57

EJE A Y C 2 0.8 2.65 4.24

EJE B 1 5.025 2.65 13.32

ZONA 2 LABORATORIOS

EJE 4 Y 12 4 3.125 2.65 33.13

4 3.125 0.806 10.08

EJE 7 2 3.125 2.65 16.56

EJE 11 2 2.075 2.65 11.00

ZONA 3 SS.HH.

EJE 13 Y 15 2 0.9 2.65 4.77

4 0.25 2.65 2.65

2 0.637 2.65 3.38

2 0.662 2.65 3.51

2 0.225 2.65 1.19

2 1.55 2.65 8.22

8 0.4 2.25 7.20

4 1.55 0.512 3.17

2 2.98 1.052 6.27

EJE 14 1 6.375 2.65 16.89

EJE G 1 2.501 2.65 6.63

1 0.4 2.25 0.90

EJE J 1 2.652 2.65 7.03

2 0.4 2.25 1.80

10.00.00 REVOQUES ENLUCIDOS Y MOLDEDURAS

10.03.00 TARRAJEO DE MUROS

10.03.02 TARRAJEO MUROS EXTERIORES E INTERIORES FROTACHODO MEXCL. C:A 1.5 E=2cm 653.41 M2

DE CABEZA

ZONA 1 ADMINISTRACION

EJE 1 Y 3 8 2.975 2.7 64.26

8 2.98 0.83 19.79

EJE 2 2 1.725 2.7 9.32

EJE A Y C 4 0.8 2.7 8.64

EJE B 2 5.025 2.7 27.14

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.125 2.7 67.50

8 3.125 0.806 20.15

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

EJE 7 4 3.125 2.7 33.75

EJE 11 4 2.075 2.7 22.41

ZONA 3 SS.HH.

EJE 13 Y 15 4 0.9 2.7 9.72

8 0.25 2.7 5.40

4 0.637 2.7 6.88

4 0.662 2.7 7.15

4 0.225 2.7 2.43

4 1.55 2.7 16.74

16 0.4 2.3 14.72

8 1.55 0.512 6.35

4 2.98 1.052 12.54

EJE 14 2 6.375 2.7 34.43

EJE G 2 2.501 2.7 13.51

2 0.4 2.3 1.84

EJE J 2 2.652 2.7 14.32

4 0.4 2.3 3.68

DE SOGA

ZONA 1 ADMINISTRACION

EJE A 2 2.5 0.85 4.25

EJE C 2 3.475 0.85 5.91

ZONA 2 LABORATORIOS

EJE D 2 10.8 1.95 42.12

EJE F 2 13.7 1.1 30.14

EJE E 2 0.625 2.7 3.38

ZONA 3 SS.HH.

ENTRE EJE 13 Y 14 2 1.8 2.7 9.72

EJE H 2 6.25 2.7 33.75

DIVISORES DE BAÑOS 10 1.5 1.8 27.00

10 0.2 1.8 3.60

2 0.9 1.8 3.24

ZONA 4 CISTERNA Y TANQUE ELEVADO

EN EJE 16 Y 17 4 1.45 2.7 15.66

EJE K Y M 4 2.7 2.7 29.16

EN PARAPETO DE LOSA 2 2 11.9 0.75 17.85

EN SOBRECIENTO REFORZADO

EN GRADAS DE ACCESO 1 3.5 0.127 0.44

1 2.5 0.127 0.32

1 1.5 0.127 0.19

1 0.75 0.38 0.29

EN RAMPA 1 9.276 0.38 3.52

1 0.6 0.38 0.23

10.03.06 TARRAJEO CON IMPERMEABILIZANTE 19.47 M2

EN MUROS 2 1.5 1.55 4.65

2 3 1.55 9.30

LOSA DE FONDO 1 3 1.5 4.50

1 3.4 0.3 1.02

10.03.07 PIZARRA ACRILICA 5.00 UND

5 5.00

10.05.00 TARRAJEO DE COLUMNAS

10.05.02 TARRAJEO EN COLUMNA MEZCL. C:A 1.5 E= 2cm 398.62 M2

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C.1 4 1 4.64 18.56

4 0.75 4.64 13.92

COLUMNA C-2 2 2 4.05 16.20

COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83

COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19

COLUMNA C-10 3 1.257 4.5 16.96

COLUMNETA CA-1 9 0.3 1.55 4.19

ZONA 2 LABORATORIOS

COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77

2 1.45 4.05 11.75

COLUMNA C-5 10 2.55 4.05 103.27

COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83

1 0.35 5.66 1.98

COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07

1 0.35 4.05 1.42

1 0.5 4.05 2.03

COLUMNETA CA-2 16 0.45 2.65 19.08

COLUMNETA CA-3 19 0.45 1.85 15.82

ZONA 3 SS.HH.

COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62

1 0.5 5.17 2.59

1 0.35 5.17 1.81

COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11

1 0.25 4.05 1.01

2 0.5 4.05 4.05

1 0.2 4.05 0.81

COLUMNA C-7 3 1.35 4.64 18.79

1 1.1 4.64 5.10

EN ZONA 4 CISTERNA Y TANQUE ELEVADO

COLUMNA C-8 2 0.8 7.9 12.64

COLUMNA C-9 2 1.3 7.9 20.54

2 1.45 7.9 22.91

COLUMNETA CA-4 1 0.45 1.55 0.70

COLUMNETAS EN PARAPETO

LOSA 2 16 0.15 0.9 2.16

10.06.00 TARRAJEO EN VIGAS

10.06.02 TARRAJEO DE VIGAS C:A 1:5 E=2cm 138.97 M2

ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL

EJE 1 Y 3 8 2.85 0.3 6.84

4 6.2 0.3 7.44

EJE 2 2 1.73 0.3 1.04

1 1 0.85 0.85

EJE A Y C 4 0.8 0.3 0.96

2 1.92 0.85 3.26

2 2.25 0.85 3.82

EJE B 2 3.5 0.3 2.10

2 1.52 0.3 0.91

1 1 0.85 0.85

VIGUETAS SOLERAS

EN EJE A 2 2.5 0.15 0.75

EN EJE C 2 3.325 0.15 1.00

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.13 0.3 7.51

4 6.5 0.3 7.80

EJE 7 4 3.125 0.3 3.75

EJE 11 4 2.08 0.3 2.50

2 0.8 0.85 1.36

EJE D 2 17.98 0.85 30.57

EJE E 2 1.625 0.3 0.98

VIGUETAS SOLERAS

EJE D 2 11.8 0.15 3.54

EJE F 2 13.7 0.15 4.11

ZONA 3 SS.HH.

EJE 13 Y 15 4 6.08 0.3 7.30

4 6.71 0.3 8.05

EJE 14 2 6.375 0.3 3.82

EJE G 2 3.51 0.3 2.11

1 3.2 0.85 2.72

EJE H 2 6.25 0.3 3.75

EJE J 2 2.64 0.3 1.58

1 2.8 0.85 2.38

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

ENTRE EJE 13 Y 14 2 1.8 0.3 1.08

ZONA 4 CISTERNA Y TANQUE ELEVADO

EN EJE 16 Y 17 LOSA 1 4 1.45 0.3 1.74

2 1 0.85 1.70

EN EJE K Y M LOSA 1 4 2.7 0.3 3.24

EN EJE 16 Y 17 LOSA 2 4 1.45 0.3 1.74

2 1 0.85 1.70

EN EJE K Y M LOSA 2 4 2.7 0.3 3.24

VIGUETAS SOLERAS

EJE 16 2 0.65 0.15 0.20

EN PARAPETO 2 2.3 0.15 0.69

10.11.00 VESTIDURA DE DERRAMES

10.11.02 VESTIDURA DERRAMES ANCHO 0.10 MEZCL. C:A 1:5 E=2cm 9.12 M2

ZONA 1 ADMINISTRACION Y ACCESO

EJEA 1 3.175 0.15 0.48

EJE C 1 4.175 0.15 0.63

ZONA 2 LABORATORIOS

EJE D 1 13.5 0.15 2.03

EJE F 1 16.95 0.15 2.54

ZONA 3 SS. HH.

EJE G 3 0.4 0.25 0.30

EJE J 6 0.4 0.25 0.60

EJE 13 Y 15 24 0.4 0.25 2.40

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 1 1 0.15 0.15

10.18.00 BRUÑAS

10.18.01 BRUÑAS DE 1"cm 358.43 M

ZONA 1 ADMINISTRACION

EJE 1 Y 3 8 2.4 19.20

4 2.975 11.90

4 2.4 9.60

4 2.975 11.90

EJE 2 2 2.6 5.20

2 1.725 3.45

EJE A 2 2.4 4.80

8 0.45 3.60

2 1.575 3.15

2 0.925 1.85

EJE C 2 2.4 4.80

2 0.8 1.60

4 0.45 1.80

2 1.575 3.15

2 1.9 3.80

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 2.4 19.20

2 2.6 5.20

8 3.125 25.00

EJE 7 4 2.6 10.40

4 3.125 12.50

EJE 11 8 2.6 20.80

4 2.075 8.30

EJE D 16 1.65 26.40

1 10.8 10.80

EJE F 22 0.85 18.70

1 13.845 13.84

ZONA 3 SS.HH.

EJE 13 Y 15 16 2.4 38.40

2 4.474 8.95

2 6.075 12.15

4 0.28 1.12

8 0.737 5.90

2 5.71 11.42

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

EJE G 2 2.4 4.80

1 2.501 2.50

EJE J 4 2.4 9.60

1 2.652 2.65

11.00.00 CIELORASOS

11.03.01 CIELORASO DE MEZCLA C:A 1:5 DE CEMENTO 9.00 M2

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3.00 3.00 9.00

11.04.00 CIELOSRASOS DE GYPLAC

11.04.01 CIELORASO DE GYPLAC ST 224.47 M2

ZONA 1 ADMINISTRACIÓN

SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67

DIRECCION 1 3.5 3.125 10.94

SALA DE PROFESORES 1 6.525 3.125 20.39

ALEROS 1 1.5 7.875 11.81

1 1 7.875 7.88

2 7 0.5 7.00

ZONA 2 LABORATORIO

ALMACEN 1 3.125 1.625 5.08

CONTROL DE ARCHIVOS 1 3.125 1.625 5.08

LABORATORIO DE COMPUTO 1 6.5 8 52.00

ALEROS 1 1.5 24.5 36.75

1 1 24.5 24.50

2 7 0.5 7.00

ZONA 3 SS.HH.

ALEROS 1 1.5 8 12.00

1 1 8 8.00

2 7.375 0.5 7.38

11.04.02 CIELORASO DE GYPLAC RH 41.15 M2

ZONA 3 SS.HH. 1 3.125 1.7 5.31

2 1.487 1.7 5.06

2 4.925 3.125 30.78

11.04.03 CIELORASO DE GYPLAC RF 18.69 M2

LABORATORIO DE FISICA Y QUIMICA 1 2.875 6.5 18.69

11.04.04 ENTRAMADO DE CIELORASO MADERA 2" x 2" x 10 1286.00 M

ZONA 1 ADMINISTRACIÓN 15 8 120.00

13 9.5 123.50

ZONA 2 LABORATORIO 41 9.5 389.50

16 24.5 392.00

ZONA 3 SS.HH. 14 9.5 133.00

16 8 128.00

12.00.00 PISOS Y PAVIMENTOS

12.01.01 CONTRAPISO E=40 MM BASE 3 CM MEZC. 1:5 ACAB. 1 CM PASTA 1:2 232.88 M2

ZONA 1 ADMINISTRACIÓN

SECRETARIA 1 3.125 2.775 8.67

1 1 0.15 0.15

1 2.25 0.1 0.23

DIRECCION 1 3.5 3.125 10.94

1 1.925 0.1 0.19

1 1 0.25 0.25

SALA DE PROFESORES 1 6.51 2.975 19.37

1 2.775 0.15 0.42

1 2.25 0.1 0.23

1 3.5 0.15 0.53

1 1.925 0.1 0.19

ZONA 2 LABORATORIOS

ALMACEN 1 3.125 1.65 5.16

1 0.8 0.25 0.20

ARCHIVO 1 3.225 1.625 5.24

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

1 0.8 0.25 0.20

LABORATORIO DE FISICA Y QUIMICA 1 12.875 5.5 70.81

2 1.625 0.5 1.63

6 3.5 0.5 10.50

2 1.2 0.15 0.36

1 3.025 0.1 0.30

LABORATORIO DE COMPUTO 1 8 5.5 44.00

6 2.5 0.5 7.50

1 2.05 0.1 0.21

1 1.2 0.15 0.18

ZONA 3

SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63

1 1 0.25 0.25

SS.HH ALUMNOS 1 4.925 1.625 8.00

5 1.35 0.9 6.08

5 0.7 0.15 0.53

1 1.663 1.5 2.49

1 0.6 0.15 0.09

1 1.5 1.012 1.52

1 4.925 1.625 8.00

1 1.775 1.5 2.66

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3 1.3 3.90

1 2.7 0.1 0.27

1 1 0.25 0.25

12.05.04 PISO DE CERAMICA DE 30 x 30 CM ANTIDESLIZANTE 190.91 M2

ZONA 1 ADMINISTRACION

SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67

1 1 0.15 0.15

1 2.25 0.1 0.23

ZONA 2 LABORATORIO

ALMACEN 1 3.125 1.65 5.16

1 0.8 0.25 0.20

LABORATORIO DE FISICA Y QUIMICA 1 12.875 5.5 70.81

2 1.625 0.5 1.63

6 3.5 0.5 10.50

2 1.2 0.15 0.36

1 3.025 0.1 0.30

LABORATORIO DE COMPUTO 1 8 5.5 44.00

6 2.5 0.5 7.50

1 2.05 0.1 0.21

1 1.2 0.15 0.18

ZONA 3 SS.HH.

SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63

1 1 0.25 0.25

SS.HH ALUMNOS 1 4.925 1.625 8.00

5 1.35 0.9 6.08

5 0.7 0.15 0.53

1 1.663 1.5 2.49

1 0.6 0.15 0.09

1 1.5 1.012 1.52

1 4.925 1.625 8.00

1 1.775 1.5 2.66

12.10.03 PISO DE CEMENTO FROTACHADO E=2” ,MEZCLA 1:4 10.24 M2

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3.2 3.2 10.24

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

12.12.02 PISO DE PARQUET 37.55 M2

ZONA 1 ADMINISTRACIÓN

DIRECCION 1 3.5 3.125 10.94

1 1.925 0.1 0.19

1 1 0.25 0.25

SALA DE PROFESORES 1 6.51 2.975 19.37

1 2.775 0.15 0.42

1 2.25 0.1 0.23

1 3.5 0.15 0.53

1 1.925 0.1 0.19

ZONA 2 LABORATORIOS

ARCHIVO 1 3.225 1.625 5.24

1 0.8 0.25 0.20

12.51.01 CONCRETO F’C 175 KG/CM2 EN VEREDAS 39.26 M3

ZONA 1 ADMINISTRACIÓN 1 9.7 8.725 0.1 8.46

-1 7.025 7 0.1 -4.92

ZONA 2 LABORATORIOS 1 25.2 9.35 0.1 23.56

-1 23.5 7 0.1 -16.45

ZONA 3 SS.HH. 1 10.075 9.1 0.1 9.17

-1 7.375 7 0.1 -5.16

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 5.2 5.2 0.1 2.70

-1 3.5 3.5 0.1 -1.23

VEREDA DE ACCESO PRINCIPAL 1 13.98 0.1 1.40

1 5 1.41 0.1 0.71

1 17.425 5 0.1 8.71

1 6.695 2.1 0.1 1.41

1 3.7 3.23 0.1 1.20

1 2.25 6.31 0.1 1.42

1 2.1 6.96 0.1 1.46

ENTRE ZONA 3 Y ZONA 5 1 9.55 1.425 0.1 1.36

1 4.075 1.75 0.1 0.71

1 3.225 0.77 0.1 0.25

1 3.225 3.129 0.1 1.01

1 1.55 1.379 0.1 0.21

ENTRE ZONA 4 Y ZONA 6 1 1.8 1.7 0.1 0.31

1 1.8 0.9 0.1 0.16

1 4.4 3.9 0.1 1.72

VEREDA POSTERIOR 1 12.16 0.9 0.1 1.09

12.51.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS 14.21 M2

ZONA 1 ADMINISTRACION

EN ACCCESO PRINCIPAL 1 2.5 0.127 0.32

2 1.05 0.1 0.21

1 5 0.1 0.50

2 2.1 0.1 0.42

2 3.7 0.1 0.74

1 13.64 0.1 1.36

8 2.5 0.1 2.00

2 2.1 0.1 0.42

2 2.4 0.1 0.48

EN VEREDAS DE ADMINISTRACION 10 0.85 0.1 0.85

2 1.85 0.1 0.37

ZONA 2 LABORATORIOS 16 0.85 0.1 1.36

8 1.85 0.1 1.48

ZONA 3 SS.HH. 4 1.05 0.1 0.42

8 1.35 0.1 1.08

EN VEREDA ENTRE ZONA 3 Y ZONA 5 3 1.425 0.1 0.43

EN VEREDAS ENTRE ZONA 3 Y ZONA 4 1 3.225 0.1 0.32

1 1.45 0.1 0.15

ENTRE ZONA 4 Y ZONA 6 1 4.33 0.1 0.43

5 0.9 0.1 0.45

ZONA 4 CISTERNA Y TANQUE ELEVADO 5 0.85 0.1 0.43

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

12.51.03 JUNTA ASFALTICA RC 250 141.47 M

ZONA 1 ADMINISTRACION

EN ACCCESO PRINCIPAL 1 2.5 2.50

2 1.05 2.10

1 5 5.00

2 2.1 4.20

2 3.7 7.40

1 13.64 13.64

8 2.5 20.00

2 2.1 4.20

2 2.4 4.80

EN VEREDAS DE ADMINISTRACION 10 0.85 8.50

2 1.85 3.70

ZONA 2 LABORATORIOS 16 0.85 13.60

8 1.85 14.80

ZONA 3 SS.HH. 4 1.05 4.20

8 1.35 10.80

EN VEREDA ENTRE ZONA 3 Y ZONA 5 3 1.425 4.28

EN VEREDAS ENTRE ZONA 3 Y ZONA 4 1 3.225 3.23

1 1.45 1.45

ENTRE ZONA 4 Y ZONA 6 1 4.33 4.33

5 0.9 4.50

ZONA 4 CISTERNA Y TANQUE ELEVADO 5 0.85 4.25

13.00.00 CONTRAZOCALO

13.03.00 CONTRAZOCALO DE CEMENTO

13.03.13 CONTRAZOCALO DE CEMENTO H=30cm 117.60 M

ZONA 1 ADMINISTRACION ACCESO PRINCIPAL

EJE 1 Y 3 2 7.00 14.00

EJE A 1 6.025 6.03

EJE C 1 7.025 7.03

ZONA 2 LABORATORIOS

EJE 4 Y 12 2 7.00 14.00

EJE D 1 19.9 19.90

EJE F 1 23.5 23.50

ZONA 3 SS.HH.

EJE 13 Y 15 2 7.375 14.75

EJE G 1 4.2 4.20

EJE J 1 5.00 5.00

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 Y 17 2 2.1 4.20

EJE K Y M 2 2.5 5.00

13.04.01 CONTRAZOCALO DE CERAMICO DE 10 x 30cm 78.75 M

ZONA ADMINISTRACION

SECRETARIA Y RECEPCION 1 9.426 9.43

ZONA 2 LABORATORIOS

LABORATORIO FISICA Y QUIMICA 1 36.325 36.33

LABORATORIO DE COMPUTO 2 6.5 13.00

2 8 16.00

2 2 4.00

14.00.00 ZOCALO

14.01.04 ZOCALO DE MAYOLICA DE 20 x 32 89.34 M2

ZONA 3 SS.HH

EN DOCENTES DAMAS 1 5.93 1.3 7.71

EN DOCENTES VARONES 1 5.93 1.3 7.71

DISCAPACITADOS 1 9.1 1.3 11.83

EN ALUMNOS DAMAS 3 3.55 1.3 13.84

1 14.72 1.3 19.14

EN ALUMNOS VARONES 2 3.55 1.3 9.23

1 1.95 1.3 2.54

1 1.65 0.9 1.48

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

1 10.997 1.3 14.30

1 3.9 0.4 1.56

18.00.00 CARPINTERIA DE MADERA

18.01.00 PUERTAS DE MADERA

18.01.07 PUERTA DE MADERA TIPO P1-1 1 1.00 1.00 UND

18.01.08 PUERTA DE MADERA TIPO P1-2 2 2.00 2.00 UND

18.01.09 PUERTA DE MADERA TIPO P2-1 3 3.00 3.00 UND

18.01.10 PUERTA DE MADERA TIPO P2-2 3 3.00 3.00 UND

18.01.11 PUERTA DE MADERA TIPO P3-1 2 2.00 2.00 UND

18.01.12 PUERTA DE MADERA TIPO P3-2 2 2.00 2.00 UND

19.00.00 CARPINTERIA METALICA Y HERRERIA

19,01.00 PUERTA METALICA

19.01.01 PUERTA METALICA TIPO P3-3 5 5.00 5.00 UND

19.01.02 PUERTA METALICA TIPO P4-1 1 1.00 1.00 UND

19.01.03 PUERTA METALICA TIPO PM-1 1 1.00 1.00 UND

19.01.04 PUERTA METALICA TIPO PM-2 1 1.00 1.00 UND

19.01.05 TAPA DE FIERRO EN TANQUE CISTERNA 1 1.00 1.00 UND

19.01.06 ESCALERA DE GATO 1 1.00 1.00 UND

19.01.07 ARCOS Y TABLERO DE BLASQUET 2 2.00 2.00 UND

19.01.08 PARANTES Y NET DE VOLEY 1 1.00 1.00 GLB

19.02.00 VENTANAS METALICAS

19.02.01 VENTANAS DE METAL TIPO V-1 1 1.00 1.00 UND

19.02.02 VENTANAS DE METAL TIPO V-2 1 1.00 1.00 UND

19.02.03 VENTANAS DE METAL TIPO V-3 1 1.00 1.00 UND

19.02.04 VENTANAS DE METAL TIPO V-4 1 1.00 1.00 UND

19.02.05 VENTANAS DE METAL TIPO V-5 1 1.00 1.00 UND

19.02.06 VENTANAS DE METAL TIPO V-6 2 2.00 2.00 UND

19.02.07 VENTANAS DE METAL TIPO V-7 1 1.00 1.00 UND

19.02.08 VENTANAS DE METAL TIPO V-8 1 1.00 1.00 UND

19.02.09 VENTANAS DE METAL TIPO V-9 1 1.00 1.00 UND

19.02.10 VENTANAS DE METAL TIPO V-10 1 1.00 1.00 UND

19.02.11 VENTANAS DE METAL TIPO V-11 1 1.00 1.00 UND

19.02.12 VENTANAS DE METAL TIPO V-12 1 1.00 1.00 UND

19.02.13 VENTANAS DE METAL TIPO V-13 2 2.00 2.00 UND

19.02.14 VENTANAS DE METAL TIPO V-14 1 1.00 1.00 UND

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

19.02.15 VENTANAS DE METAL TIPO V-15 1 1.00 1.00 UND

19.02.16 VENTANAS DE METAL TIPO V-16 1 1.00 1.00 UND

19.02.17 VENTANAS DE METAL TIPO V-17 1 1.00 1.00 UND

19.02.18 VENTANAS DE METAL TIPO V-18 11 11.00 11.00 UND

19.02.19 VENTANAS DE METAL TIPO V-19 1 1.00 1.00 UND

19.15.03 PASAMANOS AISLADOS DE TUB. 2" 97.78 M

EN ZONA 2 LABORATORIO 4 1.7 6.80

12 0.9 10.80

EN ZONA 4 CISTERNA 2 1 2.00

4 0.9 3.60

EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 2.9 2.90

3 0.9 2.70

EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 21.48 21.48

21 0.9 18.90

1 15.1 15.10

15 0.9 13.50

19.15.04 REJAS PARA CANAL PLUVIAL 6.47 M2

ZONA 1 ADMINISTRACION 2 2.125 0.3 1.28

ZONA 2 LABORATORIOS 1 2.44 0.3 0.73

2 1.8 0.3 1.08

ENTRE ZONA 3 Y ZONA 5 1 9.55 0.3 2.87

1 1.72 0.3 0.52

21.01.00 VIDRIOS, CRISTALES Y SIMILARES

21.01.03 VIDRIO INCOLORO TRANSPARENTE TRIPLE 476.86 P2

ZONA 1 ADMINISTRACION FACTOR

V - 1 1 1.72 1.7 10.76 31.46

V - 2 1 2.25 1.7 10.76 41.16

V-3 1 1.92 1.7 10.76 35.12

V-4 1 1.25 1.7 10.76 22.87

ZONA 2 LABORATORIOS

V-5 1 1.08 0.6 10.76 6.97

V-6 2 2.95 0.6 10.76 38.09

V-7 1 1.85 0.6 10.76 11.94

V-8 1 0.85 0.6 10.76 5.49

V-9 1 1.95 0.6 10.76 12.59

V-10 1 1.88 0.6 10.76 12.14

V-11 1 1.28 1.4 10.76 19.28

V-12 1 0.85 1.4 10.76 12.80

V-13 2 2.95 1.4 10.76 88.88

V-14 1 3.05 1.4 10.76 45.95

V-15 1 2.05 1.4 10.76 30.88

V-17 1 1.88 1.4 10.76 28.32

ZONA 3 SS-HH

V-18 11 0.4 0.4 10.76 18.94

ZONA 4 CISTERNA

V-19 1 1 1.3 10.76 13.99

22.00.00 PINTURA

22.01.04 PINTURA LATEX EN CIELORASO 293.31 M2

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3.00 3.00 9.00

CIELORASO GYPLAC ST

ZONA 1 ADMINISTRACIÓN

SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67

DIRECCION 1 3.5 3.125 10.94

SALA DE PROFESORES 1 6.525 3.125 20.39

ALEROS 1 1.5 7.875 11.81

1 1 7.875 7.88

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

2 7 0.5 7.00

ZONA 2 LABORATORIO

ALMACEN 1 3.125 1.625 5.08

CONTROL DE ARCHIVOS 1 3.125 1.625 5.08

LABORATORIO DE COMPUTO 1 6.5 8 52.00

ALEROS 1 1.5 24.5 36.75

1 1 24.5 24.50

2 7 0.5 7.00

ZONA 3 SS.HH.

ALEROS 1 1.5 8 12.00

1 1 8 8.00

2 7.375 0.5 7.38

CIELORASO GYPLAC RH

ZONA 3 SS.HH. 1 3.125 1.7 5.31

2 1.487 1.7 5.06

2 4.925 3.125 30.78

CIELORASO GYPLAC RF

LABORATORIO DE FISICA Y QUIMICA 1 2.875 6.5 18.69

22.01.06 PINTURA EN MUROS EXTERIORES E INTERIORES 657.54 M2

DE CABEZA

ZONA 1 ADMINISTRACION

EJE 1 Y 3 8 2.975 2.7 64.26

8 2.98 0.83 19.79

EJE 2 2 1.725 2.7 9.32

EJE A Y C 4 0.8 2.7 8.64

EJE B 2 5.025 2.7 27.14

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.125 2.7 67.50

8 3.125 0.806 20.15

EJE 7 4 3.125 2.7 33.75

EJE 11 4 2.075 2.7 22.41

ZONA 3 SS.HH.

EJE 13 Y 15 4 0.9 2.7 9.72

8 0.25 2.7 5.40

4 0.637 2.7 6.88

4 0.662 2.7 7.15

4 0.225 2.7 2.43

4 1.55 2.7 16.74

16 0.4 2.3 14.72

8 1.55 0.512 6.35

4 2.98 1.052 12.54

EJE 14 2 6.375 2.7 34.43

EJE G 2 2.501 2.7 13.51

2 0.4 2.3 1.84

EJE J 2 2.652 2.7 14.32

4 0.4 2.3 3.68

DE SOGA

ZONA 1 ADMINISTRACION

EJE A 2 2.5 0.85 4.25

EJE C 2 3.475 0.85 5.91

ZONA 2 LABORATORIOS

EJE D 2 10.8 1.95 42.12

EJE F 2 13.7 1.1 30.14

EJE E 2 0.625 2.7 3.38

ZONA 3 SS.HH.

ENTRE EJE 13 Y 14 2 1.8 2.7 9.72

EJE H 2 6.25 2.7 33.75

DIVISORES DE BAÑOS 10 1.5 1.8 27.00

10 0.2 1.8 3.60

2 0.9 1.8 3.24

ZONA 4 CISTERNA Y TANQUE ELEVADO

EN EJE 16 Y 17 4 1.45 2.7 15.66

EJE K Y M 4 2.7 2.7 29.16

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

EN PARAPETO DE LOSA 2 2 11.9 0.75 17.85

DERRAMES

ZONA 1 ADMINISTRACION Y ACCESO

EJEA 1 3.175 0.15 0.48

EJE C 1 4.175 0.15 0.63

ZONA 2 LABORATORIOS

EJE D 1 13.5 0.15 2.03

EJE F 1 16.95 0.15 2.54

ZONA 3 SS. HH.

EJE G 3 0.4 0.25 0.30

EJE J 6 0.4 0.25 0.60

EJE 13 Y 15 24 0.4 0.25 2.40

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 1 1 0.15 0.15

22.01.07 PINTURA EN VIGAS Y COLUMNAS 537.59 M2

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C.1 4 1 4.64 18.56

4 0.75 4.64 13.92

COLUMNA C-2 2 2 4.05 16.20

COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83

COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19

COLUMNA C-10 3 1.257 4.5 16.96

COLUMNETA CA-1 9 0.3 1.55 4.19

ZONA 2 LABORATORIOS

COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91

COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77

2 1.45 4.05 11.75

COLUMNA C-5 10 2.55 4.05 103.27

COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83

1 0.35 5.66 1.98

COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07

1 0.35 4.05 1.42

1 0.5 4.05 2.03

COLUMNETA CA-2 16 0.45 2.65 19.08

COLUMNETA CA-3 19 0.45 1.85 15.82

ZONA 3 SS.HH.

COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62

1 0.5 5.17 2.59

1 0.35 5.17 1.81

COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11

1 0.25 4.05 1.01

2 0.5 4.05 4.05

1 0.2 4.05 0.81

COLUMNA C-7 3 1.35 4.64 18.79

1 1.1 4.64 5.10

EN ZONA 4 CISTERNA Y TANQUE ELEVADO

COLUMNA C-8 2 0.8 7.9 12.64

COLUMNA C-9 2 1.3 7.9 20.54

2 1.45 7.9 22.91

COLUMNETA CA-4 1 0.45 1.55 0.70

COLUMNETAS EN PARAPETO

LOSA 2 16 0.15 0.9 2.16

VIGAS

ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL

EJE 1 Y 3 8 2.85 0.3 6.84

4 6.2 0.3 7.44

EJE 2 2 1.73 0.3 1.04

1 1 0.85 0.85

EJE A Y C 4 0.8 0.3 0.96

2 1.92 0.85 3.26

2 2.25 0.85 3.82

EJE B 2 3.5 0.3 2.10

2 1.52 0.3 0.91

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

1 1 0.85 0.85

VIGUETAS SOLERAS

EN EJE A 2 2.5 0.15 0.75

EN EJE C 2 3.325 0.15 1.00

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.13 0.3 7.51

4 6.5 0.3 7.80

EJE 7 4 3.125 0.3 3.75

EJE 11 4 2.08 0.3 2.50

2 0.8 0.85 1.36

EJE D 2 17.98 0.85 30.57

EJE E 2 1.625 0.3 0.98

VIGUETAS SOLERAS

EJE D 2 11.8 0.15 3.54

EJE F 2 13.7 0.15 4.11

ZONA 3 SS.HH.

EJE 13 Y 15 4 6.08 0.3 7.30

4 6.71 0.3 8.05

EJE 14 2 6.375 0.3 3.82

EJE G 2 3.51 0.3 2.11

1 3.2 0.85 2.72

EJE H 2 6.25 0.3 3.75

EJE J 2 2.64 0.3 1.58

1 2.8 0.85 2.38

ENTRE EJE 13 Y 14 2 1.8 0.3 1.08

ZONA 4 CISTERNA Y TANQUE ELEVADO

EN EJE 16 Y 17 LOSA 1 4 1.45 0.3 1.74

2 1 0.85 1.70

EN EJE K Y M LOSA 1 4 2.7 0.3 3.24

EN EJE 16 Y 17 LOSA 2 4 1.45 0.3 1.74

2 1 0.85 1.70

EN EJE K Y M LOSA 2 4 2.7 0.3 3.24

VIGUETAS SOLERAS

EJE 16 2 0.65 0.15 0.20

EN PARAPETO 2 2.3 0.15 0.69

22.01.08 PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS 97.78 M

EN ZONA 2 LABORATORIO 4 1.7 6.80

12 0.9 10.80

EN ZONA 4 CISTERNA 2 1 2.00

4 0.9 3.60

EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 2.9 2.90

3 0.9 2.70

EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 21.48 21.48

21 0.9 18.90

1 15.1 15.10

15 0.9 13.50

22.01.09 PINTURA DOS MANOS EN CONTRAZOCALO CON ESMALTE 35.28 M2

ZONA 1 ADMINISTRACION ACCESO PRINCIPAL

EJE 1 Y 3 2 7.00 0.3 4.20

EJE A 1 6.025 0.3 1.81

EJE C 1 7.025 0.3 2.11

ZONA 2 LABORATORIOS

EJE 4 Y 12 2 7.00 0.3 4.20

EJE D 1 19.9 0.3 5.97

EJE F 1 23.5 0.3 7.05

ZONA 3 SS.HH.

EJE 13 Y 15 2 7.375 0.3 4.43

EJE G 1 4.2 0.3 1.26

EJE J 1 5.00 0.3 1.50

ZONA 4 CISTERNA Y TANQUE ELEVADO

EJE 16 Y 17 2 2.1 0.3 1.26

EJE K Y M 2 2.5 0.3 1.50

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

22.01.12 PINTURA EN TRAFICO DE CAMPO DE FUTBITO 1 101.8 101.80 101.80 M

22.01.13 PINTURA EN TRAFICO DE CAMPO DE BASQUET 1 42.11 42.11 42.11 M

22.01.14 PINTURA EN TRAFICO DE CAMPO DE VOLEY 1 72 72.00 72.00 M

22.01.15 PINTURA EN TABLERO DE BASQUET Y ARCOS 2 2.00 2.00 GLB

24.00.00 APARATOS SANITARIOS Y ACCESORIOS

24.01.01 INODORO TANQUE BAJO 8 8.00 8.00 PZA

24.01.04 LAVATORIO DE 20" x 16" 3 3.00 3.00 PZA

24.02.08 LAVATORIO TIPO OVALIN 6 6.00 6.00 PZA

24.02.11 URINARIO PICO BLANCO 1 1.00 1.00 PZA

24.02.12 URINARIOS CORRIDOS ENCHAPADOS 1 1.00 1.00 UND

24.04.06 PAPELERA DE LOSA COLOR 8 8.00 8.00 PZA

24.09.01 COLOCACION DE APARATOS SANITARIOS 18 18.00 18.00 PZA

24.09.02 COLOCACION DE ACCCESORIOS SANITARIOS 18 18.00 18.00 PZA

24.10.00 PLACA RECORDATORIA

24.10.01 PLACA RECORDATORIA 1 1.00 1.00 UND

24.11.00 LIMPIEZA FINAL DE LA OBRA

24.11.01 LIMPIEZA FINAL DE LA OBRA 1 1.00 1.00 GLB

METRADOINSTALACIONES SANITARIAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

25.00.00 SISTEMA DE DESAGUE

25.02.00 SALIDA DE DESAGUE

25.02.01 SALIDA DE DESAGUE PVC SAL 2" 27 27 27.00 PTO

25.02.02 SALIDA DE DESAGUE PVC SAL 4" 8 8 8.00 PTO

25.02.04 SALIDA DE VENTILACION DE PVC 2" 9 9 9.00 PTO

25.03.00 REDES DE DISTRIBUCION

25.03.04 TUBERIA PVC 2" 84.36 M

ZONA 2 LABORATORIOS 1 22.71 22.71

ZONA 3 SS.HH. 1 45.00 45

ZONA 6 PABELLON 1 1 16.65 16.65

25.03.06 TUBERIA PVC 4" 24.46 M

ZONA 3 SS.HH. 1 24.46 24.46

25.04.00 REDES COLECTORAS

25.04.01 EXCAVACION MANUAL EN MATERIAL SUELTO H=1.00 M 17.15 M3

ZONA 2 LABORATORIOS 1 13.82 0.6 0.6 4.98

ZONA 3 SS.HH. 1 6.38 0.6 0.6 2.30

ZONA 6 PABELLON 1 1 27.43 0.6 0.6 9.87

25.04.02 RELLENO CON MATERIAL PROPIO MANUAL 17.15 M3

ZONA 2 LABORATORIOS 1 13.82 0.6 0.6 4.98

ZONA 3 SS.HH. 1 6.38 0.6 0.6 2.30

ZONA 6 PABELLON 1 1 27.43 0.6 0.6 9.87

25.04.03 TUBERIAS DE PVC S-25 D=110 mm UF NTP ISO 4435 x 6m 58.23 M

ZONA 1 ADMINISTRACION 1 5.00 5.00

ZONA 2 LABORATORIOS 1 17.32 17.32

ZONA 3 SS.HH. 1 8.48 8.48

ZONA 6 PABELLON 1 1 27.43 27.43

25.05.00 ACCESORIOS DE REDES

25.05.01 CODO PVC SAL 2" x 45° 13.00 PZA

ZONA 2 LABORATORIOS 4 4.00

ZONA 3 SS.HH. 9 9.00

25.05.02 CODO PVC SAL 2" x 90° 45.00 PZA

ZONA 2 LABORATORIOS 10 10.00

ZONA 3 SS.HH. 27 27.00

ZONA 6 PABELLON 1 8 8.00

25.05.03 CODO PVC SAL 4" x 45° 7.00 PZA

ZONA 3 SS.HH. 7 7.00

25.05.04 CODO PVC SAL 4" x 90° 8.00 PZA

ZONA 3 SS.HH. 8 8.00

25.05.17 YEE PVC SAL DE 2" 6.00 PZA

ZONA 2 LABORATORIOS 4 4.00

ZONA 3 SS.HH. 2 2.00

25.05.18 YEE PVC SAL DE 4" 8.00 PZA

ZONA 3 SS.HH. 8 8.00

25.05.19 YEE PVC SAL DE 4" a 2" 11.00 PZA

ZONA 3 SS.HH. 11 11.00

25.06.00 ADITIVOS VARIOS

25.06.01 SUMIDERO DE BRONCE DE 2" 16.00 PZA

ZONA 2 LABORATORIOS 4 4.00

ZONA 3 SS.HH. 12 12.00

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

INSTALACIONES SANITARIAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

25.06.09 REGISTRO DE BRONCE ROSCADO DE PISO DE 2" 6.00 PZA

ZONA 2 LABORATORIOS 3 3.00

ZONA 3 SS.HH. 3 3.00

25.06.11 REGISTRO DE BRONCE ROSCADO DE PISO DE 4" 10.00 PZA

ZONA 3 SS.HH. 10 10.00

25.06.15 SOMBRERO DE VENTILACIÓN DE 2" PVC 2.00 PZA

ZONA 3 SS.HH. 2 2.00

25.06.16 CACHIMBA PVC D=110 A 200 mm 3.00 JGO

3 3.00

25.06.17 TRAMPA "P" PVC D= 2" 9.00 UND

ZONA 2 LABORATORIOS 4 4.00

ZONA 3 SS.HH. 5 5.00

25.07.00 CAJA DE INSPECCION

25.07.05 CAJA DE REG. ALB. 12" x 24" TAPA F°F° 7.00 UND

ZONA 2 LABORATORIOS 1 1.00

ZONA 3 SS.HH. 2 2.00

ZONA 6 PABELLON 1 4 4.00

26.00.00 SISTEMA DE AGUA FRIA Y CONTRA INCENDIOS

26.01.00 SALIDA DE AGUA FRIA

26.01.01 SALIDA DE AGUA FRIA EN PVC INC.TUBERIAS Y ACCESORIOS 29.00 PTO

ZONA 2 LABORATORIOS 6 6.00

ZONA 3 SS.HH. 19 19.00

ZONA 6 PABELLON 1 4 4.00

26.02.00 REDE DE DISTRIBUCION

26.02.11 TUBERIA PVC CLASE 10 P/AGUA FRIA 1/2" 104.64 M

ZONA 2 LABORATORIOS 1 37.57 37.57

ZONA 3 SS.HH. 1 53.62 53.62

ZONA 6 PABELLON 1 1 13.45 13.45

26.02.12 TUBERIA PVC CLASE 10 P/AGUA FRIA 3/4" 87.06 M

RED DE DISTRIBUCION GENERAL 1 79.31 79.31

ZONA 4 CISTERNA Y TANQUE ELVADO 1 7.75 7.75

26.02.13 TUBERIA PVC CLASE 10 P/AGUA FRIA 1 1/2" 22.60 M

EN RED DE ADUCCION 1 22.6 22.60

26.02.14 TUBERIA PVC CLASE 10 P/AGUA FRIA 1" 12.25 M

ZONA 4 CISTERNA Y TANQUE ELVADO

TUBERIA DE IMPULSION 1 12.25 12.25

26.02.15 TUBERIA F°G° DE 1 1/2" 7.80 M

ZONA 4 CISTERNA Y TANQUE ELVADO

TUBERIA DE SUCCION 1 7.8 7.80

26.04.00 ACCESORIOS DE REDES

26.04.57 CODO 1/2" PVC C-10 PARA AGUA 100.00 UND

ZONA 2 LABORATORIOS 24 24.00

ZONA 3 SS.HH. 65 65.00

ZONA 6 PABELLON 1 11 11.00

26.04.58 CODO 3/4" PVC C-10 PARA AGUA 12.00 UND

EN LINEA DE DISTRIBUCIÓN GENERAL 8 8.00

ZONA 4 CISTERNA Y TANQUE ELVADO 4 4.00

26.04.59 CODO 1" PVC C-10 PARA AGUA 7.00 UND

ZONA 4 CISTERNA Y TANQUE ELVADO

INSTALACIONES SANITARIAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

TUBERIA DE IMPULSION 7 7.00

26.04.60 CODO 1 1/2" PVC C-10 PARA AGUA 2.00 UND

RED DE ADUCCIÓN 2 2.00

26.04.61 CODO 1 1/2" F°G° PARA AGUA 2.00 UND

ZONA 4 CISTERNA Y TANQUE ELVADO

TUBERIA DE SUCCION 2 2.00

26.04.91 TEE 1/2" PVC C-10 PARA AGUA 24.00 UND

ZONA 2 LABORATORIOS 5 5.00

ZONA 3 SS.HH. 17 17.00

ZONA 6 PABELLON 1 2 2.00

26.04.92 TEE 3/4" PVC C-10 PARA AGUA 5.00 UND

EN LINEA DE DISTRIBUCIÓN GENERAL 4 4.00

ZONA 4 CISTERNA Y TANQUE ELVADO 1 1.00

26.04.93 TEE 1" PVC C-10 PARA AGUA 4.00 UND

ZONA 4 CISTERNA Y TANQUE ELVADO

TUBERIA DE IMPULSION 4 4.00

26.04.94 TEE 1 1/2"F°G° PARA AGUA 2.00 UND

ZONA 4 CISTERNA Y TANQUE ELVADO

TUBERIA DE SUCCION 2 2.00

26.05.00 VALVULAS

26.05.01 VALVULA DE COMPUERTA DE BRONCE DE 1/2" 16.00 PZA

ZONA 2 LABORATORIOS 7 7.00

ZONA 3 SS.HH. 7 7.00

ZONA 6 PABELLON 1 2 2.00

26.05.02 VALVULA DE PASE DE BRONCE DE 3/4" 4.00 PZA

EN RED GENERAL 4 4.00

26.05.03 VALVULA DE COMPUERTA DE BRONCE DE 1" 2 2.00 2.00 PZA

26.05.04 VALVULA DE COMPUERTA DE BRONCE DE 1 1/2" 3 3.00 3.00 PZA

26.05.05 VALVULA DE PASE DE 1" 1 1.00 1.00 PZA

26.05.06 VALVULA CHECK DE BRONCE DE 1" 2 2.00 2.00 PZA

26.05.07 VALVULA CHECK DE BRONCE DE 1 1/2" 2 2.00 2.00 PZA

26.05.08 VALVULA DE PIE CON CANASTILLA DE BROCE DE 1 1/2" 2 2.00 2.00 PZA

26.05.09 MANOMETRO DE 10 BARES DE PRESIÓN 2 2.00 2.00 PZA

26.06.02 CAJA DE REGISTRO ALB. 10" x 12" 2 2.00 2.00 UND

26.07.01 EQUIPO DE BOMBEO 2 ELECTROBOMBAS 1 HP 2 2.00 2.00 UND

26.07.02 ABRAZADERA DE FIJACIÓN DE 3/4" 6 6.00 6.00 PZA

26.07.02 ABRAZADERA DE FIJACIÓN DE 1" 11 11.00 11.00 PZA

26.07.04 ACCESORIOS DE CISTERNA 1 1.00 1.00 GLB

26.07.05 TANQUE ELEVADO PREFABRICADO, INCLUYE ACCESORIOS 1 1.00 1.00 GLB

28.00.00 SISTEMA DE DESAGUE PLUVIAL

28.02.00 REDES DE DISTRIBUCION

28.02.07 TUBERIA PVC SAL PESADO 2" 10.00 M

INSTALACIONES SANITARIAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

ZONA 4 CISTERNA Y TANQUE ELVADO-REBOSE 1 10.00 10.00

28.02.08 TUBERIA PVC SAL PESADO 3" 77.00 M

ZONA 1 ADMISTRACION 2 5.00 10.00

2 6.00 12.00

ZONA 2 LABORATORIOS 3 5.00 15.00

3 6.00 18.00

ZONA 3 SS.HH. 2 11.00 22.00

28.02.09 TUBERIA PVC SAL PESADO 4" 6.00 M

ZONA 4 CISTERNA Y TANQUE ELVADO-REBOSE 1 6.00 6.00

28.04.00 ACCESORIOS DE REDES

28.04.62 CODO PVC SAL PESADO 2" x 45° 1 1.00 1.00 PZA

28.04.63 CODO PVC SAL PESADO 2" x 90° 4 4.00 4.00 PZA

28.04.64 CODO PVC SAL PESADO 3" x 90° 42.00 PZA

ZONA 1 ADMISTRACION 12 12.00

ZONA 2 LABORATORIOS 18 18.00

ZONA 3 SS.HH. 12 12.00

28.04.65 CANALETA METALICA GALVANIZA 81.05 M

ZONA 1 ADMISTRACION 1 16.05 16.05

ZONA 2 LABORATORIOS 1 49 49.00

ZONA 3 SS.HH. 1 16 16.00

METRADOINSTALACIONES ELECTRICAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

29.02.00 SALIDA DE TECHO

29.02.01 SALIDA PARA TECHO CENTRO DE LUZ 89.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 6 6

ZONA 2 LABORATORIOS 33 33

ZONA 3 SS.HH. 12 12

ZONA 4 CISTERNA Y TANQUE ELEVADO 2 2

ZONA 6 TALLERES 24 24

ZONA 7 AUDITORIO 12 12

29.03.04 SALIDA PARA INTERRUPTOR SIMPLE 9.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 3 3

ZONA 2 LABORATORIOS 2 2

ZONA 3 SS.HH. 4 4

29.03.05 SALIDA PAR INTERRUPTOR DOBLE 17.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 2 2

ZONA 2 LABORATORIOS 3 3

ZONA 3 SS.HH. 3 3

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 1

ZONA 6 TALLERES 5 5

ZONA 7 AUDITORIO 3 3

29.04.01 SALIDA PARA SPOT LIGHT 24.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 2 2

ZONA 2 LABORATORIOS 7 7

ZONA 3 SS.HH. 4 4

ZONA 6 TALLERES 7 7

ZONA 7 AUDITORIO 4 4

29.04.02 SALIDA PARA BRAQUET PTO

ZONA 1 ADMINISTRACION Y ACCESO 3 3

29.07.00 SALIDA PARA TOMACORRIENTE

29.07.14 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. SAP CABLE TW 14 CAJA PESADA 66.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 7 7

ZONA 2 LABORATORIOS 32 32

ZONA 3 SS.HH. 3 3

ZONA 6 TALLERES 17 17

ZONA 7 AUDITORIO 7 7

31.00.00 TUBERIAS CONDUCTORES Y CABLES

31.01.02 TUBERIA PVC SAP (ELECTRICA) D= 20mm 648.70 M

ZONA 1 ADMINISTRACION Y ACCESO 1 72.70 72.70

ZONA 2 LABORATORIOS 1 168.38 168.38

ZONA 3 SS.HH. 1 56.40 56.40

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 9.50 9.50

ZONA 6 TALLERES 1 251.76 251.76

ZONA 7 AUDITORIO 1 89.96 89.96

31.01.03 TUBERIA PVC SAP (ELECTRICA) D= 25mm 37.16 M

ZONA 1 ADMINISTRACION Y ACCESO 1 6.30 6.30

ZONA 2 LABORATORIOS 1 6.30 6.30

ZONA 3 SS.HH. 1 12.80 12.80

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 5.46 5.46

ZONA 7 AUDITORIO 1 6.30 6.30

31.01.04 TUBERIA PVC SAP (ELECTRICA) D= 40 mm 3.36 M

ZONA 6 TALLERES 1 3.36 3.36

31.01.05 TUBERIA PVC SAP (ELECTRICA) D= 50mm 85.07 M

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

INSTALACIONES ELECTRICAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

EN RED GENERAL 1 85.07 85.07

32.00.00 CABLES

32.01.01 CONDUCTOR ELECTRICO CU TW 2.5 mm2 939.02 M

ZONA 1 ADMINISTRACION Y ACCESO 1 118.28 118.28

ZONA 2 LABORATORIOS 1 246.31 246.31

ZONA 3 SS.HH. 1 104.1 104.1

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 4.4 4.4

ZONA 6 TALLERES 1 328.03 328.03

ZONA 7 AUDITORIO 1 137.9 137.9

32.01.02 CONDUCTOR ELECTRICO CU TW 4 mm2 365.76 M

ZONA 1 ADMINISTRACION Y ACCESO 1 42.5 42.5

ZONA 2 LABORATORIOS 1 114.74 114.74

ZONA 3 SS.HH. 1 16.36 16.36

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 4.4 4.4

ZONA 6 TALLERES 1 133.76 133.76

ZONA 7 AUDITORIO 1 54 54

32.01.03 CONDUCTOR ELECTRICO CU TW 10 mm2 67.02 M

ZONA 6 TALLERES 1 67.02 67.02

32.01.04 CONDUCTOR ELECTRICO CU TW 35 mm2 64.60 M

ZONA 6 TALLERES 1 64.6 64.6

32.01.05 CONDUCTOR ELECTRICO DE 10 mm2 NYY 75.36 M

ZONA 1 ADMINISTRACION Y ACCESO 1 12.6 12.6

ZONA 3 SS.HH. 1 25.6 25.6

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 24.56 24.56

ZONA 7 AUDITORIO 1 12.6 12.6

32.01.06 CONDUCTOR ELECTRICO DE 16 mm2 NYY 12.60 M

ZONA 2 LABORATORIOS 1 12.6 12.6

32.01.08 CONDUCTOR ELECTRICO DE 150 mm2 NYY 171.44 M

RED GENERAL 1 171.44 171.44

32.01.09 CONDUCTOR ELECTRICO DE 10 mm2 Cu DESNUDO 228.30 M

ZONA 1 ADMINISTRACION Y ACCESO 1 26.93 26.93

ZONA 2 LABORATORIOS 1 59.72 59.72

ZONA 3 SS.HH. 1 23.45 23.45

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 17.81 17.81

ZONA 6 TALLERES 1 100.39 100.39

32.01.10 CONDUCTOR ELECTRICO DE 35 mm2 Cu DESNUDO 123.37 M

ZONA 6 TALLERES 1 35.65 35.65

EN RED GENERAL 1 87.72 87.72

32.01.11 CABLEDO Y ESTRUCTURADO CENTRO DE COMPUTO 1 1 1.00 GLB

33.02.00 TABLERO PARA DISTRIBUCION PARA CORRIENTE ALT.

33.02.11 TABLERO GENERAL GABINETE METALICO CON 8 POLOS 1 1 1.00 PZA

33.02.12 TABLERO DISTRIBUCIÓN CAJA METALICO CON 8 POLOS 2 2 2.00 PZA

33.02.13 TABLERO DISTRIBUCIÓN CAJA METALICO CON 12 POLOS 3 3 3.00 PZA

33.02.14 TABLERO DISTRIBUCIÓN CAJA METALICO CON 24 POLOS 1 1 1.00 PZA

36.00.00 ARTEFACTOS ELECTRICO

36.01.01 FLUORESCENTE RECTO ISPE 2 x 40 W INCLUYE EQUIPO Y PANTALLA 71.00 UND

ZONA 1 ADMINISTRACION Y ACCESO 3 3

ZONA 2 LABORATORIOS 30 30

ZONA 4 CISTERNA Y TANQUE ELEVADO 2 2

INSTALACIONES ELECTRICAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

ZONA 6 TALLERES 24 24

ZONA 7 AUDITORIO 12 12

36.01.02 FLUORESCENTE CIRCULAR ISPE 1 x 32 W INCLUYE EQUIPO Y PANTALLA 18.00 UND

ZONA 1 ADMINISTRACION Y ACCESO 3 3

ZONA 2 LABORATORIOS 3 3

ZONA 3 SS.HH. 12 12

36.01.03 SPOT LIGHT DE 20 W AHORRADOR CON PANTALLA CIRCULAR 24.00 UND

ZONA 1 ADMINISTRACION Y ACCESO 2 2

ZONA 2 LABORATORIOS 7 7

ZONA 3 SS.HH. 4 4

ZONA 6 TALLERES 7 7

ZONA 7 AUDITORIO 4 4

36.01.04 BRAQUET TIPO BOLA D=40 cm 40 W-COMPLETO 3.00 UND

ZONA 1 ADMINISTRACION Y ACCESO 3 3

38.00.00 POZO A TIERRA

38.01.01 POZO A TIERRA 8 8 8.00 GLB

38.02.01 SALIDA PARA BOMBA ELECTRICA 2 2 2.00 PTO

38.02.02 TABLERO AUTOMATICO DE 30°, 20° Y 15 A 1 1 1.00 UND

38.02.03 BOMBA DE IMPULSION 2 2 2.00 UND

38.02.04 PARARRAYO IONIZANTE S6-60 1 1 1.00 GLB