GERENCIA DE INFRAESTRUCTURA INFORME MENSUAL DE OBRA Nro. 04 MES DE ABRIL 2014 Residente de Obra : ING. MANUEL CARPIO GANDULIAS Inspector de Obra : ING. JULIO CARBAJAL COILA 2014 "MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE E CONVENCION-CUSCO"

f 19 Pio Aza Koribeni

Embed Size (px)

DESCRIPTION

hola

Citation preview

Page 1: f 19 Pio Aza Koribeni

GERENCIA DE INFRAESTRUCTURA

INFORME MENSUAL DE OBRA Nro. 04MES DE ABRIL 2014

Residente de Obra : ING. MANUEL CARPIO GANDULIAS Inspector de Obra : ING. JULIO CARBAJAL COILA

2014

"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA

CONVENCION-CUSCO"

Page 2: f 19 Pio Aza Koribeni

GERENCIA DE INFRAESTRUCTURA

INFORME MENSUAL DE OBRA Nro. 04MES DE ABRIL 2014

CIP: 106532

CIP: 29186

2014

"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA

CONVENCION-CUSCO"

Page 3: f 19 Pio Aza Koribeni

2014

GERENCIA DE INFRAESTRUCTURA

GERENCIA DE INFRAESTRUCTURA

MES DE ABRIL 2014

"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"

RESIDENTE DE OBRA: ING. MANUEL CARPIO GANDULIAS.

INSPECTOR DE OBRA: ING. JULIO CARBAJAL COILA

UNIDAD OPERATIVA PALMA REAL

INFORME MENSUAL DE OBRA N° 04

MES DE ABRIL 2014

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE NIVEL PRIMARIO Y SECUNDARIO DE LA I.E. JOSE PIO DE AZA DE

CORIBENI, DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

UNIDAD OPERATIVA PALMA REAL

INFORME MENSUAL DE OBRA N° 04

RESIDENTE DE OBRA: ING. MANUEL CARPIO GANDULIAS.

INSPECTOR DE OBRA: ING. JULIO CARBAJAL COILA

Page 4: f 19 Pio Aza Koribeni

2014

RESIDENTE DE OBRA: ING. MANUEL CARPIO GANDULIAS.

INSPECTOR DE OBRA: ING. JULIO CARBAJAL COILA

Page 5: f 19 Pio Aza Koribeni

FORMATO No 01

CONTENIDO

INFORME MENSUALMES DE ABRIL 2014

RESIDENTE DE OBRA : ING. MANUEL CARPIO GANDULIASUbicación : Departamento : Cusco

Provincia : La Convención Distrito : Echarati

No DESCRIPCION1 Contenido2 Informe Mensual

3 Valorización

3.1. Resumen de las Valorizaciones

3.2. Valorización Programada

3.3. Valorización de Mayores Metrados

3.4. Valorización de Partidas Nuevas

3.5. Valorización de Deductivos4 Hoja de Metrados5 Cronograma de Avance de Obra Valorizado

6 Movimiento de Almacén Valorizado

6.1. Resumen de los Movimiento de Almacén

6.2. Movimiento de Almacén de Materiales Diarios

6.3. Movimiento de Almacén de Materiales de períodos anteriores.

6.6. Movimiento de Almacén de Materiales de Convenio

6.7. Movimiento de Amacén de Materiales de Beneficiarios7 Movimiento de Maquinaria Valorizada

7.1. Resumen de Movimiento de Maquinaria

7.2. Control Diario de Maquinaria

8 Auxiliar Estandar9 Modificaciones del Proyecto

10 Registro Fotográfico

11 Cuaderno de Obra (Copias)12 Registro Digitalizado (disket/CD)

13 AnexosP:Presentado N : No presentado

"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"

Page 6: f 19 Pio Aza Koribeni

FORMATO No 01

CONTENIDO

INFORME MENSUALMES DE ABRIL 2014

AÑO: 2,014

DESCRIPCION FORMATO CONTROLF-1 PF-2 P

PF-3 P

F-31 PF-32 PF-33 PF-34 XF-4 PF-5 P

F-6 P

F-61 PF-62 PF-65 XF-66 XF-7 P

F-71 PF-72 PF-8 PF-11 XF-12 PF-13 P

XX

X: No corresponde

"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"

Page 7: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCUTURA

CORDINACION ZONAL PALMA REAL

FICHA TECNICA DE PROYECTODATOS GENERALES

UBICACIÓN NOMBRE DEL PROYECTO:

DPTO CUSCO

PROV LA CONVENCION

DIST ECHARATE

LOC. KORIBENI

PERFIL EXPEDIENTE TECNICO

CODIGO SNIP RES. APROB. R.A. N°634-2012-A-MDE/LC

MONTO MONTO S/. 9,871,378.67

FECHA FECHA 5/30/2012

CADENA FUNCIONAL

SEC. FUNC. FUNCION SNIP N° PROGRAMA SUB PROYECTO

0160 22 9002 0010

INFORMACION DE AGENTES

Nº AGENTE

1 ING. JORGE LUIS PUMAINCA CONDORI

2 ING. JULIO CARBAJAL COILA

3 ING. MANUEL CARPIO GANDULIAS

PLAZO EJECUCION

FECHA DE INICIO: 6/4/2012FECHA DE REINICIO:

FECHA DE REINICIO:

FECHA DE REINICIO:

METAS

RESUMEN INFORME MENSUALA V A N C E F ISICO

MESPROGRAMADO MAYORES METRADOS PARTIDAS NUEVAS

VALORIZADO % ACUML VALORIZADO % VALORIZADO

TOTAL S/. 9,871,378.67

INICIO 0 0 0 0.00 0.00% 0.00Jun-12 280,474.99 2.84% 2.84% 0.00 0.00% 0.00

Jul-12 400,000.01 4.05% 6.89% 0.00 0.00% 22,167.28

Aug-12 500,000.00 5.07% 11.96% 0.00 0.00% 37,283.19

Sep-12 500,000.00 5.07% 17.02% 40,252.84 0.41% 45,002.43Oct-12 600,000.00 6.08% 23.10% 23,380.31 0.24% 49,812.15Nov-12 700,000.00 7.09% 30.19% 28,808.52 0.29% 7,346.63

"MEJORAMIENTO DE LA INFRAESTRUTURA EDUCATINA DE L AI.E PRIMARIA N°50245 Y SECUNDARIA JOSE PIO DE AZA KORIBENI, DISTRITO DE ECHARATI - LA CONVENCION - CUSCO "

NIVEL PRIMARIO : 12 AULA COMUN, 02 SALA DE USO MULTIPLE, 01 AULA DE COMPUTO, 01 CABINA CONTROL Y DEPOSITO DE AULA DE COMPUTO, 01 AULA DE ARTE, 01 BIBLIOTECA, 01 DEPOSITO DE LIBROS, 02 SS.HH. ALUMNOS 01 AULAS SS.HH. ALUMNOS DISCAPACITADOS, 01 SS.HH. ADULTOS, 01 COSINA. NIVEL SECUNDARIO: 08 AULA COMUN, 01 SALA DE USO MULTIPLE, 01 AULA DE COMPUTO, 01 CABINA DE CONTROL Y DEPOSITO AULA DE COMPUTO, 01 AULA DE ARTES, 01 AULA DE IDIOMA EXTRANJERO, 02 TALLERES, 01 BIBLIOTECA, 01 DEPOSITO DE LIBROS, 02 SS.HH. ALUMNOS, 01 SS.HH. ALUMNOS DISCAPACITADOS, 01 SS.HH. ADULTOS, 01 COCINA. INFA. ESTRUC. COMPLEMENTARIA : 01 DIRECCION Y SUBDIRECCION, 01 ADMINISTRACION, 02 SALA DE PROFESORES, 01 TOPICO, 01 PSICOLOGIA, ARCHIVO,01 LIMPIEZA, 01 GUARDIANIA Y PORTERIA, 30 VIVIENDA DOCENTE 06 VIVIENDA DE DOCENTES, 01 SS.HH. Y LAVANDERIA VIVIENDA DOCENTE. OTROS COMPLEMENTARIOS: 02 PATIO, CANCHA POLIDEPORTIVA, 01 HUERTOS JARDINES, 01 OTRAS AREAS LIBRES, 01 CERCO PERIMETRICO E INGRESO. MOBILIARIO Y EQUIPO NIVEL PRIMARIO: 300 CARPETA UNIPERSONAL DE MADERA,15 PIZARRA ACRILICA, 15 ESTANTE DE MADERA, 15 PUPITRE DOCENTE INCLUIDA SILLA, 35 SILLA UNIPERSONAL MADERA, 11, PUPITRE DOCENTE INCLUIDA SILLA, 21 COMPUTADORA, 02 IMPRESORA LASER, 21 MODULO COMPUTADORA INCLUIDA SILLA, 01 EQUIPO AUDIOVISUAL TV+DVD. MOBILIARIO Y EQUIPO NIVEL SECUNDARIO: 200 MOBILIARIO Y EQUIPO NIVEL SECUNDARIO, 14 MOBILIARIO

Page 8: f 19 Pio Aza Koribeni

Dec-12 800,000.00 8.10% 38.30% 82,936.29 0.84% 1,590.98Jan-13 191,731.30 1.94% 40.24% 169,590.74 1.72% 0.00

Feb-13 1,086,515.77 11.01% 51.25% 31,021.59 0.31% 0.00

Mar-13 964,701.52 9.77% 61.02% 215,143.88 2.18% 17,121.71Apr-13 1,014,137.23 10.27% 71.29% 46,224.77 0.47% 0.00May-13 1,340,502.06 13.58% 84.87% 30,388.29 0.31% 3,220.99Jun-13 1,189,820.32 12.05% 96.93% 53,220.12 0.54% 0.00Jul-13 303,495.47 3.07% ### 25,852.30 0.26% 1,274.76

Aug-13 0.00 0.00% ### 52,219.80 0.53% 1,477.63Sep-13 0.00 0.00% ### 85,497.69 0.87% 0.00Oct-13 0.00 0.00% ### 0.00 0.00% 0.00Nov-13 0.00 0.00% ### 0.00 0.00% 0.00Dec-13 0.00 0.00% ### 0.00 0.00% 0.00Jan-14 0.00 0.00% ### 0.00 0.00% 0.00Feb-14 0.00 0.00% ### 58,910.94 0.60% 0.00

|

TOTAL ### ### ### 8.96% ###

INICIO 41064 41094 41125 41156 41186 41217 41247 41278 41309 41364 41368 41398 41429 41459 41490 41521 41551 41582 41612 41643 416740

0.2

0.4

0.6

0.8

1

1.2

Axis Title

Page 9: f 19 Pio Aza Koribeni

GERENCIA DE INFRAESTRUCUTURA

CORDINACION ZONAL PALMA REAL

FICHA TECNICA DE PROYECTODATOS GENERALES

NOMBRE DEL PROYECTO:

EXPEDIENTE TECNICO

R.A. N°634-2012-A-MDE/LC RES. APROB./MODIFIC.

S/. 9,871,378.67 MONTO

5/30/2012 FECHA

CADENA FUNCIONAL

ACT. PROYECTO COMPONENTE META FINALIDAD5000936 001 25788

INFORMACION DE AGENTES

AGENTE CARGO

ING. JORGE LUIS PUMAINCA CONDORI ProyectistaING. JULIO CARBAJAL COILA Supervisor

ING. MANUEL CARPIO GANDULIAS Residente

PLAZO EJECUCION

FECHA DE PARALIZACION: 12/31/2012

1/12/2013 FECHA DE PARALIZACION: 12/21/2013

1/6/2014 FECHA DE PARALIZACION:

RESUMEN INFORME MENSUALA V A N C E F ISICO

PARTIDAS NUEVAS DEDUCTIVOS EJECUTADO EXP. ORIGINAL EJECUTADO ACUMUL.

% VALORIZADO % VALORIZADO %

0.00% 0.00 0.00% 0.00 0.00% 0.000.00% 0.00 0.00% 53,839.21 0.55% 53,839.21

0.22% 0.00 0.00% 22,649.89 0.23% 98,656.38

0.38% 0.00 0.00% 12,385.99 0.13% 148,325.56

0.46% 0.00 0.00% 26,278.98 0.27% 259,859.810.50% 0.00 0.00% 109,022.53 1.10% 442,074.800.07% 0.00 0.00% 97,469.28 0.99% 575,699.23

"MEJORAMIENTO DE LA INFRAESTRUTURA EDUCATINA DE L AI.E PRIMARIA N°50245 Y SECUNDARIA JOSE PIO DE AZA KORIBENI, DISTRITO DE ECHARATI - LA CONVENCION - CUSCO "

NIVEL PRIMARIO : 12 AULA COMUN, 02 SALA DE USO MULTIPLE, 01 AULA DE COMPUTO, 01 CABINA CONTROL Y DEPOSITO DE AULA DE COMPUTO, 01 AULA DE ARTE, 01 BIBLIOTECA, 01 DEPOSITO DE LIBROS, 02 SS.HH. ALUMNOS 01 AULAS SS.HH. ALUMNOS DISCAPACITADOS, 01 SS.HH. ADULTOS, 01 COSINA. NIVEL SECUNDARIO: 08 AULA COMUN, 01 SALA DE USO MULTIPLE, 01 AULA DE COMPUTO, 01 CABINA DE CONTROL Y DEPOSITO AULA DE COMPUTO, 01 AULA DE ARTES, 01 AULA DE IDIOMA EXTRANJERO, 02 TALLERES, 01 BIBLIOTECA, 01 DEPOSITO DE LIBROS, 02 SS.HH. ALUMNOS, 01 SS.HH. ALUMNOS DISCAPACITADOS, 01 SS.HH. ADULTOS, 01 COCINA. INFA. ESTRUC. COMPLEMENTARIA : 01 DIRECCION Y SUBDIRECCION, 01 ADMINISTRACION, 02 SALA DE PROFESORES, 01 TOPICO, 01 PSICOLOGIA, ARCHIVO,01 LIMPIEZA, 01 GUARDIANIA Y PORTERIA, 30 VIVIENDA DOCENTE 06 VIVIENDA DE DOCENTES, 01 SS.HH. Y LAVANDERIA VIVIENDA DOCENTE. OTROS COMPLEMENTARIOS: 02 PATIO, CANCHA POLIDEPORTIVA, 01 HUERTOS JARDINES, 01 OTRAS AREAS LIBRES, 01 CERCO PERIMETRICO E INGRESO. MOBILIARIO Y EQUIPO NIVEL PRIMARIO: 300 CARPETA UNIPERSONAL DE MADERA,15 PIZARRA ACRILICA, 15 ESTANTE DE MADERA, 15 PUPITRE DOCENTE INCLUIDA SILLA, 35 SILLA UNIPERSONAL MADERA, 11, PUPITRE DOCENTE INCLUIDA SILLA, 21 COMPUTADORA, 02 IMPRESORA LASER, 21 MODULO COMPUTADORA INCLUIDA SILLA, 01 EQUIPO AUDIOVISUAL TV+DVD. MOBILIARIO Y EQUIPO NIVEL SECUNDARIO: 200 MOBILIARIO Y EQUIPO NIVEL SECUNDARIO, 14 MOBILIARIO

Page 10: f 19 Pio Aza Koribeni

0.02% 0.00 0.00% 55,108.38 0.56% 715,334.880.00% 0.00 0.00% 4,429.85 0.04% 889,355.48

0.00% 0.00 0.00% 30,188.50 0.31% 950,565.56

0.17% 0.00 0.00% 82,718.09 0.84% 1,265,549.240.00% 0.00 0.00% 141,166.22 1.43% 1,452,940.220.03% 0.00 0.00% 237,906.37 2.41% 1,724,455.870.00% 0.00 0.00% 95,021.65 0.96% 1,872,697.640.01% 0.00 0.00% 175,113.43 1.77% 2,074,938.130.01% 0.00 0.00% 85,058.38 0.86% 2,213,693.940.00% 0.00 0.00% 137,716.61 1.40% 2,436,908.240.00% 0.00 0.00% 128,704.91 1.30% 2,565,613.150.00% 0.00 0.00% 92,249.66 0.93% 2,657,862.800.00% 0.00 0.00% 221,924.96 2.25% 2,879,787.760.00% 0.00 0.00% 125,217.22 1.27% 3,005,004.980.00% 0.00 0.00% 360,627.71 3.65% 3,424,543.63

0.00%

1.89% - 0.00% ### 19.59% ###

CURVA DE AVANCE FISICO VS AVANCE FINANCIERO

INICIO 41064 41094 41125 41156 41186 41217 41247 41278 41309 41364 41368 41398 41429 41459 41490 41521 41551 41582 41612 41643 416740

0.2

0.4

0.6

0.8

1

1.2

Axis Title

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

Chart Title

EJECUTADO ACUMUL. AVANCE FINANCIERO EJECUTADO

Page 11: f 19 Pio Aza Koribeni

AÑ0: 2014

MES DE FEBRERO DEL 2014

FICHA TECNICA DE PROYECTO

UNIDAD EJECUTORA

COORDINACION ZONAL PALMA REAL

MODALIDAD ADMINISTRACION DIRECTA

VARIACION VIABILIDAD PLAZO EJECUCION

730

CADENA FUNCIONAL

FTECANON SOBRE CANON

INFORMACION DE AGENTES

ESPECIALIDAD COLEGIATURA RESOLUCION

Ing. Civil 110648Ing. Civil 29186

Ing. Civil 106532

PLAZO EJECUCION

TIEMPO DE EJECUCION 210.00

FECHA DE TERMINO REAL: 3/30/2014TIEMPO DE EJECUCION 343.00

TIEMPO DE EJECUCION

TIEMPO DE EJECUCION 0.00

ESTRUCTURA DE PRESUPUESTO EXP. TEC.

MONTO DEL PROYECT. 9,871,378.67 Costo Directo 8,276,948.93 Gastos Generales 11.12% 920,060.23 Gastos de Inspección 4.57% 420,363.64 Gastos de Liquidación 0.86 70,863.00 Expediente Técnico 2.21% 183,142.87 Capacitacion Social

TOTAL S/. S/. 9,871,378.67RESUMEN INFORME MENSUAL

A V A N C E F ISICO AVANCE FINANCIERO

EJECUTADO ACUMUL. AVANCE FINANCIERO EJECUTADO

% MONTO ACUMULADO % % ACUM.

0.00% 0.00% 0.00 0.00 0.00% 0.00%0.55% 0.55% 71,191.47 71,191.47 0.72% 0.72%

1.00% 1.00% 155,342.51 226,533.98 1.57% 2.29%

1.50% 1.50% 112,309.90 338,843.88 1.14% 3.43%

2.63% 2.63% 269,872.82 608,716.70 2.73% 6.17%4.48% 4.48% 644,510.17 ### 6.53% 12.70%5.83% 5.83% 211,442.75 ### 2.14% 14.84%

NIVEL PRIMARIO : 12 AULA COMUN, 02 SALA DE USO MULTIPLE, 01 AULA DE COMPUTO, 01 CABINA CONTROL Y DEPOSITO DE AULA DE COMPUTO, 01 AULA DE ARTE, 01 BIBLIOTECA, 01 DEPOSITO DE LIBROS, 02 SS.HH. ALUMNOS 01 AULAS SS.HH. ALUMNOS DISCAPACITADOS, 01 SS.HH. ADULTOS, 01 COSINA. NIVEL SECUNDARIO: 08 AULA COMUN, 01 SALA DE USO MULTIPLE, 01 AULA DE COMPUTO, 01 CABINA DE CONTROL Y DEPOSITO AULA DE COMPUTO, 01 AULA DE ARTES, 01 AULA DE IDIOMA EXTRANJERO, 02 TALLERES, 01 BIBLIOTECA, 01 DEPOSITO DE LIBROS, 02 SS.HH. ALUMNOS, 01 SS.HH. ALUMNOS DISCAPACITADOS, 01 SS.HH. ADULTOS, 01 COCINA. INFA. ESTRUC. COMPLEMENTARIA : 01 DIRECCION Y SUBDIRECCION, 01 ADMINISTRACION, 02 SALA DE PROFESORES, 01 TOPICO, 01 PSICOLOGIA, ARCHIVO,01 LIMPIEZA, 01 GUARDIANIA Y PORTERIA, 30 VIVIENDA DOCENTE 06 VIVIENDA DE DOCENTES, 01 SS.HH. Y LAVANDERIA VIVIENDA DOCENTE. OTROS COMPLEMENTARIOS: 02 PATIO, CANCHA POLIDEPORTIVA, 01 HUERTOS JARDINES, 01 OTRAS AREAS LIBRES, 01 CERCO PERIMETRICO E INGRESO. MOBILIARIO Y EQUIPO NIVEL PRIMARIO: 300 CARPETA UNIPERSONAL DE MADERA,15 PIZARRA ACRILICA, 15 ESTANTE DE MADERA, 15 PUPITRE DOCENTE INCLUIDA SILLA, 35 SILLA UNIPERSONAL MADERA, 11, PUPITRE DOCENTE INCLUIDA SILLA, 21 COMPUTADORA, 02 IMPRESORA LASER, 21 MODULO COMPUTADORA INCLUIDA SILLA, 01 EQUIPO AUDIOVISUAL TV+DVD. MOBILIARIO Y EQUIPO NIVEL SECUNDARIO: 200 MOBILIARIO Y EQUIPO NIVEL SECUNDARIO, 14 MOBILIARIO

Page 12: f 19 Pio Aza Koribeni

7.25% 7.25% 294,325.83 ### 2.98% 17.82%9.01% 9.01% 0.00 ### 0.00% 17.82%

9.63% 9.63% 213,852.22 ### 2.17% 19.99%

12.82% 12.82% 407,920.51 ### 4.13% 24.12%14.72% 14.72% 273,402.25 ### 2.77% 26.89%17.47% 17.47% 723,920.37 ### 7.33% 34.22%18.97% 18.97% 318,990.07 ### 3.23% 37.45%21.02% 21.02% 254,387.06 ### 2.58% 40.03%22.43% 22.43% 602,606.25 ### 6.10% 46.13%24.69% 24.69% 271,003.06 ### 2.75% 48.88%25.99% 25.99% 314,778.68 ### 3.19% 52.07%26.92% 26.92% 342,879.92 ### 3.47% 55.54%29.17% 29.17% 173,384.72 ### 1.76% 57.30%30.44% 30.44% 90,674.54 ### 0.92% 58.22%34.69% 34.69% 288,817.03 ### 2.93% 61.14%

0.00 0.00 0.00% 0.00%0.00 0.00 0.00% 0.00%0.00 0.00 0.00% 0.00%

### TOTAL 6,035,612.13 61.14%

CURVA DE AVANCE FISICO VS AVANCE FINANCIERO

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

Chart Title

EJECUTADO ACUMUL. AVANCE FINANCIERO EJECUTADO

Page 13: f 19 Pio Aza Koribeni
Page 14: f 19 Pio Aza Koribeni
Page 15: f 19 Pio Aza Koribeni

MDEFICHA TECNICA EJECUTIVA

Obra:

Ubicación: PALMA REAL

UNIDAD OPERATIVA: PALMA REAL

1. COSTOS Y TIEMPOS

PRESUP. ASIGNADO:

MARCO PRESUPUESTAL 2014:

1. VALORIZACIÓN

DESCRIPCION

COSTO DIRECTO ELABORACION EXP. TEC.GASTOS GENERALESGASTOS GENERALES DE SUPERVISION DE OBRALIQUIDACION DE OBRAMAYORES METRADOSCOSTO DIRECTO ELABORACION EXP. TEC.GASTOS GENERALESGASTOS GENERALES DE SUPERVISION DE OBRALIQUIDACION DE OBRAOBRAS NUEVASCOSTO DIRECTO ELABORACION EXP. TEC.GASTOS GENERALESGASTOS GENERALES DE SUPERVISION DE OBRALIQUIDACION DE OBRACAPACITACION SOCIAL

TOTAL

PARTIDAS NO EJECUTADAS

2. RECURSOS HUMANOSDIRECCIÓN

DESCRIPCIÓN

INSPECTOR DE OBRARESIDENTE DE OBRAASISTENTE TECNICOPROFECIONA ITECNICO ADMINISTRATIVO IAUXILIAR SECRETARIA IAUXILIAR SECRETARIA II

3. MAQUINARIA

"MEJORAMIENTO DE LA INFRAESTRUTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIA JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE - LA CONVENCION CUSCO"

Page 16: f 19 Pio Aza Koribeni

DESCRIPCIÓN HM

1. cargador frontal apoyo 43.81

2. cargador frontal (alquilado)

3. volquetes SCANIA DE 15 M3 90

3. Volquete Scania 8m3 79.00

4. Volquete 2

5. Mini Cargador 65.7

6. Camioneta 4x4 141.00

7. camioneta STOU

8. Moto Lineal 8.15

4. EQUIPODESCRIPCIÓN HM

1. Mescladora de concreto prestada

2. Mescladora de concreto propia 1 68.90

3. Mescladora de concreto propia 2 24.70

4. Generador 16.40

5. Sierra circular 18.00

6. Motosierra 24.50

7. Motor 18 hp

8. Vibradora de Concreto propia 1 19.60

9. Vibradora de Concreto propia 2

10. Cepilladora electrica 61.60

11. Compactadora 1tipo plancha 31.00

11. Compactadora 2 tipo canguro

5. ESTADO DE LA OBRA

¿Es una obra en continuidad? ( SI )

¿Solicito ampliación de calendario? ( No)

Otros datos del estado de la obra:

¿Es una obra reiniciada en la gestión actual? (SI)

Avance físico al cambio de gestión:

¿Hubo paralización? ( SI ) veces _1_ Días hábiles Perdidos 0 total 0 días por lluvias

Page 17: f 19 Pio Aza Koribeni

6.DESCRIPCION DE METAS FISICAS

(Las mas importantes)

ENTREGADO POR:

CARGO: Residente de Proyectos Especiales

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIO N°50245 Y SECUDARIO I.E. JOSE PIO DE LA AZA DE CORIBENI

Page 18: f 19 Pio Aza Koribeni

INFORME MENSUAL FASE INVERSIÓN-CONSTRUCCIÓN

FICHA TECNICA EJECUTIVA

PALMA REAL

PALMA REAL INSPECTOR DE OBRA: ING. JULIO CARBAJAL COILA

1. COSTOS Y TIEMPOS

S/. 9871,378.67 CRONOGRAMA PROGRAMADO:

S/. 9871,378.67 CRONOGRAMA EJECUTADO:

1. VALORIZACIÓN

PLANIFICADO EJECUTADO(S/.) (S/.)

8,276,948.93 302,378.96183,142.87 33,612.25920,060.23 15,357.00420,363.64 6,690.70

70,863.00 2,588.81

49,395.615,490.782,508.67

422.901,092.97

62,852.861,390.746,986.683,192.12

538.11

9,871,378.67 494,499.16

2. RECURSOS HUMANOSDIRECCIÓN TECNICO

NºDESCRIPCIÓN

1 MAESTRO DE OBRA

1 OPERADOR DE MAQ. LIVIANA

1 ALMACENERO

1 OPERADOR DE MAQ. PESADA

0 GUARDIAN

3

0

3. MAQUINARIA

"MEJORAMIENTO DE LA INFRAESTRUTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIA JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE - LA CONVENCION CUSCO"

Dist: Echarati Prov: La convención Dpto: Cusco

Page 19: f 19 Pio Aza Koribeni

MODELO/CÓDIGO DESCRIPCIÓN DIAS

xmc 300 carguio de material exedente y agregados 7

scania 16

scania 14

CAT 9

X2q 793 transporte de personal y materiales a obra 25

FZ 150 (apoyo) traslado de personal tecnico 4

4. EQUIPOMODELO/CÓDIGO DESCRIPCIÓN DIAS

kolhler mezclado de conccreto 15

kolhler mezclado de conccreto 7

brijjstraton alumbrado de campamento 3

alquilado preparado de formas para encofrados 72

huqsvarna picado de cuartoneria 10

honda vibrado en los vaciados 8

honda vibrado en los vaciados

alquilado preparado de formas para encofrados caravista 18

honda compactado de pisos y veredas 8

5. ESTADO DE LA OBRA

¿Es una obra en continuidad? ( SI ) Fecha (s) de paralización:

¿Solicito ampliación de calendario? ( No)

¿Solicito ampliación presupuestal? (NO) monto

Otros datos del estado de la obra:

Eliminacion de Material, transporte de agregados y cemento

Eliminacion de Material, transporte de agregados y cemento

movimineto de tierras y eliminacion de material exedente

Causa (s) de la paralización:

Fecha (s) de reinicio:

¿El marco presupuestal 2014 no es suficiente para finalizar la obra? (si/no): ____SI_____

Page 20: f 19 Pio Aza Koribeni

7.OBSERVACIONES

(Dificultades encontradas en Obra)

ING. MANUEL CARPIO GANDULIAS

Residente de Obra CIP/CAP: 106532

1. FALTA DE PERSONAL TECNICO CALIFICADO, OPERARIOS,OFICIALES BAJOS RENDIMIENTOS DE AVANCE POR CONTAR SOLO CON OBREROS DE LA ZONA CON BAJA CAPACITACION TECNICA EN CONSTRUCCION.2. NO SE ATIENDE LOS REQUERIMIENTOS DE FIERRO Y MATERIALES ELECTRICOS.

FECHA DE ENTREGA:

Page 21: f 19 Pio Aza Koribeni

INFORME MENSUAL FASE REVISION

INVERSIÓN-CONSTRUCCIÓN FECHA: MARZO 2014

FICHA TECNICA EJECUTIVA

SEC. FUNC. 0160-2014

ING. JULIO CARBAJAL COILA

1. COSTOS Y TIEMPOS

CRONOGRAMA PROGRAMADO: 665 Dias

CRONOGRAMA EJECUTADO: 665 Dias

1. VALORIZACIÓN

EJECUTADO% (S/.) %

3.65%

0.60%

0.76%

5.01%

2. RECURSOS HUMANOSTECNICO OBRERO

NºDESCRIPCIÓN

1 OPERARIO I 5

1 OPERARIO II 8

1 OFICIAL 8

2 PEON 25

1 COCINERA 1

3. MAQUINARIA

"MEJORAMIENTO DE LA INFRAESTRUTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIA JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE - LA CONVENCION

Prov: La convención Dpto: Cusco

REAL (Oficina presupuestos)

4. REPORTE DE INCIDENTES

Page 22: f 19 Pio Aza Koribeni

CAPAC. DESCRIP. Nº

3.5 m3

2m3

15 m3

8m3

0.3 m3

150cc

4. EQUIPOCAPAC. DESCRIP. Nº

9P3

9P3

7000w

8HP

2HP

2HP

4HP

5. ESTADO DE LA OBRA

Fecha (s) de paralización:

¿Solicito ampliación presupuestal? (NO) monto

Otros datos del estado de la obra:

4. REPORTE DE INCIDENTES

¿El marco presupuestal 2014 no es suficiente para finalizar la obra? (si/no): ____SI_____

Page 23: f 19 Pio Aza Koribeni

8.SUGERENCIAS Y RECOMENDACIONES

FIRMA:

PALMA REAL 29 DE ABRIL DEL 2014

Se sugiere al área logistica seguir atendiendo los requerimientos de MATERIALES SOLICITADOS EN LOS REQUERIMIENTOS a la brevedad posible. Convocar a nivel

regional plazas para contratos de operarios y oficiales

Page 24: f 19 Pio Aza Koribeni

VALORIZACION FINANCIERA VS VALORIZACION EJECUTADA

INFORME MENSUAL DE OBRA Nro. 04DEL 01 DE FEBRERO AL 28 FEBRERO DEL 2014

RESIDENTE DEL OBRA : ING. MANUEL CARPIO GANDULIAS

TIEMPO EN DIASVALORIZACION FINANCIERA VALORIZACION EJECUTADA

MONTO MES MOMTO ACUM PORCENTAJE MONTO MES MOMTO ACUM PORCENTAJE

0 0 0.00 0.00% 0.00 0.00 0.00%26 71191.47 71,191.47 0.72% 53,839.21 53,839.21 0.55%57 157,442.51 228,633.98 2.32% 44,817.17 98,656.38 1.00%88 112,309.90 340,943.88 3.45% 49,669.18 148,325.56 1.50%

118 260,167.62 601,111.50 6.09% 111,534.25 259,859.80 2.63%149 511,424.39 1,112,535.89 11.27% 182,215.00 442,074.80 4.48%179 355,803.26 1,468,339.15 14.87% 133,624.43 575,699.23 5.83%210 336,720.66 1,805,059.81 18.29% 139,635.66 715,334.89 7.25%240 0.00 1,805,059.81 18.29% 174,020.59 889,355.48 9.01%270 221,052.22 2,026,112.03 20.53% 61,210.08 950,565.56 9.63%

9,871,378.67

0 26 57 88 118 149 179 210 240 2700.00%

5.00%

10.00%

15.00%

20.00%

25.00%VALORIZACIONES

Column N Column Q

0 26 57 88 118 149 179 210 240 2700.00%

5.00%

10.00%

15.00%

20.00%

25.00%

Column N Column Q

Page 25: f 19 Pio Aza Koribeni

FORMATO No 02

INFORME MENSUAL DEL 01 DE ABRIL AL 25 DE ABRIL DEL 2014

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"

A.- GENERALIDADES.-

A.1 RESIDENTE DE OBRA.- : ING. MANUEL CARPIO GANDULIASEspecialidad : ING. CIVILNro. Colegiatura CIP: 106532Dirección : PLAZA DE ARMAS DE PALMA REAL S/N

A.2. INSPECTOR DE OBRA.- ING.JULIO CARBAJAL COILAEspecialidad : ING. CIVILNro. Colegiatura CIP.29186Dirección : PLAZA DE ARMAS DE PALMA REAL S/N

A.3 FECHA REPORTADA.- MES DE ABRIL 2014

A.4 DATOS DEL PROYECTO.-

Unidad Ejecutora : MUNICIPALIDAD DISTRITAL DE ECHARATEUnidad Operativa : ZONAL PALMA REALSecuencia Funcional 160Función : 022Programa : 9002Proy y/o Actividad : 2083621Meta : 00001Finalidad : 25788Obra

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO" Fuente de Financiamiento : CANON Y SOBRE CANONModalidad de Ejecución : ADMINISTRACION DIRECTA

A.5 FINANCIERO.-Presupuesto Base Exp.tec. : S/. 9,871,378.67

MDE : S/. 9,871,378.67 Presupuesto Asignado año 2014 : S/. 3,500,000.00 Presupuesto Ejecutado mes (del 01 al 25 de abril 2014) : S/. 166,869.13 Presupuesto Acumulado : S/. 1,107,900.70 Presupuesto Saldo : S/. 2,392,099.30

A.6 VALORIZACIONES.-

Valorizacion: DEL 01 AL 25 DE ABRIL DEL 2014Valorización Mensual : S/. 302,378.96 3.65%Valorización Mayores Metrados : S/. 49,395.61 0.60%Valorización Partidas Nuevas : S/. 62,852.86 0.76%Valorización Acumulada del mes 414,627.43 5.01%Valorización Saldos : S/. 4,789,808.14 57.87%Valorizacion Acumulada: DEL 01 AL 25 DE ABRIL DEL 2014Valorización Acumuladas Mes : S/. 2,434,747.65 29.42%Valoriz. Acumulada Mayores Metrados : S/. 548,826.97 6.63%Valoriz. Acumulada Partidas Nuevas : S/. 503,566.18 6.08%

Valoriz. Acumulada Total : S/. 3,487,140.79 42.13%

A.7 CRONOGRAMA DE OBRAInicio : 06 DE ENERO 2014Programado : 845 DIAS Ejecutado : 690 DIAS

A.8 UBICACIÓNLugar :COMUNIDAD NATIVA MISION KORIBENIDistrito : ECHARATIProvincia : LA CONVENCIONDepartamento : CUSCO

Page 26: f 19 Pio Aza Koribeni

B ASPECTOS TECNICOB.1 BREVE DESCRIPCION DE LA META ANUAL

B.2 DOCUMENTOS TECNICOS DOCUMENTO NUMERO FECHA OBSERVACIONES

Resolución de Aprobacion Expediente N°634-2012-A-MDE/LC

Acta de Apertura de Cuaderno Obra 6/4/2012

Acta de Entrega de Terreno 6/4/2012

Acta de Inicio de Obra 6/4/2012

Acta de Paralización/Corte 12/31/2012

Acta de Reinicio de Obra 1/14/2013

Acta de Paralización/Corte 12/21/2013

Acta de Reinicio de Obra 1/6/2014

Acta de Entrega de Obra

B.3 RECURSOS UTILIZADOSB.3.1 RECURSOS HUMANOS

CATEGORIA MUNICIPALIDAD AFECTOS TOTAL DH ACUMULADO

Residente de Obra 1 0 31 31.00

Inspector de Obra 1 0 31 31.00

Tecnico Administrativo II 0 0 0 0.00

Profesional I 1 0 0 0.00

Asistente tecnivo 2 1 0 31 93.00

Auxiliar o Secretaria 3 0 31 62.00

Responsabe de Personal 0 0 0 0.00

Almacenero de Obra 1 0 31 31.00

Topografo 0 0 31 31.00

Maestro de Obra 1 0 31 31.00

Operador de Maquinaria Pesada 2 0 31 31.00

Operador de Maquinaria Liviana 1 0 0 0.00

Chofer 0 0 31 31.00

Operario 13 0 31 465.00

Oficial (Obrero A promedio) 8 0 31 310.00

Peones (Obrero B promedio) 25 0 31 713.00

Total 58 0 372 1860.00

B.3.2 PLANILLA DE TAREOS

DESCRIPCION PROGRAMADO ANTERIOR ACTUAL ACUMULADO SALDO

M. D. E. 3,493,400.48 2,636,733.12 42,285.95 2,679,019.07 814,381.41

CONVENIO

BENEFICIARIOS

TOTAL 3,493,400.48 2,636,733.12 42,285.95 2,679,019.07 814,381.41

COMENTARIOEl presente informe considera en la parte financiera el gasto hasta el 25 de abril del 2014, los próximos informes serán de 26 al 25 del mes siguiente

"MEJORAMIENTO DE LA INFRAESTRUTURA EDUCATIVA DE LA I.E PRIMARIA N°50245 Y SECUNDARIA JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"

La meta inicial del expediente tecnico es la construccion de 02 bloques vivienda de docentes,02 bloques de secundaria,03 bloques de primaria,02 canchas multiples,02 duchas y vestidores,01 bloque taller de confeccion, 01 bloque taller de artesanias, 02 sala de computo, 01 bloque topico,psicologia y administracion,01 patio de honor, 01 bloque de sala de uso multiple, 01 bloque de biblioteca general, 01 guardiania y playa de estacionamiento.

Page 27: f 19 Pio Aza Koribeni

B.4 AVANCE FISICO

B.4.1 BREVE APRECIACION SOBRE LA VALORIZACION MENSUAL

B.4.2 VALORIZACION DE OBRA

DESCRIPCION PROGRAMADO ANTERIOR ACTUAL ACUMULADO SALDO

Expediente Tecnico 8,276,948.93 2,132,368.69 302,378.96 2,434,747.65

Mayor Metrado - 654,550.23 49,395.61 703,945.84

Partidas Nueva - 600,570.63 62,852.86 663,423.48

Deductivos - - ### -

TOTAL 8,276,948.93 3,387,489.54 414,627.43 3,802,116.97 4,474,831.96

B.4.3 MODIFICACIONES DE OBRA

Descripción Presupuesto Mayor Partidas Deductivo Total

Base Metrado Nuevas Modificación

S/. 8,276,948.93 548,826.965 503,566.18 1,052,393.14

% 0% 6.63% 6.08% 12.71%

MAYOR METRADO.-Se ejecutaron mayores metrados en las estructuras del bloque de administracion, y en bloque de centro de computo.

PARTIDA NUEVA.-

eliminacion de material exedente, transporte de agregados y parasoles en bloque centro de computo, bruñas

DEDUCTIVOS.-se esta evaluando la nesecidad de deducir partidas y metrados que no seran ejecutados y que no corresponde a lo indicado en los planos.

B.4.4 AVANCE DEL CRONOGRAMA DE OBRA

PROGRAMADO INICIADO EJECUTADO PARALIZADO AMPLIACION ESTADO

845 6/4/2012 690 DIAS NO SI

tramite documentario en echarati

Enel presente mes se presento el expediente de partidas nuevas y mayores metrados en el que se solicita la ampliacion de presupuesto y principalmente la reprogramacion de obra.

B.4.5 CONTROL DE CALIDADen campo, se tomaron muestras de slump test y testigos (briquetas ) ensayos de control de calidad del concreto, se realizo el ensayo de rumtura de briquetas de los distintos elementos estructurasles del bloque administracion.

1. FRENTE ESTRUCTURAS, se trabajo en las estructuras de concreto armado en los bloques de administracion, centro de computo primaria y secundaria.2. ARQUITECTURA, trarrajeo de parapetos veredas y cemento pulido de parasoles, en los distintos bloques3. COBERTURAS, colocado de estructura metalica para cobertura en el bloque primaria.4. MAQUINARIA PESADA, traslado de materiales de construccion como agregados y cemento, tambien se realizo el cargio y elimincion de material exedente.5, TALLERES Y MAESTRANZA, elaboracion de bloquetas huecas de concreto de 15 x 20 x40cm, taller de carpinteria, se continua con la elavoracion de tablas y listones para los encofrados.6. instalaciones electricas y sanitarias, paralelamente con los trabajos en arquitectura y estructuras, se esta instalando la tuberia electrica y de saneamiento basico en los distintos bloques que lo requieran

Page 28: f 19 Pio Aza Koribeni

C. ASPECTO FINANCIEROC.1.1 MOVIMIENTO DE ALMACEN VALORIZADA

DESCRIPCION PERIODOS DE GESTION

2012 2013 2014

PROGRAMADO 4,814,297.23

TOTAL

COMENTARIO.-el reporte valorizado que se tiene a la actualidad es según a los costos

que se adquieren con relación a los del expediente técnico

C.1.2 EJECUCION DE METAS FINANCIERAS

DESCRIPCION PROGRAMADO ANTERIOR ACTUAL

Municipalidad 9,871,378.67 6,772,424.06 166,869.13

Convenio

Beneficiarios

TOTAL 9,871,378.67 166,869.13

* En el ítem de programado se consigna lo formulado en el expediente técnico

COMENTARIO.-las gastos financieros son exclusivamente realizados por la oficina de logistica por lo

que esta residencia solicita que se alcance cotizaciones para evitar sobrevaloraciones

en la adquisicion de materiales y servicios.

D. ASPECTO ADMINISTRATIVOLos reportes de gastos mensuales son elaborados a destiempo por el área de

administración, generando vacios en la información contable de la obra, no

permitiendo un seguimiento continuo a los gastos

E. ASPECTO SOCIALSe viene laborando con personal de la zona en lo que respecta a la mano de obra

no calificada y teniendo mutua comunicación con su junta directiva y poblacion

beneficiaria y Apafa.

F. OBSERVACIONES Y RECOMENDACIONES

En este mes se ha Ejecutado partidas del expediente tecnico, partidas por mayores metrados y partidas nuevas

Page 29: f 19 Pio Aza Koribeni

TOTAL

S/. 4,814,297.23

ACUMULADO

6,939,293.19

6,939,293.19

70.30%

En este mes se ha Ejecutado partidas del expediente tecnico, partidas por mayores metrados y partidas nuevas

Page 30: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

RESUMEN DE VALORIZACIONES DE OBRA N° 03- 2014

OBRA: "MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N° 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO" FECHA DE INICIO DE OBRA :04/06/2012INFORME MENSUAL: ¨ABRIL 2014

ITEM VALORIZACIÓN PRESUPUESTO S/.AVANCES

SALDOANTERIOR ACTUAL ACUMULADO

VALORIZADO S/. % VALORIZADO S/. % VALORIZADO S/. % VALORIZADO S/. %1 EXPEDIENTE TECNICO 8,276,948.93 2,132,368.69 25.76% 302,378.96 3.65% 2,434,747.65 29.42% 5,842,201.28 70.58%2 MAYORES METRADOS 0.00 499,431.35 6.03% 49,395.61 0.60% 548,826.97 6.63% 0.00 0.00%3 PARTIDAS NUEVAS 0.00 440,713.32 5.32% 62,852.86 0.76% 503,566.18 6.08% 0.00 0.00%4 DEDUCTIVOS 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

COSTO TOTAL 8,276,948.93 3,072,513.36 37.12% 414,627.43 5.01% 3,487,140.79 42.13% 4,789,808.14 57.87%GASTOS GENERALES (11.12%) 920060.23 341538.58 46089.71 387628.29 532431.94

GASTOS DE SUPERVICION (4.57%) 420363.64 156044.57 21057.80 177102.36 243261.28GASTOS DE LIQUIDACION (0.86%) 70863.00 26305.29 3549.83 29855.11 41007.89

ELABORACION EXPEDIENTE TECNICO (2.21%) 183142.87 67985.07 9174.40 77159.47 105983.40TOTAL PRESUPUESTO 9,871,378.67 3,664,386.85 37.12% 494,499.16 5.01% 4,158,886.02 42.13% 5,712,492.65 57.87%

Page 31: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

1 OBRAS DE CONCRETO ARMADO

1.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

01.01.01 CONSTRUCCIONES PROVICIONALES (OFICINA, ALMACEN Y GUARDIANIA) m2 800.00 100.000 01.01.02 CERCO PROVISIONAL DE OBRA GLB 1.00 10,000.000 01.01.03 CARTEL DE IDENTIFICACION DE LA OBRA GLB 1.00 1,800.000 01.01.04 INSTALACION PROVISIONAL DE AGUA GLB 1.00 4,000.000 01.01.05 INSTALACION PROVISIONAL DE DESAGUE GLB 1.00 4,000.000 01.01.06 GLB 1.00 4,000.000 01.01.07 DEMOLICION DE BLOQUE EXISTENTE DE ADOBE m2 200.00 46.000

1.02 BLOQUES PRIMARIA

01.02.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

01.02.01.01 TRABAJOS PRELIMINARES

01.02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 714.21 0.740 01.02.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 714.21 3.840 01.02.01.02 MOVIMIENTO DE TIERRAS

01.02.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 51.89 27.580 01.02.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 260.25 31.350 01.02.01.02.03 EXCAVACIÓN PARA VIGAS DE CIMENTACIÓN m3 176.84 31.350 01.02.01.02.04 RELLENO CON MATERIAL PROPIO m3 283.12 21.760 01.02.01.02.05 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 714.27 2.420 01.02.01.02.06 ELIMINACION DE MATERIAL CON MAQUINA m3 200.15 5.780 01.02.01.03 OBRAS DE CONCRETO SIMPLE

INSTALACION PROVISIONAL SUMINISTRO TRIFASICO DE ENERGIA ELECTRICA

Page 32: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.02.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 288.93 28.600 01.02.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 72.00 222.550 01.02.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 226.51 26.970 01.02.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 20.27 253.550 01.02.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 649.80 41.330 01.02.01.04 CONCRETO ARMADO

01.02.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 104.10 6.050 01.02.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 573.97 432.510 01.02.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 3,236.82 6.030 01.02.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 148.13 32.810 01.02.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 23.09 445.210 01.02.01.05 COLUMNAS

01.02.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 11,233.41 6.030 01.02.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 796.96 35.560 01.02.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 73.71 439.560 01.02.01.06 COLUMNETAS DE CONFINAMIENTO

01.02.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 835.32 6.660 01.02.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 79.56 20.550 01.02.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 5.97 450.850 01.02.01.07 VIGAS

01.02.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 95.21 483.080 01.02.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 921.54 48.850

Page 33: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.02.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 10,026.53 6.030 01.02.01.08 VIGAS DE CONFINAMIENTO

01.02.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 731.31 6.660 01.02.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 61.96 20.550 01.02.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 4.65 518.910

Page 34: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.02.01.09 LOSAS ALIGERADAS

01.02.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 606.78 36.900 01.02.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 606.78 14.090 01.02.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 7,397.00 6.660 01.02.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 93.37 492.450 01.02.01.10 ESCALERAS

01.02.01.10.01 ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2 kg 470.78 6.050 01.02.01.10.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS m2 13.52 40.640 01.02.01.10.03 CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2 m3 10.24 452.260 01.02.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

01.02.01.11.01 CERCHA TIPO 01 (Longitud de 4.50) und 90.00 135.360 01.02.01.11.02 CERCHA TIPO 02 (Longitud de 3.70) und 17.00 125.520 01.02.01.11.03 CERCHA TIPO 03 (Longitud de 3.50) und 17.00 123.060 01.02.01.11.04 TIJERAL DE METAL TIPO 01 und 5.00 440.460 01.02.01.11.05 COBERTURA CON PLANCHA ONDULINE m2 876.00 37.900 01.02.01.11.06 CUMBRERA ONDULINE ML 69.70 40.550 01.02.01.12 URINARIOS CORRIDOS EN BATERÍA DE BAÑOS

01.02.01.13 ACERO DE REFUERZO EN URINARIOS CORRIDOS kg 10.40 6.050 01.02.01.14 ENCOFRADO Y DESENCOFRADO DE URINARIOS CORRIDOS m2 3.60 40.640 01.02.01.15 CONCRETO EN GRADAS F'C= 210 KG/CM2 EN URINARIOS CORRIDOS m3 0.18 452.260

1.03 BLOQUES SECUNDARIA

01.03.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

Page 35: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.03.01.01 TRABAJOS PRELIMINARES

01.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 482.45 0.740 01.03.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 482.45 3.840 01.03.01.02 MOVIMIENTO DE TIERRAS

01.03.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 2.92 27.580 01.03.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 180.78 31.350 01.03.01.02.03 EXCAVACIÓN PARA VIGAS DE CIMENTACIÓN m3 121.09 31.350 01.03.01.02.04 RELLENO CON MATERIAL PROPIO m3 146.98 21.760 01.03.01.02.05 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 482.45 2.420 01.03.01.02.06 ELIMINACION DE MATERIAL CON MAQUINA m3 286.15 5.780 01.03.01.03 OBRAS DE CONCRETO SIMPLE

01.03.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 192.49 28.600 01.03.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 65.77 222.550 01.03.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 186.17 26.970 01.03.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 16.83 253.550 01.03.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 482.45 41.330 01.03.01.04 CONCRETO ARMADO

01.03.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 1,326.96 6.050 01.03.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 85.78 432.510 01.03.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 2,217.41 6.030 01.03.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 128.46 32.810 01.03.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 16.06 445.210

Page 36: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.03.01.05 COLUMNAS

01.03.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 7,729.35 6.030 01.03.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 366.99 35.560 01.03.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 51.65 439.560 01.03.01.06 COLUMNETAS DE CONFINAMIENTO

01.03.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 470.96 6.660 01.03.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 54.72 20.550 01.03.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 4.10 450.850 01.03.01.07 VIGAS

Page 37: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.03.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 64.99 483.080 01.03.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 623.76 48.850 01.03.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 6,195.13 6.030 01.03.01.08 VIGAS DE CONFINAMIENTO

01.03.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 502.70 6.660 01.03.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 38.62 20.550 01.03.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 3.26 518.910 01.03.01.09 LOSAS ALIGERADAS

01.03.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 232.29 36.90 01.03.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 232.29 14.090 01.03.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 2,408.43 6.660 01.03.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 61.15 492.450 01.03.01.10 ESCALERAS

01.03.01.10.01 ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2 kg 235.39 6.050 01.03.01.10.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS m2 65.76 40.640 01.03.01.10.03 CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2 m3 5.12 452.260 01.03.01.11 ESTRUCTURAS METALICAS Y COBERTURAS 40,725.530 01.03.01.11.01 CERCHA TIPO 01 (Longitud de 4.50) und 86.00 135.360 01.03.01.11.02 CERCHA TIPO 04 (Longitud de 3.20) und 25.00 119.370 01.03.01.11.03 TIJERAL DE METAL TIPO 02 und 5.00 339.550 01.03.01.11.04 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 33.60 19.120

Page 38: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.03.01.11.05 COBERTURA CON PLANCHA ONDULINE m2 575.40 37.900 01.03.01.11.06 CUMBRERA ONDULINE ML 48.15 40.550 01.03.01.12 URINARIOS CORRIDOS EN BATERÍA DE BAÑOS

01.03.01.12.01 ACERO DE REFUERZO EN URINARIOS CORRIDOS kg 10.40 6.050 01.03.01.12.02 ENCOFRADO Y DESENCOFRADO DE URINARIOS CORRIDOS m2 3.60 40.640 01.03.01.12.03 CONCRETO EN GRADAS F'C= 210 KG/CM2 EN URINARIOS CORRIDOS m3 0.18 452.260

1.04 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA

01.04.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

01.04.01.01 TRABAJOS PRELIMINARES

01.04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 162.76 0.740 01.04.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 162.76 3.840 01.04.01.02 MOVIMIENTO DE TIERRAS

01.04.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 55.43 27.580 01.04.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 65.62 31.350 01.04.01.02.03 RELLENO CON MATERIAL PROPIO m3 100.07 21.760 01.04.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 162.76 2.420 01.04.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 41.97 5.780 01.04.01.03 OBRAS DE CONCRETO SIMPLE

01.04.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 60.46 28.600 01.04.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 18.00 222.550 01.04.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 51.42 26.970 01.04.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 3.86 253.550

Page 39: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.04.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 88.20 41.330 01.04.01.04 CONCRETO ARMADO

01.04.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 544.07 6.050 01.04.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 26.25 432.510 01.04.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 594.03 6.030 01.04.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 33.44 32.810 01.04.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 4.18 445.210

Page 40: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.04.01.05 COLUMNAS

01.04.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 2,455.04 6.030 01.04.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 228.90 35.560 01.04.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 22.11 439.560 01.04.01.06 COLUMNETAS DE CONFINAMIENTO

01.04.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 281.42 6.660 01.04.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 26.94 20.550 01.04.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 2.02 450.850 01.04.01.07 VIGAS

01.04.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 23.63 483.080 01.04.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 218.21 48.850 01.04.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 2,251.76 6.030 01.04.01.08 VIGAS DE CONFINAMIENTO

01.04.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 90.60 6.660 01.04.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 7.66 20.550 01.04.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.57 518.910 01.04.01.09 LOSAS ALIGERADAS

01.04.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 109.26 36.900 01.04.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 109.26 14.090 01.04.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 587.27 6.660 01.04.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 11.79 492.450 01.04.01.10 ESCALERAS

Page 41: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.04.01.10.01 ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2 kg 252.52 6.050 01.04.01.10.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS m2 25.15 40.640 01.04.01.10.03 CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2 m3 4.56 452.260 01.04.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

01.04.01.11.01 TIJERAL DE METAL TIPO 05 und 16.00 375.660 01.04.01.11.02 TIJERAL DE METAL TIPO 07 und 14.00 219.060 01.04.01.11.03 TIJERAL DE METAL TIPO 08 und 7.00 360.230 01.04.01.11.04 RETICULA DE METAL TIPO 01 und 2.00 697.750 01.04.01.11.05 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 695.40 19.120 01.04.01.11.06 COBERTURA CON PLANCHA ONDULINE m2 371.92 37.900 01.04.01.11.07 CUMBRERA ONDULINE ML 39.90 40.550

1.05 SALÓN DE USO MÚLTIPLE 61,215.00 01.05.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

01.05.01.01 TRABAJOS PRELIMINARES

01.05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 266.00 0.740 01.05.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 266.00 3.840 01.05.01.02 MOVIMIENTO DE TIERRAS

01.05.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 38.32 27.580 01.05.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 77.55 31.350 01.05.01.02.03 RELLENO CON MATERIAL PROPIO m3 73.61 21.760 01.05.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 266.00 2.420 01.05.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 54.93 5.780

Page 42: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.05.01.03 OBRAS DE CONCRETO SIMPLE

01.05.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 76.32 28.600 01.05.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 23.12 222.550 01.05.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 66.07 26.970 01.05.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 4.95 253.550 01.05.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 266.00 41.330

Page 43: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.05.01.04 CONCRETO ARMADO

01.05.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 595.74 6.050 01.05.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 31.02 432.510 01.05.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 599.71 6.030 01.05.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 39.39 32.810 01.05.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 4.92 445.210 01.05.01.05 COLUMNAS

01.05.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 1,751.17 6.030 01.05.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 170.80 35.560 01.05.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 15.44 439.560 01.05.01.06 COLUMNETAS DE CONFINAMIENTO

01.05.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 353.94 6.660 01.05.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 33.70 20.550 01.05.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 2.53 450.850 01.05.01.07 VIGAS

01.05.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 10.06 483.080 01.05.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 88.84 48.850 01.05.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 668.57 6.030 01.05.01.08 VIGAS DE CONFINAMIENTO

01.05.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 148.73 6.660 01.05.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 11.75 20.550 01.05.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.88 518.910

Page 44: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.05.01.09 ESTRUCTURAS METALICAS Y COBERTURAS

01.05.01.09.01 TIJERAL DE METAL TIPO 13 und 2.00 554.530 01.05.01.09.02 TIJERAL DE METAL TIPO 14 und 6.00 788.890 01.05.01.09.03 TIJERAL DE METAL TIPO 15 und 1.00 1,254.300 01.05.01.09.04 TIJERAL DE METAL TIPO 16 und 2.00 1,203.780 01.05.01.09.05 RETICULA DE METAL TIPO 01 und 2.00 1,032.140 01.05.01.09.06 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 680.00 19.120 01.05.01.09.07 PLATINAS DE SUJECION DE CORREAS METALICAS ML 640.20 12.420 01.05.01.09.08 COBERTURA CON PLANCHA ONDULINE m2 357.02 37.900 01.05.01.09.09 CUMBRERA ONDULINE ML 9.40 40.550

1.06 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN

01.06.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

01.06.01.01 TRABAJOS PRELIMINARES

01.06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 136.35 0.740 01.06.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 136.35 3.840 01.06.01.02 MOVIMIENTO DE TIERRAS

01.06.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 52.32 27.580 01.06.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 40.32 31.350 01.06.01.02.03 RELLENO CON MATERIAL PROPIO m3 51.62 21.760 01.06.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 136.35 2.420 01.06.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 52.32 5.780 01.06.01.03 OBRAS DE CONCRETO SIMPLE

Page 45: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.06.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 36.78 28.600 01.06.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 31.35 222.550 01.06.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 92.24 26.970 01.06.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 8.20 253.550 01.06.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 107.77 41.330 01.06.01.04 CONCRETO ARMADO

01.06.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 312.88 6.050 01.06.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 16.13 432.510 01.06.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 479.16 6.030 01.06.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 15.84 32.810

Page 46: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.06.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 3.96 445.210 01.06.01.05 COLUMNAS

01.06.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 1,658.25 6.030 01.06.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 134.04 35.560 01.06.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 12.06 439.560 01.06.01.06 COLUMNETAS DE CONFINAMIENTO

01.06.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 580.34 6.660 01.06.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 109.75 20.550 01.06.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 4.12 450.850 01.06.01.07 VIGAS

01.06.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 19.65 483.080 01.06.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 180.14 48.850 01.06.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 1,538.87 6.030 01.06.01.08 VIGAS DE CONFINAMIENTO

01.06.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 264.20 6.660 01.06.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 31.32 20.550 01.06.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 1.57 518.910 01.06.01.09 LOSAS ALIGERADAS

01.06.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 88.07 36.900 01.06.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 88.07 14.090 01.06.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 626.57 6.660 01.06.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 11.45 492.450

Page 47: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.06.01.10 ESCALERAS

01.06.01.10.01 ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2 kg 102.86 6.050 01.06.01.10.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS m2 17.06 40.640 01.06.01.10.03 CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2 m3 2.47 452.260 01.06.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

01.06.01.11.01 TIJERAL DE METAL TIPO 05 und 14.00 375.660 01.06.01.11.02 TIJERAL DE METAL TIPO 08 und 12.00 360.230 01.06.01.11.03 RETICULA DE METAL TIPO 01 und 1.00 697.750 01.06.01.11.04 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 335.80 19.120 01.06.01.11.05 COBERTURA CON PLANCHA ONDULINE m2 189.63 37.900 01.06.01.11.06 CUMBRERA ONDULINE ML 14.70 40.550

1.07 TALLER DE CONFECCIÓN, ARTESANIAS E IDIOMAS

01.07.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

01.07.01.01 TRABAJOS PRELIMINARES

01.07.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 189.52 0.740 01.07.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 189.52 3.840 01.07.01.02 MOVIMIENTO DE TIERRAS

01.07.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 45.24 27.580 01.07.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 59.90 31.350 01.07.01.02.03 RELLENO CON MATERIAL PROPIO m3 77.53 21.760 01.07.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 139.52 2.420 01.07.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 51.98 5.780

Page 48: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.07.01.03 OBRAS DE CONCRETO SIMPLE

01.07.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 53.39 28.600 01.07.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 15.48 222.550 01.07.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 44.24 26.970 01.07.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 3.94 253.550 01.07.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 84.00 41.330

Page 49: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.07.01.04 CONCRETO ARMADO

01.07.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 494.16 6.050 01.07.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 23.96 432.510 01.07.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 566.42 6.030 01.07.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 22.15 32.810 01.07.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 3.77 445.210 01.07.01.05 COLUMNAS

01.07.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 2,204.41 6.030 01.07.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 206.36 35.56 01.07.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 19.05 439.56 01.07.01.06 COLUMNETAS DE CONFINAMIENTO

01.07.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 365.30 6.66 01.07.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 33.69 20.55 01.07.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 2.53 450.85 01.07.01.07 VIGAS

01.07.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 22.97 483.08 01.07.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 179.71 48.85 01.07.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 1,915.39 6.03 01.07.01.08 VIGAS DE CONFINAMIENTO

01.07.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 76.47 6.66 01.07.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 6.45 20.55 01.07.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.48 518.91

Page 50: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.07.01.09 LOSAS ALIGERADAS

01.07.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 90.76 36.90 01.07.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 90.76 14.09 01.07.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 572.11 6.66 01.07.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 8.96 492.45 01.07.01.10 ESCALERAS

01.07.01.10.01 ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2 kg 252.52 6.05 01.07.01.10.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS m2 25.15 40.64 01.07.01.10.03 CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2 m3 4.56 452.26 01.07.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

01.07.01.11.01 TIJERAL DE METAL TIPO 05 und 14.00 375.660 01.07.01.11.02 TIJERAL DE METAL TIPO 06 und 12.00 324.510 01.07.01.11.03 TIJERAL DE METAL TIPO 08 und 6.00 360.230 01.07.01.11.04 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 622.40 19.120 01.07.01.11.05 COBERTURA CON PLANCHA ONDULINE m2 272.87 37.900 01.07.01.11.06 CUMBRERA ONDULINE ML 35.10 40.550

1.08 BIBLIOTECA GENERAL

01.08.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

01.08.01.01 TRABAJOS PRELIMINARES

01.08.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 190.72 0.740 01.08.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 190.72 3.840 01.08.01.02 MOVIMIENTO DE TIERRAS

Page 51: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.08.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 75.86 27.580 01.08.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 57.12 31.350 01.08.01.02.03 RELLENO CON MATERIAL PROPIO m3 72.82 21.760 01.08.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 190.72 2.420 01.08.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 78.21 5.780

Page 52: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.08.01.03 OBRAS DE CONCRETO SIMPLE

01.08.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 53.71 28.600 01.08.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 44.68 222.550 01.08.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 131.50 26.970 01.08.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 11.98 253.550 01.08.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 150.83 41.330 01.08.01.04 CONCRETO ARMADO

01.08.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 443.25 6.050 01.08.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 22.85 432.510 01.08.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 1,185.00 6.030 01.08.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 25.00 32.810 01.08.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 6.25 445.210 01.08.01.05 COLUMNAS

01.08.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 2,064.22 6.030 01.08.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 197.20 35.560 01.08.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 18.49 439.560 01.08.01.06 COLUMNETAS DE CONFINAMIENTO

01.08.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 266.04 6.660 01.08.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 51.30 20.550 01.08.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 1.92 450.850 01.08.01.07 VIGAS

01.08.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 25.62 483.080

Page 53: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.08.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 243.98 48.850 01.08.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 2,250.23 6.030 01.08.01.08 VIGAS DE CONFINAMIENTO

01.08.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 127.76 6.660 01.08.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 15.51 20.550 01.08.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.78 518.910 01.08.01.09 LOSAS ALIGERADAS

01.08.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 87.30 36.900 01.08.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 87.30 14.090 01.08.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 621.98 6.660 01.08.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 11.35 492.450 01.08.01.10 ESCALERAS

01.08.01.10.01 ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2 kg 159.40 6.050 01.08.01.10.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS m2 21.96 40.640 01.08.01.10.03 CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2 m3 3.42 452.260 01.08.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

01.08.01.11.01 TIJERAL DE METAL TIPO 03 und 13.00 440.460 01.08.01.11.02 TIJERAL DE METAL TIPO 04 und 7.00 209.340 01.08.01.11.03 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 500.70 19.120 01.08.01.11.04 COBERTURA CON PLANCHA ONDULINE m2 272.87 37.900 01.08.01.11.05 CUMBRERA ONDULINE ML 23.15 40.550

1.09 DUCHAS + VESTIDORES (PRIMARIA Y SECUNDARIA) + GUARDIANIA

Page 54: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.09.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

01.09.01.01 TRABAJOS PRELIMINARES

01.09.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 69.84 0.740 01.09.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 69.84 3.840 01.09.01.02 MOVIMIENTO DE TIERRAS

01.09.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 11.41 27.580 01.09.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 21.60 31.350 01.09.01.02.03 RELLENO CON MATERIAL PROPIO m3 12.96 21.760 01.09.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 18.96 2.420 01.09.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 26.07 5.780

Page 55: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.09.01.03 OBRAS DE CONCRETO SIMPLE

01.09.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 14.40 28.600 01.09.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 28.85 222.550 01.09.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 82.42 26.970 01.09.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 6.18 253.550 01.09.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 69.84 41.330 01.09.01.04 CONCRETO ARMADO

01.09.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 152.92 6.050 01.09.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 8.64 432.510 01.09.01.05 COLUMNAS

01.09.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 425.93 6.030 01.09.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 44.60 35.560 01.09.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 2.98 439.560 01.09.01.06 COLUMNETAS DE CONFINAMIENTO

01.09.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 191.76 6.660 01.09.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 16.92 20.550 01.09.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 1.27 450.850 01.09.01.07 VIGAS

01.09.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 3.98 483.080 01.09.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 177.25 48.850 01.09.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 452.79 6.030 01.09.01.08 VIGAS DE CONFINAMIENTO

Page 56: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.09.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 66.97 6.660 01.09.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 5.94 20.550 01.09.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.45 518.910 01.09.01.09 ESTRUCTURAS METALICAS Y COBERTURAS

01.09.01.09.01 TIJERAL DE METAL TIPO 09 und 3.00 632.860 01.09.01.09.02 TIJERAL DE METAL TIPO 10 und 10.00 298.980 01.09.01.09.03 TIJERAL DE METAL TIPO 11 und 10.00 251.190 01.09.01.09.04 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 341.40 19.120 01.09.01.09.05 COBERTURA CON PLANCHA ONDULINE m2 179.07 37.900 01.09.01.09.06 CUMBRERA ONDULINE ML 25.50 40.550

1.1 VIVIENDA DE DOCENTES

01.10.01 OBRAS DE CONCRETO ARMADO (PABELLONES)

01.10.01.01 TRABAJOS PRELIMINARES

01.10.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 158.88 0.740 01.10.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 158.88 3.840 01.10.01.02 MOVIMIENTO DE TIERRAS

01.10.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 42.86 27.58 01.10.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 50.40 31.35 01.10.01.02.03 RELLENO CON MATERIAL PROPIO m3 84.23 21.760 01.10.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 158.88 2.42 01.10.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 11.74 5.780 01.10.01.03 OBRAS DE CONCRETO SIMPLE

Page 57: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.10.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 48.94 28.60 01.10.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 31.30 222.550 01.10.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 89.43 26.970 01.10.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 6.71 253.550 01.10.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 158.88 41.330

Page 58: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.10.01.04 CONCRETO ARMADO

01.10.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 488.88 6.05 01.10.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 20.16 432.510 01.10.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 701.29 6.03 01.10.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 43.20 32.810 01.10.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 5.40 445.210 01.10.01.05 COLUMNAS

01.10.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 1,708.39 6.03 01.10.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 92.20 35.560 01.10.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 14.69 439.560 01.10.01.06 COLUMNETAS DE CONFINAMIENTO

01.10.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 521.41 6.660 01.10.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 44.54 20.550 01.10.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 3.34 450.850 01.10.01.07 VIGAS

01.10.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 12.74 483.080 01.10.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 122.82 48.850 01.10.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 1,787.84 6.030 01.10.01.08 VIGAS DE CONFINAMIENTO

01.10.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 159.79 6.660 01.10.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 5.67 20.550 01.10.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.43 518.910

Page 59: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.10.01.09 LOSAS ALIGERADAS

01.10.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 169.01 36.900 01.10.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 169.01 14.090 01.10.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 634.05 6.660 01.10.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 14.13 492.450 01.10.01.10 ESCALERAS

01.10.01.10.01 ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2 kg 135.53 6.050 01.10.01.10.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS m2 18.61 40.640 01.10.01.10.03 CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2 m3 2.50 452.260 01.10.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

01.10.01.11.01 TIJERAL DE METAL TIPO 12 und 27.00 455.890 01.10.01.11.02 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 1,032.00 19.120 01.10.01.11.03 COBERTURA CON PLANCHA ONDULINE m2 550.14 37.900 01.10.01.11.04 CUMBRERA ONDULINE ML 51.90 40.550

1.11 TANQUE ELEVADO Y CISTERNA

01.11.01 TRABAJOS PRELIMINARES

01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 24.00 0.740 01.11.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 24.00 3.840 01.11.01.03 COLOCACIÓN DE NIVELES DURANTE LA OBRA m2 24.00 3.840 01.11.02 MOVIMIENTO DE TIERRAS

01.11.02.01 EXCAVACION MANUAL DE ZANJAS m3 34.70 31.960 01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 1.80 17.090

Page 60: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.11.02.03 ACARREO INTERNO, MATERIAL PROVENIENTE DE EXCAVACION m3 34.70 17.580 01.11.02.04 ELIMINACION DE MATERIAL CARGUIO MANUAL VOLQUETE DE 6 M3 m3 34.70 8.080 01.11.02.05 m2 25.25 40.930 01.11.02.06 RELLENO CON AFIRMADO e=4"(100% DE COMPACTACIÓN) m3 1.80 34.860 01.11.03 OBRAS DE CONCRETO SIMPLE

01.11.03.01 SOLADO C° S° 1:10 e= 10 cm m2 44.70 28.600

NIVELACION INTERIOR Y APISONADO PARA FALSO PISO O PISO CON PISÓN

Page 61: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.11.04 CONCRETO ARMADO

01.11.04.01 PLATEA DE CIMENTACIÓN

01.11.04.01.01 CONCRETO F'C= 210 KG/CM2 EN PLATEA DE CIMENTACIÓN m3 12.96 432.510 01.11.04.01.02 ENCOFRADO Y DESENCOFRADO EN PLATEA DE CIMENTACIÓN m2 11.28 43.600 01.11.04.01.03 ACERO f'y = 4200 kg/cm2, G° 60 EN PLATEA DE CIMENTACIÓN kg 666.80 6.050 01.11.04.02 PLACAS DE CONCRETO ARMADO PARA TANQUE CISTERNA

01.11.04.02.01 CONCRETO F'C= 210 KG/CM2 PARA PLACA DE TANQUE CISTERNA m3 6.05 151.690 01.11.04.02.02 ENCOFRADO DESENCOFRADO PARA PLACA DE TANQUE CISTERNA m2 60.48 23.220 01.11.04.02.03 ACERO f'y = 4200 kg/cm2, G° 60 EN PLACA PARA TANQUE CISTERNA kg 871.16 1.810 01.11.04.03 LOSA MACIZA

01.11.04.03.01 CONCRETO F'C= 210 KG/CM2 EN LOSA MACIZA m3 3.53 387.560 01.11.04.03.02 ENCOFRADO Y DESENCOFADO EN LOSA MACISA m2 49.26 35.100 01.11.04.03.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS MACIZAS kg 276.65 6.660 01.11.04.04 COLUMNAS

01.11.04.04.01 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 4.31 439.560 01.11.04.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 86.27 35.560 01.11.04.04.03 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 563.06 6.030 01.11.04.05 VIGAS

01.11.04.05.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 2.40 483.080 01.11.04.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 36.00 48.850 01.11.04.05.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 2,769.18 6.030 01.11.04.06 CUBA DE CONCRETO

Page 62: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.11.04.06.01 CONCRETO F'C= 210 KG/CM2 EN CUBA m3 10.90 387.560 01.11.04.06.02 ENCOFRADO Y DESENCOFRADO EN CUBA m2 99.30 29.520 01.11.04.06.03 ACERO f'y = 4200 kg/cm2, G° 60 EN CUBA kg 446.24 5.950 01.11.04.07 MUROS DE BLOQUES HUECOS DE CONCRETO

01.11.04.07.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 14.52 49.740 01.11.05 TARRAJEO

01.11.05.01 TARRAJEO CON IMPERMEABILZANTE m2 74.28 22.350 01.11.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 137.98 14.520

1.12 PRUEBAS DE LABORATORIO

01.12.01 ROTURA DE BRIQUETAS und 50.00 30.000 01.12.02 ESTUDIO DE SUELOS PARA VERIFICACION DE CAPACIDAD PORTANTE und 1.00 2,000.000 01.12.03 DISEÑO DE MEZCLAS DE CONCRETO und 1.00 1,350.000

1 ARQUITECTURA

1.01 BLOQUES PRIMARIA

01.01.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.01.01.0101.01.01.01.01 MURO DE LADRILLO ARTESANAL CABEZA m2 351.92 169.880 01.01.01.02 MUROS DE BLOQUES HUECOS DE CONCRETO

01.01.01.02.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 476.65 49.740 01.01.02 REVOQUES Y REVESTIMIENTOS

01.01.02.01 REVOQUES Y REVESTIMIENTOS

01.01.02.01.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 1,099.07 10.280

MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O ARTESANALMENTE)

Page 63: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.01.02.01.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 695.62 11.330 01.01.02.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 570.83 10.810 01.01.02.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 893.82 10.310 01.01.02.01.05 TARRAJEO EN PARAPETOS m2 299.21 13.570 01.01.02.02 VESTIDURA DE DERRAMES

01.01.02.02.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 516.40 9.070

Page 64: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.01.02.03 BRUÑAS

01.01.02.03.01 BRUÑADO DE 1/2" m 1,709.00 4.470 01.01.02.04 GRADAS

01.01.02.04.01 REVESTIMIENTO DE GRADAS DE ESCALERA m2 77.01 10.510 01.01.02.05 REVESTIMIENTO DE DESCANSOS

01.01.02.05.01 REVESTIMIENTO DE DESCANSOS m2 26.01 22.500 01.01.03 CIELORRASOS

01.01.03.01 CIELORRASO CON YESO

01.01.03.01.01 CIELORRASOS CON YESO m2 673.59 24.970 01.01.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

01.01.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 590.96 147.210 01.01.04 PISOS Y PAVIMENTOS

01.01.04.01 CONTRAPISOS

01.01.04.01.01 CONTRAPISO DE 35MM. m2 94.10 30.890 01.01.04.02 PISOS

01.01.04.02.01 PISO CERAMICO COLOR DE 0.40 x0.40 m m2 94.10 44.390 01.01.04.03 PISOS DE CONCRETO

01.01.04.03.01 PISO DE CEMENTO PULIDO DE 2¨ m2 968.20 30.730 01.01.04.04 VEREDAS

01.01.04.04.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 470.75 91.750 01.01.04.05 JUNTAS DE DILATACIÓN

01.01.04.05.01 JUNTAS ASFALTICAS E=1" ML 44.81 3.960

Page 65: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.01.04.06 CEMENTO PULIDO EN PARASOLES

01.01.04.06.01 CEMENTO PULIDO EN PARASOLES m2 82.63 30.730 01.01.05 ZOCALOS Y CONTRAZOCALOS

01.01.05.01 ZOCALOS

01.01.05.01.01 ZOCALO DE CERAMICO 0.20X0.30 cm H= 1.60 m m2 122.55 75.540 01.01.06 CARPINTERIA DE MADERA

01.01.06.01 PUERTAS

01.01.06.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 51.24 149.970 01.01.06.01.02 PUERTA DE MADERA PREFABRICADA PARA SSHH m2 21.06 117.630 01.01.06.01.03 DIVISION DE MELAMINA PARA BAÑOS m2 55.80 117.170 01.01.07 CARPINTERIA METALICA Y HERRERIA

01.01.07.01 BARANDAS METALICAS

01.01.07.01.01 TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm ML 116.20 49.670 01.01.07.01.02 TUBO DE 1 1/2" e=2 mm CURVO ML 533.80 45.480 01.01.07.01.03 TUBO REDONDO DE 3/4" e=2 mm ML 67.60 43.890 01.01.08 CERRADURAS

01.01.08.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 16.00 92.170 01.01.08.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 64.00 12.660 01.01.09 VIDRIOS, CRISTALES Y SIMILARES

01.01.09.01 ESPEJOS Y VIDRIO

01.01.09.01.01 ESPEJO DE 0.50 mx 0.80m und 22.00 27.750 01.01.09.01.02 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 242.36 217.920

Page 66: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.01.09.02 MALLA MOSQUITERO N°16 COLOR VERDE

01.01.09.02.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 125.30 28.640 01.01.10 PINTURA

01.01.10.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.01.10.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 1,099.07 9.740 01.01.10.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 695.62 9.950 01.01.10.01.03 PINTURA EN CIELORRASO m2 590.96 12.270 01.01.10.01.04 PINTURA EN COLUMNAS m2 570.83 12.270

Page 67: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.01.10.01.05 PINTURA EN VIGAS m2 919.02 12.270 01.01.10.01.06 PINTURA EN PARAPETOS m2 257.81 12.270 01.01.10.02 PINTURA DE PUERTAS

01.01.10.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 100.80 12.710 01.01.10.03 PINTURA DE ESTRUCTURAS METALICAS

01.01.10.03.01 ML 116.20 7.970 01.01.10.03.02 PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS ML 533.80 7.970 01.01.10.03.03 PINTURA EN TUBO DE 3/4" e=2mm - BARANDAS ML 67.60 7.970 01.01.10.04 JUNTAS DE CONSTRUCCIÓN

01.01.10.04.01 JUNTAS DE CONSTRUCCIÓN m 6.80 20.560 1.02 BLOQUES SECUNDARIA

01.02.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.02.01.0101.02.01.01.01 MURO DE LADRILLO ARTESANAL CABEZA m2 233.84 169.880 01.02.01.02 MUROS DE BLOQUES HUECOS DE CONCRETO

01.02.01.02.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 400.55 49.740 01.02.02 REVOQUES Y REVESTIMIENTOS

01.02.02.01 REVOQUES Y REVESTIMIENTOS

01.02.02.01.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 852.63 10.280 01.02.02.01.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 455.12 11.330 01.02.02.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 358.28 10.810 01.02.02.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 57.35 10.310

PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIÁMETRO e=2mm - BARANDAS

MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O ARTESANALMENTE)

Page 68: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.02.02.01.05 TARRAJEO EN PARAPETOS m2 211.67 13.570 01.02.02.02 VESTIDURA DE DERRAMES

01.02.02.02.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 518.00 9.070 01.02.02.03 BRUÑAS

01.02.02.03.01 BRUÑADO DE 1/2" m 1,143.40 4.470 01.02.02.04 GRADAS

01.02.02.04.01 REVESTIMIENTO DE GRADAS DE ESCALERA m2 32.47 10.510 01.02.02.05 REVESTIMIENTO DE DESCANSOS

01.02.02.05.01 REVESTIMIENTO DE DESCANSOS m2 26.01 22.500 01.02.03 CIELORRASOS

01.02.03.01 CIELORRASO CON YESO

01.02.03.01.01 CIELORRASOS CON YESO m2 447.24 24.970 01.02.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

01.02.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 389.74 147.210 01.02.04 PISOS Y PAVIMENTOS

01.02.04.01 CONTRAPISOS

01.02.04.01.01 CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS m2 87.70 30.890 01.02.04.02 PISOS

01.02.04.02.01 PISO CERAMICO COLOR DE 0.40 x0.40 m m2 87.70 44.390 01.02.04.03 PISOS DE CONCRETO

01.02.04.03.01 PISO DE CEMENTO PULIDO DE 2¨ m2 650.30 30.730 01.02.04.04 VEREDAS

Page 69: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.02.04.04.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 323.59 91.750 01.02.04.05 JUNTAS DE DILATACIÓN

01.02.04.05.01 JUNTAS ASFALTICAS E=1" ML 31.67 3.960 01.02.04.06 CEMENTO PULIDO EN PARASOLES

01.02.04.06.01 CEMENTO PULIDO EN PARASOLES m2 62.10 30.730 01.02.05 ZOCALOS Y CONTRAZOCALOS

01.02.05.01 ZOCALOS

01.02.05.01.01 ZOCALO DE CERAMICO 0.20X0.30 cm H= 1.60 m m2 124.20 75.540

Page 70: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.02.06 CARPINTERIA DE MADERA

01.02.06.01 PUERTAS

01.02.06.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 37.82 149.970 01.02.06.01.02 PUERTA DE MADERA PREFABRICADA PARA SSHH m2 16.38 117.630 01.02.06.01.03 DIVISION DE MELAMINA PARA BAÑOS m2 43.40 117.170 01.02.07 CARPINTERIA METALICA Y HERRERIA

01.02.07.01 BARANDAS METALICAS

01.02.07.01.01 TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm ML 84.30 49.670 01.02.07.01.02 TUBO DE 1 1/2" e=2 mm CURVO ML 407.60 45.480 01.02.07.01.03 TUBO REDONDO DE 3/4" e=2 mm ML 42.90 43.890 01.02.08 CERRADURAS

01.02.08.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 12.00 92.170 01.02.08.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 48.00 12.660 01.02.09 VIDRIOS, CRISTALES Y SIMILARES

01.02.09.01 ESPEJOS Y VIDRIO

01.02.09.01.01 ESPEJO DE 0.50 mx 0.80m und 9.00 27.750 01.02.09.01.02 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 166.64 217.920 01.02.09.02 MALLA MOSQUITERO N°16 COLOR VERDE

01.02.09.02.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 89.56 28.640 01.02.10 PINTURA

01.02.10.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.02.10.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 852.63 9.740

Page 71: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.02.10.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 455.12 9.950 01.02.10.01.03 PINTURA EN CIELORRASO m2 389.74 12.270 01.02.10.01.04 PINTURA EN COLUMNAS m2 358.28 12.270 01.02.10.01.05 PINTURA EN VIGAS m2 572.35 12.270 01.02.10.01.06 PINTURA EN PARAPETOS m2 182.57 12.270 01.02.10.02 PINTURA DE PUERTAS

01.02.10.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 74.40 12.710 01.02.10.03 PINTURA DE ESTRUCTURAS METALICAS

01.02.10.03.01 ML 84.30 7.970 01.02.10.03.02 PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS ML 407.60 7.970 01.02.10.03.03 PINTURA EN TUBO DE 3/4" e=2mm - BARANDAS ML 42.90 7.970 01.02.10.04 JUNTAS DE CONSTRUCCIÓN

01.02.10.04.01 JUNTAS DE CONSTRUCCIÓN m 6.80 20.560 1.03 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA

01.03.0101.03.01.01 MUROS DE BLOQUES HUECOS DE CONCRETO

01.03.01.01.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 411.13 49.740 01.03.02 REVOQUES Y REVESTIMIENTOS

01.03.02.01 REVOQUES Y REVESTIMIENTOS

01.03.02.01.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 489.29 10.280 01.03.02.01.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 298.79 11.330 01.03.02.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 260.77 10.810

PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIÁMETRO e=2mm - BARANDAS

MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O ARTESANALMENTE)

Page 72: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.03.02.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 268.80 10.310 01.03.02.01.05 TARRAJEO EN PARAPETOS m2 57.78 13.570 01.03.02.02 VESTIDURA DE DERRAMES

01.03.02.02.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 238.60 9.070 01.03.02.03 BRUÑAS

01.03.02.03.01 BRUÑADO DE 1/2" m 660.20 4.470 01.03.02.04 GRADAS

01.03.02.04.01 REVESTIMIENTO DE GRADAS DE ESCALERA m2 31.71 10.510

Page 73: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.03.02.05 REVESTIMIENTO DE DESCANSOS

01.03.02.05.01 REVESTIMIENTO DE DESCANSOS m2 59.80 22.500 01.03.03 CIELORRASOS

01.03.03.01 CIELORRASO CON YESO

01.03.03.01.01 CIELORRASOS CON YESO m2 169.86 24.970 01.03.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

01.03.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 241.20 147.210 01.03.04 PISOS Y PAVIMENTOS

01.03.04.01 PISOS DE CONCRETO

01.03.04.01.01 PISO DE CEMENTO PULIDO DE 2¨ m2 351.64 30.730 01.03.04.02 VEREDAS

01.03.04.02.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 180.53 91.750 01.03.04.03 JUNTAS DE DILATACIÓN

01.03.04.03.01 JUNTAS ASFALTICAS E=1" ML 27.63 3.960 01.03.04.04 CEMENTO PULIDO EN PARASOLES

01.03.04.04.01 CEMENTO PULIDO EN PARASOLES m2 23.94 30.730 01.03.05 CARPINTERIA DE MADERA

01.03.05.01 PUERTAS

01.03.05.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 70.90 149.970 01.03.06 CARPINTERIA METALICA Y HERRERIA

01.03.06.01 BARANDAS METALICAS

01.03.06.01.01 TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm ML 47.33 49.670

Page 74: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.03.06.01.02 TUBO DE 1 1/2" e=2 mm CURVO ML 166.38 45.480 01.03.07 CERRADURAS

01.03.07.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 12.00 92.170 01.03.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 48.00 12.660 01.03.08 VIDRIOS, CRISTALES Y SIMILARES

01.03.08.01 VIDRIOS, CRISTALES Y SIMILARES

01.03.08.01.01 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 93.19 217.920 01.03.08.02 MALLA MOSQUITERO N°16 COLOR VERDE

01.03.08.02.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 9.44 28.640 01.03.09 PINTURA

01.03.09.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.03.09.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 489.29 9.740 01.03.09.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 289.79 9.950 01.03.09.01.03 PINTURA EN CIELORRASO m2 145.92 12.270 01.03.09.01.04 PINTURA EN COLUMNAS m2 260.77 12.270 01.03.09.01.05 PINTURA EN VIGAS m2 268.80 12.270 01.03.09.01.06 PINTURA EN PARAPETOS m2 51.06 12.270 01.03.09.02 PINTURA DE PUERTAS

01.03.09.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 70.90 12.710 01.03.09.03 PINTURA DE ESTRUCTURAS METALICAS

01.03.09.03.01 ML 47.33 7.970 01.03.09.03.02 PINTURA EN TUBO DE 1 1/2" DE DIAMETRO BARANDAS ML 166.38 5.820

PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIÁMETRO e=2mm - BARANDAS

Page 75: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.03.10 POSTES DE MADERA ROLLIZO DE 6"-8" EN GALERÍA

01.03.10.01 m3 1.58 427.240 01.03.10.02 ACERO DE REFUERZO F'y = 4200 kg/cm2 EN BASES DE CONCRETO kg 52.17 1.180 01.03.10.03 und 14.00 72.320

BASE DE CONCRETO ARMADO f´c=175 kg/cm2 PARA POSTES DE MADERA ROLLIZO DE 6"-8"

COLOCACION DE POSTES DE MADERA ROLLIZO DE 6"-8" DE 6M. DE LONGITUD

Page 76: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

1.04 SALON DE USO MULTIPLE

01.04.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.04.01.01 MUROS DE BLOQUES HUECOS DE CONCRETO

01.04.01.01.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 253.07 49.740 01.04.01.02 REVOQUES Y REVESTIMIENTOS

01.04.01.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 247.99 10.280 01.04.01.02.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 252.06 11.330 01.04.01.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 87.40 10.810 01.04.01.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 75.99 10.310 01.04.01.02.05 TARRAJEO EN PARAPETOS m2 54.00 13.570 01.04.01.03 VESTIDURA DE DERRAMES

01.04.01.03.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 67.50 9.070 01.04.01.04 BRUÑAS

01.04.01.04.01 BRUÑADO DE 1/2" m 308.20 4.470 01.04.02 CIELORRASOS

01.04.02.01 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

01.04.02.01.01 CIELORRASO CON BALDOSA ACÚSTICA m2 216.08 147.210 01.04.03 PISOS Y PAVIMENTOS

01.04.03.01 PISOS DE CONCRETO

01.04.03.01.01 PISO DE CEMENTO PULIDO DE 2¨ m2 216.08 30.730 01.04.03.02 VEREDAS

01.04.03.02.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 98.31 91.750

Page 77: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.04.03.02.02 CEMENTO PULIDO EN PARASOLES m2 330.86 30.730 01.04.04 CARPINTERIA DE MADERA

01.04.04.01 PUERTAS

01.04.04.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 15.58 149.970 01.04.04.02 ESCENARIO SALA DE USO MULTIPLE

01.04.04.02.01 CONCRETO CICLOPEO FC=140 KG/CM2 + 30 % PM. m3 23.52 165.860 01.04.04.02.02 RELLENO CON MATERIAL PROPIO m3 137.24 36.860 01.04.04.02.03 VIGAS DE MADERA DE 2"x4"x12 p2 67.50 32.040 01.04.04.02.04 CONTRAPISO DE 2" m2 38.55 30.710 01.04.04.02.05 ENTABLADO DE MADERA m2 38.55 36.600 01.04.04.03 GRADAS

01.04.04.03.01 ENCOFRADO Y DESENCOFRADO DE GRADAS m2 3.70 35.560 01.04.04.03.02 CONCRETO F'C=175kg/cm2+25% PM m3 1.56 264.800 01.04.04.03.03 REVESTIMIENTO DE GRADAS DE ESCALERA m2 15.62 10.510 01.04.05 CARPINTERIA METALICA Y HERRERIA

01.04.05.01 CERRADURAS

01.04.05.01.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 5.00 92.170 01.04.05.01.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 20.00 12.660 01.04.06 VIDRIOS, CRISTALES Y SIMILARES

01.04.06.01 ESPEJOS Y VIDRIO

01.04.06.01.01 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 20.16 217.920 01.04.06.02 MALLA DE ALAMBRE GALVANIZADO

Page 78: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.04.06.02.01 MALLADE ALAMBRE GALVANIZADO DE 3/4" m2 38.24 18.510 01.04.06.03 MALLA MOSQUITERO N°16 COLOR VERDE

01.04.06.03.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 5.12 28.640 01.04.07 PINTURA

01.04.07.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.04.07.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 247.99 9.740 01.04.07.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 226.83 9.950 01.04.07.01.03 PINTURA EN COLUMNAS m2 87.40 12.270

Page 79: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.04.07.01.04 PINTURA EN VIGAS m2 75.99 12.270 01.04.07.01.05 PINTURA EN PARAPETOS m2 54.00 12.270 01.04.07.02 PINTURA DE PUERTAS

01.04.07.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 31.16 12.710 1.05 TALLER DE CONFECCIÓN, ARTESANIAS E IDIOMAS

01.05.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.05.01.01 MUROS DE BLOQUES HUECOS DE CONCRETO

01.05.01.01.01 MURO DE LADRILLO ARTESANAL CABEZA m2 109.25 169.880 01.05.01.0201.05.01.02.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 411.13 49.740 01.05.02 REVOQUES Y REVESTIMIENTOS

01.05.02.01 REVOQUES Y REVESTIMIENTOS

01.05.02.01.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 391.95 10.280 01.05.02.01.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 323.66 11.330 01.05.02.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 133.88 10.810 01.05.02.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 255.57 10.310 01.05.02.01.05 TARRAJEO EN PARAPETOS m2 57.78 13.570 01.05.02.02 VESTIDURA DE DERRAMES

01.05.02.02.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 154.60 9.070 01.05.02.03 BRUÑAS

01.05.02.03.01 BRUÑADO DE 1/2" m 573.80 4.470 01.05.02.04 GRADAS

MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O ARTESANALMENTE)

Page 80: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.05.02.04.01 REVESTIMIENTO DE GRADAS DE ESCALERA m2 31.71 10.510 01.05.02.05 REVESTIMIENTO DE DESCANSOS

01.05.02.05.01 REVESTIMIENTO DE DESCANSOS m2 53.40 22.500 01.05.03 CIELORRASOS

01.05.03.01 CIELORRASO CON YESO

01.05.03.01.01 CIELORRASOS CON YESO m2 169.86 24.970 01.05.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

01.05.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 214.21 147.210 01.05.04 PISOS Y PAVIMENTOS

01.05.04.01 PISOS DE CONCRETO

01.05.04.01.01 PISO DE CEMENTO PULIDO DE 2¨ m2 310.90 30.730 01.05.04.02 VEREDAS

01.05.04.02.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 146.09 91.750 01.05.04.03 JUNTAS DE DILATACIÓN

01.05.04.03.01 JUNTAS ASFALTICAS E=1" ML 27.63 3.960 01.05.04.04 CEMENTO PULIDO EN PARASOLES

01.05.04.04.01 CEMENTO PULIDO EN PARASOLES m2 28.56 30.730 01.05.05 CARPINTERIA DE MADERA

01.05.05.01 PUERTAS

01.05.05.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 28.56 149.970 01.05.06 CARPINTERIA METALICA Y HERRERIA

01.05.06.01 BARANDAS METALICAS

Page 81: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.05.06.01.01 TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm ML 53.37 49.670 01.05.06.01.02 TUBO DE 1 1/2" e=2 mm CURVO ML 176.22 45.480 01.05.07 CERRADURAS

01.05.07.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 12.00 92.170 01.05.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 48.00 12.660 01.05.08 VIDRIOS, CRISTALES Y SIMILARES

01.05.08.01 ESPEJOS Y VIDRIO

01.05.08.01.01 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 93.19 217.920

Page 82: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.05.08.02 MALLA MOSQUITERO N°16 COLOR VERDE

01.05.08.02.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 9.44 28.640 01.05.08.03 MALLA DE ALAMBRE GALVANIZADO

01.05.08.03.01 MALLADE ALAMBRE GALVANIZADO DE 3/4" m2 6.45 26.820 01.05.09 PINTURA

01.05.09.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.05.09.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 391.95 9.740 01.05.09.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 323.66 9.950 01.05.09.01.03 PINTURA EN CIELORRASO m2 136.62 12.270 01.05.09.01.04 PINTURA EN COLUMNAS m2 439.90 12.270 01.05.09.01.05 PINTURA EN VIGAS m2 255.57 12.270 01.05.09.01.06 PINTURA EN PARAPETOS m2 48.84 12.270 01.05.09.02 PINTURA DE PUERTAS

01.05.09.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 57.12 12.710 01.05.09.03 PINTURA DE ESTRUCTURAS METALICAS

01.05.09.03.01 ML 53.37 7.970 01.05.09.03.02 PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS ML 176.22 7.970 01.05.10 POSTES DE MADERA ROLLIZO DE 6"-8" EN GALERÍA

01.05.10.01 m3 1.35 427.240 01.05.10.02 ACERO DE REFUERZO F'y = 4200 kg/cm2 EN BASES DE CONCRETO kg 44.71 1.180 01.05.10.03 und 12.00 72.320

1.06 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN

PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIÁMETRO e=2mm - BARANDAS

BASE DE CONCRETO ARMADO f´c=175 kg/cm2 PARA POSTES DE MADERA ROLLIZO DE 6"-8"

COLOCACION DE POSTES DE MADERA ROLLIZO DE 6"-8" DE 6M. DE LONGITUD

Page 83: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.06.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.06.01.0101.06.01.01.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 331.43 49.740 01.06.02 REVOQUES Y REVESTIMIENTOS

01.06.02.01 REVOQUES Y REVESTIMIENTOS

01.06.02.01.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 511.13 10.280 01.06.02.01.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 150.61 11.330 01.06.02.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 86.21 10.810 01.06.02.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 124.11 10.310 01.06.02.01.05 TARRAJEO EN PARAPETOS m2 31.61 13.570 01.06.02.02 VESTIDURA DE DERRAMES

01.06.02.02.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 163.30 9.070 01.06.02.03 BRUÑAS

01.06.02.03.01 BRUÑADO DE 1/2" m 227.30 4.470 01.06.02.04 GRADAS

01.06.02.04.01 REVESTIMIENTO DE GRADAS DE ESCALERA m2 15.86 10.510 01.06.02.05 REVESTIMIENTO DE DESCANSOS

01.06.02.05.01 REVESTIMIENTO DE DESCANSOS m2 7.02 22.500 01.06.03 CIELORRASOS

01.06.03.01 CIELORRASO CON YESO

01.06.03.01.01 CIELORRASOS CON YESO m2 13.53 24.970 01.06.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O ARTESANALMENTE)

Page 84: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.06.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 149.54 147.210 01.06.04 PISOS Y PAVIMENTOS

01.06.04.01 PISOS DE CONCRETO

01.06.04.01.01 PISO DE CEMENTO PULIDO DE 2¨ m2 204.17 30.730

Page 85: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.06.04.02 VEREDAS

01.06.04.02.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 105.16 91.750 01.06.04.03 JUNTAS DE DILATACIÓN

01.06.04.03.01 JUNTAS ASFALTICAS E=1" ML 14.36 3.960 01.06.04.04 CEMENTO PULIDO EN PARASOLES

01.06.04.04.01 CEMENTO PULIDO EN PARASOLES m2 13.50 30.730 01.06.05 CARPINTERIA DE MADERA

01.06.05.01 PUERTAS

01.06.05.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 30.86 149.970 01.06.06 CARPINTERIA METALICA Y HERRERIA

01.06.06.01 BARANDAS METALICAS

01.06.06.01.01 TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm ML 29.95 49.670 01.06.07 CERRADURAS

01.06.07.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 12.00 92.170 01.06.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 48.00 12.660 01.06.08 VIDRIOS, CRISTALES Y SIMILARES

01.06.08.01 ESPEJOS Y VIDRIO

01.06.08.01.01 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 3.00 217.920 01.06.08.02 ESTRUCTURA DE POLICARBONATO COMPACTO

01.06.08.02.01 ESTRUCTURA METALICA DE TUBO RECTANGULAR DE 60x40mm e=2mm ML 60.76 27.320 01.06.08.02.02 POLICARBONATO COMPACTO DE 3mm DE ESPESOR m2 18.53 72.220 01.06.08.03 MALLA MOSQUITERO N°16 COLOR VERDE

Page 86: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.06.08.03.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 8.64 28.640 01.06.09 PINTURA

01.06.09.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.06.09.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 511.13 9.740 01.06.09.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 150.61 9.950 01.06.09.01.03 PINTURA EN CIELORRASO m2 90.38 12.270 01.06.09.01.04 PINTURA EN COLUMNAS m2 86.21 12.270 01.06.09.01.05 PINTURA EN VIGAS m2 124.11 12.270 01.06.09.01.06 PINTURA EN PARAPETOS m2 31.61 12.270 01.06.09.02 PINTURA DE PUERTAS

01.06.09.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 61.71 12.710 01.06.09.03 PINTURA DE ESTRUCTURAS METALICAS

01.06.09.03.01 ML 29.95 7.970 01.06.10 POSTES DE MADERA ROLLIZO DE 6"-8" EN GALERÍA

01.06.10.01 m3 0.41 427.240 01.06.10.02 ACERO DE REFUERZO F'y = 4200 kg/cm2 EN BASES DE CONCRETO kg 26.08 1.180 01.06.10.03 und 7.00 72.320

1.07 BIBLIOTECA GENERAL

01.07.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.07.01.01 MUROS DE BLOQUES HUECOS DE CONCRETO

01.07.01.01.01 MURO DE LADRILLO ARTESANAL CABEZA m2 61.68 169.880 01.07.01.02

PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIÁMETRO e=2mm - BARANDAS

BASE DE CONCRETO ARMADO f´c=175 kg/cm2 PARA POSTES DE MADERA ROLLIZO DE 6"-8"

COLOCACION DE POSTES DE MADERA ROLLIZO DE 6"-8" DE 6M. DE LONGITUD

MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O ARTESANALMENTE)

Page 87: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.07.01.02.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 178.00 49.740 01.07.02 REVOQUES Y REVESTIMIENTOS

01.07.02.01 REVOQUES Y REVESTIMIENTOS

01.07.02.01.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 262.36 10.280 01.07.02.01.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 195.60 11.330 01.07.02.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 133.88 10.810 01.07.02.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 178.33 10.310 01.07.02.01.05 TARRAJEO EN PARAPETOS m2 65.58 13.570

Page 88: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.07.02.02 VESTIDURA DE DERRAMES

01.07.02.02.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 105.40 9.070 01.07.02.03 BRUÑAS

01.07.02.03.01 BRUÑADO DE 1/2" m 401.34 4.470 01.07.02.04 GRADAS

01.07.02.04.01 REVESTIMIENTO DE GRADAS DE ESCALERA m2 24.92 10.510 01.07.02.05 REVESTIMIENTO DE DESCANSOS

01.07.02.05.01 REVESTIMIENTO DE DESCANSOS m2 11.04 22.500 01.07.03 CIELORRASOS

01.07.03.01 CIELORRASO CON YESO

01.07.03.01.01 CIELORRASOS CON YESO m2 87.30 24.970 01.07.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

01.07.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 211.36 147.210 01.07.04 PISOS Y PAVIMENTOS

01.07.04.01 PISOS DE CONCRETO

01.07.04.01.01 PISO DE CEMENTO PULIDO DE 2¨ m2 248.60 30.730 01.07.04.02 VEREDAS

01.07.04.02.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 75.61 91.750 01.07.04.03 JUNTAS DE DILATACIÓN

01.07.04.03.01 JUNTAS ASFALTICAS E=1" ML 29.33 3.960 01.07.04.04 CEMENTO PULIDO EN PARASOLES

01.07.04.04.01 CEMENTO PULIDO EN PARASOLES m2 12.68 30.730

Page 89: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.07.05 CARPINTERIA DE MADERA

01.07.05.01 PUERTAS

01.07.05.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 12.66 149.970 01.07.06 CARPINTERIA METALICA Y HERRERIA

01.07.06.01 BARANDAS METALICAS

01.07.06.01.01 TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm ML 32.20 49.670 01.07.06.01.02 TUBO DE 1 1/2" e=2 mm CURVO ML 114.60 45.480 01.07.07 CERRADURAS

01.07.07.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 4.00 92.170 01.07.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 16.00 12.660 01.07.08 VIDRIOS, CRISTALES Y SIMILARES

01.07.08.01 ESPEJOS Y VIDRIO

01.07.08.01.01 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 57.53 217.920 01.07.08.02 MALLA MOSQUITERO N°16 COLOR VERDE

01.07.08.02.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 7.68 28.640 01.07.09 PINTURA

01.07.09.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.07.09.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 262.36 9.740 01.07.09.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 195.60 9.950 01.07.09.01.03 PINTURA EN CIELORRASO m2 87.30 12.270 01.07.09.01.04 PINTURA EN COLUMNAS m2 133.88 12.270 01.07.09.01.05 PINTURA EN VIGAS m2 178.33 12.270

Page 90: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.07.09.01.06 PINTURA EN PARAPETOS m2 61.47 12.270 01.07.09.02 PINTURA DE PUERTAS

01.07.09.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 25.32 12.710 01.07.09.03 PINTURA DE ESTRUCTURAS METALICAS

01.07.09.03.01 ML 32.20 7.970 01.07.09.03.02 PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS ML 114.60 7.970

PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIÁMETRO e=2mm - BARANDAS

Page 91: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.07.10 POSTES DE MADERA ROLLIZO DE 6"-8" EN GALERÍA

01.07.10.01 m3 0.79 427.240 01.07.10.02 ACERO DE REFUERZO F'y = 4200 kg/cm2 EN BASES DE CONCRETO kg 26.08 1.180 01.07.10.03 und 7.00 72.320

1.08 DUCHAS Y VESTIDORES (PRIMARIA Y SECUNDARIA)

01.08.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.08.01.01 MUROS DE BLOQUES HUECOS DE CONCRETO

01.08.01.01.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 234.42 49.740 01.08.02 REVOQUES Y REVESTIMIENTOS

01.08.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 343.13 10.280 01.08.02.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 148.29 11.330 01.08.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 34.14 10.810 01.08.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 53.38 10.310 01.08.02.05 TARRAJEO EN PARAPETOS m2 25.61 13.570 01.08.03 VESTIDURA DE DERRAMES

01.08.03.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 195.80 9.070 01.08.04 BRUÑAS

01.08.04.01 BRUÑADO DE 1/2" m 245.60 4.470 01.08.05 CIELORRASOS

01.08.05.01 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

01.08.05.01.01 CIELORRASO CON BALDOSA ACÚSTICA m2 133.85 147.210 01.08.05.02 CONTRAPISOS

BASE DE CONCRETO ARMADO f´c=175 kg/cm2 PARA POSTES DE MADERA ROLLIZO DE 6"-8"

COLOCACION DE POSTES DE MADERA ROLLIZO DE 6"-8" DE 6M. DE LONGITUD

Page 92: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.08.05.02.01 CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS m2 68.72 30.890 01.08.05.03 PISOS

01.08.05.03.01 PISO CERAMICO COLOR DE 0.40 x0.40 m m2 68.72 44.390 01.08.05.04 PISOS DE CONCRETO

01.08.05.04.01 PISO DE CEMENTO PULIDO DE 2¨ m2 10.80 30.730 01.08.05.05 VEREDAS

01.08.05.05.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 18.54 91.750 01.08.05.06 JUNTAS DE DILATACIÓN

01.08.05.06.01 JUNTAS ASFALTICAS E=1" ML 281.19 3.960 01.08.06 ZOCALOS Y CONTRAZOCALOS

01.08.06.01 ZOCALOS

01.08.06.01.01 ZOCALO DE CERAMICO 0.20X0.30 cm H= 1.60 m m2 219.73 75.540 01.08.07 CARPINTERIA DE MADERA

01.08.07.01 PUERTAS

01.08.07.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 11.50 149.970 01.08.07.01.02 PUERTA DE MADERA PREFABRICADA PARA SSHH m2 28.08 117.630 01.08.08 CARPINTERIA METALICA Y HERRERIA

01.08.08.01 CERRADURAS

01.08.08.01.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 4.00 92.170 01.08.08.01.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 16.00 12.660 01.08.09 VIDRIOS, CRISTALES Y SIMILARES

01.08.09.01 ESPEJOS Y VIDRIO

Page 93: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.08.09.01.01 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 32.90 217.920 01.08.09.02 MALLA MOSQUITERO N°16 COLOR VERDE

01.08.09.02.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 4.24 28.640

Page 94: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.08.10 PINTURA

01.08.10.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.08.10.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 343.13 9.740 01.08.10.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 148.29 9.950 01.08.10.01.03 PINTURA EN COLUMNAS m2 34.14 12.270 01.08.10.01.04 PINTURA EN VIGAS m2 53.38 12.270 01.08.10.02 PINTURA DE PUERTAS

01.08.10.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 25.61 12.710 1.09 VIVIENDA DE DOCENTES

01.09.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.09.01.01 MUROS DE BLOQUES HUECOS DE CONCRETO

01.09.01.01.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 1,194.28 49.740 01.09.02 REVOQUES Y REVESTIMIENTOS

01.09.02.01 REVOQUES Y REVESTIMIENTOS

01.09.02.01.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 1,975.03 10.280 01.09.02.01.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 539.86 11.330 01.09.02.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 291.38 10.810 01.09.02.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 498.95 10.310 01.09.02.01.05 TARRAJEO EN PARAPETOS m2 186.84 13.570 01.09.02.02 VESTIDURA DE DERRAMES

01.09.02.02.01 VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA m 694.90 9.070 01.09.02.03 BRUÑAS

Page 95: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.09.02.03.01 BRUÑADO DE 1/2" m 948.60 4.470 01.09.02.04 GRADAS

01.09.02.04.01 REVESTIMIENTO DE GRADAS DE ESCALERA m2 146.02 10.510 01.09.02.05 REVESTIMIENTO DE DESCANSOS

01.09.02.05.01 REVESTIMIENTO DE DESCANSOS m2 13.00 22.500 01.09.03 CIELORRASOS

01.09.03.01 CIELORRASO CON YESO

01.09.03.01.01 CIELORRASOS CON YESO m2 331.16 24.970 01.09.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

01.09.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 415.53 147.210 01.09.04 PISOS Y PAVIMENTOS

01.09.04.01 CONTRAPISOS

01.09.04.01.01 CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS m2 91.50 30.890 01.09.04.02 PISOS

01.09.04.02.01 PISO CERAMICO COLOR DE 0.40 x0.40 m m2 915.00 44.390 01.09.04.03 PISOS DE CONCRETO

01.09.04.03.01 PISO DE CEMENTO PULIDO DE 2¨ m2 590.94 30.730 01.09.04.04 VEREDAS

01.09.04.04.01 VEREDA DE CONCRETO 4¨ F'C= 175 KG/CM2. m2 205.89 91.750 01.09.04.05 JUNTAS DE DILATACIÓN

01.09.04.05.01 JUNTAS ASFALTICAS E=1" ML 73.35 3.960 01.09.04.06 CEMENTO PULIDO EN PARASOLES

Page 96: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.09.04.06.01 CEMENTO PULIDO EN PARASOLES m2 91.08 30.730 01.09.05 ZOCALOS Y CONTRAZOCALOS

01.09.05.01 ZOCALOS

01.09.05.01.01 ZOCALO DE CERAMICO 0.20X0.30 cm H= 1.60 m m2 313.80 75.540

Page 97: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.09.06 CARPINTERIA DE MADERA

01.09.06.01 PUERTAS

01.09.06.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO m2 163.52 149.970 01.09.07 CARPINTERIA METALICA Y HERRERIA

01.09.07.01 BARANDAS METALICAS

01.09.07.01.01 TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm ML 94.89 49.670 01.09.07.01.02 TUBO DE 1 1/2" e=2 mm CURVO ML 89.28 45.480 01.09.07.02 CERRADURAS

01.09.07.02.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und 66.00 92.170 01.09.07.02.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 264.00 12.660 01.09.08 VIDRIOS, CRISTALES Y SIMILARES

01.09.08.01 ESPEJOS Y VIDRIO

01.09.08.01.01 ESPEJO DE 0.50 mx 0.80m und 30.00 27.750 01.09.08.01.02 VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS m2 160.43 217.920 01.09.08.02 MALLA MOSQUITERO N°16 COLOR VERDE

01.09.08.02.01 MALLA MOSQUITERO N° 16 COLOR VERDE m2 44.40 28.640 01.09.09 PINTURA

01.09.09.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

01.09.09.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 1,975.03 9.740 01.09.09.01.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 539.86 9.950 01.09.09.01.03 PINTURA EN CIELORRASO m2 331.16 12.270 01.09.09.01.04 PINTURA EN COLUMNAS m2 291.38 12.270

Page 98: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.09.09.01.05 PINTURA EN VIGAS m2 498.95 12.270 01.09.09.01.06 PINTURA EN PARAPETOS m2 186.84 12.270 01.09.09.02 PINTURA DE PUERTAS

01.09.09.02.01 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 327.05 12.710 01.09.09.03 PINTURA DE ESTRUCTURAS METALICAS

01.09.09.03.01 ML 94.89 7.970 01.09.09.03.02 PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS ML 89.28 7.970

1.1 LIMPIEZA PERMANENTE DE OBRA

01.10.01 LIMPIEZA PERMANENTE DE OBRA m2 3,574.40 0.380 01.10.02 LIMPIEZA FINAL DE LA OBRA m2 3,574.40 0.380

1.11 OTROS

01.11.01 MESAS DE CONCRETO PARA BAÑOS, LABORATORIO Y COCINA

01.11.01.01 ACERO DE REFUERZO F'y = 4200 kg/cm2 EN MESAS DE TRABAJO kg 689.01 5.700 01.11.01.02 ENCOFRADO Y DESENCOFRADO EN MESAS DE TRABAJO m2 101.87 25.850 01.11.01.03 CONCRETO Fc=175 Kg/cm2 EN MESAS DE TRABAJO m3 13.11 242.090 01.11.01.04 CERAMICO 0.20 X 0.30 m. P/REVESTIMIENTO DE MESAS DE TRABAJO m2 50.25 73.320 01.11.02 URINARIOS CORRIDOS EN BATERÍA DE BAÑOS

01.11.03 CERAMICO 0.20 X 0.30 m. P/REVESTIMIENTO DE MESAS DE TRABAJO m2 7.20 73.320 1.12 PINTURA DE ESTRUCTURAS METALICAS

01.12.01 PINTURA EN TUBO RECTANGULAR DE 100x50mm ML 2,412.30 8.400 01.12.02 PINTURA EN TUBO DE 3" e=2.00mm ML 91.35 6.400 01.12.03 PINTURA EN TUBO DE 2" e=2.00mm ML 251.40 6.400

PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIÁMETRO e=2mm - BARANDAS

Page 99: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.12.04 PINTURA EN TUBO DE 3/4" e=1.8mm ML 132.80 6.400 01.12.05 PINTURA EN PLANCHA METALICA DE e=1/4" (0.20X0.20 m) m2 80.16 5.290

1.14 OTRAS AREAS LIBRES

01.14.01 TRABAJOS PRELIMINARES

01.14.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,103.90 0.380 01.14.01.02 TRAZO, NIVELES Y REPLANTEO m2 1,103.90 3.580

Page 100: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.14.01.04 MOVIMIENTO DE TIERRAS

01.14.01.04.01 EXCAVACION MANUAL m3 220.78 27.040 01.14.01.04.02 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL m2 1,103.90 2.460 01.14.01.04.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 220.78 8.390 01.14.01.05 GRADAS

01.14.01.05.01 CONCRETO F'C=175kg/cm2+25% PM m3 27.59 264.800 01.14.01.05.02 ENCOFRADO Y DESENCOFRADO DE GRADAS m2 110.16 35.560 01.14.01.06 PISO DE CONCRETO

01.14.01.06.01 ENCOFRADO Y DESENCOFRADO m2 221.76 28.550 01.14.01.06.02 PISO DE CONCRETO F'C=175 kg/cm2 e=10cm m2 891.29 40.470

1.13 HUERTOS Y JARDINES

01.13.01 MOVIMIENTO DE TIERRAS

01.13.01.01 MOVIMIENTO DE TIERRAS m2 30,809.99 7.180 01.13.01.02 TIERRA TRATADA m2 4,478.58 5.320 01.13.01.03 SEMBRIO DE GRAS m2 76,772.43 7.880

1.15 PATIO, CANCHAS POLIDEPORTIVAS

01.15.01 TRABAJOS PRELIMINARES

01.15.01.01 TRAZO, NIVELES Y REPLANTEO m2 1,889.25 3.580 01.15.02 MOVIMIENTO DE TIERRAS

01.15.02.01 EXCAVACION MANUAL m3 382.50 27.040 01.15.02.02 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL m2 1,889.25 2.460

Page 101: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.15.02.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 496.02 8.390 01.15.02.04 PISO DE CONCRETO CANCHAS Y PATIO DE HONOR

01.15.02.04.01 ENCOFRADO Y DESENCOFRADO CANCHAS Y PATIO DE HONOR m2 499.20 9.620 01.15.02.04.02 PISO DE CONCRETO F'C=175 kg/cm2 e=10cm m2 1,868.25 40.470 01.15.02.05 SARDINEL

01.15.02.05.01 ENCOFRADO Y DESENCOF. P/ SARDINEL m2 20.60 29.960 01.15.02.05.02 CONCRETO F'C=175 kg/cm" PARA SARDINELES m3 6.51 422.600 01.15.02.06 CARPINTERIA METALICA

01.15.02.06.01 COLOCACION PARA MODULO MULTIDEPORTIVO BASKET Y FULBITO und 1.00 5,000.000 01.15.02.06.02 und 1.00 1,060.000 01.15.02.07 PINTURA

01.15.02.07.01 PINTURA ESMALTE SINTETICO CANCHAS DEPORTIVAS DE 0.10 m m 632.00 5.820 01.15.02.08 OTROS

01.15.02.08.01 JUNTAS ASFALTICAS E=1" ML 1,092.90 5.830 01.15.02.09 GRADERIAS DE CONCRETO CICLOPEO

01.15.02.09.01 TRAZO, NIVELES Y REPLANTEO m2 314.00 3.580 01.15.02.10 MOVIMIENTO DE TIERRAS

01.15.02.10.01 EXCAVACION MANUAL m3 92.05 27.040 01.15.02.10.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 92.05 8.390 01.15.02.10.03 ENCOFRADO Y DESENCOFRADO DE GRADAS m2 259.75 35.560 01.15.02.10.04 CONCRETO F'C=175kg/cm2+25% PM m3 89.90 264.800 01.15.02.10.05 REVESTIMIENTO DE GRADAS DE ESCALERA m2 494.20 10.510

COLOCACION DE PARANTE DE MODULO VOLEY INCLUYE MALLA DEPORTIVA

Page 102: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.15.02.10.06 JUNTAS ASFALTICAS E=1" ML 25.70 5.830 1.16 CARPINTERIA METALICA

01.16.01 ESTRUCTURA METALICA PARA ATRIO

01.16.01.01 PIES DERECHOS DE TUBO DE 100mm x 100mm, e=2.5mm ML 12.90 57.060 01.16.01.02 ANCLAJE CON PLANCHA METALICA DE e=1/4" (0.20X0.20 m) und 5.00 37.460 01.16.01.03 ML 16.00 33.840 VIGA DE ACERO PARA LA ARMADURA DEL TECHO DE TUBO RECTANGULAR

DE 100x50mm e=2.5mm

Page 103: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

01.16.01.04 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 28.00 20.980 01.16.01.05 COBERTURA CON PLANCHA ONDULINE m2 27.65 37.900 01.16.02 POSTE DE IZAMIENTO DE LA BANDERA

01.16.02.01 ENCOFRADO Y DESENCOFRADO m2 3.92 28.550 01.16.02.02 CONCRETO F'C=175kg/cm2+25% PM m3 0.88 264.800 01.16.02.03 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 3.92 11.330 01.16.02.04 POSTE DE IZAMIENTO DE LA BANDERA und 2.00 369.780

2 ESTRUCTURA TENSIONADA

2.01 MOVIMIENTO DE TIERRAS

02.01.01 EXCAVACION MANUAL m3 43.01 27.040 02.01.02 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA m3 43.01 17.580

2.02 OBRAS DE CONCRETO SIMPLE

02.02.01 SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 24.96 44.400 2.03 OBRAS DE CONCRETO ARMADO

02.03.01 DADOS DE CONCRETO

02.03.01.01 DADOS DE CONCRETO F'C=210 kg/cm2 m3 18.00 441.790 02.03.01.02 ENCOFRADO Y DESENCOFRADO m2 9.48 28.550 02.03.01.03 ACERO f'y=4200 kg/cm2 G° 60 kg 305.20 5.970 02.03.02 ZAPATAS

02.03.02.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 8.64 451.900 02.03.02.02 ACERO f'y=4200 kg/cm2 G° 60 kg 823.28 5.970 02.03.03 COLUMNAS

Page 104: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

02.03.03.01 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 3.78 460.070 02.03.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 51.30 36.940 02.03.03.03 ACERO f'y=4200 kg/cm2 G° 60 kg 823.28 5.970

3 ESTRUCTURA METALICA ARCO DE SOPORTE

3.01 TUBOS PRINCIPALES DE DE 4" DE DIAMETRO e=3mm ML 118.20 87.040 3.02 TUBOS DE UNION DE 2" DE DIAMETRO e=3mm ML 132.75 45.040 3.03 PLANCHA DE ACERO DE DE 1x 1m DE 3/4" m2 2.00 333.290 3.04 FIERRO CORRUGADO DE 5/8" kg 55.18 5.970 3.05 TENSIONADA DE MALLA MEDIA PARA COBERTURA m2 343.28 84.000 3.06 PINTURA

03.06.01 PINTURA EN TUBOS DE 4"x5/32" ML 118.20 23.070 03.06.02 PINTURA EN TUBOS DE 2"x 3mm ML 132.75 18.070 03.06.03 PINTURA EN PLANCHA DE 1x 1m DE 3/4" m2 2.00 39.940 03.06.04 PINTURA EN PLANCHA DE 0.3 m DE 1/4" m2 0.84 39.940

4 CERCO PERIMETRICO

4.01 OBRAS PROVISIONALES

04.01.01 LIMPIEZA DE TERRENO MANUAL m2 705.04 0.380 04.01.02 TRAZO, NIVELES Y REPLANTEO m2 705.04 3.580

4.02 MOVIMIENTO DE TIERRAS

04.02.01 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL m2 705.04 2.460 04.02.02 EXCAVACION MANUAL m3 95.20 27.040 04.02.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 95.20 8.390

Page 105: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

4.03 OBRAS DE CONCRETO SIMPLE

04.03.01 CIMIENTOS CORRIDOS

04.03.01.01 CONCRETO F'C=175kg/cm2+25% PM m3 25.54 264.800 04.03.01.02 ENCOFRADO Y DESENCOF. CIMIENTO m2 20.83 37.320 04.03.01.03 SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 32.08 44.400 04.03.02 SOBRECIMIENTOS

04.03.02.01 CONCRETO F'C = 175 KG/CM2 m3 102.63 303.670 04.03.02.02 ENCOFRADO Y DESENCOF. SOBRECIMIENTO m2 1,026.27 25.710

Page 106: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

04.03.03 DADOS DE CONCRETO

04.03.03.01 CONCRETO F'C = 175 KG/CM2 m3 0.16 303.670 04.03.03.02 ENCOFRADO Y DESENCOFRADO m2 2.19 28.550

4.04 OBRAS DE CONCRETO ARMADO

04.04.01 ZAPATAS

04.04.01.01 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 10.37 460.070 04.04.01.02 ACERO f'y=4200 kg/cm2 G° 60 kg 279.58 5.970 04.04.02 VIGAS DE CIMENTACION

04.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 1.46 452.310 04.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION m2 7.60 23.690 04.04.02.03 ACERO f'y=4200 kg/cm2 G° 60 kg 166.49 5.970 04.04.03 COLUMNAS

04.04.03.01 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 9.49 460.070 04.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 173.42 36.940 04.04.03.03 ACERO f'y=4200 kg/cm2 G° 60 kg 1,329.79 5.970 04.04.04 VIGAS

04.04.04.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 6.05 498.310 04.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 82.33 72.030 04.04.04.03 ACERO f'y=4200 kg/cm2 G° 60 kg 1,006.29 5.970

4.05 ESTRUCTURAS METALICAS

04.05.01 ESTRUCTURA METALICA PARA CUBIERTA

04.05.01.01 PARES METALICOS DE 100mm x 50mm e=2mm ML 23.40 39.090

Page 107: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

04.05.01.02 TUBO NEGRO REDONDO DE 2" e=2mm ML 6.10 40.250 04.05.01.03 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 93.75 20.980 04.05.01.04 PLANCHA METALICA DE 1/4" (0.20x0.20m) und 0.56 61.710 04.05.02 COBERTURAS

04.05.02.01 COBERTURA CON PLANCHA ONDULINE m2 51.44 37.900 4.06 MUROS Y TABIQUES DE ALBAÑILERIA

04.06.01 MUROS Y TABIQUES DE ALBAÑILERIA

04.06.01.01 MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5 m2 119.40 53.170 04.06.02 REVOQUES Y REVESTIMIENTOS

04.06.02.01 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 238.80 11.330 04.06.02.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 86.24 13.460 04.06.02.03 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 90.94 9.740 04.06.03 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

04.06.03.01 CIELORRASO CON BALDOSA ACÚSTICA m2 39.77 147.210 04.06.04 ZOCALOS Y CONTRAZOCALOS

04.06.04.01 ZOCALO DE CEMENTO PULIDO MEZCLA CEMENTO-ARENA m2 576.01 25.820 4.07 CARPINTERIA METALICA Y HERRERIA

04.07.01 PUERTAS DE FIERRO

04.07.01.01 PUERTA P-01 und 2.00 1,065.490 04.07.01.02 PUERTA P-02 und 1.00 1,003.690 04.07.02 CERCO DE MALLA OLIMPICA

04.07.02.01 TUBO GALVANIZADO DE 3" DE DIAMETRO e=2mm pza 125.40 194.700

Page 108: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

04.07.02.02 MALLA OLIMPICA N° 10 CON COCADA DE 2 1/2"X2 1/2" DE F° G° m2 597.52 49.210 04.07.02.03 ÁNGULO DE 1 1/2" X 1 1/2" X 1/8" ML 1,508.70 16.930 04.07.02.04 ALAMBRE GALVANIZADO CON PUAS ML 1,886.25 2.670 04.07.03 ELEMENTOS METALICOS ESPECIALES

04.07.03.01 CELOSIA METALICA DE ANGULO DE 3/4" X 1/8 ML 331.80 31.600 4.08 CERRAJERIA

04.08.01 PICAPORTE HECHIZO DE ACERO DE Ø 1/2" und 2.00 35.640

Page 109: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

4.09 PINTURA

04.09.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES

04.09.01.01 PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES m2 455.75 9.740 04.09.02 PINTURA DE ESTRUCTURAS METALICAS

04.09.02.01 PINTURA EN CELOSIA METALICA DE ANGULO 3/4" X 1/8 ML 331.80 7.890 04.09.02.02 PINTURA EN ANGULAR DE 1 1/2" X 1 1/2" X 1/8" ML 1,508.70 7.620 04.09.02.03 ML 20.60 7.970 04.09.02.04 PINTURA EN TUBO DE 1"x2" ML 97.84 8.280 04.09.02.05 PINTURA EN TUBO CUADRADO DE 1"X1" ML 16.40 8.280

5 MOBILIARIO Y EQUIPO

5.01 MOBILIARIO Y EQUIPO PRIMARIA

05.01.01 CARPETAS UNIPERSONALES und 300.00 220.000 05.01.02 PIZARRAS ACRILICAS DE 1.20x4.80 m und 15.00 1,100.000 05.01.03 ESTANTE DE MADERA und 15.00 370.000 05.01.04 PUPITRE DOCENTE INCLUIDA SILLA und 15.00 710.000 05.01.05 SILLA UNIPERSONAL MADERA und 35.00 45.000 05.01.06 MESA PEDAGOGICA MADERA INCLUIDA 8 SILLAS und 11.00 2,120.000 05.01.07 MODULO COMPUTADORA INCLUIDA SILLA und 21.00 280.000 05.01.08 COMPUTADORA und 21.00 2,500.000 05.01.09 IMPRESORA LASER und 2.00 700.000 05.01.10 EQUIPO AUDIOVISUAL TV+DVD und 1.00 1,238.000

5.02 MOBILIARIO Y EQUIPO SECUNDARIA

PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIÁMETRO e=2mm - BARANDAS

Page 110: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

05.02.01 CARPETAS UNIPERSONALES und 200.00 220.000 05.02.02 PIZARRAS ACRILICAS DE 1.20x4.80 m und 14.00 1,100.000 05.02.03 ESTANTE DE MADERA und 14.00 370.000 05.02.04 PUPITRE DOCENTE INCLUIDA SILLA und 14.00 710.000 05.02.05 SILLA UNIPERSONAL MADERA und 35.00 45.000 05.02.06 COMPUTADORA und 21.00 2,500.000 05.02.07 MODULO COMPUTADORA INCLUIDA SILLA und 21.00 280.000 05.02.08 EQUIPO AUDIOVISUAL TV+DVD und 1.00 1,238.000

5.03 MOBILIARIO Y EQUIPO SALÓN DE USO MÚLTIPLE

05.03.01 COCINA

05.03.01.01 MESA PEDAGOGICA MADERA INCLUIDA 8 SILLAS und 21.00 2,120.000 05.03.01.02 IMPRESORA LASER und 2.00 700.000 05.03.01.03 COCINA A GAS DE 4 HORNILLAS und 2.00 1,640.000 05.03.02 SALÓN DE USO MÚLTIPLE

05.03.02.01 PROYECTOR MULTIMEDIA und 1.00 3,500.000 05.03.02.02 ECRAN ENRROLLABLE (3.00 x 2.50 m) und 1.00 2,900.000 05.03.02.03 ESTRUCTURA METÁLICA PARA PROYECTOR (Tipo Rack) und 1.00 550.000

7 INSTALACIONES SANITARIAS

7.01 BLOQUES PRIMARIA

07.01.01 SISTEMA DE AGUA FRIA

07.01.01.01 TRABAJOS PRELIMINARES

07.01.01.01.01 TRAZO, NIVELES Y REPLANTEO m 74.40 3.610

Page 111: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.01.01.02 MOVIMIENTO DE TIERRAS

07.01.01.02.01 EXCAVACION MANUAL DE ZANJAS m 45.60 28.120 07.01.01.02.02 REFINE Y NIVELACION DE FONDOS DE ZANJA m 45.60 1.800 07.01.01.02.03 m 45.60 1.850 07.01.01.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 45.60 17.090 07.01.01.02.05 m3 5.34 58.590

PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO e=10cm

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 112: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.01.01.03 REDES DE DISTRIBUCION DE AGUA

07.01.01.03.01 TUBERIA PVC SAP DE 1" C-10 C/R m 8.00 23.800 07.01.01.03.02 TUBERIA PVC SAP DE 1/2" C-10 C/R m 66.40 19.990 07.01.01.03.03 PRUEBA HIDRAULICA Y DESINFECCION m 74.40 3.140 07.01.01.04 VALVULAS

07.01.01.04.01 VALVULA DE BOLA PVC CON ROSCA Ø 1" pza 1.00 39.230 07.01.01.04.02 VALVULA DE BOLA PVC CON ROSCA DE 1/2" pza 16.00 33.800 07.01.01.04.03 GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2" und 22.00 42.050 07.01.01.05 REDES DE ALIMENTACION DE AGUA

07.01.01.05.01 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO pto 22.00 39.700 07.01.01.05.02 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO pto 18.00 34.990 07.01.01.05.03 pto 2.00 34.990 07.01.01.06 ACCESORIOS

07.01.01.06.01 REDUCCION PVC SAP 1 1/2" a 1" und 5.00 5.090 07.01.01.06.02 CODO PVC U.R. SAP DE 1" X 90° und 1.00 6.170 07.01.01.06.03 CODO PVC U.R. SAP DE 1/2" X 90° und 58.00 6.170 07.01.01.06.04 TEE PVC SAP DE 1" UR und 4.00 8.400 07.01.01.06.05 TEE PVC SAP 1/2" UR pza 32.00 15.980 07.01.01.07 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS

07.01.01.07.01 LAVATORIO BLANCO OVALIN pza 22.00 50.000 07.01.01.07.02 INODORO COLOR BLANCO und 18.00 210.000 07.01.01.07.03 JABONERA DE LOZA und 22.00 22.000

SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - URINARIO CORRIDO DE CONCRETO

Page 113: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.01.01.07.04 PAPELERA DE LOZA und 18.00 22.000 07.01.01.08 SUMINISTRO DE ACCESORIOS SANITARIOS

07.01.01.08.01 INSTALACION DE LAVATORIO BLANCO OVALIN und 22.00 9.160 07.01.01.08.02 INSTALACION DE URINARIO COLOR BLANCO und 18.00 9.160 07.01.01.08.03 INSTALACION DE JABONERA DE LOZA und 22.00 6.170 07.01.01.08.04 INSTALACION DE PAPELERA DE LOZA und 18.00 6.170 07.01.02 DESAGUE Y VENTILACION

07.01.02.01 MOVIMIENTO DE TIERRAS

07.01.02.01.01 TRAZO, NIVELES Y REPLANTEO m 95.50 3.610 07.01.02.01.02 EXCAVACION MANUAL DE ZANJAS m 47.75 28.120 07.01.02.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 47.75 1.800 07.01.02.02 REDES DE DERIVACION

07.01.02.02.01 TUBERIA PVC SAL DE 2" m 25.35 18.410 07.01.02.02.02 TUBERIA PVC SAL 4" m 22.40 12.360 07.01.02.03 SALIDA DE DESAGUE

07.01.02.03.01 SALIDA DESAGUE PVC SAL DE 4" pto 18.00 80.820 07.01.02.03.02 SALIDA DESAGUE PVC SAL DE 2" pto 22.00 76.620 07.01.02.04 SALIDAS DE VENTILACION

07.01.02.04.01 SALIDA PARA VENTILACION PVC SAL DE 2" pto 2.00 74.820 07.01.02.05 ACCESORIOS DE DESAGUE

07.01.02.05.01 YEE PVC SAL 4" pza 18.00 20.080 07.01.02.05.02 YEE PVC SAL DE 4" a 2" und 12.00 19.100

Page 114: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.01.02.05.03 YEE PVC SAL 2" pza 14.00 17.080 07.01.02.05.04 CODO PVC SAL DE 2" X 45° und 18.00 16.720 07.01.02.05.05 CODO PVC SAL DE 4" X 45° und 6.00 18.820 07.01.02.05.06 CODO PVC SAL DE 2" X 90° und 36.00 16.200 07.01.02.05.07 CODO PVC SAL 4" X 90 pza 4.00 20.330

Page 115: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.01.02.05.08 TEE PVC SAL DE 2" und 18.00 13.650 07.01.02.05.09 TEE PVC SAL DE 4" und 18.00 18.580 07.01.02.05.10 SUMIDERO DE BRONCE 2" und 10.00 59.010 07.01.02.05.11 REGISTROS DE BRONCE DE 2" und 6.00 27.330 07.01.02.05.12 REGISTROS DE BRONCE DE 4" und 2.00 37.760 07.01.02.05.13 SOMBRERO PARA VENTILACION DE PVC DE 2" und 2.00 13.180 07.01.02.06 CAMARAS DE INSPECCION

07.01.02.06.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 1.00 308.520 07.01.03 SISTEMA DE DRENAJE PLUVIAL

07.01.03.01 MOVIMIENTO DE TIERRAS

07.01.03.01.01 TRAZO, NIVELES Y REPLANTEO m 180.36 3.610 07.01.03.01.02 EXCAVACION MANUAL DE ZANJAS m 179.87 28.120 07.01.03.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 180.36 1.800 07.01.03.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 121.30 17.090 07.01.03.01.05 m3 55.51 58.590 07.01.03.02 RED DE RECOLECCION

07.01.03.02.01 TUBERIA PVC SAL 6" m 9.10 40.080 07.01.03.02.02 TUBERIA PVC SAL 8" m 13.35 46.280 07.01.03.02.03 TUBERIA PVC SAL DE 10" m 32.10 52.480 07.01.03.03 OBRAS DE CONCRETO SIMPLE

07.01.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 87.61 29.740 07.01.03.03.02 CONCRETO F'C=175 kg/cm2 m3 18.18 407.670

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 116: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.01.03.04 OBRAS DE CONCRETO ARMADO

07.01.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 54.46 29.740 07.01.03.04.02 CONCRETO F'C=175 kg/cm2 m3 2.90 407.670 07.01.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 182.40 5.820 07.01.03.05 ACCESORIOS

07.01.03.05.01 TUBERIA PVC SAP DE 4" m 118.50 184.400 07.01.03.05.02 CODO PVC SAP DE 4" X 45° und 45.00 7.560 07.01.03.05.03 CODO PVC SAP DE 4" X 90° und 30.00 7.560 07.01.03.05.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 60.00 14.540 07.01.03.05.05 SUMIDERO DE BRONCE DE 4" und 15.00 71.140

7.02 BLOQUES SECUNDARIA

07.02.01 SISTEMA DE AGUA FRIA

07.02.01.01 TRABAJOS PRELIMINARES

07.02.01.01.01 TRAZO, NIVELES Y REPLANTEO m 46.30 3.610 07.02.01.02 MOVIMIENTO DE TIERRAS

07.02.01.02.01 EXCAVACION MANUAL DE ZANJAS m 27.80 28.120 07.02.01.02.02 REFINE Y NIVELACION DE FONDOS DE ZANJA m 27.80 1.800 07.02.01.02.03 m 27.80 1.850 07.02.01.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 27.80 17.090 07.02.01.02.05 m3 3.26 58.590 07.02.01.03 REDES DE DISTRIBUCION DE AGUA

07.02.01.03.01 TUBERIA PVC SAP DE 1" C-10 C/R m 6.30 23.800

PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO e=10cm

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 117: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.02.01.03.02 TUBERIA PVC SAP DE 1/2" C-10 C/R m 40.00 19.990 07.02.01.03.03 PRUEBA HIDRAULICA Y DESINFECCION m 46.30 3.140 07.02.01.04 VALVULAS

07.02.01.04.01 VALVULA DE BOLA PVC CON ROSCA Ø 1" pza 1.00 39.230 07.02.01.04.02 VALVULA DE BOLA PVC CON ROSCA DE 1/2" pza 16.00 33.800 07.02.01.04.03 GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2" und 18.00 42.050

Page 118: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.02.01.05 REDES DE ALIMENTACION DE AGUA

07.02.01.05.01 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO pto 18.00 39.700 07.02.01.05.02 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO pto 14.00 34.990 07.02.01.05.03 pto 2.00 34.990 07.02.01.06 ACCESORIOS

07.02.01.06.01 REDUCCION PVC SAP 1 1/2" a 1" und 4.00 5.090 07.02.01.06.02 CODO PVC U.R. SAP DE 1" X 90° und 1.00 6.170 07.02.01.06.03 CODO PVC U.R. SAP DE 1/2" X 90° und 54.00 6.170 07.02.01.06.04 TEE PVC SAP DE 1" UR und 2.00 8.400 07.02.01.06.05 TEE PVC SAP 1/2" UR pza 28.00 15.980 07.02.01.07 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS

07.02.01.07.01 LAVATORIO BLANCO OVALIN pza 18.00 50.000 07.02.01.07.02 INODORO COLOR BLANCO und 14.00 210.000 07.02.01.07.03 JABONERA DE LOZA und 18.00 22.000 07.02.01.07.04 PAPELERA DE LOZA und 14.00 22.000 07.02.01.08 SUMINISTRO DE ACCESORIOS SANITARIOS

07.02.01.08.01 INSTALACION DE LAVATORIO BLANCO OVALIN und 18.00 9.160 07.02.01.08.02 INSTALACION DE URINARIO COLOR BLANCO und 14.00 9.160 07.02.01.08.03 INSTALACION DE JABONERA DE LOZA und 18.00 6.170 07.02.01.08.04 INSTALACION DE PAPELERA DE LOZA und 14.00 6.170 07.02.02 DESAGUE Y VENTILACION

07.02.02.01 MOVIMIENTO DE TIERRAS

SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - URINARIO CORRIDO DE CONCRETO

Page 119: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.02.02.01.01 TRAZO, NIVELES Y REPLANTEO m 91.50 3.610 07.02.02.01.02 EXCAVACION MANUAL DE ZANJAS m 45.75 28.120 07.02.02.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 45.75 1.800 07.02.02.02 REDES DE DERIVACION

07.02.02.02.01 TUBERIA PVC SAL DE 2" m 48.70 18.410 07.02.02.02.02 TUBERIA PVC SAL 4" m 42.80 12.360 07.02.02.03 SALIDA DE DESAGUE

07.02.02.03.01 SALIDA DESAGUE PVC SAL DE 4" pto 14.00 80.820 07.02.02.03.02 SALIDA DESAGUE PVC SAL DE 2" pto 18.00 76.620 07.02.02.04 SALIDAS DE VENTILACION

07.02.02.04.01 SALIDA PARA VENTILACION PVC SAL DE 2" pto 4.00 74.820 07.02.02.05 ACCESORIOS DE DESAGUE

07.02.02.05.01 YEE PVC SAL 4" pza 14.00 20.080 07.02.02.05.02 YEE PVC SAL DE 4" a 2" und 22.00 19.100 07.02.02.05.03 YEE PVC SAL 2" pza 8.00 17.080 07.02.02.05.04 CODO PVC SAL DE 2" X 45° und 16.00 16.720 07.02.02.05.05 CODO PVC SAL DE 4" X 45° und 6.00 18.820 07.02.02.05.06 CODO PVC SAL DE 2" X 90° und 28.00 16.200 07.02.02.05.07 CODO PVC SAL 4" X 90 pza 4.00 20.330 07.02.02.05.08 TEE PVC SAL DE 2" und 18.00 13.650 07.02.02.05.09 TEE PVC SAL DE 4" und 18.00 18.580 07.02.02.05.10 SUMIDERO DE BRONCE 2" und 14.00 59.010

Page 120: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.02.02.05.11 REGISTROS DE BRONCE DE 2" und 6.00 27.330 07.02.02.05.12 REGISTROS DE BRONCE DE 4" und 2.00 37.760 07.02.02.05.13 SOMBRERO PARA VENTILACION DE PVC DE 2" und 4.00 13.180 07.02.02.06 CAMARAS DE INSPECCION

07.02.02.06.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 2.00 308.520

Page 121: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.02.03 SISTEMA DE DRENAJE PLUVIAL

07.02.03.01 MOVIMIENTO DE TIERRAS

07.02.03.01.01 TRAZO, NIVELES Y REPLANTEO m 110.88 3.610 07.02.03.01.02 EXCAVACION MANUAL DE ZANJAS m 109.83 28.120 07.02.03.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 110.48 1.800 07.02.03.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 67.21 17.090 07.02.03.01.05 m3 37.21 58.590 07.02.03.02 RED DE RECOLECCION

07.02.03.02.01 TUBERIA PVC SAL 6" m 23.20 40.080 07.02.03.02.02 TUBERIA PVC SAL 8" m 13.80 46.280 07.02.03.03 OBRAS DE CONCRETO SIMPLE

07.02.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 71.82 29.740 07.02.03.03.02 CONCRETO F'C=175 kg/cm2 m3 13.17 407.670 07.02.03.04 OBRAS DE CONCRETO ARMADO

07.02.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 20.68 29.740 07.02.03.04.02 CONCRETO F'C=175 kg/cm2 m3 147.00 407.670 07.02.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 971.52 5.820 07.02.03.05 ACCESORIOS

07.02.03.05.01 TUBERIA PVC SAP DE 4" m 63.20 184.400 07.02.03.05.02 CODO PVC SAP DE 4" X 45° und 24.00 7.560 07.02.03.05.03 CODO PVC SAP DE 4" X 90° und 6.00 7.560 07.02.03.05.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 32.00 14.540

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 122: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.02.03.05.05 SUMIDERO DE BRONCE DE 4" und 8.00 71.140 7.03 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA

07.03.01 SISTEMA DE AGUA FRIA

07.03.01.01 TRABAJOS PRELIMINARES

07.03.01.01.01 TRAZO, NIVELES Y REPLANTEO m 65.10 3.610 07.03.01.02 MOVIMIENTO DE TIERRAS

07.03.01.02.01 EXCAVACION MANUAL DE ZANJAS m 12.70 28.120 07.03.01.02.02 REFINE Y NIVELACION DE FONDOS DE ZANJA m 12.70 1.800 07.03.01.02.03 m 12.70 1.850 07.03.01.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 12.70 17.090 07.03.01.02.05 m3 1.48 58.590 07.03.01.03 REDES DE DISTRIBUCION DE AGUA

07.03.01.03.01 TUBERIA PVC SAP DE 1" C-10 C/R m 12.70 23.800 07.03.01.03.02 TUBERIA PVC SAP DE 1/2" C-10 C/R m 52.40 19.990 07.03.01.03.03 PRUEBA HIDRAULICA Y DESINFECCION m 65.10 3.140 07.03.01.04 VALVULAS

07.03.01.04.01 VALVULA DE BOLA PVC CON ROSCA Ø 1" pza 2.00 39.230 07.03.01.04.02 VALVULA DE BOLA PVC CON ROSCA DE 1/2" pza 4.00 33.800 07.03.01.04.03 GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2" und 17.00 42.050 07.03.01.04.04 LLAVE PARA DUCHA DE DISCO CERAMICODE 1/2" und 17.00 49.050 07.03.01.05 REDES DE ALIMENTACION DE AGUA

07.03.01.05.01 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO pto 17.00 39.700

PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO e=10cm

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 123: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.03.01.05.02 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2"- DUCHAS pto 1.00 34.990 07.03.01.06 ACCESORIOS

07.03.01.06.01 REDUCCION PVC SAP 1 1/2" a 1" und 2.00 5.090 07.03.01.06.02 CODO PVC U.R. SAP DE 1" X 90° und 10.00 6.170 07.03.01.06.03 CODO PVC U.R. SAP DE 1/2" X 90° und 18.00 6.170 07.03.01.06.04 TEE PVC SAP 1/2" UR pza 9.00 15.980

Page 124: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.03.01.07 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS

07.03.01.07.01 LAVATORIO BLANCO OVALIN pza 17.00 50.000 07.03.01.07.02 DUCHA CROMADA CON CABEZA GIRATORIA und 17.00 37.200 07.03.01.07.03 JABONERA DE LOZA und 17.00 22.000 07.03.01.08 SUMINISTRO DE ACCESORIOS SANITARIOS

07.03.01.08.01 INSTALACION DE LAVATORIO BLANCO OVALIN und 17.00 9.160 07.03.01.08.02 INSTALACION DE DUCHA CROMADA CON CABEZA GIRATORIA und 17.00 11.920 07.03.01.08.03 INSTALACION DE JABONERA DE LOZA und 17.00 6.170 07.03.02 DESAGUE Y VENTILACION

07.03.02.01 MOVIMIENTO DE TIERRAS

07.03.02.01.01 TRAZO, NIVELES Y REPLANTEO m 39.60 3.610 07.03.02.01.02 EXCAVACION MANUAL DE ZANJAS m 39.60 28.120 07.03.02.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 39.60 1.800 07.03.02.02 REDES DE DERIVACION

07.03.02.02.01 TUBERIA PVC SAL DE 2" m 39.60 18.410 07.03.02.03 SALIDA DE DESAGUE

07.03.02.03.01 SALIDA DESAGUE PVC SAL DE 2" pto 17.00 76.620 07.03.02.04 ACCESORIOS DE DESAGUE

07.03.02.04.01 YEE PVC SAL 2" pza 16.00 17.080 07.03.02.04.02 CODO PVC SAL DE 2" X 90° und 5.00 16.200 07.03.02.04.03 CODO PVC SAL 4" X 90 pza 1.00 20.330 07.03.02.04.04 TEE PVC SAL DE 2" und 4.00 13.650

Page 125: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.03.02.04.05 TEE PVC SAL DE 4" und 4.00 18.580 07.03.02.04.06 SUMIDERO DE BRONCE 2" und 2.00 59.010 07.03.02.04.07 REGISTROS DE BRONCE DE 2" und 1.00 27.330 07.03.02.05 CAMARAS DE INSPECCION

07.03.02.05.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 2.00 308.520 07.03.03 SISTEMA DE DRENAJE PLUVIAL

07.03.03.01 MOVIMIENTO DE TIERRAS

07.03.03.01.01 TRAZO, NIVELES Y REPLANTEO m 76.25 3.610 07.03.03.01.02 EXCAVACION MANUAL DE ZANJAS m 76.42 28.120 07.03.03.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 108.43 1.800 07.03.03.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 65.80 17.090 07.03.03.01.05 m3 17.04 58.590 07.03.03.02 RED DE RECOLECCION

07.03.03.02.01 TUBERIA PVC SAL 6" m 4.10 40.080 07.03.03.02.02 TUBERIA PVC SAL 8" m 30.50 46.280 07.03.03.03 OBRAS DE CONCRETO SIMPLE

07.03.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 22.28 29.740 07.03.03.03.02 CONCRETO F'C=175 kg/cm2 m3 6.28 407.670 07.03.03.04 OBRAS DE CONCRETO ARMADO

07.03.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 8.16 29.740 07.03.03.04.02 CONCRETO F'C=175 kg/cm2 m3 0.56 407.670 07.03.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 17.71 5.820

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 126: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.03.03.05 ACCESORIOS

07.03.03.05.01 TUBERIA PVC SAP DE 4" m 31.60 184.400 07.03.03.05.02 CODO PVC SAP DE 4" X 45° und 12.00 7.560 07.03.03.05.03 CODO PVC SAP DE 4" X 90° und 8.00 7.560 07.03.03.05.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 16.00 14.540 07.03.03.05.05 SUMIDERO DE BRONCE DE 4" und 8.00 71.140

Page 127: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

7.04 SALÓN DE USO MÚLTIPLE

07.04.01 SISTEMA DE AGUA FRIA

07.04.01.01 MOVIMIENTO DE TIERRAS

07.04.01.01.01 TRAZO, NIVELES Y REPLANTEO m 8.20 3.610 07.04.01.02 TRABAJOS PRELIMINARES

07.04.01.02.01 EXCAVACION MANUAL DE ZANJAS m 8.20 28.120 07.04.01.02.02 REFINE Y NIVELACION DE FONDOS DE ZANJA 8.20 1.800 07.04.01.02.03 m 8.20 1.850 07.04.01.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO 8.20 17.090 07.04.01.02.05 2.38 58.590 07.04.01.03 REDES DE DISTRIBUCION DE AGUA

07.04.01.03.01 TUBERIA PVC SAP DE 1" C-10 C/R 1.20 23.800 07.04.01.03.02 TUBERIA PVC SAP DE 1/2" C-10 C/R 7.00 19.990 07.04.01.03.03 PRUEBA HIDRAULICA Y DESINFECCION 8.00 3.140 07.04.01.04 VALVULAS

07.04.01.04.01 VALVULA DE BOLA PVC CON ROSCA Ø 1" 1.00 39.230 07.04.01.04.02 VALVULA DE BOLA PVC CON ROSCA DE 1/2" 1.00 33.800 07.04.01.04.03 GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2" 4.00 42.050 07.04.01.05 REDES DE ALIMENTACION DE AGUA

07.04.01.05.01 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO 2.00 39.700 07.04.01.06 ACCESORIOS

07.04.01.06.01 REDUCCION PVC SAP 1 1/2" a 1" 1.00 5.090

mPREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO e=10cm mACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

m3

mmm

pzapzaundptound

Page 128: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.04.01.06.02 CODO PVC U.R. SAP DE 1" X 90° 9.00 6.170 07.04.01.06.03 CODO 1/2" X 45°UR 1.00 5.060 07.04.01.06.04 TEE PVC SAP 1/2" UR 6.00 15.980 07.04.01.07 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS

07.04.01.07.01 LAVATORIO BLANCO OVALIN 2.00 50.000 07.04.01.07.02 JABONERA DE LOZA 2.00 22.000 07.04.01.08 SUMINISTRO DE ACCESORIOS SANITARIOS

07.04.01.08.01 INSTALACION DE LAVATORIO BLANCO OVALIN 2.00 9.160 07.04.01.08.02 INSTALACION DE JABONERA DE LOZA 2.00 6.170 07.04.02 DESAGUE Y VENTILACION

07.04.02.01 MOVIMIENTO DE TIERRAS

07.04.02.01.01 TRAZO, NIVELES Y REPLANTEO 21.05 3.610 07.04.02.01.02 EXCAVACION MANUAL DE ZANJAS 21.05 28.120 07.04.02.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA 21.05 1.800 07.04.02.02 REDES DE DERIVACION

07.04.02.02.01 TUBERIA PVC SAL DE 2" 5.05 18.410 07.04.02.03 SALIDA DE DESAGUE

07.04.02.03.01 SALIDA DESAGUE PVC SAL DE 2" 2.00 76.620 07.04.02.04 ACCESORIOS DE DESAGUE

07.04.02.04.01 YEE PVC SAL DE 4" a 2" 1.00 19.100 07.04.02.04.02 YEE PVC SAL 2" 14.00 17.080 07.04.02.04.03 CODO PVC SAL DE 2" X 90° 1.00 16.200

undundpzapzaundundund

mmm

m

ptoundpzaund

Page 129: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.04.02.04.04 SUMIDERO DE BRONCE 2" 2.00 59.010 07.04.02.04.05 REGISTROS DE BRONCE DE 2" 2.00 27.330 07.04.02.05 CAMARAS DE INSPECCION

07.04.02.05.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" 1.00 308.520

undundund

Page 130: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.04.03 SISTEMA DE DRENAJE PLUVIAL

07.04.03.01 MOVIMIENTO DE TIERRAS

07.04.03.01.01 TRAZO, NIVELES Y REPLANTEO 38.18 3.610 07.04.03.01.02 EXCAVACION MANUAL DE ZANJAS 37.99 28.120 07.04.03.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA 36.74 1.800 07.04.03.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO 79.20 17.090 07.04.03.01.05 5.44 58.590 07.04.03.02 RED DE RECOLECCION

07.04.03.02.01 TUBERIA PVC SAL 8" 34.30 46.280 07.04.03.03 OBRAS DE CONCRETO ARMADO

07.04.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES 20.38 29.740 07.04.03.03.02 CONCRETO F'C=175 kg/cm2 0.43 407.670 07.04.03.03.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 64.94 5.820 07.04.03.04 ACCESORIOS

07.04.03.04.01 TUBERIA PVC SAP DE 4" m 47.40 184.400 07.04.03.04.02 CODO PVC SAP DE 4" X 45° und 18.00 7.560 07.04.03.04.03 CODO PVC SAP DE 4" X 90° und 12.00 7.560 07.04.03.04.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 24.00 14.540 07.04.03.04.05 SUMIDERO DE BRONCE DE 4" und 6.00 71.140

7.05 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN

07.05.01 SISTEMA DE AGUA FRIA

07.05.01.01 TRABAJOS PRELIMINARES

mmmm

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

m3

m

m2m3

Page 131: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.05.01.01.01 TRAZO, NIVELES Y REPLANTEO m 21.68 3.610 07.05.01.02 MOVIMIENTO DE TIERRAS

07.05.01.02.01 EXCAVACION MANUAL DE ZANJAS m 16.10 28.120 07.05.01.02.02 REFINE Y NIVELACION DE FONDOS DE ZANJA m 16.10 1.800 07.05.01.02.03 m 16.10 1.850 07.05.01.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 16.10 17.090 07.05.01.02.05 m3 1.88 58.590 07.05.01.03 REDES DE DISTRIBUCION DE AGUA

07.05.01.03.01 TUBERIA PVC SAP DE 1" C-10 C/R m 9.10 23.800 07.05.01.03.02 TUBERIA PVC SAP DE 1/2" C-10 C/R m 12.58 19.990 07.05.01.03.03 PRUEBA HIDRAULICA Y DESINFECCION m 21.68 3.140 07.05.01.04 VALVULAS

07.05.01.04.01 VALVULA DE BOLA PVC CON ROSCA Ø 1" pza 1.00 39.230 07.05.01.04.02 VALVULA DE BOLA PVC CON ROSCA DE 1/2" pza 4.00 33.800 07.05.01.04.03 GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2" und 3.00 42.050 07.05.01.04.04 LLAVE CON GRIFO PARA LAVADERO DE ACERO INOXIDABLE DE 1/2" und 1.00 53.950 07.05.01.05 REDES DE ALIMENTACION DE AGUA

07.05.01.05.01 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO pto 4.00 39.700 07.05.01.05.02 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO pto 3.00 34.990 07.05.01.06 ACCESORIOS

07.05.01.06.01 REDUCCION PVC SAP 1 1/2" a 1" und 2.00 5.090 07.05.01.06.02 CODO PVC U.R. SAP DE 1" X 90° und 2.00 6.170

PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO e=10cm

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 132: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.05.01.06.03 CODO PVC U.R. SAP DE 1/2" X 90° und 10.00 6.170 07.05.01.06.04 TEE PVC SAP DE 1" UR und 2.00 8.400 07.05.01.06.05 TEE PVC SAP 1/2" UR pza 6.00 15.980 07.05.01.07 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS

07.05.01.07.01 LAVATORIO BLANCO OVALIN pza 3.00 50.000 07.05.01.07.02 LAVADERO DE ACERO INOXIDABLE 1 POZA 18"x20" C/ACCESORIOS pza 1.00 355.560 07.05.01.07.03 INODORO COLOR BLANCO und 2.00 210.000

Page 133: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.05.01.07.04 JABONERA DE LOZA und 3.00 22.000 07.05.01.07.05 PAPELERA DE LOZA und 2.00 22.000 07.05.01.08 SUMINISTRO DE ACCESORIOS SANITARIOS

07.05.01.08.01 INSTALACION DE LAVATORIO BLANCO OVALIN und 3.00 9.160 07.05.01.08.02 INSTALACION DE LAVADERO DE ACERO INOXIDABLE DE 01 POZA und 1.00 9.160 07.05.01.08.03 INSTALACION DE INODORO COLOR BLANCO und 2.00 9.160 07.05.01.08.04 INSTALACION DE JABONERA DE LOZA und 3.00 6.170 07.05.01.08.05 INSTALACION DE PAPELERA DE LOZA und 2.00 6.170 07.05.02 DESAGUE Y VENTILACION

07.05.02.01 MOVIMIENTO DE TIERRAS

07.05.02.01.01 TRAZO, NIVELES Y REPLANTEO m 104.75 3.610 07.05.02.01.02 EXCAVACION MANUAL DE ZANJAS m 21.05 28.120 07.05.02.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 21.05 1.800 07.05.02.02 REDES DE DERIVACION

07.05.02.02.01 TUBERIA PVC SAL DE 2" m 72.10 18.410 07.05.02.03 SALIDA DE DESAGUE

07.05.02.03.01 SALIDA DESAGUE PVC SAL DE 4" pto 3.00 80.820 07.05.02.03.02 SALIDA DESAGUE PVC SAL DE 2" pto 2.00 76.620 07.05.02.04 SALIDAS DE VENTILACION

07.05.02.04.01 SALIDA PARA VENTILACION PVC SAL DE 2" pto 1.00 74.820 07.05.02.05 ACCESORIOS DE DESAGUE

07.05.02.05.01 YEE PVC SAL DE 4" a 2" und 5.00 19.100

Page 134: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.05.02.05.02 YEE PVC SAL 2" pza 1.00 17.080 07.05.02.05.03 CODO PVC SAL DE 2" X 45° und 3.00 16.720 07.05.02.05.04 CODO PVC SAL DE 2" X 90° und 53.00 16.200 07.05.02.05.05 CODO PVC SAL 4" X 90 pza 2.00 20.330 07.05.02.05.06 TEE PVC SAL DE 4" und 4.00 18.580 07.05.02.05.07 SUMIDERO DE BRONCE 2" und 3.00 59.010 07.05.02.05.08 REGISTROS DE BRONCE DE 4" und 2.00 37.760 07.05.02.05.09 SOMBRERO PARA VENTILACION DE PVC DE 2" und 1.00 13.180 07.05.02.06 CAMARAS DE INSPECCION

07.05.02.06.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 2.00 308.520 07.05.03 SISTEMA DE DRENAJE PLUVIAL

07.05.03.01 MOVIMIENTO DE TIERRAS

07.05.03.01.01 TRAZO, NIVELES Y REPLANTEO m 60.50 3.610 07.05.03.01.02 EXCAVACION MANUAL DE ZANJAS m 30.25 28.120 07.05.03.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 30.25 1.800 07.05.03.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 30.25 17.090 07.05.03.01.05 m3 9.83 58.590 07.05.03.02 OBRAS DE CONCRETO SIMPLE

07.05.03.02.01 ENCOFRADO Y DESENCOF. DE CANALES m2 21.18 29.740 07.05.03.02.02 CONCRETO F'C=175 kg/cm2 m3 4.39 407.670 07.05.03.03 OBRAS DE CONCRETO ARMADO

07.05.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 0.90 29.740

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 135: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.05.03.03.02 CONCRETO F'C=175 kg/cm2 m3 0.05 407.670 07.05.03.03.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 4.08 5.820 07.05.03.04 ACCESORIOS

07.05.03.04.01 TUBERIA PVC SAP DE 4" m 15.80 184.400 07.05.03.04.02 CODO PVC SAP DE 4" X 45° und 6.00 7.560

Page 136: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.05.03.04.03 CODO PVC SAP DE 4" X 90° und 4.00 7.560 07.05.03.04.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 8.00 14.540 07.05.03.04.05 SUMIDERO DE BRONCE DE 4" und 2.00 71.140

7.06 TALLER DE CONFECCIÓN, ARTESANIAS E IDIOMAS

07.06.01 SISTEMA DE DRENAJE PLUVIAL

07.06.01.01 MOVIMIENTO DE TIERRAS

07.06.01.01.01 TRAZO, NIVELES Y REPLANTEO m 51.69 3.610 07.06.01.01.02 EXCAVACION MANUAL DE ZANJAS m 51.62 28.120 07.06.01.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 51.69 1.800 07.06.01.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 41.20 17.090 07.06.01.01.05 m3 12.37 58.590 07.06.01.02 RED DE RECOLECCION

07.06.01.02.01 TUBERIA PVC SAL 8" m 18.20 46.280 07.06.01.03 OBRAS DE CONCRETO SIMPLE

07.06.01.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 16.03 29.740 07.06.01.03.02 CONCRETO F'C=175 kg/cm2 m3 4.52 407.670 07.06.01.04 OBRAS DE CONCRETO ARMADO

07.06.01.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 8.61 29.740 07.06.01.04.02 CONCRETO F'C=175 kg/cm2 m3 0.58 407.670 07.06.01.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 47.40 5.820 07.06.01.05 ACCESORIOS

07.06.01.05.01 TUBERIA PVC SAP DE 4" m 38.50 184.400

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 137: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.06.01.05.02 CODO PVC SAP DE 4" X 45° und 15.00 7.560 07.06.01.05.03 CODO PVC SAP DE 4" X 90° und 10.00 7.560 07.06.01.05.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 20.00 14.540 07.06.01.05.05 SUMIDERO DE BRONCE DE 4" und 5.00 71.140

7.07 BIBLIOTECA GENERAL

07.07.01 SISTEMA DE DRENAJE PLUVIAL

07.07.01.01 MOVIMIENTO DE TIERRAS

07.07.01.01.01 TRAZO, NIVELES Y REPLANTEO m 24.64 3.610 07.07.01.01.02 EXCAVACION MANUAL DE ZANJAS m 23.52 28.120 07.07.01.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 23.64 1.800 07.07.01.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 61.30 17.090 07.07.01.01.05 m3 3.33 58.590 07.07.01.02 RED DE RECOLECCION

07.07.01.02.01 TUBERIA PVC SAL 8" m 21.20 46.280 07.07.01.03 OBRAS DE CONCRETO ARMADO

07.07.01.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 13.12 29.740 07.07.01.03.02 CONCRETO F'C=175 kg/cm2 m3 0.91 407.670 07.07.01.03.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 48.00 5.820 07.07.01.04 ACCESORIOS

07.07.01.04.01 TUBERIA PVC SAP DE 4" m 31.60 184.400 07.07.01.04.02 CODO PVC SAP DE 4" X 45° und 12.00 7.560 07.07.01.04.03 CODO PVC SAP DE 4" X 90° und 8.00 7.560

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 138: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.07.01.04.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 6.00 14.540 07.07.01.04.05 SUMIDERO DE BRONCE DE 4" und 4.00 71.140

7.08 DUCHAS Y VESTIDORES (PRIMARIA Y SECUNDARIA)

07.08.01 SISTEMA DE AGUA FRIA

07.08.01.01 TRABAJOS PRELIMINARES

07.08.01.01.01 TRAZO, NIVELES Y REPLANTEO m 70.30 3.610

Page 139: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.08.01.02 MOVIMIENTO DE TIERRAS

07.08.01.02.01 EXCAVACION MANUAL DE ZANJAS m 45.90 28.120 07.08.01.02.02 REFINE Y NIVELACION DE FONDOS DE ZANJA m 45.90 1.800 07.08.01.02.03 m 45.90 1.850 07.08.01.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 45.90 17.090 07.08.01.02.05 m3 5.36 58.590 07.08.01.03 REDES DE DISTRIBUCION DE AGUA

07.08.01.03.01 TUBERIA PVC SAP DE 1" C-10 C/R m 20.40 23.800 07.08.01.03.02 TUBERIA PVC SAP DE 1/2" C-10 C/R m 49.90 19.990 07.08.01.03.03 PRUEBA HIDRAULICA Y DESINFECCION m 70.30 3.140 07.08.01.04 VALVULAS

07.08.01.04.01 VALVULA DE BOLA PVC CON ROSCA Ø 1" pza 3.00 39.230 07.08.01.04.02 VALVULA DE BOLA PVC CON ROSCA DE 1/2" pza 5.00 33.800 07.08.01.04.03 GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2" und 1.00 42.050 07.08.01.04.04 LLAVE PARA DUCHA DE DISCO CERAMICODE 1/2" und 12.00 49.050 07.08.01.05 REDES DE ALIMENTACION DE AGUA

07.08.01.05.01 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO pto 1.00 39.700 07.08.01.05.02 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO pto 1.00 34.990 07.08.01.05.03 pto 13.00 34.990 07.08.01.06 ACCESORIOS

07.08.01.06.01 REDUCCION PVC SAP 1 1/2" a 1" und 25.00 5.090 07.08.01.06.02 CODO PVC U.R. SAP DE 1" X 90° und 5.00 6.170

PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO e=10cm

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - URINARIO CORRIDO DE CONCRETO

Page 140: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.08.01.06.03 CODO PVC U.R. SAP DE 1/2" X 90° und 13.00 6.170 07.08.01.06.04 TEE PVC SAP DE 1" UR und 4.00 8.400 07.08.01.06.05 TEE PVC SAP 1/2" UR pza 10.00 15.980 07.08.01.07 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS

07.08.01.07.01 LAVATORIO BLANCO OVALIN pza 1.00 50.000 07.08.01.07.02 INODORO COLOR BLANCO und 1.00 210.000 07.08.01.07.03 DUCHA CROMADA CON CABEZA GIRATORIA und 12.00 37.200 07.08.01.07.04 JABONERA DE LOZA und 1.00 22.000 07.08.01.07.05 PAPELERA DE LOZA und 1.00 22.000 07.08.01.08 SUMINISTRO DE ACCESORIOS SANITARIOS

07.08.01.08.01 INSTALACION DE LAVATORIO BLANCO OVALIN und 1.00 9.160 07.08.01.08.02 INSTALACION DE DUCHA CROMADA CON CABEZA GIRATORIA und 1.00 11.920 07.08.01.08.03 INSTALACION DE URINARIO COLOR BLANCO und 1.00 9.160 07.08.01.08.04 INSTALACION DE JABONERA DE LOZA und 1.00 6.170 07.08.01.08.05 INSTALACION DE PAPELERA DE LOZA und 1.00 6.170 07.08.02 DESAGUE Y VENTILACION

07.08.02.01 MOVIMIENTO DE TIERRAS

07.08.02.01.01 TRAZO, NIVELES Y REPLANTEO m 66.10 3.610 07.08.02.01.02 EXCAVACION MANUAL DE ZANJAS m 66.10 28.120 07.08.02.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 66.10 1.800 07.08.02.02 REDES DE DERIVACION

07.08.02.02.01 TUBERIA PVC SAL DE 2" m 46.55 18.410

Page 141: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.08.02.02.02 TUBERIA PVC SAL 4" m 19.55 12.360 07.08.02.03 SALIDA DE DESAGUE

07.08.02.03.01 SALIDA DESAGUE PVC SAL DE 4" pto 1.00 80.820 07.08.02.03.02 SALIDA DESAGUE PVC SAL DE 2" pto 1.00 76.620 07.08.02.04 SALIDAS DE VENTILACION

07.08.02.04.01 SALIDA PARA VENTILACION PVC SAL DE 2" pto 1.00 74.820

Page 142: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.08.02.05 ACCESORIOS DE DESAGUE

07.08.02.05.01 YEE PVC SAL DE 4" a 2" und 22.00 19.100 07.08.02.05.02 CODO PVC SAL DE 2" X 45° und 5.00 16.720 07.08.02.05.03 CODO PVC SAL DE 2" X 90° und 2.00 16.200 07.08.02.05.04 TEE PVC SAL DE 4" und 1.00 18.580 07.08.02.05.05 SUMIDERO DE BRONCE 2" und 21.00 59.010 07.08.02.05.06 REGISTROS DE BRONCE DE 2" und 4.00 27.330 07.08.02.05.07 REGISTROS DE BRONCE DE 4" und 1.00 37.760 07.08.02.05.08 SOMBRERO PARA VENTILACION DE PVC DE 2" und 1.00 13.180 07.08.02.06 CAMARAS DE INSPECCION

07.08.02.06.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 5.00 308.520 07.08.03 SISTEMA DE DRENAJE PLUVIAL

07.08.03.01 MOVIMIENTO DE TIERRAS

07.08.03.01.01 TRAZO, NIVELES Y REPLANTEO m 134.92 3.610 07.08.03.01.02 EXCAVACION MANUAL DE ZANJAS m 134.70 28.120 07.08.03.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 202.14 1.800 07.08.03.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 95.07 17.090 07.08.03.01.05 m3 19.54 58.590 07.08.03.02 RED DE RECOLECCION

07.08.03.02.01 TUBERIA PVC SAL 6" m 24.69 40.080 07.08.03.02.02 TUBERIA PVC SAL DE 10" m 38.72 52.480 07.08.03.03 OBRAS DE CONCRETO SIMPLE

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 143: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.08.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 17.69 29.740 07.08.03.03.02 CONCRETO F'C=175 kg/cm2 m3 5.64 407.670 07.08.03.04 OBRAS DE CONCRETO ARMADO

07.08.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 26.04 29.740 07.08.03.04.02 CONCRETO F'C=175 kg/cm2 m3 1.36 407.670 07.08.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 98.16 5.820 07.08.03.05 ACCESORIOS

07.08.03.05.01 TUBERIA PVC SAP DE 4" m 45.70 184.400 07.08.03.05.02 CODO PVC SAP DE 4" X 45° und 18.00 7.560 07.08.03.05.03 CODO PVC SAP DE 4" X 90° und 12.00 7.560 07.08.03.05.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 2.00 14.540 07.08.03.05.05 SUMIDERO DE BRONCE DE 4" und 6.00 71.140 07.08.03.05.06 ML 24.30 69.960

7.09 VIVIENDA DE DOCENTES

07.09.01 SISTEMA DE AGUA FRIA

07.09.01.01 TRABAJOS PRELIMINARES

07.09.01.01.01 TRAZO, NIVELES Y REPLANTEO m 218.70 3.610 07.09.01.02 MOVIMIENTO DE TIERRAS

07.09.01.02.01 EXCAVACION MANUAL DE ZANJAS m 125.50 28.120 07.09.01.02.02 REFINE Y NIVELACION DE FONDOS DE ZANJA m 125.50 1.800 07.09.01.02.03 m 125.50 1.850 07.09.01.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 125.50 17.090

CANALETA DE PLANCHA DE FºGALVANIZADO e=3/16 INCLUYE ACCESORIOS DE FIJACION

PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO e=10cm

Page 144: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.09.01.02.05 m3 14.68 58.590 07.09.01.03 REDES DE DISTRIBUCION DE AGUA

07.09.01.03.01 TUBERIA PVC SAP DE 1" C-10 C/R m 68.10 23.800 07.09.01.03.02 TUBERIA PVC SAP DE 1/2" C-10 C/R m 150.70 19.990 07.09.01.03.03 PRUEBA HIDRAULICA Y DESINFECCION m 218.80 3.140

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 145: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.09.01.04 VALVULAS

07.09.01.04.01 VALVULA DE BOLA PVC CON ROSCA Ø 1" pza 3.00 39.230 07.09.01.04.02 VALVULA DE BOLA PVC CON ROSCA DE 1/2" pza 43.00 33.800 07.09.01.04.03 GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2" und 30.00 42.050 07.09.01.04.04 LLAVE PARA DUCHA DE DISCO CERAMICODE 1/2" und 30.00 49.050 07.09.01.05 REDES DE ALIMENTACION DE AGUA

07.09.01.05.01 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO pto 44.00 39.700 07.09.01.05.02 SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO pto 30.00 34.990 07.09.01.05.03 pto 30.00 34.990 07.09.01.06 ACCESORIOS

07.09.01.06.01 REDUCCION PVC SAP 1 1/2" a 1" und 15.00 5.090 07.09.01.06.02 CODO PVC U.R. SAP DE 1" X 90° und 56.00 6.170 07.09.01.06.03 TEE PVC SAP DE 1" UR und 15.00 8.400 07.09.01.06.04 TEE PVC SAP 1/2" UR pza 56.00 15.980 07.09.01.07 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS

07.09.01.07.01 LAVATORIO BLANCO OVALIN und 30.00 50.000 07.09.01.07.02 INODORO COLOR BLANCO und 30.00 210.000 07.09.01.07.03 LAVADERO DE ACERO INOXIDABLE 1 POZA 18"x20" C/ACCESORIOS pza 6.00 355.560 07.09.01.07.04 LAVADERO DE GRANITO C/POZA 21"x25 und 8.00 180.000 07.09.01.07.05 DUCHA CROMADA CON CABEZA GIRATORIA und 30.00 37.200 07.09.01.07.06 JABONERA DE LOZA und 30.00 22.000 07.09.01.07.07 PAPELERA DE LOZA und 30.00 22.000

SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - URINARIO CORRIDO DE CONCRETO

Page 146: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.09.01.08 SUMINISTRO DE ACCESORIOS SANITARIOS

07.09.01.08.01 INSTALACION DE LAVATORIO BLANCO OVALIN und 30.00 9.160 07.09.01.08.02 INSTALACION DE INODORO COLOR BLANCO und 30.00 9.160 07.09.01.08.03 INSTALACION DE LAVADERO DE ACERO INOXIDABLE DE 01 POZA und 6.00 9.160 07.09.01.08.04 INSTALACION DE LAVADERO DE GRANITO C/POZA 21"x25" und 8.00 11.920 07.09.01.08.05 INSTALACION DE DUCHA CROMADA CON CABEZA GIRATORIA und 30.00 11.920 07.09.01.08.06 INSTALACION DE JABONERA DE LOZA und 30.00 6.170 07.09.01.08.07 INSTALACION DE PAPELERA DE LOZA und 30.00 6.170 07.09.02 DESAGUE Y VENTILACION

07.09.02.01 MOVIMIENTO DE TIERRAS

07.09.02.01.01 TRAZO, NIVELES Y REPLANTEO m 422.87 3.610 07.09.02.01.02 REFINE Y NIVELACION DE FONDOS DE ZANJA m 211.45 1.800 07.09.02.01.03 EXCAVACION MANUAL DE ZANJAS m 211.45 28.120 07.09.02.02 REDES DE DERIVACION

07.09.02.02.01 TUBERIA PVC SAL DE 2" m 198.80 18.410 07.09.02.02.02 TUBERIA PVC SAL 4" m 224.07 12.360 07.09.02.03 SALIDA DE DESAGUE

07.09.02.03.01 SALIDA DESAGUE PVC SAL DE 4" pto 30.00 80.820 07.09.02.03.02 SALIDA DESAGUE PVC SAL DE 2" pto 45.00 76.620 07.09.02.04 SALIDAS DE VENTILACION

07.09.02.04.01 SALIDA PARA VENTILACION PVC SAL DE 2" pto 18.00 74.820 07.09.02.05 ACCESORIOS DE DESAGUE

Page 147: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.09.02.05.01 YEE PVC SAL DE 4" a 2" und 60.00 19.100 07.09.02.05.02 YEE PVC SAL 2" pza 18.00 17.080 07.09.02.05.03 CODO PVC SAL DE 2" X 45° und 45.00 16.720 07.09.02.05.04 CODO PVC SAL DE 2" X 90° und 182.00 16.200 07.09.02.05.05 CODO PVC SAL 4" X 90 pza 24.00 20.330 07.09.02.05.06 TEE PVC SAL DE 2" und 112.00 13.650 07.09.02.05.07 TEE PVC SAL DE 4" und 80.00 18.580

Page 148: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.09.02.05.08 SUMIDERO DE BRONCE 2" und 68.00 59.010 07.09.02.05.09 REGISTROS DE BRONCE DE 2" und 2.00 27.330 07.09.02.05.10 REGISTROS DE BRONCE DE 4" und 30.00 37.760 07.09.02.05.11 SOMBRERO PARA VENTILACION DE PVC DE 2" und 18.00 13.180 07.09.02.06 CAMARAS DE INSPECCION

07.09.02.06.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 21.00 308.520 07.09.03 SISTEMA DE DRENAJE PLUVIAL

07.09.03.01 MOVIMIENTO DE TIERRAS

07.09.03.01.01 TRAZO, NIVELES Y REPLANTEO m 81.04 3.610 07.09.03.01.02 EXCAVACION MANUAL DE ZANJAS m 44.07 28.120 07.09.03.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 19.18 1.800 07.09.03.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 121.30 17.090 07.09.03.01.05 m3 32.90 58.590 07.09.03.02 RED DE RECOLECCION

07.09.03.02.01 TUBERIA PVC SAL 6" m 48.65 40.080 07.09.03.03 OBRAS DE CONCRETO SIMPLE

07.09.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 45.59 29.740 07.09.03.03.02 CONCRETO F'C=175 kg/cm2 m3 13.78 407.670 07.09.03.04 OBRAS DE CONCRETO ARMADO

07.09.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 29.50 29.740 07.09.03.04.02 CONCRETO F'C=175 kg/cm2 m3 2.72 407.670 07.09.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 121.92 5.820

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 149: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

07.09.03.05 ACCESORIOS

07.09.03.05.01 TUBERIA PVC SAP DE 4" m 86.90 184.400 07.09.03.05.02 CODO PVC SAP DE 4" X 45° und 33.00 7.560 07.09.03.05.03 CODO PVC SAP DE 4" X 90° und 22.00 7.560 07.09.03.05.04 ABRAZADERA DE FIJACIÓN DE FºGº DE 4" pza 44.00 14.540 07.09.03.05.05 SUMIDERO DE BRONCE DE 4" und 11.00 71.140 07.09.03.05.06 PRUEBA HIDRAULICA Y DESINFECCION (BLOQUES ) m 641.37 3.140

8 INSTALACIONES SANITARIAS EN EXTERIORES

8.01 SISTEMA DE AGUA FRIA

08.01.01 TRABAJOS PRELIMINARES

08.01.01.01 TRAZO, NIVELES Y REPLANTEO m 465.84 3.610 08.01.02 MOVIMIENTO DE TIERRAS

08.01.02.01 EXCAVACION MANUAL DE ZANJAS m 465.84 28.120 08.01.02.02 REFINE Y NIVELACION DE FONDOS DE ZANJA m 465.84 1.800 08.01.02.03 m 465.84 1.850 08.01.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 465.84 17.090 08.01.02.05 m3 20.96 58.590 08.01.03 REDES DE DISTRIBUCION DE AGUA

08.01.03.01 TUBERIA PVC SAP DE 1" C-10 C/R m 43.70 23.800 08.01.03.02 TUBERIA PVC SAP DE 3/4" C-10 C/R m 42.31 18.050 08.01.03.03 TUBERIA PVC SAP DE 1 1/4" C-10 C/R m 5.00 23.600 08.01.03.04 TUBERIA PVC SAP DE 1/2" C-10 C/R m 22.50 19.990

PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO e=10cm

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 150: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

08.01.04 VALVULAS

08.01.04.01 PRUEBA HIDRAULICA Y DESINFECCION m 465.84 3.140 08.01.04.02 VALVULA DE BOLA PVC CON ROSCA Ø 1 1/4" pza 17.00 39.130 08.01.04.03 VALVULA DE BOLA PVC CON ROSCA Ø 1 1/2" pza 2.00 35.130 08.01.04.04 VALVULA DE BOLA PVC CON ROSCA Ø 3/4" pza 17.00 26.130 08.01.04.05 VALVULA DE BOLA PVC CON ROSCA Ø 1" pza 4.00 39.230

Page 151: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

08.01.05 ACCESORIOS

08.01.05.01 REDUCCION PVC SAP 1 1/2" a 1" und 3.00 5.090 08.01.05.02 REDUCCION PVC SAL 2"-1 1/2" pza 2.00 5.870 08.01.05.03 REDUCCION PVC SAP 3/4" a 1/2" und 2.00 4.170 08.01.05.04 REDUCCION PVC SAP 1" a 3/4" und 4.00 5.590 08.01.05.05 CODO PVC U.R. SAP DE 1" X 90° und 3.00 6.170 08.01.05.06 CODO PVC SAP DE 1" X 45° und 1.00 4.070 08.01.05.07 CODO PVC U.R. SAP DE 3/4" X 90° und 1.00 6.170 08.01.05.08 CODO PVC U.R. SAP DE 1/2" X 90° und 13.00 6.170 08.01.05.09 TEE PVC SAP 1 1/2" pza 3.00 14.940 08.01.05.10 VALVULA CHECK PVC U.R. SAP DE 1 1/2" und 2.00 59.300 08.01.05.11 TEE PVC SAP 1" pza 3.00 14.440 08.01.05.12 TEE PVC SAP 3/4" pza 1.00 14.440 08.01.05.13 TEE PVC SAP 1/2" pza 4.00 14.830

8.02 DESAGUE Y VENTILACION

08.02.01 MOVIMIENTO DE TIERRAS

08.02.01.01 TRAZO, NIVELES Y REPLANTEO m 627.36 3.610 08.02.01.02 EXCAVACION MANUAL DE ZANJAS m 627.36 28.120 08.02.01.03 m3 56.00 58.590 08.02.01.04 REFINE Y NIVELACION DE FONDOS DE ZANJA m 627.36 1.800 08.02.01.05 TUBERIA PVC SAL 4" m 154.93 12.360 08.02.02 REDES DE DERIVACION

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 152: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

08.02.02.01 TUBERIA PVC SAL 8" m 148.79 46.280 08.02.02.02 TUBERIA PVC SAL 6" m 323.64 40.080 08.02.02.03 PRUEBA HIDRAULICA Y DESINFECCION m 627.36 3.140 08.02.03 SALIDA DE DESAGUE

08.02.03.01 SALIDA DESAGUE PVC SAL DE 4" pto 1.00 80.820 08.02.03.02 SALIDA DESAGUE PVC SAL DE 2" pto 1.00 76.620 08.02.04 SALIDAS DE VENTILACION

08.02.04.01 SALIDA PARA VENTILACION PVC SAL DE 2" pto 1.00 74.820 08.02.05 ACCESORIOS DE DESAGUE

08.02.05.01 YEE PVC SAL 6" x45º pza 2.00 22.080 08.02.06 BUZÓN

08.02.06.01 TRAZO, NIVELES Y REPLANTEO m 35.28 3.610 08.02.06.02 m3 45.86 58.590 08.02.06.03 ENCOFRADO Y DESENCOFADO m2 148.95 29.740 08.02.06.04 CONCRETO F'C=175 kg/cm2 m3 33.77 407.670 08.02.06.05 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 689.14 5.820 08.02.06.06 TAPA METÁLICA und 14.00 337.800

8.03 SISTEMA DE DRENAJE PLUVIAL

08.03.01 MOVIMIENTO DE TIERRAS

08.03.01.01 TRAZO, NIVELES Y REPLANTEO m 116.16 3.610 08.03.01.02 EXCAVACION MANUAL DE ZANJAS m 65.25 28.120 08.03.01.03 REFINE Y NIVELACION DE FONDOS DE ZANJA m 132.80 1.800

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 153: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

08.03.01.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m 30.59 17.090 08.03.01.05 m3 43.08 58.590 08.03.02 RED DE RECOLECCION

08.03.02.01 TUBERIA PVC SAL 6" m 29.20 40.080 08.03.02.02 TUBERIA PVC SAL DE 10" m 49.60 52.480

ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m

Page 154: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

08.03.03 OBRAS DE CONCRETO SIMPLE

08.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 48.80 29.740 08.03.03.02 CONCRETO F'C=175 kg/cm2 m3 18.91 407.670 08.03.04 OBRAS DE CONCRETO ARMADO

08.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 33.20 29.740 08.03.04.02 CONCRETO F'C=175 kg/cm2 m3 3.66 407.670 08.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 175.44 5.820 08.03.05 ACCESORIOS

08.03.05.01 ML 122.00 12.950 8.04 ACCESORIOS PARA TANQUE ELEVADO Y CISTERNA

08.04.01 ESCALERA DE GATO METALICA (INCLUYE COLOCACIÓN) GLB 1.00 1,600.000 08.04.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 182.80 9.950 08.04.03 m2 7.50 7.720 08.04.04 TAPA METÁLICA DE 0.60 x0.60 m und 2.00 337.800 08.04.05 und 1.00 887.800 08.04.06 VENTANA DE FIERRO C/PERFIL DE 1/8" + HOJA BASTIDOR DE 3/4" und 2.00 87.800 08.04.07 TUBERIA DE FºGº DE 1" m 14.00 12.240 08.04.08 TUBERIA DE FºGº DE 1 1/2" m 12.00 12.240 08.04.09 TUBERIA DE FºGº DE 2" und 2.00 159.240 08.04.10 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PARA TANQUE ELEVADO GLB 1.00 1,700.000 08.04.11 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PARA TANQUE CISTERNA GLB 1.00 1,500.000 08.04.12 SUMINISTRO Y COLOCACIÓN DE HIPOCLORINADOR und 1.00 300.000

REJILLA METALICA DE 2.0x0.40mx1/2" EN CANAL DE EVACUACION DE 0.30x0.25

PINTURA ANTICORROSIVA Y ACABADO CON ESMALTE SINTÉTICO A DOS MANOS EN ESTERUCTURA METÁLICA

PUERTA METÁLICA DE 0.60m x 1.20m DOS HOJAS INCLUYE BISAGRAS Y CERRADURAS

Page 155: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

08.04.13 PRUEBA HIDRAULICA Y DESINFECCION GLB 1.00 255.710 9 INSTALACIONES ELECTRICAS

9.01 BLOQUES PRIMARIA

09.01.0109.01.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 142.00 71.580 09.01.01.02 SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO pto 72.00 92.130 09.01.01.03 SALIDA PARA INTERRUPTOR SIMPLE pto 4.00 57.730 09.01.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 12.00 67.130 09.01.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE pto 16.00 77.930 09.01.01.06 SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES pto 72.00 65.080 09.01.01.07 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 46.00 122.980 09.01.01.08 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 14.00 88.930 09.01.0209.01.02.01 TABLERO GENERAL TG-1 (36 POLOS RIEL DIN) EQ 1.00 1,818.820 09.01.02.02 TABLERO DE DISTRIBUCION TD-P1 (24 POLOS RIEL DIN) EQ 1.00 1,287.140 09.01.02.03 TABLERO DE DISTRIBUCION TD-P2 (24 POLOS RIEL DIN) EQ 1.00 925.140 09.01.02.04 ALIMENTADOR TG-1 m 70.00 115.270 09.01.02.05 ALIMENTADOR TD-P1 m 25.00 83.670 09.01.02.06 ALIMENTADOR TD-P2 m 40.00 43.720 09.01.02.07 MEDIDOR DE ENERGIA (SUMINISTRO TRIFÁSICO PROVICIONAL) GLB 1.00 1,285.160 09.01.02.08 CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm. pto 3.00 59.570 09.01.02.09 CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm. pto 3.00 55.570

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

Page 156: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.01.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.01.03.01 EQ 72.00 230.520 09.01.03.02 EQ 70.00 208.520 09.01.03.03 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 14.00 104.390 09.01.03.04 VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC EQ 72.00 113.470

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 P/MONTAJE SUSPENDIDOARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

Page 157: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.01.04 SISTEMA DE PROTECCION TIPO POZO DE PUESTA A TIERRA

09.01.04.01 POZO DE PUESTA A TIERRA und 1.00 1,132.630 9.02 BLOQUES SECUNDARIA

09.02.0109.02.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 96.00 71.580 09.02.01.02 SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO pto 48.00 92.130 09.02.01.03 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE pto 8.00 77.930 09.02.01.04 SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE pto 10.00 145.070 09.02.01.05 SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES pto 48.00 65.080 09.02.01.06 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 33.00 122.980 09.02.01.07 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 9.00 88.930 09.02.0209.02.02.01 TABLERO DE DISTRIBUCION TD-S1 (24 POLOS RIEL DIN) EQ 1.00 1,011.140 09.02.02.02 TABLERO DE DISTRIBUCION TD-S2 (24 POLOS RIEL DIN) EQ 1.00 925.140 09.02.02.03 ALIMENTADOR TD-S1 m 20.00 43.720 09.02.02.04 ALIMENTADOR TD-S2 m 28.00 43.720 09.02.02.05 CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm. pto 2.00 59.570 09.02.02.06 CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm. pto 2.00 55.570 09.02.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.02.03.01 EQ 48.00 230.520 09.02.03.02 EQ 48.00 208.520 09.02.03.03 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 9.00 104.390

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 P/MONTAJE SUSPENDIDOARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

Page 158: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.02.03.04 VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC EQ 48.00 113.470 9.03 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA

09.03.0109.03.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 62.00 71.580 09.03.01.02 SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO pto 20.00 92.130 09.03.01.03 SALIDA PARA INTERRUPTOR SIMPLE pto 12.00 57.730 09.03.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 2.00 67.130 09.03.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE pto 2.00 105.910 09.03.01.06 SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE pto 4.00 144.490 09.03.01.07 SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES pto 20.00 65.080 09.03.01.08 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 24.00 122.980 09.03.01.09 pto 46.00 125.990 09.03.01.10 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 3.00 88.930 09.03.0209.03.02.01 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-L1 Y TD-L2 (18P RIEL DIN) EQ 2.00 929.140 09.03.02.02 ALIMENTADOR TD-L1 Y TD-L2 m 60.00 43.720 09.03.02.03 CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm. pto 2.00 59.570 09.03.02.04 CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm. pto 2.00 55.570 09.03.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.03.03.01 EQ 32.00 230.520 09.03.03.02 EQ 28.00 208.520 09.03.03.03 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 3.00 104.390

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. P/EMPOTRAR EN PISO

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 P/MONTAJE SUSPENDIDOARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

Page 159: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.03.03.04 SOCKET E-27 PARA EMPOTRAR EQ 2.00 204.970 09.03.03.05 VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC EQ 20.00 113.470 09.03.04 SISTEMA DE PROTECCION TIPO POZO DE PUESTA A TIERRA

09.03.04.01 POZO DE PUESTA A TIERRA und 2.00 1,132.630

Page 160: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.03.05 INSTALACIONES ELECTRICAS DE SEÑAL DEBIL

09.03.05.01 SALIDA PARA PLACA DOBLE DE RED DE DATA P/EMPOTRAR EN PISO pto 30.00 105.160 09.03.05.02 SALIDA SIMPLE PARA RED DE DATA pto 2.00 89.930 09.03.05.03 SALIDA PARA PARA SERVIDOR DE DATA EQ 2.00 1,980.120 09.03.05.04 CAJA DE PASE CUADRADA DE 200X200X80 mm. pto 2.00 61.640 09.03.06 INSTALACION DE GAS PARA LABORATORIO

09.03.06.01 INSTALACION DE GAS PARA LABORATIO GLB 1.00 5,500.000 9.04 SALÓN DE USO MÚLTIPLE

09.04.0109.04.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 23.00 71.580 09.04.01.02 SALIDA PARA CENTROS DE LUZ EN PARED pto 2.00 70.780 09.04.01.03 SALIDA PARA INTERRUPTOR SIMPLE pto 8.00 57.730 09.04.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 3.00 67.130 09.04.01.05 SALIDA PARA EXTRACTOR DE AIRE pto 2.00 64.660 09.04.01.06 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 15.00 122.980 09.04.01.07 pto 1.00 296.580 09.04.01.08 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 5.00 88.930 09.04.0209.04.02.01 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-SM (18P RIEL DIN) EQ 1.00 812.140 09.04.02.02 ALIMENTADOR TD-SM m 40.00 27.230 09.04.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.04.03.01 EQ 2.00 230.520

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. PARA PROYECTOR MULTIMEDIA EN TECHO

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 P/MONTAJE SUSPENDIDO

Page 161: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.04.03.02 EQ 4.00 208.520 09.04.03.03 EQ 6.00 334.810 09.04.03.04 ARTEFACTO DE ILUMINACIÓN TIPO SUSPENDIDO SIIMILAR A MOD. MS-70W EQ 7.00 131.020 09.04.03.05 ARTEFACTO DE ILUMINACIÓN TIPO BRAQUET SIIMILAR A MOD. APL-60W EQ 2.00 160.020 09.04.03.06 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 5.00 104.390 09.04.03.07 SOCKET E-27 PARA EMPOTRAR EQ 4.00 204.970 09.04.03.08 EXTRACTOR DE AIRE TIPO AXIAL EQ 2.00 164.130 09.04.04 INSTALACIONES ELECTRICAS DE SEÑAL DEBIL

09.04.04.01 pto 1.00 133.110 09.04.04.02 SALIDA SIMPLE PARA RED DE DATA pto 1.00 89.930

9.05 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN

09.05.0109.05.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 31.00 71.580 09.05.01.02 SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO pto 9.00 92.130 09.05.01.03 SALIDA PARA TIMBRE TIPO PESADO O CHICHARRA pto 1.00 117.020 09.05.01.04 SALIDA PARA INTERRUPTOR SIMPLE pto 14.00 57.730 09.05.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 2.00 67.130 09.05.01.06 SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE pto 2.00 145.070 09.05.01.07 SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES pto 9.00 65.080 09.05.01.08 SALIDA PARA PULSADOR DE TIMBRE pto 1.00 92.110 09.05.01.09 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 28.00 122.980 09.05.01.10 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 4.00 88.930

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDOARTEFACTO REFLECTOR TIPO CAMPANA INDUSTRIAL 250 W SIMILAR A MOD. MER-H DE JOSFEL

SALIDA SIMPLE PARA RED DE DATA EN TECHO PARA PROYECTOR MULTIMEDIA

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

Page 162: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.05.0209.05.02.01 TABLERO DE DISTRIBUCION TD - A1 (36 POLOS RIEL DIN) EQ 1.00 1,548.820 09.05.02.02 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-A2 Y TD-AS (18P RIEL DIN) EQ 1.00 850.140 09.05.02.03 ALIMENTADOR TD-A1 m 40.00 83.670 09.05.02.04 ALIMENTADOR TD-A2 Y TD-AS m 10.00 43.720 09.05.02.05 CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm. pto 1.00 59.570

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

Page 163: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.05.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.05.03.01 EQ 17.00 230.520 09.05.03.02 EQ 11.00 208.520 09.05.03.03 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 4.00 104.390 09.05.03.04 SOCKET E-27 PARA EMPOTRAR EQ 3.00 204.970 09.05.03.05 VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC EQ 9.00 113.470

9.06 TALLER DE CONFECCIÓN, ARTESANIAS E IDIOMAS

09.06.0109.06.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 56.00 71.580 09.06.01.02 SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO pto 16.00 92.130 09.06.01.03 SALIDA PARA INTERRUPTOR SIMPLE pto 6.00 57.730 09.06.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 4.00 67.130 09.06.01.05 SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE pto 4.00 145.070 09.06.01.06 SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES pto 16.00 65.080 09.06.01.07 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 32.00 122.980 09.06.01.08 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 6.00 88.930 09.06.0209.06.02.01 TABLERO GENERAL TG- 2 (36 POLOS RIEL DIN) EQ 1.00 1,445.820 09.06.02.02 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-A2 Y TD-AS (18P RIEL DIN) EQ 1.00 850.140 09.06.02.03 ALIMENTADOR TG-2 m 145.00 155.270 09.06.02.04 ALIMENTADOR TD-A2 Y TD-AS m 5.00 43.720 09.06.02.05 CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm. pto 1.00 59.570

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 P/MONTAJE SUSPENDIDOARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

Page 164: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.06.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.06.03.01 EQ 32.00 230.520 09.06.03.02 EQ 24.00 208.520 09.06.03.03 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 6.00 104.390 09.06.03.04 VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC EQ 16.00 113.470 09.06.04 SISTEMA DE PROTECCION TIPO POZO DE PUESTA A TIERRA

09.06.04.01 POZO DE PUESTA A TIERRA und 1.00 1,132.630 9.07 BIBLIOTECA GENERAL

09.07.0109.07.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 32.00 71.580 09.07.01.02 SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO pto 13.00 92.130 09.07.01.03 SALIDA PARA INTERRUPTOR SIMPLE pto 3.00 57.730 09.07.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 4.00 67.130 09.07.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE pto 1.00 77.930 09.07.01.06 SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE pto 2.00 145.070 09.07.01.07 SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES pto 13.00 65.080 09.07.01.08 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 16.00 122.980 09.07.01.09 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 4.00 88.930 09.07.0209.07.02.01 TABLERO DE DISTRIBUCION TD-BI (24 POLOS RIEL DIN) EQ 1.00 956.140 09.07.02.02 ALIMENTADOR TD-BI m 28.00 43.720 09.07.02.03 CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm. pto 1.00 55.570

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 P/MONTAJE SUSPENDIDOARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

Page 165: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.07.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.07.03.01 EQ 20.00 230.520 09.07.03.02 EQ 12.00 208.520 09.07.03.03 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 4.00 104.390 09.07.03.04 VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC EQ 13.00 113.470

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 P/MONTAJE SUSPENDIDOARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

Page 166: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

9.08 DUCHAS Y VESTIDORES (PRIMARIA Y SECUNDARIA)

09.08.0109.08.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 21.00 71.580 09.08.01.02 SALIDA PARA CENTROS DE LUZ EN PARED pto 1.00 70.780 09.08.01.03 SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO pto 1.00 92.130 09.08.01.04 SALIDA PARA TIMBRE TIPO PESADO O CHICHARRA pto 1.00 117.020 09.08.01.05 SALIDA PARA INTERRUPTOR SIMPLE pto 1.00 57.730 09.08.01.06 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 9.00 67.130 09.08.01.07 SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES pto 1.00 65.080 09.08.01.08 SALIDA PARA PULSADOR DE TIMBRE pto 1.00 92.110 09.08.01.09 SALIDA PARA EXTRACTOR DE AIRE pto 1.00 64.660 09.08.01.10 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 9.00 122.980 09.08.0209.08.02.01 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-DU1 (12P RIEL DIN) EQ 1.00 512.790 09.08.02.02 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-DU2 (12P RIEL DIN) EQ 1.00 474.790 09.08.02.03 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-GU (8P RIEL DIN) EQ 1.00 472.720 09.08.02.04 ALIMENTADOR TD-DU1 m 20.00 27.230 09.08.02.05 ALIMENTADOR TD-DU2 m 20.00 27.230 09.08.02.06 ALIMENTADOR TD-GU m 42.00 27.230 09.08.02.07 CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm. pto 2.00 55.570 09.08.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.08.03.01 EQ 12.00 208.520

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

Page 167: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.08.03.02 ARTEFACTO DE ILUMINACIÓN TIPO BRAQUET SIIMILAR A MOD. APL-60W EQ 1.00 160.020 09.08.03.03 SOCKET E-27 PARA EMPOTRAR EQ 9.00 204.970 09.08.03.04 EXTRACTOR DE AIRE TIPO AXIAL EQ 1.00 164.130 09.08.03.05 VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC EQ 1.00 113.470

9.09 VIVIENDA DE DOCENTES

09.09.0109.09.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 96.00 71.580 09.09.01.02 SALIDA PARA CENTROS DE LUZ EN PARED pto 36.00 70.780 09.09.01.03 SALIDA PARA INTERRUPTOR SIMPLE pto 36.00 57.730 09.09.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 36.00 67.130 09.09.01.05 SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE pto 18.00 145.070 09.09.01.06 SALIDA PARA EXTRACTOR DE AIRE pto 30.00 64.660 09.09.01.07 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 117.00 122.980 09.09.01.08 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 15.00 88.930 09.09.0209.09.02.01 TABLERO GENERAL TG-3 (36 POLOS RIEL DIN) EQ 1.00 1,450.820 09.09.02.02 EQ 3.00 812.140 09.09.02.03 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-VB1 , TD-VC1 (18P RIEL DIN) EQ 2.00 881.140 09.09.02.04 ALIMENTADOR TG-3 m 38.00 63.270 09.09.02.05 ALIMENTADOR TD-VA2 , TD-VB2 Y TD-VC2 m 30.00 43.720 09.09.02.06 ALIMENTADOR TD-VB1 Y TD-VC1 m 66.00 43.720 09.09.02.07 CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm. pto 3.00 59.570

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-VA2 , TD-VB2 Y TD-VC2 (18P RIEL DIN)

Page 168: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.09.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.09.03.01 EQ 12.00 230.520 09.09.03.02 EQ 24.00 208.520 09.09.03.03 ARTEFACTO DE ILUMINACIÓN TIPO BRAQUET SIIMILAR A MOD. APL-60W EQ 36.00 160.020 09.09.03.04 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 15.00 104.390 09.09.03.05 SOCKET E-27 PARA EMPOTRAR EQ 60.00 204.970 09.09.03.06 EXTRACTOR DE AIRE TIPO AXIAL EQ 30.00 164.130

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 P/MONTAJE SUSPENDIDOARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

Page 169: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

9.1 ILUMINACIÓN EN EXTERIORES

09.10.0109.10.01.01 SALIDA PARA ALUMBRADO EN EXTERIORES pto 33.00 118.870 09.10.01.02 SALIDA PARA ALUMBRADO DE LOSA DEPORTIVA pto 16.00 308.630 09.10.01.03 SALIDA PARA ALUMBRADO PATIO DE HONOR pto 6.00 156.800 09.10.01.04 IZAJE Y CIMENTACION DE POSTE DE C.A.C. 12/200 pto 8.00 1,547.490 09.10.02 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.10.02.01 EQ 22.00 375.260 09.10.02.02 ARTEFACTO DE ILUMINACIÓN TIPO FAROLA SIIMILAR A MOD. JP-250 EQ 33.00 383.020

9.11 TANQUE ELEVADO Y CISTERNA

09.11.0109.11.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO pto 1.00 71.580 09.11.01.02 SALIDA PARA INTERRUPTOR SIMPLE pto 1.00 57.730 09.11.01.03 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 1.00 122.980 09.11.01.04 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 1.00 88.930 09.11.0209.11.02.01 TABLERO DE DISTRIBUCIÓN ELÉCTRICA TD-BO (8P RIEL DIN) EQ 1.00 509.520 09.11.02.02 TABLERO DE CONTROL DE BOMBAS TC-BO EQ 1.00 6,660.000 09.11.02.03 ALIMENTADOR TD-BO m 18.00 29.380 09.11.02.04 CAJA METALICA CUADRADA DE PASE DE 100X100X75 mm. pto 3.00 60.980 09.11.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

09.11.03.01 EQ 1.00 208.520

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

ARTEFACTO TIPO REFLECTOR ASIMETRICO 250W SIIMILARE A MOD. CONTEMPO 3 P/MONTAJE SUSPENDIDO

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

Page 170: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

09.11.03.02 ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA EQ 1.00 104.390 9.12 SISTEMA DE MEDIA TENSIÓN

09.12.01 GLB 1.00 58,000.000 10 MITIGACIÓN DE IMPACTO AMBIENTAL

10.01 MANEJO DE RESIDUOS SÓLIDOS

10.01.01 EXCAVACIÓN DE HOYOS PARA RELLENO PROVISIONAL (4.00x4.00x1.80m) m3 28.80 28.210 10.01.02 CLAUSURA DE RELLENO PROVISIONAL m3 28.80 28.210

10.02 EQUIPAMIENTO PROVISIONAL PARA MANEJO DE RESIDUOS SÓLIDOS

10.02.01 und 12.00 88.500 10.02.02 BOLSAS DE POLIETILENO CONTENCIÓN Y DEPÓSITO (DE 110x 90cm) mll 1.00 250.000

10.03 REHABILITACIÓN DE ÁREAS DEGRADADAS

10.03.01 REHABILITACIÓN DE ÁREA DE CAMPAMPAMENTO m2 200.00 28.780 10.03.02 REHABILITACIÓN DE ÁREA DE PREPARADO DE MATERIAL m2 200.00 28.780

10.04 CONTROL DE CALIDAD DEL AIRE

10.04.01 AGUA PARA RIEGO m3 6.00 110.550 10.04.02 LONA PARA CUBRIR TRASLADO DE MATERIALES m2 100.00 15.300

11 CÁLCULO DE TRANSPORTE DE MATERIALES

11.01 CÁLCULO DETRANSPORTE DE MATERIALES kg 1.00 815,570.490

COSTO DIRECTOGASTOS GENERALES

GASTOS DE SUPERVICION

SUB-ESTACIÓN ELÉCTRICA DE 75 KVA (Incluye elaboración de Expediente Técnico)

TACHO CON TAPA RÍGIDA (CONTENEDOR DE RESIDUOS SÓLIDOS DE 110 Lt.)

Page 171: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"FECHA DE INICIO DE OBRA 04 DE JUNIO DEL 2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item

DESCRIPCION

Und. Metrado Precio Unitario

COSTO EXPEDIENTE TECNICO COSTO LIQUIDACION

PRESUPUESTO TOTAL

Page 172: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,494,281.07

113,000.00

80,000.00 800.00 80000.00 100.00% 0.00 0.00 0.00% 800.00 80000.00 10,000.00 1.00 10000.00 100.00% 0.00 0.00 0.00% 1.00 10000.00 1,800.00 1.00 1800.00 100.00% 0.00 0.00 0.00% 1.00 1800.00 4,000.00 1.00 4000.00 100.00% 0.00 0.00 0.00% 1.00 4000.00 4,000.00 1.00 4000.00 100.00% 0.00 0.00 0.00% 1.00 4000.00 4,000.00 1.00 4000.00 100.00% 0.00 0.00 0.00% 1.00 4000.00 9,200.00 200.00 9200.00 100.00% 0.00 0.00 0.00% 200.00 9200.00 860,913.99

860,913.99 3,271.09 528.52 714.21 528.52 100.00% 0.00 0.00 0.00% 714.21 528.52 2,742.57 714.21 2742.57 100.00% 0.00 0.00 0.00% 714.21 2742.57 24,179.99 1,431.13 51.89 1431.13 100.00% 0.00 0.00 0.00% 51.89 1431.13 8,158.84 260.25 8158.84 100.00% 0.00 0.00 0.00% 260.25 8158.84 5,543.93 176.84 5543.93 100.00% 0.00 0.00 0.00% 176.84 5543.93 6,160.69 283.12 6160.69 100.00% 0.00 0.00 0.00% 283.12 6160.69 1,728.53 714.27 1728.53 100.00% 0.00 0.00 0.00% 714.27 1728.53 1,156.87 200.15 1156.87 100.00% 0.00 0.00 0.00% 200.15 1156.87 62,391.66

Page 173: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 8,263.40 288.93 8263.40 100.00% 0.00 0.00 0.00% 288.93 8263.40 16,023.60 72.00 16023.60 100.00% 0.00 0.00 0.00% 72.00 16023.60 6,108.97 226.51 6108.97 100.00% 0.00 0.00 0.00% 226.51 6108.97 5,139.46 20.27 5139.46 100.00% 0.00 0.00 0.00% 20.27 5139.46 26,856.23 649.80 26856.23 100.00% 0.00 0.00 0.00% 649.80 26856.23 283,535.64 629.81 104.10 629.81 100.00% 0.00 0.00 0.00% 104.10 629.81 248,247.76 107.43 46464.55 18.72% 0.00 0.00 0.00% 107.43 46464.55 19,518.02 3236.82 19518.02 100.00% 0.00 0.00 0.00% 3236.82 19518.02 4,860.15 148.13 4860.15 100.00% 0.00 0.00 0.00% 148.13 4860.15 10,279.90 23.09 10279.90 100.00% 0.00 0.00 0.00% 23.09 10279.90 128,477.33 67,737.46 11233.41 67737.46 100.00% 0.00 0.00 0.00% 11233.41 67737.46 28,339.90 796.96 28339.90 100.00% 0.00 0.00 0.00% 796.96 28339.90 32,399.97 73.71 32399.97 100.00% 0.00 0.00 0.00% 73.71 32399.97 9,889.76 5,563.23 835.32 5563.23 100.00% 0.00 0.00 0.00% 835.32 5563.23 1,634.96 79.56 1634.96 100.00% 0.00 0.00 0.00% 79.56 1634.96 2,691.57 5.97 2691.57 100.00% 0.00 0.00 0.00% 5.97 2691.57 151,471.26 45,994.05 95.21 45994.05 100.00% 0.00 0.00 0.00% 95.21 45994.05 45,017.23 921.54 45017.23 100.00% 0.00 0.00 0.00% 921.54 45017.23

Page 174: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 60,459.98 10026.53 60459.98 100.00% 0.00 0.00 0.00% 10026.53 60459.98 8,556.73 4,870.52 731.31 4870.52 100.00% 0.00 0.00 0.00% 731.31 4870.52 1,273.28 61.96 1273.28 100.00% 0.00 0.00 0.00% 61.96 1273.28 2,412.93 4.65 2412.93 100.00% 0.00 0.00 0.00% 4.65 2412.93

Page 175: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 126,183.79 22,390.18 606.78 22390.18 100.00% 0.00 0.00 0.00% 606.78 22390.18 8,549.53 606.78 8549.53 100.00% 0.00 0.00 0.00% 606.78 8549.53 49,264.02 7397.00 49264.02 100.00% 0.00 0.00 0.00% 7397.00 49264.02 45,980.06 93.37 45980.06 100.00% 0.00 0.00% 93.37 45980.06 8,028.81 2,848.22 470.78 2848.22 100.00% 0.00 0.00 0.00% 470.78 2848.22 549.45 13.52 549.45 100.00% 0.00 0.00 0.00% 13.52 549.45 4,631.14 10.24 4631.14 100.00% 0.00 0.00 0.00% 10.24 4631.14 54,637.30 12,182.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,133.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,092.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,202.30 5.00 2202.30 100.00% 0.00 0.00 0.00% 5.00 2202.30 33,200.40 200.00 7580.00 22.83% 676.00 25620.40 77.17% 876.00 33200.40 2,826.34 23.00 932.65 33.00% 46.70 1893.69 67.00% 69.70 2826.34 290.63 62.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 146.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 81.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

435,961.60

435,961.60

Page 176: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,209.62 357.01 482.45 357.01 100.00% 0.00 0.00 0.00% 482.45 357.01 1,852.61 482.45 1852.61 100.00% 0.00 0.00 0.00% 482.45 1852.61 15,563.91 80.53 2.92 80.53 100.00% 0.00 0.00 0.00% 2.92 80.53 5,667.45 180.78 5667.45 100.00% 0.00 0.00 0.00% 180.78 5667.45 3,796.17 121.09 3796.17 100.00% 0.00 0.00 0.00% 121.09 3796.17 3,198.28 146.98 3198.28 100.00% 0.00 0.00 0.00% 146.98 3198.28 1,167.53 482.45 1167.53 100.00% 0.00 0.00 0.00% 482.45 1167.53 1,653.95 286.15 1653.95 100.00% 0.00 0.00 0.00% 286.15 1653.95 49,370.23 5,505.21 192.49 5505.21 100.00% 0.00 0.00 0.00% 192.49 5505.21 14,637.11 65.77 14637.11 100.00% 0.00 0.00 0.00% 65.77 14637.11 5,021.00 186.17 5021.00 100.00% 0.00 0.00 0.00% 186.17 5021.00 4,267.25 16.83 4267.25 100.00% 0.00 0.00 0.00% 16.83 4267.25 19,939.66 482.45 19939.66 100.00% 0.00 0.00 0.00% 482.45 19939.66 69,864.64 8,028.11 1326.96 8028.11 100.00% 0.00 0.00 0.00% 1326.96 8028.11 37,100.71 85.78 37100.71 100.00% 0.00 0.00 0.00% 85.78 37100.71 13,370.98 2217.41 13370.98 100.00% 0.00 0.00 0.00% 2217.41 13370.98 4,214.77 128.46 4214.77 100.00% 0.00 0.00 0.00% 128.46 4214.77 7,150.07 16.06 7150.07 100.00% 0.00 0.00 0.00% 16.06 7150.07

Page 177: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 82,361.41 46,607.98 7729.35 46607.98 100.00% 0.00 0.00 0.00% 7729.35 46607.98 13,050.16 366.99 13050.16 100.00% 0.00 0.00 0.00% 366.99 13050.16 22,703.27 51.65 22703.27 100.00% 0.00 0.00 0.00% 51.65 22703.27 6,109.58 3,136.59 470.96 3136.59 100.00% 0.00 0.00 0.00% 470.96 3136.59 1,124.50 54.72 1124.50 100.00% 0.00 0.00 0.00% 54.72 1124.50 1,848.49 4.10 1848.49 100.00% 0.00 0.00 0.00% 4.10 1848.49 99,222.68

Page 178: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo0.00

31,395.37 64.99 31395.37 100.00% 0.00 0.00 0.00% 64.99 31395.37 30,470.68 623.76 30470.68 100.00% 0.00 0.00 0.00% 623.76 30470.68 37,356.63 6195.13 37356.63 100.00% 0.00 0.00 0.00% 6195.13 37356.63 5,833.27 3,347.98 502.70 3347.98 100.00% 0.00 0.00 0.00% 502.70 3347.98 793.64 38.62 793.64 100.00% 0.00 0.00 0.00% 38.62 793.64 1,691.65 3.26 1691.65 100.00% 0.00 0.00 0.00% 3.26 1691.65 57,997.93 8,571.50 232.29 8571.50 100.00% 0.00 0.00 0.00% 232.29 8571.50 3,272.97 232.29 3272.97 100.00% 0.00 0.00 0.00% 232.29 3272.97 16,040.14 2408.43 16040.14 100.00% 0.00 0.00 0.00% 2408.43 16040.14 30,113.32 61.15 30113.32 100.00% 0.00 0.00 0.00% 61.15 30113.32 6,412.17 1,424.11 235.39 1424.11 100.00% 0.00 0.00 0.00% 235.39 1424.11 2,672.49 65.76 2672.49 100.00% 0.00 0.00 0.00% 65.76 2672.49 2,315.57 5.12 2315.57 100.00% 0.00 0.00 0.00% 5.12 2315.57 40,725.53 11,640.96 86.00 11640.96 100.00% 0.00 0.00 0.00% 86.00 11640.96 2,984.25 25.00 2984.25 100.00% 0.00 0.00 0.00% 25.00 2984.25 1,697.75 5.00 1697.75 100.00% 0.00 0.00 0.00% 5.00 1697.75 642.43 20.00 382.40 59.52% 0.00 0.00 0.00% 20.00 382.40

Page 179: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 21,807.66 575.40 21807.66 100.00% 0.00 0.00 0.00% 575.40 21807.66 1,952.48 48.15 1952.48 100.00% 0.00 0.00 0.00% 48.15 1952.48 290.63 62.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 146.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 81.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 174,691.50 174,691.50 745.44 120.44 162.76 120.44 100.00% 0.00 0.00 0.00% 162.76 120.44 625.00 162.76 625.00 100.00% 0.00 0.00 0.00% 162.76 625.00 6,399.94 1,528.76 22.62 623.86 40.81% 32.81 904.90 59.19% 55.43 1528.76 2,057.19 65.62 2057.19 100.00% 0.00 0.00 0.00% 65.62 2057.19 2,177.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 393.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 242.59 41.97 242.59 100.00% 0.00 0.00 0.00% 41.97 242.59 11,745.87 1,729.16 60.46 1729.16 100.00% 0.00 0.00 0.00% 60.46 1729.16 4,005.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,386.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 978.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 180: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 3,645.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 21,185.16 3,291.62 544.07 3291.62 100.00% 0.00 0.00 0.00% 544.07 3291.62 11,353.39 16.20 7006.66 61.71% 10.05 4346.73 38.29% 26.25 11353.39 3,582.00 594.03 3582.00 100.00% 0.00 0.00 0.00% 594.03 3582.00 1,097.17 21.30 698.85 63.70% 12.14 398.31 36.30% 33.44 1097.17 1,860.98 2.94 1308.92 70.33% 1.24 552.06 29.67% 4.18 1860.98

Page 181: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 32,662.24 14,803.89 0.00 0.00 0.00% 2455.04 14803.89 100.00% 2455.04 14803.89 8,139.68 72.00 2560.32 31.45% 132.90 4725.92 58.06% 204.90 7286.24 9,718.67 6.74 2962.63 30.48% 9.76 4290.11 44.14% 16.50 7252.74 3,338.60 1,874.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 553.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 910.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 35,652.85 11,415.18 0.00 0.00 0.00% 15.00 7246.20 63.48% 15.00 7246.20 10,659.56 55.50 2711.18 25.43% 115.66 5649.99 53.00% 171.16 8361.17 13,578.11 307.00 1851.21 13.63% 1494.00 9008.82 66.35% 1801.00 10860.03 1,056.59 603.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 157.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 295.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 15,288.37 4,031.69 0.00 0.00 0.00% 109.26 4031.69 100.00% 109.26 4031.69 1,539.47 0.00 0.00 0.00% 72.96 1028.01 66.78% 72.96 1028.01 3,911.22 0.00 0.00 0.00% 587.27 3911.22 100.00% 587.27 3911.22 5,805.99 0.00 0.00 0.00% 11.79 5805.99 100.00% 11.79 5805.99 4,612.16

Page 182: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,527.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,022.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,062.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 42,004.28 6,010.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,066.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,521.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,395.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,296.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

14,095.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,617.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 141,711.77 141,711.77 1,218.28 196.84 266.00 196.84 100.00% 0.00 0.00 0.00% 266.00 196.84 1,021.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,051.03 1,056.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,431.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,601.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 643.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 317.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 183: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 21,358.87 0.00 2,182.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,145.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,781.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,255.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,993.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 184: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 24,119.76 0.00 3,604.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,416.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,616.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,292.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,190.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,420.02 10,559.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,073.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,786.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,190.43 2,357.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 692.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,140.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,231.09 4,859.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,339.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,031.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,688.64 990.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 241.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 456.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 185: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 46,433.65 1,109.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,733.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,254.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,407.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,064.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,001.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,951.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,531.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 381.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 136,230.89 136,230.89 624.48 100.90 136.35 100.90 100.00% 0.00 0.00 0.00% 136.35 100.90 523.58 136.35 523.58 100.00% 0.00 0.00 0.00% 136.35 523.58 4,462.65 1,442.99 52.32 1442.99 100.00% 0.00 0.00 0.00% 52.32 1442.99 1,264.03 40.32 1264.03 100.00% 0.00 0.00 0.00% 40.32 1264.03 1,123.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 329.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 302.41 52.32 302.41 100.00% 0.00 0.00 0.00% 52.32 302.41 17,049.80

Page 186: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,051.91 36.78 1051.91 100.00% 0.00 0.00 0.00% 36.78 1051.91 6,976.94 4.50 1001.48 14.35% 0.00 0.00 0.00% 4.50 1001.48 2,487.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,079.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,454.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 14,041.38 1,892.92 312.88 1892.92 100.00% 0.00 0.00 0.00% 312.88 1892.92 6,976.39 16.13 6976.39 100.00% 0.00 0.00 0.00% 16.13 6976.39 2,889.33 479.16 2889.33 100.00% 0.00 0.00 0.00% 479.16 2889.33 519.71 15.84 519.71 100.00% 0.00 0.00 0.00% 15.84 519.71

Page 187: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,763.03 3.96 1763.03 100.00% 0.00 0.00 0.00% 3.96 1763.03 20,066.80 9,999.25 1658.25 9999.25 100.00% 0.00 0.00 0.00% 1658.25 9999.25 4,766.46 134.04 4766.46 100.00% 0.00 0.00 0.00% 134.04 4766.46 5,301.09 12.06 5301.09 100.00% 0.00 0.00 0.00% 12.06 5301.09 7,977.92 3,865.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,255.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,857.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 27,571.75 9,492.52 17.32 8366.95 88.14% 2.33 1125.58 11.86% 19.65 9492.52 8,799.84 180.14 8799.84 100.00% 0.00 0.00 0.00% 180.14 8799.84 9,279.39 538.87 3249.39 35.02% 1000.00 6030.00 64.98% 1538.87 9279.39 3,217.89 1,759.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 643.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 814.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 14,302.20 0.00 3,249.78 88.07 3249.78 100.00% 0.00 0.00 0.00% 88.07 3249.78 1,240.91 88.07 1240.91 100.00% 0.00 0.00 0.00% 88.07 1240.91 4,172.96 626.57 4172.96 100.00% 0.00 0.00 0.00% 626.57 4172.96 5,638.55 11.45 5638.55 100.00% 0.00 0.00 0.00% 11.45 5638.55

Page 188: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,432.70 622.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 693.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,117.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 24,483.32 5,259.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,322.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 697.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,420.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,186.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 596.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 154,156.77 154,156.77 868.00 140.24 189.52 140.24 100.00% 0.00 0.00 0.00% 189.52 140.24 727.76 189.52 727.76 100.00% 0.00 0.00 0.00% 189.52 727.76 5,450.72 1,247.72 30.05 828.78 66.42% 0.00 0.00 0.00% 30.05 828.78 1,877.87 41.12 1289.11 68.65% 0.00 0.00 0.00% 41.12 1289.11 1,687.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 337.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 300.44 51.98 300.44 100.00% 0.00 0.00 0.00% 51.98 300.44

Page 189: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 10,635.88 1,526.95 40.50 1158.30 75.86% 0.00 0.00 0.00% 40.50 1158.30 3,445.07 7.74 1722.54 50.00% 0.00 0.00 0.00% 7.74 1722.54 1,193.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 998.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,471.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 190: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 19,173.30 2,989.67 247.08 1494.83 50.00% 0.00 0.00 0.00% 247.08 1494.83 10,362.94 16.47 7123.44 68.74% 0.00 0.00 0.00% 16.47 7123.44 3,415.51 386.56 2330.96 68.25% 0.00 0.00 0.00% 386.56 2330.96 726.74 22.15 726.74 100.00% 0.00 0.00 0.00% 22.15 726.74 1,678.44 3.77 1678.44 100.00% 0.00 0.00 0.00% 3.77 1678.44 29,004.37 13,292.59 1353.00 8158.59 61.38% 0.00 0.00 0.00% 1353.00 8158.59 7,338.16 136.59 4857.14 66.19% 0.00 0.00 0.00% 136.59 4857.14 8,373.62 13.35 5868.13 70.08% 0.00 0.00 0.00% 13.35 5868.13 4,265.88 2,432.90 0.00 0.00 0.00% 200.00 1332.00 54.75% 200.00 1332.00 692.33 0.00 0.00 0.00% 18.69 384.08 55.48% 18.69 384.08 1,140.65 0.00 0.00 0.00% 1.25 563.56 49.41% 1.25 563.56 31,424.98 11,096.35 22.97 11096.35 100.00% 0.00 0.00 0.00% 22.97 11096.35 8,778.83 179.00 8744.15 99.60% 0.00 0.00 0.00% 179.00 8744.15 11,549.80 1173.43 7075.78 61.26% 0.00 0.00 0.00% 1173.43 7075.78 890.92 509.29 0.00 0.00 0.00% 76.47 509.29 100.00% 76.47 509.29 132.55 0.00 0.00 0.00% 3.25 66.79 50.39% 3.25 66.79 249.08 0.00 0.00 0.00% 0.24 124.54 50.00% 0.24 124.54

Page 191: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 12,850.45 3,349.04 90.76 3349.04 100.00% 0.00 0.00 0.00% 90.76 3349.04 1,278.81 44.69 629.68 49.24% 0.00 0.00 0.00% 44.69 629.68 3,810.25 497.00 3310.02 86.87% 0.00 0.00 0.00% 497.00 3310.02 4,412.35 8.96 4412.35 100.00% 0.00 0.00 0.00% 8.96 4412.35 4,612.16 1,527.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,022.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,062.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 34,980.11 5,259.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,894.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,161.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 11,900.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,341.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,423.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 171,213.89 171,213.89 873.49 141.13 190.72 141.13 100.00% 0.00 0.00 0.00% 190.72 141.13 732.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,381.08

Page 192: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,092.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,790.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,584.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 461.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 452.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 193: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 24,297.53 1,536.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,943.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,546.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,037.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,233.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,312.87 2,681.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,882.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,145.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 820.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,782.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 27,587.14 12,447.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,012.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8,127.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,691.68 1,771.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,054.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 865.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 37,863.82 0.00 12,376.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 194: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 11,918.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,568.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,574.36 850.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 318.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 404.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 14,183.13 3,221.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,230.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,142.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,589.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,403.55 964.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 892.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,546.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 28,045.24 5,725.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,465.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,573.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,341.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 938.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 63,484.57

Page 195: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 63,484.57 319.87 51.68 69.84 51.68 100.00% 0.00 0.00 0.00% 69.84 51.68 268.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,470.42 0.00 314.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 677.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 282.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 45.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 150.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 196: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 13,508.71 0.00 411.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,420.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,222.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,566.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,886.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,662.06 0.00 925.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,736.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,464.23 0.00 2,568.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,585.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,309.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,197.41 0.00 0.00 1,277.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 347.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 572.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,311.64 0.00 0.00 1,922.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8,658.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,730.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 801.60 0.00 0.00

Page 197: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 446.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 122.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 233.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 21,748.63 0.00 0.00 1,898.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,989.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,511.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,527.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,786.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,034.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 172,319.04 0.00 172,319.04 0.00 0.00 727.67 0.00 0.00 117.57 158.88 117.57 100.00% 0.00 0.00 0.00% 158.88 117.57 610.10 158.88 610.10 100.00% 0.00 0.00 0.00% 158.88 610.10 5,047.31 0.00 1,182.08 42.86 1182.08 100.00% 0.00 0.00 0.00% 42.86 1182.08 1,580.04 50.40 1580.04 100.00% 0.00 0.00 0.00% 50.40 1580.04 1,832.84 84.23 1832.84 100.00% 0.00 0.00 0.00% 84.23 1832.84 384.49 158.88 384.49 100.00% 0.00 0.00 0.00% 158.88 384.49 67.86 11.74 67.86 100.00% 0.00 0.00 0.00% 11.74 67.86 19,045.26 0.00

Page 198: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,399.68 48.94 1399.68 100.00% 0.00 0.00 0.00% 48.94 1399.68 6,965.82 31.30 6965.82 100.00% 0.00 0.00 0.00% 31.30 6965.82 2,411.93 89.43 2411.93 100.00% 0.00 0.00 0.00% 89.43 2411.93 1,701.32 6.71 1701.32 100.00% 0.00 0.00 0.00% 6.71 1701.32 6,566.51 30.48 1259.74 19.18% 0.00 0.00 0.00% 30.48 1259.74

Page 199: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 19,727.42 0.00 2,957.72 488.88 2957.72 100.00% 0.00 0.00 0.00% 488.88 2957.72 8,719.40 20.16 8719.40 100.00% 0.00 0.00 0.00% 20.16 8719.40 4,228.78 701.29 4228.78 100.00% 0.00 0.00 0.00% 701.29 4228.78 1,417.39 43.20 1417.39 100.00% 0.00 0.00 0.00% 43.20 1417.39 2,404.13 5.40 2404.13 100.00% 0.00 0.00 0.00% 5.40 2404.13 20,037.36 0.00 10,301.59 1708.39 10301.59 100.00% 0.00 0.00 0.00% 1708.39 10301.59 3,278.63 92.20 3278.63 100.00% 0.00 0.00 0.00% 92.20 3278.63 6,457.14 14.69 6457.14 100.00% 0.00 0.00 0.00% 14.69 6457.14 5,893.73 0.00 0.00 3,472.59 521.41 3472.59 100.00% 0.00 0.00 0.00% 521.41 3472.59 915.30 44.54 915.30 100.00% 0.00 0.00 0.00% 44.54 915.30 1,505.84 3.34 1505.84 100.00% 0.00 0.00 0.00% 3.34 1505.84 22,934.88 0.00 0.00 6,154.44 12.74 6154.44 100.00% 0.00 0.00 0.00% 12.74 6154.44 5,999.76 122.82 5999.76 100.00% 0.00 0.00 0.00% 122.82 5999.76 10,780.68 1787.84 10780.68 100.00% 0.00 0.00 0.00% 1787.84 10780.68 1,403.85 0.00 0.00 1,064.20 159.79 1064.20 100.00% 0.00 0.00 0.00% 159.79 1064.20 116.52 5.67 116.52 100.00% 0.00 0.00 0.00% 5.67 116.52 223.13 0.43 223.13 100.00% 0.00 0.00 0.00% 0.43 223.13

Page 200: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 19,798.91 0.00 0.00 6,236.47 169.01 6236.47 100.00% 0.00 0.00 0.00% 169.01 6236.47 2,381.35 169.01 2381.35 100.00% 0.00 0.00 0.00% 169.01 2381.35 4,222.77 634.05 4222.77 100.00% 0.00 0.00 0.00% 634.05 4222.77 6,958.32 14.13 6958.32 100.00% 0.00 0.00 0.00% 14.13 6958.32 2,706.92 0.00 0.00 819.96 135.53 819.96 100.00% 0.00 0.00 0.00% 135.53 819.96 756.31 18.61 756.31 100.00% 0.00 0.00 0.00% 18.61 756.31 1,130.65 2.50 1130.65 100.00% 0.00 0.00 0.00% 2.50 1130.65 54,995.73 0.00 0.00 12,309.03 27.00 12309.03 100.00% 0.00 0.00 0.00% 27.00 12309.03 19,731.84 1032.00 19731.84 100.00% 0.00 0.00 0.00% 1032.00 19731.84 20,850.31 550.14 20850.31 100.00% 0.00 0.00 0.00% 550.14 20850.31 2,104.55 51.90 2104.55 100.00% 0.00 0.00 0.00% 51.90 2104.55 65,747.05 0.00 202.08 0.00 0.00 17.76 24.00 17.76 100.00% 0.00 0.00 0.00% 24.00 17.76 92.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 92.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,126.41 0.00 1,109.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 30.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 201: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 610.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 280.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,033.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 62.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,278.42 1,278.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 202: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 57,476.51 10,131.28 5,605.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 491.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,034.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,898.87 917.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,404.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,576.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,939.61 1,368.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,729.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,842.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8,357.51 1,894.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,067.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,395.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 19,616.15 1,159.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,758.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,698.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,810.87

Page 203: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 4,224.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,931.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,655.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 722.22 0.00 722.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,663.63 1,660.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,003.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,850.000 1,500.00 25.00 750.00 50.00% 4.00 120.00 8.00% 29.00 870.00 2,000.00 1.00 2000.00 100.00% 0.00 0.00 0.00% 1.00 2000.00 1,350.00 1.00 1350.00 100.00% 0.00 0.00 0.00% 1.00 1350.00 3,131,400.57

494,129.47

83,492.74 59,784.17 59,784.17 351.92 59784.17 100.00% 0.00 0.00 0.00% 351.92 59784.17 23,708.57 23,708.57 476.65 23708.57 100.00% 0.00 0.00 0.00% 476.65 23708.57 52,343.63 38,626.04 11,298.44 1099.07 11298.44 100.00% 0.00 0.00 0.00% 1099.07 11298.44

Page 204: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 7,881.37 695.62 7881.37 100.00% 0.00 0.00 0.00% 695.62 7881.37 6,170.67 570.83 6170.67 100.00% 0.00 0.00 0.00% 570.83 6170.67 9,215.28 893.82 9215.28 100.00% 0.00 0.00 0.00% 893.82 9215.28 4,060.28 299.21 4060.28 100.00% 0.00 0.00 0.00% 299.21 4060.28 4,683.75 0.00 4,683.75 516.40 4683.75 100.00% 0.00 0.00 0.00% 516.40 4683.75

Page 205: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 7,639.23 0.00 7,639.23 1709.00 7639.23 100.00% 0.00 0.00 0.00% 1709.00 7639.23 809.38 0.00 809.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 585.23 0.00 585.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 103,814.76 0.00 16,819.54 0.00 16,819.54 673.59 16819.54 100.00% 0.00 0.00 0.00% 673.59 16819.54 86,995.22 0.00 86,995.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 82,744.62 0.00 2,906.75 0.00 2,906.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,177.10 0.00 4,177.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 29,752.79 29,752.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 43,191.31 43,191.31 0.00 0.00 0.00% 470.75 43191.31 100.00% 470.75 43191.31 177.45 177.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 206: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,539.22 2,539.22 82.63 2539.22 100.00% 0.00 0.00 0.00% 82.63 2539.22 9,257.43 9,257.43 9,257.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,699.84 16,699.84 7,684.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,477.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,538.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 33,015.83 33,015.83 5,771.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 24,277.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,966.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,284.96 0.00 1,474.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 810.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 57,014.18 53,425.59 610.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 52,815.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 207: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 3,588.59 3,588.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 53,461.48 46,321.23 10,704.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,921.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,251.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,004.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 208: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 11,276.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,163.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,281.17 0.00 1,281.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,719.27 926.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,254.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 538.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 139.81 139.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 342,630.33

59,648.10 39,724.74 39,724.74 233.84 39724.74 100.00% 0.00 0.00 0.00% 233.84 39724.74 19,923.36 0.00 19,923.36 400.55 19923.36 100.00% 0.00 0.00 0.00% 400.55 19923.36 31,993.95 21,258.20 8,765.04 852.63 8765.04 100.00% 0.00 0.00 0.00% 852.63 8765.04 5,156.51 455.12 5156.51 100.00% 0.00 0.00 0.00% 455.12 5156.51 3,873.01 358.28 3873.01 100.00% 0.00 0.00 0.00% 358.28 3873.01 591.28 57.35 591.28 100.00% 0.00 0.00 0.00% 57.35 591.28

Page 209: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,872.36 150.00 2035.50 70.87% 61.67 836.86 29.13% 211.67 2872.36 4,698.26 4,698.26 429.20 3892.84 82.86% 88.80 805.42 17.14% 518.00 4698.26 5,111.00 5,111.00 1143.40 5111.00 100.00% 0.00 0.00 0.00% 1143.40 5111.00 341.26 341.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 585.23 585.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 68,541.21 11,167.58 11,167.58 447.24 11167.58 100.00% 0.00 0.00 0.00% 447.24 11167.58 57,373.63 57,373.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 58,308.89 2,709.05 2,709.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,893.00 3,893.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 19,983.72 19,983.72 400.00 12292.00 61.51% 0.00 0.00 0.00% 400.00 12292.00 29,689.38

Page 210: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 29,689.38 0.00 0.00 0.00% 323.59 29689.38 100.00% 323.59 29689.38 125.41 125.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,908.33 1,908.33 62.10 1908.33 100.00% 0.00 0.00 0.00% 62.10 1908.33 9,382.07 9,382.07 9,382.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 211: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 12,683.83 12,683.83 5,671.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,926.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,085.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 24,607.71 24,607.71 4,187.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18,537.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,882.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,713.72 1,106.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 607.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 39,128.94 36,563.94 249.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 36,314.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,565.00 2,565.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 36,621.91 31,274.13 8,304.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 212: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 4,528.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,782.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,396.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,022.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,240.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 945.62 945.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,262.35 671.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,248.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 341.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 139.81 139.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 173,398.54

20,449.61 20,449.61 20,449.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 21,583.47 14,789.51 5,029.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,385.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,818.92 0.00 0.00 0.00% 130.00 1405.30 49.85% 130.00 1405.30

Page 213: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,771.33 0.00 0.00 0.00% 100.00 1031.00 37.20% 100.00 1031.00 784.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,164.10 2,164.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,951.09 2,951.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 333.27 333.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 214: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,345.50 1,345.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 39,748.45 4,241.40 4,241.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 35,507.05 35,507.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 28,214.62 10,805.90 10,805.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,563.63 16,563.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 109.41 109.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 735.68 735.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,632.87 10,632.87 10,632.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,917.84 9,917.84 2,350.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 215: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 7,566.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,713.72 1,106.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 607.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 20,578.32 20,307.96 20,307.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 270.36 270.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18,810.56 16,563.87 4,765.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,883.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,790.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,199.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,298.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 626.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 901.14 901.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,345.55 377.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 968.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 216: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,749.08 675.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 61.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,012.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 217: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 110,540.48 22,443.79 12,587.70 12,587.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,866.21 2,549.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,855.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 944.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 783.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 732.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 612.23 612.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,377.65 1,377.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 31,809.14 31,809.14 31,809.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 25,827.41 6,640.14 6,640.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 19,187.27 9,019.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 218: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 10,167.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,762.56 2,336.53 2,336.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,717.20 3,901.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,058.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,162.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,183.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,410.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 708.83 131.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 413.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 164.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 714.05 714.05 460.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 253.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,247.73 4,393.27 4,393.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 707.82

Page 219: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 707.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 146.64 0.00 146.64 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,735.80 7,339.76 2,415.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,256.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,072.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 220: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 932.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 662.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 396.04 0.00 396.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 176,107.24 39,009.00 18,559.39 18,559.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 20,449.61 20,449.61 0.00 0.00 0.00% 193.80 9639.61 47.14% 193.80 9639.61 18,064.44 12,562.56 4,029.25 0.00 0.00 0.00% 30.00 308.40 7.65% 30.00 308.40 3,667.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,447.24 0.00 0.00 0.00% 66.94 723.62 50.00% 66.94 723.62 2,634.93 0.00 0.00 0.00% 127.79 1317.46 50.00% 127.79 1317.46 784.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,402.22 1,402.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,564.89 2,564.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 333.27

Page 221: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 333.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,201.50 1,201.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 35,775.25 4,241.40 4,241.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 31,533.85 31,533.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,944.78 9,553.96 9,553.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,403.76 13,403.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 109.41 109.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 877.65 877.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,283.14 4,283.14 4,283.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,665.38 10,665.38

Page 222: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,650.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8,014.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,713.72 1,106.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 607.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 20,751.31 20,307.96 20,307.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 223: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 270.36 270.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 172.99 172.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 20,402.85 17,847.02 3,817.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,220.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,676.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,397.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,135.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 599.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 726.00 726.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,829.83 425.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,404.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,497.37 576.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 52.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 867.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 91,672.78

Page 224: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 16,485.33 16,485.33 16,485.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12,423.08 9,601.28 5,254.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,706.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 931.93 0.00 0.00 0.00% 86.21 931.93 100.00% 86.21 931.93 1,279.57 0.00 0.00 0.00% 124.11 1279.57 100.00% 124.11 1279.57 428.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,481.13 1,481.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,016.03 1,016.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 166.69 166.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 157.95 157.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 22,351.62 337.84 337.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 22,013.78

Page 225: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 22,013.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,394.30 6,274.14 6,274.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 226: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 9,648.43 9,648.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 56.87 56.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 414.86 414.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,628.07 4,628.07 4,628.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,487.62 1,487.62 1,487.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,713.72 1,106.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 607.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,899.41 653.76 653.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,998.20 1,659.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,338.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 247.45

Page 227: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 247.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 11,577.45 10,554.42 4,978.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,498.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,108.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,057.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,522.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 387.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 784.33 784.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 238.70 238.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 712.18 175.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 30.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 506.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 114,620.17 19,331.92 10,478.20 10,478.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8,853.72

Page 228: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 8,853.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12,349.23 9,088.95 2,697.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,216.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,447.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,838.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 889.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 229: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 955.98 955.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,793.99 1,793.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 261.91 261.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 248.40 248.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 33,294.19 2,179.88 2,179.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 31,114.31 31,114.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 15,082.51 7,639.48 7,639.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,937.22 6,937.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 116.15 116.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 389.66 389.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 230: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,898.62 1,898.62 1,898.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,811.38 6,811.38 1,599.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,212.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 571.24 368.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 202.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12,756.90 12,536.94 12,536.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 219.96 219.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 11,649.65 10,157.84 2,555.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,946.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,071.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,642.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,188.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 231: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 754.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 321.82 321.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,169.99 256.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 913.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 232: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 874.53 0.00 337.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 30.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 506.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 84,737.27 0.00 11,660.05 0.00 11,660.05 0.00 11,660.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,474.44 0.00 3,527.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,680.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 369.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 550.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 347.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,775.91 0.00 1,775.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,097.83 0.00 1,097.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 28,023.74 19,704.06 19,704.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,122.76 0.00

Page 233: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,122.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,050.48 0.00 3,050.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 331.88 0.00 331.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,701.05 0.00 1,701.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,113.51 0.00 1,113.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,598.40 0.00 16,598.40 0.00 16,598.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,027.71 0.00 5,027.71 0.00 1,724.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,303.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 571.24 0.00 571.24 0.00 368.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 202.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,291.00 0.00 7,169.57 0.00

Page 234: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 7,169.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 121.43 0.00 121.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 235: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 6,216.95 0.00 5,891.45 0.00 3,342.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,475.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 418.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 654.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 325.50 0.00 325.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 411,822.78 0.00 59,403.49 0.00 59,403.49 0.00 59,403.49 1194.28 59403.49 100.00% 0.00 0.00 0.00% 1194.28 59403.49 49,619.48 0.00 37,249.33 0.00 20,303.31 1975.03 20303.31 100.00% 0.00 0.00 0.00% 1975.03 20303.31 6,116.61 539.86 6116.61 100.00% 0.00 0.00 0.00% 539.86 6116.61 3,149.82 291.38 3149.82 100.00% 0.00 0.00 0.00% 291.38 3149.82 5,144.17 498.95 5144.17 100.00% 0.00 0.00 0.00% 498.95 5144.17 2,535.42 186.84 2535.42 100.00% 0.00 0.00 0.00% 186.84 2535.42 6,302.74 0.00 6,302.74 694.90 6302.74 100.00% 0.00 0.00 0.00% 694.90 6302.74 4,240.24 0.00

Page 236: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 4,240.24 948.60 4240.24 100.00% 0.00 0.00 0.00% 948.60 4240.24 1,534.67 0.00 1,534.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 292.50 0.00 292.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 69,439.24 0.00 8,269.07 0.00 8,269.07 331.16 8269.07 100.00% 0.00 0.00 0.00% 331.16 8269.07 61,170.17 0.00 61,170.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 83,582.65 0.00 2,826.44 0.00 2,826.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 40,616.85 0.00 40,616.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18,159.59 0.00 18,159.59 121.00 3718.33 20.48% 0.00 0.00 0.00% 121.00 3718.33 18,890.41 0.00 18,890.41 205.89 18890.41 100.00% 0.00 0.00 0.00% 205.89 18890.41 290.47 0.00 290.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,798.89 0.00

Page 237: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,798.89 91.08 2798.89 100.00% 0.00 0.00 0.00% 91.08 2798.89 23,704.45 0.00 23,704.45 0.00 23,704.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 238: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 24,523.09 0.00 24,523.09 0.00 24,523.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18,199.10 0.00 8,773.64 0.00 4,713.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,060.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,425.46 0.00 6,083.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,342.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 37,065.03 0.00 0.00 35,793.41 0.00 0.00 832.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 34,960.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,271.62 0.00 0.00 1,271.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 46,286.25 0.00 0.00 40,661.61 0.00 0.00 19,236.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,371.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,063.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,575.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 239: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 6,122.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,292.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,156.81 0.00 0.00 4,156.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,467.83 0.00 0.00 756.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 711.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,716.54 0.00 1,358.27 3574.07 1358.15 99.99% 0.33 0.13 0.01% 3574.40 1358.27 1,358.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,946.730 13,418.83 3,927.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,633.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,173.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,684.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 527.90 0.00 0.00 527.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,730.89 0.00 20,263.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 584.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,608.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 240: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 849.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 424.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 68,534.14 0.00 68,534.14 0.00 0.00 419.48 1103.90 419.48 100.00% 0.00 0.00 0.00% 1103.90 419.48 3,951.96 275.98 988.01 25.00% 0.00 0.00 0.00% 275.98 988.01

Page 241: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 10,537.82 0.00 0.00 5,969.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,715.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,852.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 11,223.12 0.00 0.00 7,305.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,917.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 42,401.76 0.00 0.00 6,331.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 36,070.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 850,008.53 850,008.53 221,215.73 4300.00 30874.00 13.96% 4000.99 28,727.11 12.99% 8300.99 59601.11 23,826.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 604,966.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

168,575.58

6,763.52 850.15 3043.54 45.00% 0.00 0.00 0.00% 850.15 3043.54

10,342.80 0.00 0.00 0.00% 130.00 3515.20 33.99% 130.00 3515.20 4,647.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 242: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 4,161.61 0.00 0.00 0.00% 144.00 1208.16 29.03% 144.00 1208.16

4,802.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 75,608.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

617.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,751.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

5,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,060.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

3,678.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

6,371.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

1,124.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

2,489.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 772.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,236.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,805.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,194.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 243: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 149.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,229.10 0.00

0.00 736.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 187.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 541.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 244: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 587.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,047.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 111.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 233.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 44.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 739.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 30,440.70 0.00

0.00 1,162.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 756.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 1,108.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.000.00

7,952.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 270.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,822.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 3,904.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,914.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00

Page 245: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,739.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,895.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,914.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 51,337.80 0.00 10,288.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,979.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 666.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 329.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 28,835.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 2,726.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,398.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 79.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 33.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 271,155.23 0.00

0.00 267.92 705.04 267.92 100.00% 0.00 0.00 0.00% 705.04 267.92 2,524.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 1,734.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,574.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 798.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 246: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo0.000.00

6,762.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 777.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,424.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 31,165.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 26,385.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 247: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo0.00

48.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 62.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

4,770.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,669.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

660.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 180.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 993.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

4,366.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,406.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,938.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 0.00 3,014.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,930.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,007.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

914.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 248: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 245.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,966.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 34.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 1,949.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

6,348.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.000.00

2,705.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,160.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 885.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 5,854.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

14,872.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

2,130.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,003.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 24,415.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 249: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 29,403.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 25,542.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,036.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 10,484.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

0.00 71.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 250: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo0.000.00

4,439.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.000.00

2,617.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 11,496.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 164.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 810.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 135.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 376,476.00 0.00 184,613.00 0.00 66,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,650.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,575.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,320.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,880.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 52,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,238.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 135,713.00 0.00

Page 251: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 44,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 15,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,180.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,940.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,575.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 52,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,880.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,238.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 56,150.00 0.00 49,200.00 0.00 44,520.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,280.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,950.00 0.00 3,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,900.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 439,779.92 76,671.13 14,946.79 268.58 268.58 74.40 268.58 100.00% 0.00 0.00 0.00% 74.40 268.58

Page 252: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,540.88 1,282.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 82.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 84.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 779.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 312.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 253: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,751.36 190.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,327.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 233.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,505.13 39.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 540.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 925.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,573.20 873.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 629.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 69.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 934.44 25.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 357.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 33.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 511.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,760.00 0.00 1,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,780.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 484.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 254: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 396.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 613.20 0.00 201.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 164.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 135.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 111.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,459.81 1,773.44 344.76 95.50 344.76 100.00% 0.00 0.00 0.00% 95.50 344.76 1,342.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 85.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 743.55 466.69 25.35 466.69 100.00% 0.00 0.00 0.00% 25.35 466.69 276.86 12.00 148.32 53.57% 0.00 0.00 0.00% 12.00 148.32 3,140.40 0.00 1,454.76 13.00 1050.66 72.22% 0.00 0.00 0.00% 13.00 1050.66 1,685.64 18.00 1379.16 81.82% 0.00 0.00 0.00% 18.00 1379.16 149.64 149.64 2.00 149.64 100.00% 0.00 0.00 0.00% 2.00 149.64 3,344.26 361.44 5.00 100.40 27.78% 0.00 0.00 0.00% 5.00 100.40 229.20 12.00 229.20 100.00% 0.00 0.00 0.00% 12.00 229.20

Page 255: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 239.12 13.00 222.04 92.86% 0.00 0.00 0.00% 13.00 222.04 300.96 17.00 284.24 94.44% 0.00 0.00 0.00% 17.00 284.24 112.92 2.00 37.64 33.33% 0.00 0.00 0.00% 2.00 37.64 583.20 28.00 453.60 77.78% 0.00 0.00 0.00% 28.00 453.60 81.32 4.00 81.32 100.00% 0.00 0.00 0.00% 4.00 81.32

Page 256: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 245.70 18.00 245.70 100.00% 0.00 0.00 0.00% 18.00 245.70 334.44 14.00 260.12 77.78% 0.00 0.00 0.00% 14.00 260.12 590.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 163.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 75.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 26.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 308.52 308.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 52,264.53 0.00 11,359.04 0.00 651.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,057.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 324.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,073.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,252.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,667.18 364.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 617.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,684.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,016.96 2,605.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,411.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 257: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 3,863.45 1,619.64 54.46 1619.64 100.00% 0.00 0.00 0.00% 54.46 1619.64 1,182.24 2.90 1182.24 100.00% 0.00 0.00 0.00% 2.90 1182.24 1,061.57 182.40 1061.57 100.00% 0.00 0.00 0.00% 182.40 1061.57 24,357.90 21,851.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 340.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 226.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 872.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,067.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 116,486.58 11,281.25 167.14 167.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,549.31 0.00 781.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 50.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 51.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 475.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 191.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,094.92 0.00 149.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 258: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 799.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 145.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,336.93 0.00 39.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 540.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 756.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 259: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,274.44 0.00 714.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 489.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 69.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 823.95 0.00 20.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 333.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 447.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,544.00 0.00 900.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,940.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 396.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 308.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 490.56 0.00 164.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 128.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 111.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 86.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,003.52 0.00 1,699.16 0.00

Page 260: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 330.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,286.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 82.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,425.58 0.00 896.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 529.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,510.64 0.00 1,131.48 13.00 1050.66 92.86% 0.00 0.00 0.00% 13.00 1050.66 1,379.16 18.00 1379.16 100.00% 0.00 0.00 0.00% 18.00 1379.16 299.28 0.00 299.28 2.00 149.64 50.00% 0.00 0.00 0.00% 2.00 149.64 3,451.82 0.00 281.12 7.00 140.56 50.00% 0.00 0.00 0.00% 7.00 140.56 420.20 13.00 248.30 59.09% 0.00 0.00 0.00% 13.00 248.30 136.64 8.00 136.64 100.00% 0.00 0.00 0.00% 8.00 136.64 267.52 5.00 83.60 31.25% 0.00 0.00 0.00% 5.00 83.60 112.92 5.00 94.10 83.33% 0.00 0.00 0.00% 5.00 94.10 453.60 28.00 453.60 100.00% 0.00 0.00 0.00% 28.00 453.60 81.32 4.00 81.32 100.00% 0.00 0.00 0.00% 4.00 81.32 245.70 18.00 245.70 100.00% 0.00 0.00 0.00% 18.00 245.70 334.44 2.00 37.16 11.11% 0.00 0.00 0.00% 2.00 37.16 826.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 261: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 163.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 75.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 52.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 617.04 0.00 617.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 262: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 95,201.81 0.00 7,016.31 0.00 400.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,088.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 198.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,148.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,180.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,568.52 0.00 929.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 638.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,504.94 0.00 2,135.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,369.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 66,196.76 615.02 20.68 615.02 100.00% 0.00 0.00 0.00% 20.68 615.02 59,927.49 4.94 2013.89 3.36% 0.00 0.00 0.00% 4.94 2013.89 5,654.25 440.03 2560.97 45.29% 0.00 0.00 0.00% 440.03 2560.97 12,915.28 11,654.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 181.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 45.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 465.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 263: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 569.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 29,135.29 7,615.05 235.01 235.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 707.23 357.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 22.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 217.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 86.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,554.15 302.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,047.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 204.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,762.36 78.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 135.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 714.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 833.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 709.89 674.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 264: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 34.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 326.76 10.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 61.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 111.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 143.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 265: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,856.40 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 632.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 374.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 463.25 155.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 202.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 104.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,625.29 1,327.79 142.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,113.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 71.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 729.04 729.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,302.54 1,302.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 648.88 273.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 81.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 20.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 54.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 266: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 74.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 118.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 27.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 617.04 0.00 617.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,894.95 4,742.25 275.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,148.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 195.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,124.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 998.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,575.87 0.00 164.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,411.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,222.78 0.00 662.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,560.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 574.05 0.00 242.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 228.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 103.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 267: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 6,780.00 0.00 5,827.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 90.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 60.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 232.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 569.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 268: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 18,562.20 0.00 1,420.15 0.00 29.60 0.00 29.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 540.09 0.00 230.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 14.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 15.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 140.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 139.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 193.61 0.00 28.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 139.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 25.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 241.23 0.00 39.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 33.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 168.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 79.40 0.00 79.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 161.56 0.00 5.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 269: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 55.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 95.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 144.00 0.00 100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 44.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 30.66 0.00 18.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,707.64 0.00 705.81 0.00 75.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 591.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 37.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 92.97 0.00 92.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 153.24 0.00 153.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 447.10 0.00 19.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 239.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 270: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 118.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 54.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 308.52 0.00 308.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 271: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 15,434.41 0.00 2,944.50 0.00 137.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,068.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 66.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,353.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 318.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,587.40 0.00 1,587.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,159.35 0.00 606.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 175.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 377.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,743.16 0.00 8,740.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 136.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 90.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 348.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 426.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,227.28 0.00 3,447.76 0.00 78.26 0.00

Page 272: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 78.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 896.80 0.00 452.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 28.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 29.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 275.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 110.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 536.13 0.00 216.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 251.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 68.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 354.53 0.00 39.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 135.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 126.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 53.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 263.77 0.00 158.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 104.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 196.90 0.00 10.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 273: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 61.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 95.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,035.56 0.00 150.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 355.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 420.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 274: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 66.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 44.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 85.81 0.00 27.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,824.94 0.00 1,007.97 0.00 378.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 591.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 37.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,327.36 0.00 1,327.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 395.70 0.00 242.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 153.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 74.82 74.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,402.05 95.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 275: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 17.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 50.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 858.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 40.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 74.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 177.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 75.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 617.04 617.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,954.58 2,216.40 218.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 850.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 54.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 516.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 575.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,419.56 629.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,789.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 70.90 26.77 0.00 0.00 0.00% 0.90 26.77 100.00% 0.90 26.77

Page 276: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 20.38 0.00 0.00 0.00% 0.05 20.38 100.00% 0.05 20.38 23.75 0.00 0.00 0.00% 4.08 23.75 100.00% 4.08 23.75 3,247.72 2,913.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 45.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 277: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 30.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 116.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 142.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 15,025.04 0.00 15,025.04 0.00 3,160.06 0.00 186.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,451.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 93.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 704.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 724.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 842.30 0.00 842.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,319.40 0.00 476.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,842.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 768.38 0.00 256.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 236.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 275.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,934.90 0.00 7,099.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 278: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 113.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 75.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 290.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 355.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,407.31 0.00 10,407.31 0.00 2,035.60 0.00 88.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 661.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 42.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,047.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 195.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 981.14 0.00 981.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,040.53 0.00 390.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 370.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 279.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,350.04 0.00 5,827.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 90.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 60.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 279: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 87.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 284.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 40,195.14 0.00 7,185.85 0.00 253.78 0.00 253.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 280: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,556.72 0.00 1,290.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 82.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 84.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 784.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 314.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,703.76 0.00 485.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 997.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 220.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 917.34 0.00 117.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 169.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 42.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 588.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 529.56 0.00 39.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 34.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 454.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 431.71 0.00 127.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 30.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 281: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 80.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 33.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 159.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 750.40 0.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 210.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 446.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 22.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 22.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 42.58 0.00 9.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 11.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,044.07 0.00 2,216.33 0.00 238.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,858.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 118.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,098.63 0.00 856.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 282: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 241.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 157.44 0.00 80.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 76.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 74.82 0.00 74.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 283: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,954.25 0.00 420.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 83.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 32.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,239.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 109.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 37.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,542.60 0.00 1,542.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 25,965.22 0.00 7,408.27 0.00 487.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,787.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 363.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,624.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,144.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,021.61 0.00 0.00 989.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,032.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,825.36 0.00 0.00

Page 284: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 526.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,299.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,900.15 0.00 0.00 774.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 554.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 571.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,809.83 0.00 0.00 8,427.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 136.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 90.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 29.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 426.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,700.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 117,069.95 0.00 37,931.97 0.00 0.00 789.51 0.00 0.00 789.51 218.70 789.51 100.00% 0.00 0.00 0.00% 218.70 789.51 6,992.04 0.00 0.00 3,529.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 225.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 232.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,144.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 285: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 860.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,320.30 0.00 0.00 1,620.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,012.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 687.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 286: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 4,304.09 0.00 0.00 117.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,453.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,261.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,471.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,846.20 0.00 0.00 1,746.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,049.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,049.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,442.75 0.00 0.00 76.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 345.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 126.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 894.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,809.36 0.00 0.00 1,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,300.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,133.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,440.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,116.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 660.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 660.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 287: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,427.72 0.00 0.00 274.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 274.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 54.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 95.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 357.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 185.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 185.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 42,075.48 0.00 7,853.14 0.00 1,526.56 130.02 469.37 30.75% 0.00 0.00 0.00% 130.02 469.37 380.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,945.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,429.42 0.00 0.00 3,659.91 198.80 3659.91 100.00% 0.00 0.00 0.00% 198.80 3659.91 2,769.51 111.00 1371.96 49.54% 0.00 0.00 0.00% 111.00 1371.96 5,872.50 0.00 2,424.60 30.00 2424.60 100.00% 0.00 0.00 0.00% 30.00 2424.60 3,447.90 45.00 3447.90 100.00% 0.00 0.00 0.00% 45.00 3447.90 1,346.76 0.00 1,346.76 18.00 1346.76 100.00% 0.00 0.00 0.00% 18.00 1346.76 14,094.74 0.00

Page 288: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,146.00 60.00 1146.00 100.00% 0.00 0.00 0.00% 60.00 1146.00 307.44 18.00 307.44 100.00% 0.00 0.00 0.00% 18.00 307.44 752.40 18.00 300.96 40.00% 0.00 0.00 0.00% 18.00 300.96 2,948.40 48.00 777.60 26.37% 0.00 0.00 0.00% 48.00 777.60 487.92 24.00 487.92 100.00% 0.00 0.00 0.00% 24.00 487.92 1,528.80 66.00 900.90 58.93% 0.00 0.00 0.00% 66.00 900.90 1,486.40 45.00 836.10 56.25% 0.00 0.00 0.00% 45.00 836.10

Page 289: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 4,012.68 11.00 649.11 16.18% 0.00 0.00 0.00% 11.00 649.11 54.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,132.80 5.00 188.80 16.67% 0.00 0.00 0.00% 5.00 188.80 237.24 7.00 92.26 38.89% 0.00 0.00 0.00% 7.00 92.26 6,478.92 0.00 6,478.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 37,062.50 0.00 5,566.95 0.00 292.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,239.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 34.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,073.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,927.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,949.89 0.00 1,949.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,973.54 0.00 1,355.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,617.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,695.76 0.00 877.33 29.50 877.33 100.00% 0.00 0.00 0.00% 29.50 877.33 1,108.86 2.72 1108.86 100.00% 0.00 0.00 0.00% 2.72 1108.86 709.57 121.92 709.57 100.00% 0.00 0.00 0.00% 121.92 709.57

Page 290: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 19,876.36 0.00 16,024.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 249.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 166.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 639.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 782.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,013.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 142,537.31 0.00 31,288.72 0.00 1,681.68 0.00 1,681.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,988.99 0.00 13,099.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 838.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 861.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,961.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,228.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,371.54 0.00 1,040.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 763.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 118.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 449.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 291: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 2,799.34 0.00 1,462.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 665.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 70.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 444.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 156.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 292: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 447.17 0.00 15.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 11.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 22.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 80.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 44.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 118.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 43.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 14.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 59.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 78,086.25 0.00 26,231.35 0.00 2,264.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 17,641.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,281.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,129.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,914.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 21,827.40 0.00

Page 293: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 6,886.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12,971.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,969.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 157.44 0.00 80.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 76.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 74.82 0.00 74.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 44.16 0.00 44.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 29,751.08 0.00 127.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,686.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,429.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,767.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,010.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,729.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,554.15 0.00 5,540.05 0.00 419.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,834.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 239.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 294: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 522.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,524.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,773.35 0.00 1,170.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,603.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 295: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 9,160.35 0.00 1,451.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,709.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,500.50 0.00 987.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,492.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,021.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,579.90 0.00 1,579.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 9,608.19 0.00 1,600.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,818.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 57.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 675.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 887.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 175.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 171.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 146.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 318.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 300.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 296: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 255.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 507,327.64 90,197.84 30,668.94 10,164.36 90.00 6442.20 63.38% 0.00 0.00 0.00% 90.00 6442.20 6,633.36 28.00 2579.64 38.89% 0.00 0.00 0.00% 28.00 2579.64 230.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 805.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,246.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,685.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,657.08 8.00 983.84 17.39% 0.00 0.00 0.00% 8.00 983.84 1,245.02 2.00 177.86 14.29% 0.00 0.00 0.00% 2.00 177.86 17,571.13 1,818.82 1.00 1818.82 100.00% 0.00 0.00 0.00% 1.00 1818.82 1,287.14 1.00 1287.14 100.00% 0.00 0.00 0.00% 1.00 1287.14 925.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8,068.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,091.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,748.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,285.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 178.71 1.00 59.57 33.33% 2.00 119.14 66.67% 3.00 178.71 166.71 1.00 55.57 33.33% 2.00 111.14 66.67% 3.00 166.71

Page 297: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 40,825.14 16,597.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 14,596.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,461.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8,169.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 298: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 1,132.63 1,132.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 53,075.72 21,350.61 6,871.68 47.00 3364.26 48.96% 0.00 0.00 0.00% 47.00 3364.26 4,422.24 16.00 1474.08 33.33% 0.00 0.00 0.00% 16.00 1474.08 623.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,450.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,123.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,058.34 9.00 1106.82 27.27% 0.00 0.00 0.00% 9.00 1106.82 800.37 2.00 177.86 22.22% 0.00 0.00 0.00% 2.00 177.86 4,265.12 0.00 1,011.14 1.00 1011.14 100.00% 0.00 0.00 0.00% 1.00 1011.14 925.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 874.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,224.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 119.14 2.00 119.14 100.00% 0.00 0.00 0.00% 2.00 119.14 111.14 1.00 55.57 50.00% 0.00 0.00 0.00% 1.00 55.57 27,459.99 0.00 11,064.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 10,008.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 939.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 299: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 5,446.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 54,315.72 0.00 18,212.81 0.00 4,437.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,842.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 692.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 134.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 211.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 577.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,301.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,951.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,795.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 266.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,711.76 0.00 1,858.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,623.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 119.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 111.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,207.71 0.00 7,376.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,838.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 313.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 300: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 409.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,269.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,265.26 0.00 2,265.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 301: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 7,418.18 0.00 3,154.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 179.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,960.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 123.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,500.00 0.00 5,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 13,502.01 0.00 5,166.38 0.00 1,646.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 141.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 461.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 201.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 129.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,844.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 296.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 444.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,901.34 0.00 812.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,089.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,211.25 0.00 461.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 302: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 834.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,008.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 917.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 320.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 521.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 819.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 328.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 223.04 0.00 133.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 89.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 23,383.57 0.00 8,874.78 0.00 2,218.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 829.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 117.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 808.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 134.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 290.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 585.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 92.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,443.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 355.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 303: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 6,242.53 0.00 1,548.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 850.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,346.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 437.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 59.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 304: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 8,266.26 0.00 3,918.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,293.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 417.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 614.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,021.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 53,231.85 0.00 12,187.96 0.00 4,008.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,474.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 346.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 268.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 580.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,041.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,935.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 533.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 25,088.28 1,445.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 850.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 22,514.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 218.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 59.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 305: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 14,822.98 7,376.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,004.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 626.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,815.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,132.63 1,132.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 18,708.65 7,467.47 2,290.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,197.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 173.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 268.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 77.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 290.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 846.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,967.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 355.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,235.87 956.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,224.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 55.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 306: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 9,005.31 4,610.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,502.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 417.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,475.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 307: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 12,362.57 3,773.68 1,503.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 70.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 92.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 117.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 57.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 604.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 65.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 92.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 64.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,106.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 3,804.30 512.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 474.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 472.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 544.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 544.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,143.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 111.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,784.59 2,502.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 308: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 160.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,844.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 164.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 113.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 78,937.39 34,188.39 6,871.68 20.00 1431.60 20.83% 0.00 0.00 0.00% 20.00 1431.60 2,548.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,078.28 5.00 288.65 13.89% 0.00 0.00 0.00% 5.00 288.65 2,416.68 7.00 469.91 19.44% 0.00 0.00 0.00% 7.00 469.91 2,611.26 1.00 145.07 5.56% 0.00 0.00 0.00% 1.00 145.07 1,939.80 5.00 323.30 16.67% 0.00 0.00 0.00% 5.00 323.30 14,388.66 20.00 2459.60 17.09% 0.00 0.00 0.00% 20.00 2459.60 1,333.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12,429.61 1,450.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,436.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,762.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,404.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,311.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,885.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 178.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 309: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 32,319.39 2,766.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,004.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,760.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,565.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12,298.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,923.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 310: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 43,076.89 22,181.51 3,922.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 4,938.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 940.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12,379.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 20,895.38 8,255.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 12,639.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 8,535.43 341.22 71.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 57.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 122.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 88.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 7,881.30 509.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 6,660.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 528.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 182.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 312.91 208.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00

Page 311: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 104.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 58,000.00 58,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 16,642.200 1,624.90 812.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 812.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,312.00 1,062.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 250.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 11,512.00 5,756.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 5,756.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 2,193.30 663.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 1,530.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 815,570.49 815,570.49 0.13 101,946.31 12.50% 0.09 72,993.56 8.95% 0.21 174939.87

8,276,948.93 2132368.69 25.76% 302,378.96 3.65% 2,434,747.65 920,060.230 237032.71 33,612.25 270,644.96 420,363.640 108297.18 15,357.00 123,654.19

Page 312: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado Costo 183,142.873 47182.62 6,690.70 53,873.32 70,863.000 18256.25 2,588.81 20,845.06

9,871,378.67 2543137.45 25.76% 360,627.71 3.65% 2,903,765.17

Page 313: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 314: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%18.72% 466.54 201,783.22 81.28%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 315: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 316: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 90.00 12,182.40 100.00%0.00% 17.00 2,133.84 100.00%0.00% 17.00 2,092.02 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 10.40 62.92 100.00%0.00% 3.60 146.30 100.00%0.00% 0.18 81.41 100.00%

Page 317: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 318: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 319: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%59.52% 13.60 260.03 40.48%

Page 320: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

0.00% 10.40 62.92 100.00%0.00% 3.60 146.30 100.00%0.00% 0.18 81.41 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 100.07 2,177.52 100.00%0.00% 162.76 393.88 100.00%

100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%0.00% 18.00 4,005.90 100.00%0.00% 51.42 1,386.80 100.00%0.00% 3.86 978.70 100.00%

Page 321: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 88.20 3,645.31 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 322: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%89.52% 24.00 853.44 10.48%74.63% 5.61 2,465.93 25.37%

0.00% 281.42 1,874.26 100.00%0.00% 26.94 553.62 100.00%0.00% 2.02 910.72 100.00%

63.48% 8.63 4,168.98 36.52%78.44% 47.05 2,298.39 21.56%79.98% 450.76 2,718.08 20.02%

0.00% 90.60 603.40 100.00%0.00% 7.66 157.41 100.00%0.00% 0.57 295.78 100.00%

100.00% 0.00 0.00 0.00%66.78% 36.30 511.47 33.22%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 323: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 252.52 1,527.75 100.00%

0.00% 25.15 1,022.10 100.00%0.00% 4.56 2,062.31 100.00%

0.00% 16.00 6,010.56 100.00%0.00% 14.00 3,066.84 100.00%0.00% 7.00 2,521.61 100.00%0.00% 2.00 1,395.50 100.00%0.00% 695.40 13,296.05 100.00%

0.00% 371.92 14,095.77 100.00%0.00% 39.90 1,617.95 100.00%

100.00% 0.00 0.00 0.00%0.00% 266.00 1,021.44 100.00%

0.00% 38.32 1,056.87 100.00%0.00% 77.55 2,431.19 100.00%0.00% 73.61 1,601.75 100.00%0.00% 266.00 643.72 100.00%0.00% 54.93 317.50 100.00%

Page 324: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 76.32 2,182.75 100.00%0.00% 23.12 5,145.36 100.00%0.00% 66.07 1,781.91 100.00%0.00% 4.95 1,255.07 100.00%0.00% 266.00 10,993.78 100.00%

Page 325: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 595.74 3,604.23 100.00%0.00% 31.02 13,416.46 100.00%0.00% 599.71 3,616.25 100.00%0.00% 39.39 1,292.39 100.00%0.00% 4.92 2,190.43 100.00%

0.00% 1751.17 10,559.56 100.00%0.00% 170.80 6,073.65 100.00%0.00% 15.44 6,786.81 100.00%

0.00% 353.94 2,357.24 100.00%0.00% 33.70 692.54 100.00%0.00% 2.53 1,140.65 100.00%

0.00% 10.06 4,859.78 100.00%0.00% 88.84 4,339.83 100.00%0.00% 668.57 4,031.48 100.00%

0.00% 148.73 990.54 100.00%0.00% 11.75 241.46 100.00%0.00% 0.88 456.64 100.00%

Page 326: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 2.00 1,109.06 100.00%0.00% 6.00 4,733.34 100.00%0.00% 1.00 1,254.30 100.00%0.00% 2.00 2,407.56 100.00%0.00% 2.00 2,064.28 100.00%0.00% 680.00 13,001.60 100.00%0.00% 640.20 7,951.28 100.00%0.00% 357.02 13,531.06 100.00%0.00% 9.40 381.17 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 51.62 1,123.25 100.00%0.00% 136.35 329.97 100.00%

100.00% 0.00 0.00 0.00%

Page 327: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

14.35% 26.85 5,975.47 85.65%0.00% 92.24 2,487.71 100.00%0.00% 8.20 2,079.11 100.00%0.00% 107.77 4,454.13 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 328: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 580.34 3,865.06 100.00%0.00% 109.75 2,255.36 100.00%0.00% 4.12 1,857.50 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 264.20 1,759.57 100.00%0.00% 31.32 643.63 100.00%0.00% 1.57 814.69 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 329: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 102.86 622.30 100.00%0.00% 17.06 693.32 100.00%0.00% 2.47 1,117.08 100.00%

0.00% 14.00 5,259.24 100.00%0.00% 12.00 4,322.76 100.00%0.00% 1.00 697.75 100.00%0.00% 335.80 6,420.50 100.00%0.00% 189.63 7,186.98 100.00%0.00% 14.70 596.09 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

66.42% 15.19 418.94 33.58%68.65% 18.78 588.75 31.35%0.00% 77.53 1,687.05 100.00%0.00% 139.52 337.64 100.00%

100.00% 0.00 0.00 0.00%

Page 330: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

75.86% 12.89 368.65 24.14%50.00% 7.74 1,722.54 50.00%0.00% 44.24 1,193.15 100.00%0.00% 3.94 998.99 100.00%0.00% 84.00 3,471.72 100.00%

Page 331: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

50.00% 247.08 1,494.83 50.00%68.74% 7.49 3,239.50 31.26%68.25% 179.86 1,084.56 31.75%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

61.38% 851.41 5,134.00 38.62%66.19% 69.77 2,481.02 33.81%70.08% 5.70 2,505.49 29.92%

54.75% 165.30 1,100.90 45.25%55.48% 15.00 308.25 44.52%49.41% 1.28 577.09 50.59%

100.00% 0.00 0.00 0.00%99.60% 0.71 34.68 0.40%61.26% 741.96 4,474.02 38.74%

100.00% 0.00 0.00 0.00%50.39% 3.20 65.76 49.61%50.00% 0.24 124.54 50.00%

Page 332: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%49.24% 46.07 649.13 50.76%86.87% 75.11 500.23 13.13%

100.00% 0.00 0.00 0.00%

0.00% 252.52 1,527.75 100.00%0.00% 25.15 1,022.10 100.00%0.00% 4.56 2,062.31 100.00%

0.00% 14.00 5,259.24 100.00%0.00% 12.00 3,894.12 100.00%0.00% 6.00 2,161.38 100.00%0.00% 622.40 11,900.29 100.00%0.00% 272.87 10,341.77 100.00%0.00% 35.10 1,423.31 100.00%

100.00% 0.00 0.00 0.00%0.00% 190.72 732.36 100.00%

Page 333: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 75.86 2,092.22 100.00%

0.00% 57.12 1,790.71 100.00%0.00% 72.82 1,584.56 100.00%0.00% 190.72 461.54 100.00%0.00% 78.21 452.05 100.00%

Page 334: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 53.71 1,536.11 100.00%0.00% 44.68 9,943.53 100.00%0.00% 131.50 3,546.56 100.00%0.00% 11.98 3,037.53 100.00%0.00% 150.83 6,233.80 100.00%

0.00% 443.25 2,681.66 100.00%0.00% 22.85 9,882.85 100.00%0.00% 1185.00 7,145.55 100.00%0.00% 25.00 820.25 100.00%0.00% 6.25 2,782.56 100.00%

0.00% 2064.22 12,447.25 100.00%0.00% 197.20 7,012.43 100.00%0.00% 18.49 8,127.46 100.00%

0.00% 266.04 1,771.83 100.00%0.00% 51.30 1,054.22 100.00%0.00% 1.92 865.63 100.00%

0.00% 25.62 12,376.51 100.00%

Page 335: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 243.98 11,918.42 100.00%

0.00% 2250.23 13,568.89 100.00%

0.00% 127.76 850.88 100.00%0.00% 15.51 318.73 100.00%0.00% 0.78 404.75 100.00%

0.00% 87.30 3,221.37 100.00%0.00% 87.30 1,230.06 100.00%0.00% 621.98 4,142.39 100.00%0.00% 11.35 5,589.31 100.00%

0.00% 159.40 964.37 100.00%0.00% 21.96 892.45 100.00%0.00% 3.42 1,546.73 100.00%

0.00% 13.00 5,725.98 100.00%0.00% 7.00 1,465.38 100.00%0.00% 500.70 9,573.38 100.00%0.00% 272.87 10,341.77 100.00%0.00% 23.15 938.73 100.00%

Page 336: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%0.00% 69.84 268.19 100.00%

0.00% 11.41 314.69 100.00%0.00% 21.60 677.16 100.00%0.00% 12.96 282.01 100.00%0.00% 18.96 45.88 100.00%0.00% 26.07 150.68 100.00%

Page 337: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 14.40 411.84 100.00%0.00% 28.85 6,420.57 100.00%0.00% 82.42 2,222.87 100.00%0.00% 6.18 1,566.94 100.00%0.00% 69.84 2,886.49 100.00%

0.00% 152.92 925.17 100.00%0.00% 8.64 3,736.89 100.00%

0.00% 425.93 2,568.36 100.00%0.00% 44.60 1,585.98 100.00%0.00% 2.98 1,309.89 100.00%

0.00% 191.76 1,277.12 100.00%0.00% 16.92 347.71 100.00%0.00% 1.27 572.58 100.00%

0.00% 3.98 1,922.66 100.00%0.00% 177.25 8,658.66 100.00%0.00% 452.79 2,730.32 100.00%

Page 338: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 66.97 446.02 100.00%

0.00% 5.94 122.07 100.00%0.00% 0.45 233.51 100.00%

0.00% 3.00 1,898.58 100.00%0.00% 10.00 2,989.80 100.00%0.00% 10.00 2,511.90 100.00%0.00% 341.40 6,527.57 100.00%0.00% 179.07 6,786.75 100.00%0.00% 25.50 1,034.03 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 339: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%19.18% 128.40 5,306.77 80.82%

Page 340: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 341: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%0.00% 24.00 92.16 100.00%

0.00% 24.00 92.16 100.00%

0.00% 34.70 1,109.01 100.00%0.00% 1.80 30.76 100.00%

Page 342: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 34.70 610.03 100.00%

0.00% 34.70 280.38 100.00%0.00% 25.25 1,033.48 100.00%0.00% 1.80 62.75 100.00%

0.00% 44.70 1,278.42 100.00%

Page 343: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 12.96 5,605.33 100.00%0.00% 11.28 491.81 100.00%0.00% 666.80 4,034.14 100.00%

0.00% 6.05 917.72 100.00%0.00% 60.48 1,404.35 100.00%0.00% 871.16 1,576.80 100.00%

0.00% 3.53 1,368.09 100.00%0.00% 49.26 1,729.03 100.00%0.00% 276.65 1,842.49 100.00%

0.00% 4.31 1,894.50 100.00%0.00% 86.27 3,067.76 100.00%0.00% 563.06 3,395.25 100.00%

0.00% 2.40 1,159.39 100.00%0.00% 36.00 1,758.60 100.00%0.00% 2769.18 16,698.16 100.00%

Page 344: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 10.90 4,224.40 100.00%

0.00% 99.30 2,931.34 100.00%0.00% 446.24 2,655.13 100.00%

0.00% 14.52 722.22 100.00%

0.00% 74.28 1,660.16 100.00%0.00% 137.98 2,003.47 100.00%

58.00% 21.00 630.00 42.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

Page 345: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

Page 346: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%

0.00% 77.01 809.38 100.00%

0.00% 26.01 585.23 100.00%

100.00% 0.00 0.00 0.00%

0.00% 590.96 86,995.22 100.00%

0.00% 94.10 2,906.75 100.00%

0.00% 94.10 4,177.10 100.00%

0.00% 968.20 29,752.79 100.00%

100.00% 0.00 0.00 0.00%

0.00% 44.81 177.45 100.00%

Page 347: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%

0.00% 122.55 9,257.43 100.00%

0.00% 51.24 7,684.46 100.00%0.00% 21.06 2,477.29 100.00%0.00% 55.80 6,538.09 100.00%

0.00% 116.20 5,771.65 100.00%0.00% 533.80 24,277.22 100.00%0.00% 67.60 2,966.96 100.00%

0.00% 16.00 1,474.72 100.00%0.00% 64.00 810.24 100.00%

0.00% 22.00 610.50 100.00%0.00% 242.36 52,815.09 100.00%

Page 348: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 125.30 3,588.59 100.00%

0.00% 1099.07 10,704.94 100.00%0.00% 695.62 6,921.42 100.00%0.00% 590.96 7,251.08 100.00%0.00% 570.83 7,004.08 100.00%

Page 349: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 919.02 11,276.38 100.00%

0.00% 257.81 3,163.33 100.00%

0.00% 100.80 1,281.17 100.00%

0.00% 116.20 926.11 100.00%0.00% 533.80 4,254.39 100.00%0.00% 67.60 538.77 100.00%

0.00% 6.80 139.81 100.00%

100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 350: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

0.00% 32.47 341.26 100.00%

0.00% 26.01 585.23 100.00%

100.00% 0.00 0.00 0.00%

0.00% 389.74 57,373.63 100.00%

0.00% 87.70 2,709.05 100.00%

0.00% 87.70 3,893.00 100.00%

61.51% 250.30 7,691.72 38.49%

Page 351: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

0.00% 31.67 125.41 100.00%

100.00% 0.00 0.00 0.00%

0.00% 124.20 9,382.07 100.00%

Page 352: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 37.82 5,671.87 100.00%0.00% 16.38 1,926.78 100.00%0.00% 43.40 5,085.18 100.00%

0.00% 84.30 4,187.18 100.00%0.00% 407.60 18,537.65 100.00%0.00% 42.90 1,882.88 100.00%

0.00% 12.00 1,106.04 100.00%0.00% 48.00 607.68 100.00%

0.00% 9.00 249.75 100.00%0.00% 166.64 36,314.19 100.00%

0.00% 89.56 2,565.00 100.00%

0.00% 852.63 8,304.62 100.00%

Page 353: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 455.12 4,528.44 100.00%

0.00% 389.74 4,782.11 100.00%0.00% 358.28 4,396.10 100.00%0.00% 572.35 7,022.73 100.00%0.00% 182.57 2,240.13 100.00%

0.00% 74.40 945.62 100.00%

0.00% 84.30 671.87 100.00%0.00% 407.60 3,248.57 100.00%0.00% 42.90 341.91 100.00%

0.00% 6.80 139.81 100.00%

0.00% 411.13 20,449.61 100.00%

0.00% 489.29 5,029.90 100.00%0.00% 298.79 3,385.29 100.00%

49.85% 130.77 1,413.62 50.15%

Page 354: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 37.20% 168.80 1,740.33 62.80%

0.00% 57.78 784.07 100.00%

0.00% 238.60 2,164.10 100.00%

0.00% 660.20 2,951.09 100.00%

0.00% 31.71 333.27 100.00%

Page 355: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 59.80 1,345.50 100.00%

0.00% 169.86 4,241.40 100.00%

0.00% 241.20 35,507.05 100.00%

0.00% 351.64 10,805.90 100.00%

0.00% 180.53 16,563.63 100.00%

0.00% 27.63 109.41 100.00%

0.00% 23.94 735.68 100.00%

0.00% 70.90 10,632.87 100.00%

0.00% 47.33 2,350.88 100.00%

Page 356: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 166.38 7,566.96 100.00%

0.00% 12.00 1,106.04 100.00%0.00% 48.00 607.68 100.00%

0.00% 93.19 20,307.96 100.00%

0.00% 9.44 270.36 100.00%

0.00% 489.29 4,765.68 100.00%0.00% 289.79 2,883.41 100.00%0.00% 145.92 1,790.44 100.00%0.00% 260.77 3,199.65 100.00%0.00% 268.80 3,298.18 100.00%0.00% 51.06 626.51 100.00%

0.00% 70.90 901.14 100.00%

0.00% 47.33 377.22 100.00%0.00% 166.38 968.33 100.00%

Page 357: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 1.58 675.04 100.00%0.00% 52.17 61.56 100.00%0.00% 14.00 1,012.48 100.00%

Page 358: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 253.07 12,587.70 100.00%

0.00% 247.99 2,549.34 100.00%0.00% 252.06 2,855.84 100.00%0.00% 87.40 944.79 100.00%0.00% 75.99 783.46 100.00%0.00% 54.00 732.78 100.00%

0.00% 67.50 612.23 100.00%

0.00% 308.20 1,377.65 100.00%

0.00% 216.08 31,809.14 100.00%

0.00% 216.08 6,640.14 100.00%

0.00% 98.31 9,019.94 100.00%

Page 359: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 330.86 10,167.33 100.00%

0.00% 15.58 2,336.53 100.00%

0.00% 23.52 3,901.03 100.00%0.00% 137.24 5,058.67 100.00%0.00% 67.50 2,162.70 100.00%0.00% 38.55 1,183.87 100.00%0.00% 38.55 1,410.93 100.00%

0.00% 3.70 131.57 100.00%0.00% 1.56 413.09 100.00%0.00% 15.62 164.17 100.00%

0.00% 5.00 460.85 100.00%0.00% 20.00 253.20 100.00%

0.00% 20.16 4,393.27 100.00%

Page 360: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 38.24 707.82 100.00%

0.00% 5.12 146.64 100.00%

0.00% 247.99 2,415.42 100.00%0.00% 226.83 2,256.96 100.00%0.00% 87.40 1,072.40 100.00%

Page 361: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 75.99 932.40 100.00%

0.00% 54.00 662.58 100.00%

0.00% 31.16 396.04 100.00%

0.00% 109.25 18,559.39 100.00%

47.14% 217.33 10,809.99 52.86%

7.65% 361.95 3,720.85 92.35%0.00% 323.66 3,667.07 100.00%

50.00% 66.94 723.62 50.00%50.00% 127.79 1,317.46 50.00%0.00% 57.78 784.07 100.00%

0.00% 154.60 1,402.22 100.00%

0.00% 573.80 2,564.89 100.00%

Page 362: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 31.71 333.27 100.00%

0.00% 53.40 1,201.50 100.00%

0.00% 169.86 4,241.40 100.00%

0.00% 214.21 31,533.85 100.00%

0.00% 310.90 9,553.96 100.00%

0.00% 146.09 13,403.76 100.00%

0.00% 27.63 109.41 100.00%

0.00% 28.56 877.65 100.00%

0.00% 28.56 4,283.14 100.00%

Page 363: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 53.37 2,650.89 100.00%

0.00% 176.22 8,014.49 100.00%

0.00% 12.00 1,106.04 100.00%0.00% 48.00 607.68 100.00%

0.00% 93.19 20,307.96 100.00%

Page 364: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 9.44 270.36 100.00%

0.00% 6.45 172.99 100.00%

0.00% 391.95 3,817.59 100.00%0.00% 323.66 3,220.42 100.00%0.00% 136.62 1,676.33 100.00%0.00% 439.90 5,397.57 100.00%0.00% 255.57 3,135.84 100.00%0.00% 48.84 599.27 100.00%

0.00% 57.12 726.00 100.00%

0.00% 53.37 425.36 100.00%0.00% 176.22 1,404.47 100.00%

0.00% 1.35 576.77 100.00%0.00% 44.71 52.76 100.00%0.00% 12.00 867.84 100.00%

Page 365: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 331.43 16,485.33 100.00%

0.00% 511.13 5,254.42 100.00%0.00% 150.61 1,706.41 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 31.61 428.95 100.00%

0.00% 163.30 1,481.13 100.00%

0.00% 227.30 1,016.03 100.00%

0.00% 15.86 166.69 100.00%

0.00% 7.02 157.95 100.00%

0.00% 13.53 337.84 100.00%

Page 366: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 149.54 22,013.78 100.00%

0.00% 204.17 6,274.14 100.00%

Page 367: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 105.16 9,648.43 100.00%

0.00% 14.36 56.87 100.00%

0.00% 13.50 414.86 100.00%

0.00% 30.86 4,628.07 100.00%

0.00% 29.95 1,487.62 100.00%

0.00% 12.00 1,106.04 100.00%0.00% 48.00 607.68 100.00%

0.00% 3.00 653.76 100.00%

0.00% 60.76 1,659.96 100.00%0.00% 18.53 1,338.24 100.00%

Page 368: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 8.64 247.45 100.00%

0.00% 511.13 4,978.41 100.00%0.00% 150.61 1,498.57 100.00%0.00% 90.38 1,108.96 100.00%0.00% 86.21 1,057.80 100.00%0.00% 124.11 1,522.83 100.00%0.00% 31.61 387.85 100.00%

0.00% 61.71 784.33 100.00%

0.00% 29.95 238.70 100.00%

0.00% 0.41 175.17 100.00%0.00% 26.08 30.77 100.00%0.00% 7.00 506.24 100.00%

0.00% 61.68 10,478.20 100.00%

Page 369: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 178.00 8,853.72 100.00%

0.00% 262.36 2,697.06 100.00%0.00% 195.60 2,216.15 100.00%0.00% 133.88 1,447.24 100.00%0.00% 178.33 1,838.58 100.00%0.00% 65.58 889.92 100.00%

Page 370: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 105.40 955.98 100.00%

0.00% 401.34 1,793.99 100.00%

0.00% 24.92 261.91 100.00%

0.00% 11.04 248.40 100.00%

0.00% 87.30 2,179.88 100.00%

0.00% 211.36 31,114.31 100.00%

0.00% 248.60 7,639.48 100.00%

0.00% 75.61 6,937.22 100.00%

0.00% 29.33 116.15 100.00%

0.00% 12.68 389.66 100.00%

Page 371: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 12.66 1,898.62 100.00%

0.00% 32.20 1,599.37 100.00%0.00% 114.60 5,212.01 100.00%

0.00% 4.00 368.68 100.00%0.00% 16.00 202.56 100.00%

0.00% 57.53 12,536.94 100.00%

0.00% 7.68 219.96 100.00%

0.00% 262.36 2,555.39 100.00%0.00% 195.60 1,946.22 100.00%0.00% 87.30 1,071.17 100.00%0.00% 133.88 1,642.71 100.00%0.00% 178.33 2,188.11 100.00%

Page 372: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 61.47 754.24 100.00%

0.00% 25.32 321.82 100.00%

0.00% 32.20 256.63 100.00%0.00% 114.60 913.36 100.00%

Page 373: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 0.79 337.52 100.00%0.00% 26.08 30.77 100.00%0.00% 7.00 506.24 100.00%

0.00% 234.42 11,660.05 100.00%

0.00% 343.13 3,527.38 100.00%0.00% 148.29 1,680.13 100.00%0.00% 34.14 369.05 100.00%0.00% 53.38 550.35 100.00%0.00% 25.61 347.53 100.00%

0.00% 195.80 1,775.91 100.00%

0.00% 245.60 1,097.83 100.00%

0.00% 133.85 19,704.06 100.00%

Page 374: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 68.72 2,122.76 100.00%

0.00% 68.72 3,050.48 100.00%

0.00% 10.80 331.88 100.00%

0.00% 18.54 1,701.05 100.00%

0.00% 281.19 1,113.51 100.00%

0.00% 219.73 16,598.40 100.00%

0.00% 11.50 1,724.66 100.00%0.00% 28.08 3,303.05 100.00%

0.00% 4.00 368.68 100.00%0.00% 16.00 202.56 100.00%

Page 375: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 32.90 7,169.57 100.00%

0.00% 4.24 121.43 100.00%

Page 376: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 343.13 3,342.09 100.00%0.00% 148.29 1,475.49 100.00%0.00% 34.14 418.90 100.00%0.00% 53.38 654.97 100.00%

0.00% 25.61 325.50 100.00%

100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

Page 377: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

0.00% 146.02 1,534.67 100.00%

0.00% 13.00 292.50 100.00%

100.00% 0.00 0.00 0.00%

0.00% 415.53 61,170.17 100.00%

0.00% 91.50 2,826.44 100.00%

0.00% 915.00 40,616.85 100.00%

20.48% 469.94 14,441.26 79.52%

100.00% 0.00 0.00 0.00%

0.00% 73.35 290.47 100.00%

Page 378: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

0.00% 313.80 23,704.45 100.00%

Page 379: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 163.52 24,523.09 100.00%

0.00% 94.89 4,713.19 100.00%0.00% 89.28 4,060.45 100.00%

0.00% 66.00 6,083.22 100.00%0.00% 264.00 3,342.24 100.00%

0.00% 30.00 832.50 100.00%0.00% 160.43 34,960.91 100.00%

0.00% 44.40 1,271.62 100.00%

0.00% 1975.03 19,236.79 100.00%0.00% 539.86 5,371.61 100.00%0.00% 331.16 4,063.33 100.00%0.00% 291.38 3,575.23 100.00%

Page 380: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 498.95 6,122.12 100.00%

0.00% 186.84 2,292.53 100.00%

0.00% 327.05 4,156.81 100.00%

0.00% 94.89 756.27 100.00%0.00% 89.28 711.56 100.00%

100.00% 0.00 0.00 0.00%0.00% 3574.40 1,358.27 100.00%

0.00% 689.01 3,927.36 100.00%0.00% 101.87 2,633.34 100.00%0.00% 13.11 3,173.80 100.00%0.00% 50.25 3,684.33 100.00%

0.00% 7.20 527.90 100.00%

0.00% 2412.30 20,263.32 100.00%0.00% 91.35 584.64 100.00%0.00% 251.40 1,608.96 100.00%

Page 381: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 132.80 849.92 100.00%

0.00% 80.16 424.05 100.00%

100.00% 0.00 0.00 0.00%25.00% 827.92 2,963.95 75.00%

Page 382: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 220.78 5,969.89 100.00%0.00% 1103.90 2,715.59 100.00%0.00% 220.78 1,852.34 100.00%

0.00% 27.59 7,305.83 100.00%0.00% 110.16 3,917.29 100.00%

0.00% 221.76 6,331.25 100.00%0.00% 891.29 36,070.51 100.00%

26.94% 22509.00 161,614.62 73.06%0.00% 4478.58 23,826.05 100.00%0.00% 76772.43 604,966.75 100.00%

45.00% 1039.10 3,719.98 55.00%

33.99% 252.50 6,827.60 66.01%0.00% 1889.25 4,647.56 100.00%

Page 383: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 29.03% 352.02 2,953.45 70.97%

0.00% 499.20 4,802.30 100.00%0.00% 1868.25 75,608.08 100.00%

0.00% 20.60 617.18 100.00%0.00% 6.51 2,751.13 100.00%

0.00% 1.00 5,000.00 100.00%0.00% 1.00 1,060.00 100.00%

0.00% 632.00 3,678.24 100.00%

0.00% 1092.90 6,371.61 100.00%

0.00% 314.00 1,124.12 100.00%

0.00% 92.05 2,489.03 100.00%0.00% 92.05 772.30 100.00%0.00% 259.75 9,236.71 100.00%0.00% 89.90 23,805.52 100.00%0.00% 494.20 5,194.04 100.00%

Page 384: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 25.70 149.83 100.00%

0.00% 12.90 736.07 100.00%0.00% 5.00 187.30 100.00%0.00% 16.00 541.44 100.00%

Page 385: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 28.00 587.44 100.00%

0.00% 27.65 1,047.94 100.00%

0.00% 3.92 111.92 100.00%0.00% 0.88 233.02 100.00%0.00% 3.92 44.41 100.00%0.00% 2.00 739.56 100.00%

0.00% 43.01 1,162.99 100.00%0.00% 43.01 756.12 100.00%

0.00% 24.96 1,108.22 100.00%

0.00% 18.00 7,952.22 100.00%0.00% 9.48 270.65 100.00%0.00% 305.20 1,822.04 100.00%

0.00% 8.64 3,904.42 100.00%0.00% 823.28 4,914.98 100.00%

Page 386: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 3.78 1,739.06 100.00%

0.00% 51.30 1,895.02 100.00%0.00% 823.28 4,914.98 100.00%

0.00% 118.20 10,288.13 100.00%0.00% 132.75 5,979.06 100.00%0.00% 2.00 666.58 100.00%0.00% 55.18 329.42 100.00%0.00% 343.28 28,835.52 100.00%

0.00% 118.20 2,726.87 100.00%0.00% 132.75 2,398.79 100.00%0.00% 2.00 79.88 100.00%0.00% 0.84 33.55 100.00%

100.00% 0.00 0.00 0.00%0.00% 705.04 2,524.04 100.00%

0.00% 705.04 1,734.40 100.00%0.00% 95.20 2,574.21 100.00%0.00% 95.20 798.73 100.00%

Page 387: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 25.54 6,762.99 100.00%0.00% 20.83 777.38 100.00%0.00% 32.08 1,424.35 100.00%

0.00% 102.63 31,165.65 100.00%0.00% 1026.27 26,385.40 100.00%

Page 388: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 0.16 48.59 100.00%0.00% 2.19 62.52 100.00%

0.00% 10.37 4,770.93 100.00%0.00% 279.58 1,669.09 100.00%

0.00% 1.46 660.37 100.00%0.00% 7.60 180.04 100.00%0.00% 166.49 993.95 100.00%

0.00% 9.49 4,366.06 100.00%0.00% 173.42 6,406.13 100.00%0.00% 1329.79 7,938.85 100.00%

0.00% 6.05 3,014.78 100.00%0.00% 82.33 5,930.23 100.00%0.00% 1006.29 6,007.55 100.00%

0.00% 23.40 914.71 100.00%

Page 389: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 6.10 245.53 100.00%

0.00% 93.75 1,966.88 100.00%0.00% 0.56 34.56 100.00%

0.00% 51.44 1,949.58 100.00%

0.00% 119.40 6,348.50 100.00%

0.00% 238.80 2,705.60 100.00%0.00% 86.24 1,160.79 100.00%0.00% 90.94 885.76 100.00%

0.00% 39.77 5,854.54 100.00%

0.00% 576.01 14,872.58 100.00%

0.00% 2.00 2,130.98 100.00%0.00% 1.00 1,003.69 100.00%

0.00% 125.40 24,415.38 100.00%

Page 390: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 597.52 29,403.96 100.00%

0.00% 1508.70 25,542.29 100.00%0.00% 1886.25 5,036.29 100.00%

0.00% 331.80 10,484.88 100.00%

0.00% 2.00 71.28 100.00%

Page 391: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 455.75 4,439.01 100.00%

0.00% 331.80 2,617.90 100.00%0.00% 1508.70 11,496.29 100.00%0.00% 20.60 164.18 100.00%0.00% 97.84 810.12 100.00%0.00% 16.40 135.79 100.00%

0.00% 300.00 66,000.00 100.00%0.00% 15.00 16,500.00 100.00%0.00% 15.00 5,550.00 100.00%0.00% 15.00 10,650.00 100.00%0.00% 35.00 1,575.00 100.00%0.00% 11.00 23,320.00 100.00%0.00% 21.00 5,880.00 100.00%0.00% 21.00 52,500.00 100.00%0.00% 2.00 1,400.00 100.00%0.00% 1.00 1,238.00 100.00%

Page 392: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 200.00 44,000.00 100.00%

0.00% 14.00 15,400.00 100.00%0.00% 14.00 5,180.00 100.00%0.00% 14.00 9,940.00 100.00%0.00% 35.00 1,575.00 100.00%0.00% 21.00 52,500.00 100.00%0.00% 21.00 5,880.00 100.00%0.00% 1.00 1,238.00 100.00%

0.00% 21.00 44,520.00 100.00%0.00% 2.00 1,400.00 100.00%0.00% 2.00 3,280.00 100.00%

0.00% 1.00 3,500.00 100.00%0.00% 1.00 2,900.00 100.00%0.00% 1.00 550.00 100.00%

100.00% 0.00 0.00 0.00%

Page 393: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 45.60 1,282.27 100.00%0.00% 45.60 82.08 100.00%0.00% 45.60 84.36 100.00%0.00% 45.60 779.30 100.00%0.00% 5.34 312.87 100.00%

Page 394: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 8.00 190.40 100.00%0.00% 66.40 1,327.34 100.00%0.00% 74.40 233.62 100.00%

0.00% 1.00 39.23 100.00%0.00% 16.00 540.80 100.00%0.00% 22.00 925.10 100.00%

0.00% 22.00 873.40 100.00%0.00% 18.00 629.82 100.00%0.00% 2.00 69.98 100.00%

0.00% 5.00 25.45 100.00%0.00% 1.00 6.17 100.00%0.00% 58.00 357.86 100.00%0.00% 4.00 33.60 100.00%0.00% 32.00 511.36 100.00%

0.00% 22.00 1,100.00 100.00%0.00% 18.00 3,780.00 100.00%0.00% 22.00 484.00 100.00%

Page 395: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 18.00 396.00 100.00%

0.00% 22.00 201.52 100.00%0.00% 18.00 164.88 100.00%0.00% 22.00 135.74 100.00%0.00% 18.00 111.06 100.00%

100.00% 0.00 0.00 0.00%0.00% 47.75 1,342.73 100.00%0.00% 47.75 85.95 100.00%

100.00% 0.00 0.00 0.00%53.57% 10.40 128.54 46.43%

72.22% 5.00 404.10 27.78%81.82% 4.00 306.48 18.18%

100.00% 0.00 0.00 0.00%

27.78% 13.00 261.04 72.22%100.00% 0.00 0.00 0.00%

Page 396: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 92.86% 1.00 17.08 7.14%

94.44% 1.00 16.72 5.56%33.33% 4.00 75.28 66.67%77.78% 8.00 129.60 22.22%

100.00% 0.00 0.00 0.00%

Page 397: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

77.78% 4.00 74.32 22.22%0.00% 10.00 590.10 100.00%0.00% 6.00 163.98 100.00%0.00% 2.00 75.52 100.00%0.00% 2.00 26.36 100.00%

0.00% 1.00 308.52 100.00%

0.00% 180.36 651.10 100.00%0.00% 179.87 5,057.94 100.00%0.00% 180.36 324.65 100.00%0.00% 121.30 2,073.02 100.00%0.00% 55.51 3,252.33 100.00%

0.00% 9.10 364.73 100.00%0.00% 13.35 617.84 100.00%0.00% 32.10 1,684.61 100.00%

0.00% 87.61 2,605.52 100.00%0.00% 18.18 7,411.44 100.00%

Page 398: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 118.50 21,851.40 100.00%0.00% 45.00 340.20 100.00%0.00% 30.00 226.80 100.00%0.00% 60.00 872.40 100.00%0.00% 15.00 1,067.10 100.00%

0.00% 46.30 167.14 100.00%

0.00% 27.80 781.74 100.00%0.00% 27.80 50.04 100.00%0.00% 27.80 51.43 100.00%0.00% 27.80 475.10 100.00%0.00% 3.26 191.00 100.00%

0.00% 6.30 149.94 100.00%

Page 399: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 40.00 799.60 100.00%

0.00% 46.30 145.38 100.00%

0.00% 1.00 39.23 100.00%0.00% 16.00 540.80 100.00%0.00% 18.00 756.90 100.00%

Page 400: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 18.00 714.60 100.00%0.00% 14.00 489.86 100.00%0.00% 2.00 69.98 100.00%

0.00% 4.00 20.36 100.00%0.00% 1.00 6.17 100.00%0.00% 54.00 333.18 100.00%0.00% 2.00 16.80 100.00%0.00% 28.00 447.44 100.00%

0.00% 18.00 900.00 100.00%0.00% 14.00 2,940.00 100.00%0.00% 18.00 396.00 100.00%0.00% 14.00 308.00 100.00%

0.00% 18.00 164.88 100.00%0.00% 14.00 128.24 100.00%0.00% 18.00 111.06 100.00%0.00% 14.00 86.38 100.00%

Page 401: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 91.50 330.32 100.00%

0.00% 45.75 1,286.49 100.00%0.00% 45.75 82.35 100.00%

0.00% 48.70 896.57 100.00%0.00% 42.80 529.01 100.00%

92.86% 1.00 80.82 7.14%100.00% 0.00 0.00 0.00%

50.00% 2.00 149.64 50.00%

50.00% 7.00 140.56 50.00%59.09% 9.00 171.90 40.91%

100.00% 0.00 0.00 0.00%31.25% 11.00 183.92 68.75%83.33% 1.00 18.82 16.67%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

11.11% 16.00 297.28 88.89%0.00% 14.00 826.14 100.00%

Page 402: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 6.00 163.98 100.00%

0.00% 2.00 75.52 100.00%0.00% 4.00 52.72 100.00%

0.00% 2.00 617.04 100.00%

Page 403: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 110.88 400.28 100.00%0.00% 109.83 3,088.42 100.00%0.00% 110.48 198.86 100.00%0.00% 67.21 1,148.62 100.00%0.00% 37.21 2,180.13 100.00%

0.00% 23.20 929.86 100.00%0.00% 13.80 638.66 100.00%

0.00% 71.82 2,135.93 100.00%0.00% 13.17 5,369.01 100.00%

100.00% 0.00 0.00 0.00%3.36% 142.06 57,913.60 96.64%

45.29% 531.49 3,093.27 54.71%

0.00% 63.20 11,654.08 100.00%0.00% 24.00 181.44 100.00%0.00% 6.00 45.36 100.00%0.00% 32.00 465.28 100.00%

Page 404: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 8.00 569.12 100.00%

0.00% 65.10 235.01 100.00%

0.00% 12.70 357.12 100.00%0.00% 12.70 22.86 100.00%0.00% 12.70 23.50 100.00%0.00% 12.70 217.04 100.00%0.00% 1.48 86.71 100.00%

0.00% 12.70 302.26 100.00%0.00% 52.40 1,047.48 100.00%0.00% 65.10 204.41 100.00%

0.00% 2.00 78.46 100.00%0.00% 4.00 135.20 100.00%0.00% 17.00 714.85 100.00%0.00% 17.00 833.85 100.00%

0.00% 17.00 674.90 100.00%

Page 405: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 1.00 34.99 100.00%

0.00% 2.00 10.18 100.00%0.00% 10.00 61.70 100.00%0.00% 18.00 111.06 100.00%0.00% 9.00 143.82 100.00%

Page 406: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 17.00 850.00 100.00%0.00% 17.00 632.40 100.00%0.00% 17.00 374.00 100.00%

0.00% 17.00 155.72 100.00%0.00% 17.00 202.64 100.00%0.00% 17.00 104.89 100.00%

0.00% 39.60 142.96 100.00%0.00% 39.60 1,113.55 100.00%0.00% 39.60 71.28 100.00%

0.00% 39.60 729.04 100.00%

0.00% 17.00 1,302.54 100.00%

0.00% 16.00 273.28 100.00%0.00% 5.00 81.00 100.00%0.00% 1.00 20.33 100.00%0.00% 4.00 54.60 100.00%

Page 407: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 4.00 74.32 100.00%

0.00% 2.00 118.02 100.00%0.00% 1.00 27.33 100.00%

0.00% 2.00 617.04 100.00%

0.00% 76.25 275.26 100.00%0.00% 76.42 2,148.93 100.00%0.00% 108.43 195.17 100.00%0.00% 65.80 1,124.52 100.00%0.00% 17.04 998.37 100.00%

0.00% 4.10 164.33 100.00%0.00% 30.50 1,411.54 100.00%

0.00% 22.28 662.61 100.00%0.00% 6.28 2,560.17 100.00%

0.00% 8.16 242.68 100.00%0.00% 0.56 228.30 100.00%0.00% 17.71 103.07 100.00%

Page 408: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 31.60 5,827.04 100.00%0.00% 12.00 90.72 100.00%0.00% 8.00 60.48 100.00%0.00% 16.00 232.64 100.00%0.00% 8.00 569.12 100.00%

Page 409: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 8.20 29.60 100.00%

0.00% 8.20 230.58 100.00%0.00% 8.20 14.76 100.00%0.00% 8.20 15.17 100.00%0.00% 8.20 140.14 100.00%0.00% 2.38 139.44 100.00%

0.00% 1.20 28.56 100.00%0.00% 7.00 139.93 100.00%0.00% 8.00 25.12 100.00%

0.00% 1.00 39.23 100.00%0.00% 1.00 33.80 100.00%0.00% 4.00 168.20 100.00%

0.00% 2.00 79.40 100.00%

0.00% 1.00 5.09 100.00%

Page 410: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 9.00 55.53 100.00%

0.00% 1.00 5.06 100.00%0.00% 6.00 95.88 100.00%

0.00% 2.00 100.00 100.00%0.00% 2.00 44.00 100.00%

0.00% 2.00 18.32 100.00%0.00% 2.00 12.34 100.00%

0.00% 21.05 75.99 100.00%0.00% 21.05 591.93 100.00%0.00% 21.05 37.89 100.00%

0.00% 5.05 92.97 100.00%

0.00% 2.00 153.24 100.00%

0.00% 1.00 19.10 100.00%0.00% 14.00 239.12 100.00%0.00% 1.00 16.20 100.00%

Page 411: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 2.00 118.02 100.00%

0.00% 2.00 54.66 100.00%

0.00% 1.00 308.52 100.00%

Page 412: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 38.18 137.83 100.00%0.00% 37.99 1,068.28 100.00%0.00% 36.74 66.13 100.00%0.00% 79.20 1,353.53 100.00%0.00% 5.44 318.73 100.00%

0.00% 34.30 1,587.40 100.00%

0.00% 20.38 606.10 100.00%0.00% 0.43 175.30 100.00%0.00% 64.94 377.95 100.00%

0.00% 47.40 8,740.56 100.00%0.00% 18.00 136.08 100.00%0.00% 12.00 90.72 100.00%0.00% 24.00 348.96 100.00%0.00% 6.00 426.84 100.00%

Page 413: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 21.68 78.26 100.00%

0.00% 16.10 452.73 100.00%0.00% 16.10 28.98 100.00%0.00% 16.10 29.79 100.00%0.00% 16.10 275.15 100.00%0.00% 1.88 110.15 100.00%

0.00% 9.10 216.58 100.00%0.00% 12.58 251.47 100.00%0.00% 21.68 68.08 100.00%

0.00% 1.00 39.23 100.00%0.00% 4.00 135.20 100.00%0.00% 3.00 126.15 100.00%0.00% 1.00 53.95 100.00%

0.00% 4.00 158.80 100.00%0.00% 3.00 104.97 100.00%

0.00% 2.00 10.18 100.00%0.00% 2.00 12.34 100.00%

Page 414: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 10.00 61.70 100.00%

0.00% 2.00 16.80 100.00%0.00% 6.00 95.88 100.00%

0.00% 3.00 150.00 100.00%0.00% 1.00 355.56 100.00%0.00% 2.00 420.00 100.00%

Page 415: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 3.00 66.00 100.00%

0.00% 2.00 44.00 100.00%

0.00% 3.00 27.48 100.00%0.00% 1.00 9.16 100.00%0.00% 2.00 18.32 100.00%0.00% 3.00 18.51 100.00%0.00% 2.00 12.34 100.00%

0.00% 104.75 378.15 100.00%0.00% 21.05 591.93 100.00%0.00% 21.05 37.89 100.00%

0.00% 72.10 1,327.36 100.00%

0.00% 3.00 242.46 100.00%0.00% 2.00 153.24 100.00%

0.00% 1.00 74.82 100.00%

0.00% 5.00 95.50 100.00%

Page 416: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 1.00 17.08 100.00%

0.00% 3.00 50.16 100.00%0.00% 53.00 858.60 100.00%0.00% 2.00 40.66 100.00%0.00% 4.00 74.32 100.00%0.00% 3.00 177.03 100.00%0.00% 2.00 75.52 100.00%0.00% 1.00 13.18 100.00%

0.00% 2.00 617.04 100.00%

0.00% 60.50 218.41 100.00%0.00% 30.25 850.63 100.00%0.00% 30.25 54.45 100.00%0.00% 30.25 516.97 100.00%0.00% 9.83 575.94 100.00%

0.00% 21.18 629.89 100.00%0.00% 4.39 1,789.67 100.00%

100.00% 0.00 0.00 0.00%

Page 417: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

0.00% 15.80 2,913.52 100.00%0.00% 6.00 45.36 100.00%

Page 418: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 4.00 30.24 100.00%

0.00% 8.00 116.32 100.00%0.00% 2.00 142.28 100.00%

0.00% 51.69 186.60 100.00%0.00% 51.62 1,451.55 100.00%0.00% 51.69 93.04 100.00%0.00% 41.20 704.11 100.00%0.00% 12.37 724.76 100.00%

0.00% 18.20 842.30 100.00%

0.00% 16.03 476.73 100.00%0.00% 4.52 1,842.67 100.00%

0.00% 8.61 256.06 100.00%0.00% 0.58 236.45 100.00%0.00% 47.40 275.87 100.00%

0.00% 38.50 7,099.40 100.00%

Page 419: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 15.00 113.40 100.00%

0.00% 10.00 75.60 100.00%0.00% 20.00 290.80 100.00%0.00% 5.00 355.70 100.00%

0.00% 24.64 88.95 100.00%0.00% 23.52 661.38 100.00%0.00% 23.64 42.55 100.00%0.00% 61.30 1,047.62 100.00%0.00% 3.33 195.10 100.00%

0.00% 21.20 981.14 100.00%

0.00% 13.12 390.19 100.00%0.00% 0.91 370.98 100.00%0.00% 48.00 279.36 100.00%

0.00% 31.60 5,827.04 100.00%0.00% 12.00 90.72 100.00%0.00% 8.00 60.48 100.00%

Page 420: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 6.00 87.24 100.00%

0.00% 4.00 284.56 100.00%

0.00% 70.30 253.78 100.00%

Page 421: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 45.90 1,290.71 100.00%0.00% 45.90 82.62 100.00%0.00% 45.90 84.92 100.00%0.00% 45.90 784.43 100.00%0.00% 5.36 314.04 100.00%

0.00% 20.40 485.52 100.00%0.00% 49.90 997.50 100.00%0.00% 70.30 220.74 100.00%

0.00% 3.00 117.69 100.00%0.00% 5.00 169.00 100.00%0.00% 1.00 42.05 100.00%0.00% 12.00 588.60 100.00%

0.00% 1.00 39.70 100.00%0.00% 1.00 34.99 100.00%0.00% 13.00 454.87 100.00%

0.00% 25.00 127.25 100.00%0.00% 5.00 30.85 100.00%

Page 422: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 13.00 80.21 100.00%

0.00% 4.00 33.60 100.00%0.00% 10.00 159.80 100.00%

0.00% 1.00 50.00 100.00%0.00% 1.00 210.00 100.00%0.00% 12.00 446.40 100.00%0.00% 1.00 22.00 100.00%0.00% 1.00 22.00 100.00%

0.00% 1.00 9.16 100.00%0.00% 1.00 11.92 100.00%0.00% 1.00 9.16 100.00%0.00% 1.00 6.17 100.00%0.00% 1.00 6.17 100.00%

0.00% 66.10 238.62 100.00%0.00% 66.10 1,858.73 100.00%0.00% 66.10 118.98 100.00%

0.00% 46.55 856.99 100.00%

Page 423: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 19.55 241.64 100.00%

0.00% 1.00 80.82 100.00%0.00% 1.00 76.62 100.00%

0.00% 1.00 74.82 100.00%

Page 424: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 22.00 420.20 100.00%0.00% 5.00 83.60 100.00%0.00% 2.00 32.40 100.00%0.00% 1.00 18.58 100.00%0.00% 21.00 1,239.21 100.00%0.00% 4.00 109.32 100.00%0.00% 1.00 37.76 100.00%0.00% 1.00 13.18 100.00%

0.00% 5.00 1,542.60 100.00%

0.00% 134.92 487.06 100.00%0.00% 134.70 3,787.76 100.00%0.00% 202.14 363.85 100.00%0.00% 95.07 1,624.75 100.00%0.00% 19.54 1,144.85 100.00%

0.00% 24.69 989.58 100.00%0.00% 38.72 2,032.03 100.00%

Page 425: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 17.69 526.10 100.00%

0.00% 5.64 2,299.26 100.00%

0.00% 26.04 774.43 100.00%0.00% 1.36 554.43 100.00%0.00% 98.16 571.29 100.00%

0.00% 45.70 8,427.08 100.00%0.00% 18.00 136.08 100.00%0.00% 12.00 90.72 100.00%0.00% 2.00 29.08 100.00%0.00% 6.00 426.84 100.00%0.00% 24.30 1,700.03 100.00%

100.00% 0.00 0.00 0.00%

0.00% 125.50 3,529.06 100.00%0.00% 125.50 225.90 100.00%0.00% 125.50 232.18 100.00%0.00% 125.50 2,144.80 100.00%

Page 426: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 14.68 860.10 100.00%

0.00% 68.10 1,620.78 100.00%0.00% 150.70 3,012.49 100.00%0.00% 218.80 687.03 100.00%

Page 427: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 3.00 117.69 100.00%0.00% 43.00 1,453.40 100.00%0.00% 30.00 1,261.50 100.00%0.00% 30.00 1,471.50 100.00%

0.00% 44.00 1,746.80 100.00%0.00% 30.00 1,049.70 100.00%0.00% 30.00 1,049.70 100.00%

0.00% 15.00 76.35 100.00%0.00% 56.00 345.52 100.00%0.00% 15.00 126.00 100.00%0.00% 56.00 894.88 100.00%

0.00% 30.00 1,500.00 100.00%0.00% 30.00 6,300.00 100.00%0.00% 6.00 2,133.36 100.00%0.00% 8.00 1,440.00 100.00%0.00% 30.00 1,116.00 100.00%0.00% 30.00 660.00 100.00%0.00% 30.00 660.00 100.00%

Page 428: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 30.00 274.80 100.00%0.00% 30.00 274.80 100.00%0.00% 6.00 54.96 100.00%0.00% 8.00 95.36 100.00%0.00% 30.00 357.60 100.00%0.00% 30.00 185.10 100.00%0.00% 30.00 185.10 100.00%

30.75% 292.85 1,057.19 69.25%0.00% 211.45 380.61 100.00%0.00% 211.45 5,945.97 100.00%

100.00% 0.00 0.00 0.00%49.54% 113.07 1,397.55 50.46%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%

Page 429: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 100.00% 0.00 0.00 0.00%

100.00% 0.00 0.00 0.00%40.00% 27.00 451.44 60.00%26.37% 134.00 2,170.80 73.63%

100.00% 0.00 0.00 0.00%58.93% 46.00 627.90 41.07%56.25% 35.00 650.30 43.75%

Page 430: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 16.18% 57.00 3,363.57 83.82%

0.00% 2.00 54.66 100.00%16.67% 25.00 944.00 83.33%38.89% 11.00 144.98 61.11%

0.00% 21.00 6,478.92 100.00%

0.00% 81.04 292.55 100.00%0.00% 44.07 1,239.25 100.00%0.00% 19.18 34.52 100.00%0.00% 121.30 2,073.02 100.00%0.00% 32.90 1,927.61 100.00%

0.00% 48.65 1,949.89 100.00%

0.00% 45.59 1,355.85 100.00%0.00% 13.78 5,617.69 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 431: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 86.90 16,024.36 100.00%0.00% 33.00 249.48 100.00%0.00% 22.00 166.32 100.00%0.00% 44.00 639.76 100.00%0.00% 11.00 782.54 100.00%0.00% 641.37 2,013.90 100.00%

0.00% 465.84 1,681.68 100.00%

0.00% 465.84 13,099.42 100.00%0.00% 465.84 838.51 100.00%0.00% 465.84 861.80 100.00%0.00% 465.84 7,961.21 100.00%0.00% 20.96 1,228.05 100.00%

0.00% 43.70 1,040.06 100.00%0.00% 42.31 763.70 100.00%0.00% 5.00 118.00 100.00%0.00% 22.50 449.78 100.00%

Page 432: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 465.84 1,462.74 100.00%0.00% 17.00 665.21 100.00%0.00% 2.00 70.26 100.00%0.00% 17.00 444.21 100.00%0.00% 4.00 156.92 100.00%

Page 433: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 3.00 15.27 100.00%0.00% 2.00 11.74 100.00%0.00% 2.00 8.34 100.00%0.00% 4.00 22.36 100.00%0.00% 3.00 18.51 100.00%0.00% 1.00 4.07 100.00%0.00% 1.00 6.17 100.00%0.00% 13.00 80.21 100.00%0.00% 3.00 44.82 100.00%0.00% 2.00 118.60 100.00%0.00% 3.00 43.32 100.00%0.00% 1.00 14.44 100.00%0.00% 4.00 59.32 100.00%

0.00% 627.36 2,264.77 100.00%0.00% 627.36 17,641.36 100.00%0.00% 56.00 3,281.04 100.00%0.00% 627.36 1,129.25 100.00%0.00% 154.93 1,914.93 100.00%

Page 434: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 148.79 6,886.00 100.00%

0.00% 323.64 12,971.49 100.00%0.00% 627.36 1,969.91 100.00%

0.00% 1.00 80.82 100.00%0.00% 1.00 76.62 100.00%

0.00% 1.00 74.82 100.00%

0.00% 2.00 44.16 100.00%

0.00% 35.28 127.36 100.00%0.00% 45.86 2,686.94 100.00%0.00% 148.95 4,429.77 100.00%0.00% 33.77 13,767.02 100.00%0.00% 689.14 4,010.79 100.00%0.00% 14.00 4,729.20 100.00%

0.00% 116.16 419.34 100.00%0.00% 65.25 1,834.83 100.00%0.00% 132.80 239.04 100.00%

Page 435: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 30.59 522.78 100.00%

0.00% 43.08 2,524.06 100.00%

0.00% 29.20 1,170.34 100.00%0.00% 49.60 2,603.01 100.00%

Page 436: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 48.80 1,451.31 100.00%0.00% 18.91 7,709.04 100.00%

0.00% 33.20 987.37 100.00%0.00% 3.66 1,492.07 100.00%0.00% 175.44 1,021.06 100.00%

0.00% 122.00 1,579.90 100.00%

0.00% 1.00 1,600.00 100.00%0.00% 182.80 1,818.86 100.00%0.00% 7.50 57.90 100.00%0.00% 2.00 675.60 100.00%0.00% 1.00 887.80 100.00%0.00% 2.00 175.60 100.00%0.00% 14.00 171.36 100.00%0.00% 12.00 146.88 100.00%0.00% 2.00 318.48 100.00%0.00% 1.00 1,700.00 100.00%0.00% 1.00 1,500.00 100.00%0.00% 1.00 300.00 100.00%

Page 437: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 1.00 255.71 100.00%

63.38% 52.00 3,722.16 36.62%38.89% 44.00 4,053.72 61.11%0.00% 4.00 230.92 100.00%0.00% 12.00 805.56 100.00%0.00% 16.00 1,246.88 100.00%0.00% 72.00 4,685.76 100.00%

17.39% 38.00 4,673.24 82.61%14.29% 12.00 1,067.16 85.71%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

0.00% 1.00 925.14 100.00%0.00% 70.00 8,068.90 100.00%0.00% 25.00 2,091.75 100.00%0.00% 40.00 1,748.80 100.00%0.00% 1.00 1,285.16 100.00%

100.00% 0.00 0.00 0.00%100.00% 0.00 0.00 0.00%

Page 438: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 72.00 16,597.44 100.00%0.00% 70.00 14,596.40 100.00%0.00% 14.00 1,461.46 100.00%0.00% 72.00 8,169.84 100.00%

Page 439: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 1.00 1,132.63 100.00%

48.96% 49.00 3,507.42 51.04%33.33% 32.00 2,948.16 66.67%0.00% 8.00 623.44 100.00%0.00% 10.00 1,450.70 100.00%0.00% 48.00 3,123.84 100.00%

27.27% 24.00 2,951.52 72.73%22.22% 7.00 622.51 77.78%

100.00% 0.00 0.00 0.00%0.00% 1.00 925.14 100.00%0.00% 20.00 874.40 100.00%0.00% 28.00 1,224.16 100.00%

100.00% 0.00 0.00 0.00%50.00% 1.00 55.57 50.00%

0.00% 48.00 11,064.96 100.00%0.00% 48.00 10,008.96 100.00%0.00% 9.00 939.51 100.00%

Page 440: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 48.00 5,446.56 100.00%

0.00% 62.00 4,437.96 100.00%0.00% 20.00 1,842.60 100.00%0.00% 12.00 692.76 100.00%0.00% 2.00 134.26 100.00%0.00% 2.00 211.82 100.00%0.00% 4.00 577.96 100.00%0.00% 20.00 1,301.60 100.00%0.00% 24.00 2,951.52 100.00%0.00% 46.00 5,795.54 100.00%0.00% 3.00 266.79 100.00%

0.00% 2.00 1,858.28 100.00%0.00% 60.00 2,623.20 100.00%0.00% 2.00 119.14 100.00%0.00% 2.00 111.14 100.00%

0.00% 32.00 7,376.64 100.00%0.00% 28.00 5,838.56 100.00%0.00% 3.00 313.17 100.00%

Page 441: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 2.00 409.94 100.00%

0.00% 20.00 2,269.40 100.00%

0.00% 2.00 2,265.26 100.00%

Page 442: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 30.00 3,154.80 100.00%0.00% 2.00 179.86 100.00%0.00% 2.00 3,960.24 100.00%0.00% 2.00 123.28 100.00%

0.00% 1.00 5,500.00 100.00%

0.00% 23.00 1,646.34 100.00%0.00% 2.00 141.56 100.00%0.00% 8.00 461.84 100.00%0.00% 3.00 201.39 100.00%0.00% 2.00 129.32 100.00%0.00% 15.00 1,844.70 100.00%0.00% 1.00 296.58 100.00%0.00% 5.00 444.65 100.00%

0.00% 1.00 812.14 100.00%0.00% 40.00 1,089.20 100.00%

0.00% 2.00 461.04 100.00%

Page 443: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 4.00 834.08 100.00%

0.00% 6.00 2,008.86 100.00%0.00% 7.00 917.14 100.00%0.00% 2.00 320.04 100.00%0.00% 5.00 521.95 100.00%0.00% 4.00 819.88 100.00%0.00% 2.00 328.26 100.00%

0.00% 1.00 133.11 100.00%0.00% 1.00 89.93 100.00%

0.00% 31.00 2,218.98 100.00%0.00% 9.00 829.17 100.00%0.00% 1.00 117.02 100.00%0.00% 14.00 808.22 100.00%0.00% 2.00 134.26 100.00%0.00% 2.00 290.14 100.00%0.00% 9.00 585.72 100.00%0.00% 1.00 92.11 100.00%0.00% 28.00 3,443.44 100.00%0.00% 4.00 355.72 100.00%

Page 444: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 1.00 1,548.82 100.00%0.00% 1.00 850.14 100.00%0.00% 40.00 3,346.80 100.00%0.00% 10.00 437.20 100.00%0.00% 1.00 59.57 100.00%

Page 445: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 17.00 3,918.84 100.00%0.00% 11.00 2,293.72 100.00%0.00% 4.00 417.56 100.00%0.00% 3.00 614.91 100.00%0.00% 9.00 1,021.23 100.00%

0.00% 56.00 4,008.48 100.00%0.00% 16.00 1,474.08 100.00%0.00% 6.00 346.38 100.00%0.00% 4.00 268.52 100.00%0.00% 4.00 580.28 100.00%0.00% 16.00 1,041.28 100.00%0.00% 32.00 3,935.36 100.00%0.00% 6.00 533.58 100.00%

0.00% 1.00 1,445.82 100.00%0.00% 1.00 850.14 100.00%0.00% 145.00 22,514.15 100.00%0.00% 5.00 218.60 100.00%0.00% 1.00 59.57 100.00%

Page 446: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 32.00 7,376.64 100.00%0.00% 24.00 5,004.48 100.00%0.00% 6.00 626.34 100.00%0.00% 16.00 1,815.52 100.00%

0.00% 1.00 1,132.63 100.00%

0.00% 32.00 2,290.56 100.00%0.00% 13.00 1,197.69 100.00%0.00% 3.00 173.19 100.00%0.00% 4.00 268.52 100.00%0.00% 1.00 77.93 100.00%0.00% 2.00 290.14 100.00%0.00% 13.00 846.04 100.00%0.00% 16.00 1,967.68 100.00%0.00% 4.00 355.72 100.00%

0.00% 1.00 956.14 100.00%0.00% 28.00 1,224.16 100.00%0.00% 1.00 55.57 100.00%

Page 447: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 20.00 4,610.40 100.00%0.00% 12.00 2,502.24 100.00%0.00% 4.00 417.56 100.00%0.00% 13.00 1,475.11 100.00%

Page 448: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 21.00 1,503.18 100.00%0.00% 1.00 70.78 100.00%0.00% 1.00 92.13 100.00%0.00% 1.00 117.02 100.00%0.00% 1.00 57.73 100.00%0.00% 9.00 604.17 100.00%0.00% 1.00 65.08 100.00%0.00% 1.00 92.11 100.00%0.00% 1.00 64.66 100.00%0.00% 9.00 1,106.82 100.00%

0.00% 1.00 512.79 100.00%0.00% 1.00 474.79 100.00%0.00% 1.00 472.72 100.00%0.00% 20.00 544.60 100.00%0.00% 20.00 544.60 100.00%0.00% 42.00 1,143.66 100.00%0.00% 2.00 111.14 100.00%

0.00% 12.00 2,502.24 100.00%

Page 449: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 1.00 160.02 100.00%

0.00% 9.00 1,844.73 100.00%0.00% 1.00 164.13 100.00%0.00% 1.00 113.47 100.00%

20.83% 76.00 5,440.08 79.17%0.00% 36.00 2,548.08 100.00%

13.89% 31.00 1,789.63 86.11%19.44% 29.00 1,946.77 80.56%5.56% 17.00 2,466.19 94.44%

16.67% 25.00 1,616.50 83.33%17.09% 97.00 11,929.06 82.91%0.00% 15.00 1,333.95 100.00%

0.00% 1.00 1,450.82 100.00%0.00% 3.00 2,436.42 100.00%0.00% 2.00 1,762.28 100.00%0.00% 38.00 2,404.26 100.00%0.00% 30.00 1,311.60 100.00%0.00% 66.00 2,885.52 100.00%0.00% 3.00 178.71 100.00%

Page 450: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 12.00 2,766.24 100.00%0.00% 24.00 5,004.48 100.00%0.00% 36.00 5,760.72 100.00%0.00% 15.00 1,565.85 100.00%0.00% 60.00 12,298.20 100.00%0.00% 30.00 4,923.90 100.00%

Page 451: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo %

0.00% 33.00 3,922.71 100.00%0.00% 16.00 4,938.08 100.00%0.00% 6.00 940.80 100.00%0.00% 8.00 12,379.92 100.00%

0.00% 22.00 8,255.72 100.00%0.00% 33.00 12,639.66 100.00%

0.00% 1.00 71.58 100.00%0.00% 1.00 57.73 100.00%0.00% 1.00 122.98 100.00%0.00% 1.00 88.93 100.00%

0.00% 1.00 509.52 100.00%0.00% 1.00 6,660.00 100.00%0.00% 18.00 528.84 100.00%0.00% 3.00 182.94 100.00%

0.00% 1.00 208.52 100.00%

Page 452: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 0.00% 1.00 104.39 100.00%

0.00% 1.00 58,000.00 100.00%

0.00% 28.80 812.45 100.00%0.00% 28.80 812.45 100.00%

0.00% 12.00 1,062.00 100.00%0.00% 1.00 250.00 100.00%

0.00% 200.00 5,756.00 100.00%0.00% 200.00 5,756.00 100.00%

0.00% 6.00 663.30 100.00%0.00% 100.00 1,530.00 100.00%

21.45% 0.79 640,630.62 78.55%

29.42% 5,842,201.17 70.58%649,415.26 296,709.45

Page 453: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI0

GERENCIA DE INFRAESTRUCTURA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

% Metrado Costo % 129,269.56

50,017.94 29.42% 6,967,613.37 70.58%

Page 454: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION POR MAYORES METRADOS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

1 OBRAS DE CONCRETO ARMADO1.02 BLOQUES PRIMARIA

01.02.01.04 CONCRETO ARMADO01.02.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 1946.17 6.0501.02.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 40.07 32.8101.02.01.05 COLUMNAS01.02.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 640.20 6.0301.02.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 12.42 35.5601.02.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 1.86 439.5601.02.01.07 VIGAS01.02.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 9.42 483.0801.02.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 18.62 48.8501.02.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 3056.07 6.0301.02.01.11 ESTRUCTURAS METALICAS Y COBERTURAS01.02.01.11.04 TIJERAL DE METAL TIPO 01 und 30.00 440.4601.02.01.11.05 COBERTURA CON PLANCHA ONDULINE m2 54.00 37.9001.02.01.11.06 CUMBRERA ONDULINE ML 13.90 40.55

Precio Unitario

Page 455: f 19 Pio Aza Koribeni

1.03 BLOQUES SECUNDARIA01.03.01.02 MOVIMIENTO DE TIERRAS01.03.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 130.30 27.58 01.03.01.02.04 RELLENO CON MATERIAL PROPIO m3 48.72 21.7601.03.01.02 OBRAS DE CONCRETO SIMPLE01.03.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 43.22 28.60 01.03.01.04 CONCRETO ARMADO01.03.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 55.50 32.8101.03.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 6.94 445.2101.03.01.05 COLUMNAS01.03.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 201.08 35.56 01.03.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 3.77 439.560 01.03.01.07 VIGAS01.03.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 23.27 483.080 01.03.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 11.86 48.850 01.03.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 4453.97 6.030 01.03.01.09 LOSAS ALIGERADAS01.03.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA M2 393.76 36.90 01.03.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 165.60 14.090 01.03.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 1649.78 6.660 01.03.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 36.37 492.450 01.03.01.11 ESTRUCTURAS METALICAS Y COBERTURAS01.03.01.11.03 TIJERAL DE METAL TIPO 02 und 19.00 339.5501.03.01.11.05 COBERTURA CON PLANCHA ONDULINE m2 14.06 37.9001.03.01.11.06 CUMBRERA ONDULINE ML 2.65 40.55

1.1 VIVIENDA DE DOCENTES01.10.01.01 TRABAJOS PRELIMINARES01.10.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 285.65 0.7401.10.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 285.65 3.8401.10.01.02 MOVIMIENTO DE TIERRAS01.10.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 104.56 27.58 01.10.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 80.64 31.35 01.10.01.02.03 RELLENO CON MATERIAL PROPIO m3 101.44 21.76

Page 456: f 19 Pio Aza Koribeni

01.10.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 285.65 2.42 01.10.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 159.18 5.78

Page 457: f 19 Pio Aza Koribeni

01.10.01.03 OBRAS DE CONCRETO SIMPLE01.10.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 121.69 28.60 01.10.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 49.05 222.55 01.10.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 225.980 26.970 01.10.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 34.400 253.550

CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 285.650 41.330 01.10.01.04 CONCRETO ARMADO01.10.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 866.48 6.05 01.10.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 41.66 432.51 01.10.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 1,607.85 6.03 01.10.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 114.01 32.81 01.10.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 14.27 445.21 01.10.01.05 COLUMNAS01.10.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 2,987.29 6.03 01.10.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 277.52 35.56 01.10.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 24.27 439.56 01.10.01.06 COLUMNETAS DE CONFINAMIENTO01.10.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 1,603.870 6.660 01.10.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 150.680 20.550 01.10.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 11.790 450.850 01.10.01.07 VIGAS01.10.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 28.46 483.080 01.10.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 214.97 48.85 01.10.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 7,015.92 6.03 01.10.01.08 VIGAS DE CONFINAMIENTO01.10.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 359.490 6.660 01.10.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 72.960 20.550 01.10.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 5.450 518.910 01.10.01.09 LOSAS ALIJERADAS01.10.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 371.620 36.900 01.10.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 219.600 14.090 01.10.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 1,735.660 6.660 01.10.01.09.04 CONCRETO EN LOSAS ALIJERADA F'C = 210 KG/CM2 m3 38.38 439.56 01.10.01.10 ESCALERAS

Page 458: f 19 Pio Aza Koribeni

01.10.01.10.01 ACERO EN ESCALERAS FY= 4200 KG/CM2 GRADO 60 KG 276.46 35.56 01.10.01.10.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS m2 18.39 40.64 01.10.01.10.03 CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2 m3 2.50 452.26

1.06 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN01.06.01 OBRAS DE CONCRETO ARMADO (PABELLONES)01.06.01.02 MOVIMIENTO DE TIERRAS01.06.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 2.88 31.35 01.06.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 2.53 2.42 01.06.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 38.40 5.78 01.06.01.03 OBRAS DE CONCRETO SIMPLE01.06.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 25.90 28.60 01.06.01.04 CONCRETO ARMADO01.06.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 2.69 432.51 01.06.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 31.68 32.81 01.06.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 3.17 445.21 01.06.01.06 COLUMNETAS DE CONFINAMIENTO01.06.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 31.11 6.66 01.06.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 3.20 450.85 01.06.01.07 VIGAS01.06.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 2.58 483.08 01.06.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 35.99 48.85 01.06.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 761.02 6.03 01.06.01.08 VIGAS DE CONFINAMIENTO01.06.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 31.55 6.66 01.06.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 22.12 20.55 01.06.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.75 518.91 01.06.01.09 LOSAS ALIGERADAS01.06.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 9.04 14.09 01.06.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 273.16 6.66 01.06.01.10 ESCALERAS01.06.01.10.01 ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2 kg 29.94 6.05

Page 459: f 19 Pio Aza Koribeni

1.07 TALLER DE CONFECCIÓN, ARTESANIAS E IDIOMAS01.07.01 OBRAS DE CONCRETO ARMADO (PABELLONES)01.07.01.01 TRABAJOS PRELIMINARES01.07.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 25.28 0.740 01.07.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 57.40 3.840 01.07.01.02 MOVIMIENTO DE TIERRAS01.07.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 30.05 27.580 01.07.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 41.17 31.350 01.07.01.02.03 RELLENO CON MATERIAL PROPIO m3 41.80 21.760 01.07.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 139.52 2.420 01.07.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 38.18 5.780 01.07.01.03 OBRAS DE CONCRETO SIMPLE01.07.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 40.90 28.600 01.07.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 15.49 222.550 01.07.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 44.24 26.970 01.07.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 3.93 253.550 01.07.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 84.00 41.330 01.07.01.04 CONCRETO ARMADO01.07.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 299.07 6.050 01.07.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 16.47 432.510 01.07.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 386.56 6.030 01.07.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 22.15 32.810 01.07.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 3.78 445.210 01.07.01.05 COLUMNAS01.07.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 1235.23 6.030 01.07.01.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 79.29 35.560 01.07.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 11.89 439.560 01.07.01.06 COLUMNETAS DE CONFINAMIENTO01.07.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 622.38 6.660 01.07.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 33.69 20.550 01.07.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 2.33 450.850 01.07.01.07 VIGAS01.07.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 22.97 483.080 01.07.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 179.72 48.850

Page 460: f 19 Pio Aza Koribeni

01.07.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 1173.60 6.030 01.07.01.08 VIGAS DE CONFINAMIENTO01.07.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 205.30 6.660 01.07.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 6.81 20.550 01.07.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.49 518.910 01.07.01.09 LOSAS ALIGERADAS01.07.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 90.77 36.900 01.07.01.09.02 PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS m2 44.69 14.090 01.07.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 497.00 6.660 01.07.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 22.39 492.450 01.07.01.11 ESTRUCTURAS METALICAS Y COBERTURAS01.07.01.11.03 TIJERAL DE METAL TIPO 08 und 6.00 360.230 01.07.01.11.04 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 264.22 19.120 01.07.01.11.05 COBERTURA CON PLANCHA ONDULINE m2 82.92 37.900

1.04 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA 01.04.01 OBRAS DE CONCRETO ARMADO (PABELLONES)01.04.01.01 TRABAJOS PRELIMINARES01.04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 119.07 0.7401.04.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 119.07 3.8401.04.01.02 MOVIMIENTO DE TIERRAS01.04.01.02.01 EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS) m3 35.04 27.5801.04.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS m3 51.34 31.3501.04.01.02.03 RELLENO CON MATERIAL PROPIO m3 50.6728 21.7601.04.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA m2 119.07 2.4201.04.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA m3 15.18 5.7801.04.01.03 OBRAS DE CONCRETO SIMPLE01.04.01.03.01 SOLADO C° S° 1:10 e= 10 cm m2 38.68 28.6001.04.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 17.9905 222.5501.04.01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 32.391 26.9701.04.01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS m3 3.467125 253.5501.04.01.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4" m2 88.2 41.3301.04.01.04 CONCRETO ARMADO01.04.01.04.01 ACERO f'y = 4200 kg/cm2, G° 60 EN ZAPATAS kg 208.34 6.05

Page 461: f 19 Pio Aza Koribeni

01.04.01.04.02 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 16.20 432.5101.04.01.04.03 ACERO f'y = 4200 kg/cm, G° 60 EN VIGAS DE CIMENTACION kg 419.56 6.0301.04.01.04.04 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 24.6 32.8101.04.01.04.05 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 2.92 445.2101.04.01.05 COLUMNAS01.04.01.05.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS kg 1369.00 6.0301.04.01.05.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 10.806 439.5601.04.01.06 COLUMNETAS DE CONFINAMIENTO01.04.01.06.01 ACERO f'y = 4200 kg/cm2, G° 60 EN COLUMNAS DE CONFINAMIENTO kg 387.59 6.6601.04.01.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO m2 4.98 20.5501.04.01.06.03 CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2 m3 2.021 450.8501.04.01.07 VIGAS01.04.01.07.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 14.9248 483.0801.04.01.07.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 139.294 48.8501.04.01.07.03 ACERO f'y = 4200 kg/cm2, G° 60 EN VIGAS kg 1411.96404 6.0301.04.01.08 VIGAS DE CONFINAMIENTO01.04.01.08.01 ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO kg 90.61 6.6601.04.01.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 7.7 20.5501.04.01.08.03 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 0.6 518.9101.04.01.09 LOSAS ALIGERADAS01.04.01.09.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 51.54 36.9001.04.01.09.03 ACERO f'y = 4200 kg/cm2, G° 60 EN LOSAS ALIGERADAS kg 237.70 6.6601.04.01.09.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 19.29 492.4501.04.01.11 ESTRUCTURAS METALICAS Y COBERTURAS01.04.01.11.05 CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm ML 16.18 19.1201.04.01.11.06 COBERTURA CON PLANCHA ONDULINE m2 30.51 37.90

1.1 LIMPIEZA PERMANENTE DE OBRA01.10.01 LIMPIEZA PERMANENTE DE OBRA m2 22485.60 0.38 01.10.02 LIMPIEZA FINAL DE LA OBRA m2 9455.60 0.38

1 ARQUITECTURA1.01 BLOQUES PRIMARIA

01.01.03 CIELORRASOS01.01.03.01 CIELORRASO CON YESO

Page 462: f 19 Pio Aza Koribeni

01.01.03.01.01 CIELORRASOS CON YESO m2 26.41 24.97 01.01.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO01.01.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 207.98 147.21 01.01.04 PISOS Y PAVIMENTOS01.01.04.01 CONTRAPISOS01.01.04.01.01 CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS, AUTAS Y PASADISO Y SEG. NIVEL m2 1370.80 30.89

1.02 BLOQUES SECUNDARIA01.02.03 CIELORRASOS01.02.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO01.02.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 126.21 147.21 01.02.04 PISOS Y PAVIMENTOS01.02.04.01 CONTRAPISOS01.02.04.01.01 CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS, AULAS Y PASADISO SEG NIVEL m2 630.30 30.89

1.03 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA01.03.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO01.03.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 26.20 147.21

Page 463: f 19 Pio Aza Koribeni

1.04 SALON DE USO MULTIPLE01.05.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO01.05.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 32.79 147.21 1.06 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN01.06.03 CIELORRASOS01.06.03.01 CIELORRASO CON YESO01.06.03.01.01 CIELORRASOS CON YESO m2 122.82 24.97 01.06.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO01.06.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 5.30 147.21

1.09 VIVIENDA DE DOCENTES01.09.03 CIELORRASOS01.09.03.01 CIELORRASO CON YESO01.09.03.01.01 CIELORRASOS CON YESO m2 88.45 24.97 01.09.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO01.09.03.02.01 CIELORRASO CON BALDOSA ACÚSTICA m2 57.27 147.21

7 INSTALACIONES SANITARIAS7.01 BLOQUES PRIMARIA

07.01.02.02.01 TUBERIA PVC SAL DE 2" m 13.65 12.360 07.01.03.04 OBRAS DE CONCRETO ARMADO07.01.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 294.41 29.74 07.01.03.04.02 CONCRETO F'C=175 kg/cm2 m3 17.33 407.67 07.01.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 2055.23 5.82

7.02 BLOQUES SECUNDARIA07.02.03 SISTEMA DE DRENAJE PLUVIAL07.02.03.04 OBRAS DE CONCRETO ARMADO07.02.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 230.54 29.7407.02.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 516.76 5.82

7.03 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA07.03.03 SISTEMA DE DRENAJE PLUVIAL07.03.03.04 OBRAS DE CONCRETO ARMADO07.03.03.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 53.58 29.74 07.03.03.04.02 CONCRETO F'C=175 kg/cm2 m3 5.87 407.67

Page 464: f 19 Pio Aza Koribeni

07.03.03.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 414.05 5.82 7.04 SALÓN DE USO MÚLTIPLE

07.04.03 SISTEMA DE DRENAJE PLUVIAL07.04.03.03 OBRAS DE CONCRETO ARMADO07.04.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 35.24 29.74 07.04.03.03.02 CONCRETO F'C=175 kg/cm2 m3 5.75 407.67 07.04.03.03.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 455.06 5.82

7.05 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN07.05.03 SISTEMA DE DRENAJE PLUVIAL07.05.03.03 OBRAS DE CONCRETO ARMADO07.05.03.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 34.72 29.74 07.05.03.03.02 CONCRETO F'C=175 kg/cm2 m3 2.49 407.67 07.05.03.03.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 256.48 5.82

7.06 TALLER DE CONFECCIÓN, ARTESANIAS E IDIOMAS07.06.01 SISTEMA DE DRENAJE PLUVIAL07.06.01.04 OBRAS DE CONCRETO ARMADO07.06.01.04.01 ENCOFRADO Y DESENCOF. DE CANALES m2 21.11 29.74 07.06.01.04.02 CONCRETO F'C=175 kg/cm2 m3 3.67 407.67 07.06.01.04.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 348.29 5.82

7.07 BIBLIOTECA GENERAL07.07.01 SISTEMA DE DRENAJE PLUVIAL07.07.01.03 OBRAS DE CONCRETO ARMADO07.07.01.03.01 ENCOFRADO Y DESENCOF. DE CANALES m2 61.73 29.74 07.07.01.03.02 CONCRETO F'C=175 kg/cm2 m3 5.63 407.67 07.07.01.03.03 ACERO DE REFUERZO F'y = 4200 kg/cm2 kg 512.40 5.82

Page 465: f 19 Pio Aza Koribeni

7.09 VIVIENDA DE DOCENTES07.09.02 DESAGUE Y VENTILACION07.09.02.02 REDES DE DERIVACION07.09.02.02.01 TUBERIA PVC SAL DE 2" m 54.00 18.41 07.09.02.02.02 TUBERIA PVC SAL 4" m 24.00 12.360 07.09.02.03 SALIDA DE DESAGUE07.09.02.03.01 SALIDA DESAGUE PVC SAL DE 4" pto 35.00 80.820 07.09.02.03.02 SALIDA DESAGUE PVC SAL DE 2" pto 50.00 76.620 07.09.02.04 SALIDAS DE VENTILACION07.09.02.04.01 SALIDA PARA VENTILACION PVC SAL DE 2" pto 17.00 74.820 07.09.02.05 ACCESORIOS DE DESAGUE07.09.02.05.01 YEE PVC SAL DE 4" a 2" und 35.00 19.100 07.09.02.05.02 YEE PVC SAL 2" pza 77.00 17.080 07.09.02.05.05 CODO PVC SAL 4" X 90 pza 36.00 20.330

COSTO DIRECTO

GASTOS GENERALES

GASTOS DE SUPERVICIONCOSTO LIQUIDACION

ELABORACION EXPEDIENTE TECNICO

PRESUPUESTO TOTAL

Page 466: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION POR MAYORES METRADOS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Parcial

Valorización Anterior Valorización Actual Valorización Acumulada

Metrado Costo % Metrado Costo % Metrado

11774.33 1946.17 11774.33 100% - - 0% 1946.171314.70 40.07 1314.70 100% - - 0% 40.07

- 3860.39 640.20 3860.39 100% - - 0% 640.20441.51 12.42 441.51 100% - - 0% 12.42817.58 1.86 817.58 100% - - 0% 1.86

- 4550.61 9.42 4550.61 100% - - 0% 9.42909.59 18.62 909.59 100% - - 0% 18.62

18428.10 3056.07 18428.10 100% - - 0% 3056.07

13213.80 30.00 13213.80 100% - - 0% 30.00 2046.60 0.00 0.00 0% 54.00 2,046.60 100% 54.00 563.65 0.00 0.00 0% 13.90 563.65 100% 13.90

Page 467: f 19 Pio Aza Koribeni

3593.67 130.30 3593.67 100.00% - - 0.0% 130.30 1060.15 48.72 1060.15 100% - - 0% 48.72

1236.09 43.22 1236.09 100.00% - - 0.0% 43.22

1820.96 55.50 1820.96 100% - - 0% 55.50 3089.76 6.94 3089.76 100% - - 0% 6.94

7150.40 201.08 7150.40 100.00% - - 0.0% 201.08 1657.14 3.77 1657.14 100.00% - - 0.0% 3.77

11241.27 23.270 11241.27 100.00% - - 0.0% 23.27 579.36 11.860 579.36 100.00% - - 0.0% 11.86

26857.44 4,453.970 26857.44 100.00% - - 0.00% 4,453.97

14529.74 393.760 14529.74 100.00% - - 0.0% 393.76 2333.30 165.600 2333.30 100.00% - - 0.0% 165.60 10987.53 1,649.780 10987.53 100.00% - - 0.0% 1,649.78 17910.41 36.370 17910.41 100.00% - - 0.0% 36.37

6451.45 19.00 6451.45 100% - - 0% 19.00532.87 14.06 532.87 100% - - 0% 14.06107.46 2.65 107.46 100% - - 0% 2.65

211.38 285.65 211.38 100% - - 0% 285.651096.90 285.65 1096.90 100% - - 0% 285.65

2,883.76 104.56 2883.76 100.00% - - 0.0% 104.56 2,528.06 80.64 2528.06 100.00% - - 0.0% 80.64 2,207.27 101.44 2207.27 100.00% - - 0.0% 101.44

Page 468: f 19 Pio Aza Koribeni

691.27 285.65 691.27 100.00% - - 0% 285.65 920.06 159.18 920.06 100.00% - - 0% 159.18

Page 469: f 19 Pio Aza Koribeni

3,480.33 121.69 3480.33 100.00% - - 0.0% 121.69 10,916.08 49.05 10916.08 100.00% - - 0.0% 49.05 6,094.68 225.98 6094.68 100.00% - - 0.00% 225.98 8,722.12 34.400 8722.12 100.00% - - 0.00% 34.40 11,805.91 - 0.00 0.00% - - 0.00% 0.00

5,242.20 866.48 5242.20 100.00% - - 0.0% 866.48 18,018.37 41.66 18018.37 100.00% - - 0.0% 41.66 9,695.34 1,607.85 9695.34 100.00% - - 0.0% 1,607.85 3,740.67 114.01 3740.67 100.00% - - 0.0% 114.01 6,353.15 14.27 6353.15 100.00% - - 0.0% 14.27

18,013.36 2,987.29 18013.36 100.00% - - 0.0% 2,987.29 9,868.61 277.52 9868.61 100.00% - - 0.0% 277.52 10,668.12 24.27 10668.12 100.00% - - 0.0% 24.27

10,681.77 1,603.870 10681.77 100.00% - - 0.00% 1603.87 3,096.47 150.680 3096.47 100.00% - - 0.00% 150.68 5,315.52 11.790 5315.52 100.00% - - 0.00% 11.79

13,748.46 28.46 13748.46 100.00% - - 0.00% 28.46 10,501.28 214.97 10501.28 100.00% - - 0.0% 214.97 42,306.00 7,015.92 42306.00 100.00% - - 0.0% 7015.92

2,394.20 359.490 2394.20 100.00% - - 0.00% 359.49 1,499.33 72.96 1499.33 100.00% - - 0.0% 72.96 2,828.06 5.45 2828.06 100.00% - - 0.0% 5.45

13,712.78 371.620 13712.78 100.00% - - 0.00% 371.62 3,094.16 219.60 3094.16 100.00% - - 0.00% 219.60 11,559.50 1735.66 11559.50 100.00% - - 0.00% 1735.66 16,870.31 38.38 16870.31 100.00% - - 0.0% 38.38

Page 470: f 19 Pio Aza Koribeni

9,830.92 276.46 9830.92 100.00% - - 0.0% 276.46 747.37 18.39 747.37 100.00% - - 0.0% 18.39 1,130.65 2.50 1130.65 100.00% - - 0.0% 2.50

90.29 2.88 90.29 100.00% - - 0.0% 2.88 6.11 - 0.00 0.00% - - 0.0% - 221.95 - 0.00 0.00% - - 0.0% -

740.74 25.90 740.74 100.00% - - 0.0% 25.90

1,161.72 2.69 1161.72 100.00% - - 0.0% 2.69 1,039.42 31.68 1039.42 100.00% - - 0.0% 31.68 1,410.43 3.17 1410.43 100.00% - - 0.0% 3.17

207.17 - 0.00 0.00% - - 0.0% - 1,441.28 - 0.00 0.00% - - 0.0% -

1,246.93 - 0.00 0.00% 2.58 1,246.35 100.0% 2.58 1,758.21 - 0.00 0.00% 35.99 1,758.11 100.0% 35.99 4,588.95 - 0.00 0.00% 761.02 4,588.95 100.0% 761.02

210.13 - 0.00 0.00% - - 0.0% - 454.52 - 0.00 0.00% - - 0.0% - 390.37 - 0.00 0.00% - - 0.0% -

127.37 9.04 127.37 100.00% - - 0.0% 9.04 1,819.26 273.16 1819.25 100.00% - - 0.0% 273.16

181.16 - 0.00 0.00% - - 0.0% -

Page 471: f 19 Pio Aza Koribeni

18.71 25.28 18.71 100.00% - - 0.0% 25.28 220.42 - 0.00 0.00% - - 0.0% -

828.72 - 0.00 0.00% - - 0.0% - 1,290.68 - 0.00 0.00% - - 0.0% - 909.65 - 0.00 0.00% - - 0.0% - 337.64 - 0.00 0.00% - - 0.0% - 220.68 - 0.00 0.00% - - 0.0% -

1,169.74 - 0.00 0.00% - - 0.0% - 3,446.70 - 0.00 0.00% - - 0.0% - 1,193.10 - 0.00 0.00% - - 0.0% - 996.67 - 0.00 0.00% - - 0.0% - 3,471.72 - 0.00 0.00% - - 0.0% -

1,809.36 - 0.00 0.00% - - 0.0% - 7,122.57 - 0.00 0.00% - - 0.0% - 2,330.95 - 0.00 0.00% - - 0.0% - 726.87 - 0.00 0.00% - - 0.0% - 1,682.00 - 0.00 0.00% - - 0.0% -

7,448.44 - 0.00 0.00% - - 0.0% - 2,819.69 - 0.00 0.00% - - 0.0% - 5,227.25 - 0.00 0.00% - - 0.0% -

4,145.05 - 0.00 0.00% - - 0.0% - 692.33 - 0.00 0.00% - - 0.0% - 1,050.48 - 0.00 0.00% - - 0.0% -

11,096.35 - 0.00 0.00% - - 0.0% - 8,779.22 - 0.00 0.00% - - 0.0% -

Page 472: f 19 Pio Aza Koribeni

7,076.83 - 0.00 0.00% - - 0.0% -

1,367.31 - 0.00 0.00% - - 0.0% - 139.95 - 0.00 0.00% - - 0.0% - 252.97 - 0.00 0.00% - - 0.0% -

3,349.34 - 0.00 0.00% - - 0.0% - 629.68 - 0.00 0.00% - - 0.0% - 3,310.03 - 0.00 0.00% - - 0.0% - 11,026.61 6.67 3284.64 29.79% - - 0.0% 6.67

2,161.38 - 0.00 0.00% - - 0.0% - 5,051.89 - 0.00 0.00% - - 0.0% - 3,142.67 - 0.00 0.00% - - 0.0% -

88.11 - 0.00 0.00% 119.07 88.11 100.0% 119.07 457.23 - 0.00 0.00% 119.07 457.23 100.0% 119.07

966.31 - 0.00 0.00% 35.04 966.31 100.0% 35.04 1,609.51 - 0.00 0.00% 36.34 1,139.26 70.8% 36.34 1,102.64 - 0.00 0.00% - - 0.0% - 288.15 - 0.00 0.00% - - 0.0% - 87.74 - 0.00 0.00% - - 0.0% -

1,106.25 - 0.00 0.00% 19.34 553.12 50.0% 19.34 4,003.79 - 0.00 0.00% - - 0.0% - 873.59 - 0.00 0.00% - - 0.0% - 879.09 - 0.00 0.00% - - 0.0% - 3,645.31 - 0.00 0.00% - - 0.0% -

1,260.45 - 0.00 0.00% 100.00 605.00 48.0% 100.00

Page 473: f 19 Pio Aza Koribeni

7,005.10 - 0.00 0.00% 6.19 2,677.24 38.2% 6.19 2,529.97 - 0.00 0.00% 319.56 1,926.95 76.2% 319.56 807.13 - 0.00 0.00% 14.60 479.03 59.3% 14.60 1,300.01 - 0.00 0.00% - - 0.0% -

8,255.09 - 0.00 0.00% 300.00 1,809.00 21.9% 300.00 4,749.89 - 0.00 0.00% - - 0.0% -

2,581.37 - 0.00 0.00% - - 0.0% - 102.34 - 0.00 0.00% - - 0.0% - 911.17 - 0.00 0.00% - - 0.0% -

7,209.87 - 0.00 0.00% - - 0.0% - 6,804.51 - 0.00 0.00% - - 0.0% - 8,514.14 - 0.00 0.00% - - 0.0% -

603.46 - 0.00 0.00% - - 0.0% - 157.25 - 0.00 0.00% - - 0.0% - 300.14 - 0.00 0.00% - - 0.0% -

1,901.83 - 0.00 0.00% 20.00 738.00 38.8% 20.00 1,583.10 - 0.00 0.00% - - 0.0% - 9,499.36 - 0.00 0.00% 11.79 5,805.99 61.1% 11.79

309.36 - 0.00 0.00% - - 0.0% - 1,156.33 - 0.00 0.00% - - 0.0% -

8,544.53 - 0.00 0.00% 1,060.00 402.80 4.7% 1,060.00 3,593.13 - 0.00 0.00% - - 0.0% -

Page 474: f 19 Pio Aza Koribeni

659.46 26.41 659.46 100.00% - - 0.0% 26.41

30,616.74 - 0.00 0.00% - - 0.0% -

42,344.01 - 0.00 0.00% - - 0.0% -

18,579.37 - 0.00 0.00% - - 0.0% -

19,469.97 - 0.00 0.00% 630.30 19,469.97 100.0% 630.30

3,856.90 - 0.00 0.00% - - 0.0% -

Page 475: f 19 Pio Aza Koribeni

4,827.02 - 0.00 0.00% - - 0.0% -

3,066.82 - 0.00 0.00% - - 0.0% -

780.21 - 0.00 0.00% - - 0.0% -

2,208.60 88.45 2208.60 100.00% - - 0.0% 88.45

8,430.72 - 0.00 0.00% - - 0.0% -

168.71 13.65 168.71 100.00% - - 0.0% 13.65

8,755.75 294.41 8755.75 100.00% - - 0.0% 294.41 7,064.92 17.33 7064.92 100.00% - - 0.0% 17.33 11,961.44 2055.23 11961.44 100.00% - - 0.0% 2,055.23

6,856.26 230.54 6856.26 100.00% - - 0.0% 230.54 3,007.54 516.76 3007.54 100.00% - - 0.0% 516.76

1,593.47 0.00 0.00 0.00% - - 0.0% - 2,393.02 0.00 0.00 0.00% - - 0.0% -

Page 476: f 19 Pio Aza Koribeni

2,409.77 0.00 0.00 0.00% - - 0.0% -

1,048.04 0.00 0.00 0.00% - - 0.0% - 2,344.10 0.00 0.00 0.00% - - 0.0% - 2,648.45 0.00 0.00 0.00% - - 0.0% -

1,032.66 0.00 0.00 0.00% - - 0.0% - 1,016.93 0.00 0.00 0.00% - - 0.0% - 1,492.71 0.00 0.00 0.00% - - 0.0% -

627.77 0.00 0.00 0.00% 10.60 315.24 50.2% 10.60 1,494.31 0.00 0.00 0.00% 1.83 746.04 49.9% 1.83 2,027.05 0.00 0.00 0.00% 174.00 1,012.68 50.0% 174.00

1,835.78 0.00 0.00 0.00% - - 0.0% - 2,295.18 0.00 0.00 0.00% - - 0.0% - 2,982.17 0.00 0.00 0.00% - - 0.0% -

Page 477: f 19 Pio Aza Koribeni

994.14 54.00 994.14 100.00% - - 0.0% 54.00 296.64 24.00 296.64 100.00% - - 0.0% 24.00 - 2,828.70 35.00 2828.70 100.00% - - 0.0% 35.00 3,831.00 50.00 3831.00 100.00% - - 0.0% 50.00 - 1,271.94 17.00 1271.94 100.00% - - 0.0% 17.00 - 0.00 - 668.50 35.00 668.50 100.00% - - 0.0% 35.00 1,315.16 77.00 1315.16 100.00% - - 0.0% 77.00 731.88 36.00 731.88 100.00% - - 0.0% 36.00

8,276,948.93 499,431.35 6.03% 49,395.61 0.60%

920,060.23 55,516.46 6.03% 5,490.78 0.60%

420,363.64 25,364.75 6.03% 2,508.67 0.60% 70,863.00 4,275.88 6.03% 422.90 0.60% 183,142.87 11,050.85 6.03% 1,092.97 0.60%

9,871,378.67 595,639.29 6.03% 58,910.94 0.60%

Page 478: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION POR MAYORES METRADOS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Costo % Metrado Costo %

11774.33 100% 0.00 0.00 0%1314.70 100% 0.00 0.00 0%

3860.39 100% 0.00 0.00 0%441.51 100% 0.00 0.00 0%817.58 100% 0.00 0.00 0%

4550.61 100% 0.00 0.00 0%909.59 100% 0.00 0.00 0%

18428.10 100% 0.00 0.00 0%

13213.80 100% 0.00 0.00 0%2046.60 100% 0.00 0.00 0%563.65 100% 0.00 0.00 0%

Page 479: f 19 Pio Aza Koribeni

3,593.67 100.0% - 0.00 0.0% 1,060.15 100% - 0.00 0%

1,236.09 100.0% - 0.00 0.0%

1,820.96 100% - 0.00 0% 3,089.76 100% - 0.00 0%

7,150.40 100.0% 0.00 0.00 0.0% 1,657.14 100.0% 0.00 0.00 0.0%

11,241.27 100.0% 0.00 0.00 0.0% 579.36 100.0% 0.00 0.00 0.0%

26857.44 100.0% 0.00 0.00 0.00%

14,529.74 100.0% 0.00 0.00 0.0% 2,333.30 100.0% 0.00 0.00 0.0% 10,987.53 100.0% 0.00 0.00 0.0% 17,910.41 100.0% 0.00 0.00 0.0%

6,451.45 100% 0.00 0.00 0% 532.87 100% 0.00 0.00 0% 107.46 100% 0.00 0.00 0%

211.38 100% 0.00 0.00 0% 1,096.90 100% 0.00 0.00 0%

2,883.76 100.0% 0.00 0.00 0.0% 2,528.06 100.0% 0.00 0.00 0.0% 2,207.27 100.0% 0.00 0.00 0.0%

Page 480: f 19 Pio Aza Koribeni

691.27 100.0% 0.00 0.00 0.0% 920.06 100.0% 0.00 0.00 0.0%

Page 481: f 19 Pio Aza Koribeni

3,480.33 100.0% 0.00 0.00 0.00% 10,916.08 100.0% 0.00 0.00 0.00%

6094.68 100.0% 0.00 0.00 0.00%8722.12 100.0% 0.00 0.00 0.00%

0.00 0.00% 285.65 11,805.91 100.00%

5,242.20 100.0% 0.00 0.00 0.0% 18,018.37 100.0% 0.00 0.00 0.0% 9,695.34 100.0% 0.00 0.00 0.0% 3,740.67 100.0% 0.00 0.00 0.0% 6,353.15 100.0% 0.00 0.00 0.0%

18,013.36 100.0% 0.00 0.00 0.0% 9,868.61 100.0% 0.00 0.00 0.0% 10,668.12 100.0% 0.00 0.00 0.0%

10681.77 100.0% 0.00 0.00 0.00%3096.47 100.0% 0.00 0.00 0.00%5315.52 100.0% 0.00 0.00 0.00%

13748.46 100.0% 0.00 0.00 0.0%10501.28 100.0% 0.00 0.00 0.0%42306.00 100.0% 0.00 0.00 0.0%

2394.20 100.0% 0.00 0.00 0.0%1499.33 100.0% 0.00 0.00 0.0%2828.06 100.0% 0.00 0.00 0.0%

13712.78 100.0% 0.00 0.00 0.0%3094.16 100.0% 0.00 0.00 0.00%11559.50 100.0% 0.00 0.00 0.00%16870.31 100.0% 0.00 0.00 0.00%

Page 482: f 19 Pio Aza Koribeni

9830.92 100.0% 0.00 0.00 0.00%747.37 100.0% 0.00 0.00 0.00%1130.65 100.0% 0.00 0.00 0.00%

90.29 100.0% 0.00 0.00 0.0% - 0.0% 2.53 6.11 100.0% - 0.0% 38.40 221.95 100.0%

740.74 100.0% 0.00 0.00 0.0%

1,161.72 100.0% 0.00 0.00 0.0% 1,039.42 100.0% 0.00 0.00 0.0% 1,410.43 100.0% 0.00 0.00 0.0%

- 0.0% 31.11 207.17 100.0% - 0.0% 3.20 1441.28 100.0%

1,246.35 100.0% 0.00 0.58 0.0% 1,758.11 100.0% 0.00 0.10 0.0% 4,588.95 100.0% 0.00 0.00 0.0%

- 0.0% 31.55 210.13 100.0% - 0.0% 22.12 454.52 100.0% - 0.0% 0.75 390.37 100.0%

127.37 100.0% 0.00 0.00 0.0% 1,819.25 100.0% 0.00 0.02 0.0%

- 0.0% 29.94 181.16 100.0%

Page 483: f 19 Pio Aza Koribeni

18.71 100.0% 0.00 0.00 0.0% - 0.0% 57.40 220.42 100.0%

- 0.0% 30.05 828.72 100.0% - 0.0% 41.17 1290.68 100.0% - 0.0% 41.80 909.65 100.0% - 0.0% 139.52 337.64 100.0% - 0.0% 38.18 220.68 100.0%

- 0.0% 40.90 1169.74 100.0% - 0.0% 15.49 3446.70 100.0% - 0.0% 44.24 1193.10 100.0% - 0.0% 3.93 996.67 100.0% - 0.0% 84.00 3471.72 100.0%

- 0.0% 299.07 1809.36 100.0% - 0.0% 16.47 7122.57 100.0% - 0.0% 386.56 2330.95 100.0% - 0.0% 22.15 726.87 100.0% - 0.0% 3.78 1682.00 100.0%

- 0.0% 1235.23 7448.44 100.0% - 0.0% 79.29 2819.69 100.0% - 0.0% 11.89 5227.25 100.0%

- 0.0% 622.38 4145.05 100.0% - 0.0% 33.69 692.33 100.0% - 0.0% 2.33 1050.48 100.0%

- 0.0% 22.97 11096.35 100.0% - 0.0% 179.72 8779.22 100.0%

Page 484: f 19 Pio Aza Koribeni

- 0.0% 1173.60 7076.83 100.0%

- 0.0% 205.30 1367.31 100.0% - 0.0% 6.81 139.95 100.0% - 0.0% 0.49 252.97 100.0%

- 0.0% 90.77 3349.34 100.0% - 0.0% 44.69 629.68 100.0% - 0.0% 497.00 3310.03 100.0% 3,284.64 29.8% 15.72 7741.96 70.2%

- 0.0% 6.00 2161.38 100.0% - 0.0% 264.22 5051.89 100.0% - 0.0% 82.92 3142.67 100.0%

88.11 100.0% 0.00 0.00 0.0% 457.23 100.0% 0.00 0.00 0.0%

966.31 100.0% 0.00 0.00 0.0% 1,139.26 70.8% 15.00 470.25 29.2% - 0.0% 50.67 1102.64 100.0% - 0.0% 119.07 288.15 100.0% - 0.0% 15.18 87.74 100.0%

553.12 50.0% 19.34 553.12 50.0% - 0.0% 17.99 4003.79 100.0% - 0.0% 32.39 873.59 100.0% - 0.0% 3.47 879.09 100.0% - 0.0% 88.20 3645.31 100.0%

605.00 48.0% 108.34 655.45 52.0%

Page 485: f 19 Pio Aza Koribeni

2,677.24 38.2% 10.01 4327.87 61.8% 1,926.95 76.2% 100.00 603.02 23.8% 479.03 59.3% 10.00 328.10 40.7% - 0.0% 2.92 1300.01 100.0%

1,809.00 21.9% 1069.00 6446.09 78.1% - 0.0% 10.81 4749.89 100.0%

- 0.0% 387.59 2581.37 100.0% - 0.0% 4.98 102.34 100.0% - 0.0% 2.02 911.17 100.0%

- 0.0% 14.92 7209.87 100.0% - 0.0% 139.29 6804.51 100.0% - 0.0% 1411.96 8514.14 100.0%

- 0.0% 90.61 603.46 100.0% - 0.0% 7.65 157.25 100.0% - 0.0% 0.58 300.14 100.0%

738.00 38.8% 31.54 1163.83 61.2% - 0.0% 237.70 1583.10 100.0% 5,805.99 61.1% 7.50 3693.38 38.9%

- 0.0% 16.18 309.36 100.0% - 0.0% 30.51 1156.33 100.0%

402.80 4.7% 21425.60 8141.73 95.3% - 0.0% 9455.60 3593.13 100.0%

Page 486: f 19 Pio Aza Koribeni

659.46 100.0% 0.00 0.00 0.0%

- 0.0% 207.98 30616.74 100.0%

- 0.0% 1370.80 42344.01 100.0%

- 0.0% 126.21 18579.37 100.0%

19,469.97 100.0% 0.00 0.00 0.0%

- 0.0% 26.20 3856.90 100.0%

Page 487: f 19 Pio Aza Koribeni

- 0.0% 32.79 4827.02 100.0%

- 0.0% 122.82 3066.82 100.0%

- 0.0% 5.30 780.21 100.0%

2,208.60 100.0% 0.00 0.00 0.0%

- 0.0% 57.27 8430.72 100.0%

168.71 100.0% 0.00 0.00 0.0%

8,755.75 100.0% 0.00 0.00 0.0% 7,064.92 100.0% 0.00 0.00 0.0% 11,961.44 100.0% 0.00 0.00 0.0%

6,856.26 100.0% 0.00 0.00 0.0% 3,007.54 100.0% 0.00 0.00 0.0%

- 0.0% 53.58 1593.47 100.0% - 0.0% 5.87 2393.02 100.0%

Page 488: f 19 Pio Aza Koribeni

- 0.0% 414.05 2409.77 100.0%

- 0.0% 35.24 1048.04 100.0% - 0.0% 5.75 2344.10 100.0% - 0.0% 455.06 2648.45 100.0%

- 0.0% 34.72 1032.66 100.0% - 0.0% 2.49 1016.93 100.0% - 0.0% 256.48 1492.71 100.0%

315.24 50.2% 10.51 312.52 49.8% 746.04 49.9% 1.84 748.28 50.1% 1,012.68 50.0% 174.29 1014.37 50.0%

- 0.0% 61.73 1835.78 100.0% - 0.0% 5.63 2295.18 100.0% - 0.0% 512.40 2982.17 100.0%

Page 489: f 19 Pio Aza Koribeni

994.14 100.0% 0.00 0.00 0.0% 296.64 100.0% 0.00 0.00 0.0%

0.00 0.00 2,828.70 100.0% 0.00 0.00 0.0% 3,831.00 100.0% 0.00 0.00 0.0%

0.00 0.00 1,271.94 100.0% 0.00 0.00 0.0%

0.00 0.00 668.50 100.0% 0.00 0.00 0.0% 1,315.16 100.0% 0.00 0.00 0.0% 731.88 100.0% 0.00 0.00 0.0%

548,826.97 6.63% 332,968.03 4.02%

61,007.25 6.63% 37,012.51 4.02%

27,873.42 6.63% 16,910.54 4.0% 4,698.78 6.63% 2,850.70 4.0% 12,143.82 6.63% 7,367.54 4.0%

654,550.23 6.63% 397,109.32 4.0%

Page 490: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

Page 491: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

1 OBRAS DE CONCRETO ARMADO

1.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA PESADA Y EQUIPOS. GLB 1CORTE DE MATERIAL SUELTO, PARA EXPLANACIONES m3 9994.24ELIMINACION DE MATERIAL EXEDENTE, CON MAQUINARIA m3 12492.8TRANSPORTE DE AGREGADOS A PIE DE OBRA m3 3500

1.02 BLOQUES PRIMARIA

01.02.01.03 OBRAS DE CONCRETO SIMPLE

Page 492: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS m3 22601.02.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

TIJERAL METALICO TIPO 04B und 4CORREAS METALICAS DE 50 X 100 mm X 2.5 mm ml 1212.8PARASOLES

ACERO DE REFUERZO ENPARA SOLES Fy=4200 Kg/cm2 kg 879.1ENCOFRADO Y DESENCOFRADO EN PARA SOLES m2 90.86CONCRETO EN PARA SOLES F'C= 210 KG/CM2 m3 8.75

1.03 BLOQUES SECUNDARIA

01.03.01.03 OBRAS DE CONCRETO SIMPLE

ENCOFRADO Y DESENCOFRADO EN CIMINIENTOS CORRIDOS 186.0001.03.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

TIJERAL DE METAL TIPO 03 und 2

Page 493: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

CORREA METALICA DE TUBO RECTANGULAR DE 50x100mm e=2.5mm ml 757.4PARASOLES

ACERO DE REFUERZO ENPARA SOLES Fy=4200 Kg/cm2 kg 606.52ENCOFRADO Y DESENCOFRADO EN PARA SOLES Y RAMPAS m2 63.86CONCRETO EN PARA SOLES F'C= 210 KG/CM2 m3 6.39

1.04 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA

01.04.01.03 OBRAS DE CONCRETO SIMPLE

ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS m2 123.24PARASOLES

ACERO DE REFUERZO EN PARASOLES Fy=4200 Kg/cm2 kg 279.23ENCOFRADO Y DESENCOFRADO EN PARASOLES m2 56.7CONCRETO EN PARASOLES F'C= 210 KG/CM2 m3 2.88MURO DE CONTENCION L=4m

Page 494: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3 24.8ELIMINACION DE MATERIAL EXEDENTE m3 28.768RELLENO Y COMPACTADO CON MATERIAL GRANULAR m3 5ACERO DE REFUERZO EN MURO DE CONTENCION Fy=4200 Kg/cm2 kg 356ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 25CONCRETO EN MURO DE CONTENCION F'C= 210 KG/CM2 m3 8.64

1.05 SALÓN DE USO MÚLTIPLE

01.05.01.03 OBRAS DE CONCRETO SIMPLE

ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDOS m2 39.391.06 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN

01.06.01.03 OBRAS DE CONCRETO SIMPLE

ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS m3 96.46PARA SOLES

Page 495: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

ACERO DE REFUERZO EN PARA SOLES Fy=4200 Kg/cm2 kg 156.4ENCOFRADO Y DESENCOFRADO EPARASOLES m2 25.8CONCRETO EN EPARA SOLES F'C= 210 KG/CM2 m3 1.47

1.07 TALLER DE CONFECCIÓN, ARTESANIAS E IDIOMAS

01.07.01.03 OBRAS DE CONCRETO SIMPLE

ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDOS m2 106.1736PARA SOLES

ACERO DE REFUERZO EN PARA SOLES Fy=4200 Kg/cm2 kg 269.8ENCOFRADO Y DESENCOFRADO EPARASOLES m2 24.26CONCRETO EN EPARA SOLES F'C= 210 KG/CM2 m3 2.79MURO DE CONTENCION L=8m

EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3 49.6ELIMINACION DE MATERIAL EXEDENTE m3 57.536

Page 496: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 16ACERO DE REFUERZO EN MURO DE CONTENCION Fy=4200 Kg/cm2 kg 712ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 50CONCRETO EN MURO DE CONTENCION F'C= 210 KG/CM2 m3 17.28

Page 497: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

1.08 BIBLIOTECA GENERAL

01.08.01.03 OBRAS DE CONCRETO SIMPLE

ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDOS m2 132.17601.08.01.11 ESTRUCTURAS METALICAS Y COBERTURAS

TIJERAL DE METAL TIPO 08 und 7PARA SOLES

ACERO DE REFUERZO EN PARA SOLES Fy=4200 Kg/cm2 kg 204.4ENCOFRADO Y DESENCOFRADO EPARASOLES m2 15.35CONCRETO EN EPARA SOLES F'C= 210 KG/CM2 m3 2.21

1.1 VIVIENDA DE DOCENTES

01.10.01.03 OBRAS DE CONCRETO SIMPLE

ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS m2 233.38PARA SOLES

Page 498: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

ACERO DE REFUERZO EN PARA SOLES Fy=4200 Kg/cm2 kg 1229.63ENCOFRADO Y DESENCOFRADO EPARASOLES m2 127.95CONCRETO EN EPARA SOLES F'C= 210 KG/CM2 m3 11.52

1 ARQUITECTURA

1.01 BLOQUES PRIMARIA

01.01.04.02 PISOS

PISO CERAMICO ALTO TRANSITO EN AULAS m2 1370.801.01.04.04 VEREDAS

BRUÑA EN VEREDAS ml 443.801.01.04.06 CEMENTO PULIDO EN PARASOLES

BRUÑAS EN PARASOLES ml 47.2501.01.05 ZOCALOS Y CONTRAZOCALOS

01.01.05.01 ZOCALOS

Page 499: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

CONTRAZOCALO DE CERAMICO h=10cm ml 44201.01.10.03 PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 35PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 1212.8

1.02 BLOQUES SECUNDARIA

01.02.04.02 PISOS

PISO CERAMICO ALTO TRANSITO EN AULAS m2 650.3001.02.04.04 VEREDAS

BRUÑA EN VEREDAS ml 371.1701.02.04.06 CEMENTO PULIDO EN PARASOLES

BRUÑAS EN PARASOLES ml 32.401.02.05 ZOCALOS Y CONTRAZOCALOS

01.02.05.01 ZOCALOS

Page 500: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

CONTRAZOCALO DE CERAMICO h=10cm ml 29601.02.10.03 PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 24PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 757.4

1.03 SALA DE CÓMPUTO PRIMARIA Y SECUNDARIA

01.03.04.02 VEREDAS

BRUÑA EN VEREDAS ml 259.6401.03.04.04 CEMENTO PULIDO EN PARASOLES

BRUÑAS EN PARASOLES ml 22.0001.03.09.03 PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 39.00PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 695.40

1.04 SALON DE USO MULTIPLE

Page 501: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

01.04.03 PISOS Y PAVIMENTOS

01.04.03.01 PISOS

CONTRAPISO DE 35MM. EN SALON Y COCINA m2 259.42PISO CERAMICO ALTO TRANSITO EN SALON MULTIUSOS m2 259.42CONTRAZOCALO DE CERAMICO h=10cm ml 104.55

01.04.03.02 VEREDAS

BRUÑA EN VEREDAS ml 108.141PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 19PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 680

Page 502: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

1.05 TALLER DE CONFECCIÓN, ARTESANIAS E IDIOMAS

01.05.04.02 VEREDAS

BRUÑA EN VEREDAS ml 169.801.05.04.04 CEMENTO PULIDO EN PARASOLES

BRUÑA EN PARASOLES ml 23.101.05.09.03 PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 38PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 886.62

1.06 TÓPICO, SICOLOGÍA Y ADMINISTRACIÓN

01.06.09.03 PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 27PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 335.8

1.07 BIBLIOTECA GENERAL

Page 503: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

01.07.04.02 VEREDAS

BRUÑA EN VEREDAS ml 176.0901.07.04.04 CEMENTO PULIDO EN PARASOLES

BRUÑA EN PARASOLES ml 12.101.07.09.03 PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 20PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 500.7

1.08 DUCHAS Y VESTIDORES (PRIMARIA Y SECUNDARIA)

01.08.05.05 VEREDAS

BRUÑA EN VEREDAS 22.248PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 23PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 341.4

Page 504: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

1.09 VIVIENDA DE DOCENTES

01.09.04.04 VEREDAS

BRUÑA EN VEREDAS 275.301.09.04.06 CEMENTO PULIDO EN PARASOLES

BRUÑA EN PARASOLES ml 30.7101.09.09.03 PINTURA DE ESTRUCTURAS METALICAS

PINTURA ANTI CORROSIVA EN TIJERALES METALICOS und 27PINTURA ANTI CORROSIVA EN CORREAS METALICAS ml 1032

COSTO DIRECTOGASTOS GENERALES

Page 505: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

OBRA "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

FECHA DE INICIO DE OBRA 6/4/2012

CORRESPONDIENTE AL MES DE ABRIL - 2014

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Item DESCRIPCION Und. Metrado

GASTOS DE SUPERVICIONCOSTO LIQUIDACION

ELABORACION EXPEDIENTE TECNICO

PRESUPUESTO TOTAL

Page 506: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

Page 507: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

12500 12,500.00 1.00 12,500.00 100.00% 0.00 0.00 0.00%

8.73 87,249.72 9994.24 87,249.72 100.00% 0.00 0.00 0.00%

5.86 73,207.81 9,224.27 54,054.25 73.84% 120.00 703.20 0.96%

40.4 141,400.00 2,894.75 116,947.80 82.71% 46.00 1,858.40 1.31%

Page 508: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

38.5 8,701.00 226.00 8,701.00 100.00% 0.00 0.00 0.00%

795.88 3,183.52 0.00 0.00 0.00% 4.00 3,183.52 100.00%

62.37 75,642.34 508.00 31,683.96 41.89% 704.80 43,958.38 58.11%

7.15 6,285.57 879.1 6,285.57 100.00% 0.00 0.00 0.00%

47.85 4,347.65 90.86 4,347.65 100.00% 0.00 0.00 0.00%

507.16 4,437.65 8.75 4,437.65 100.00% 0.00 0.00 0.00%

38.50 7,161.00 186.00 7,161.00 100.00% 0.00 0.00 0.00%

1104.78 2,209.56 2 2,209.56 100.00% 0.00 0.00 0.00%

Page 509: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

62.37 47,239.04 757.4 47,239.04 100.00% 0.00 0.00 0.00%

7.15 4,336.62 606.52 4,336.62 100.00% 0.00 0.00 0.00%

47.85 3,055.70 63.86 3,055.70 100.00% 0.00 0.00 0.00%

507.16 3,240.75 6.39 3,240.75 100.00% 0.00 0.00 0.00%

38.5 4,744.74 0.00 0.00 0.00% 0.00 0.00 0.00%

7.15 1,996.49 0.00 0.00 0.00% 138.10 987.42 49.46%

47.85 2,713.10 0.00 0.00 0.00% 28.35 1,356.55 50.00%

507.16 1,460.62 0.00 0.00 0.00% 1.44 730.31 50.00%

Page 510: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

29.34 727.63 0.00 0.00 0.00% 0.00 0.00 0.00%

16.28 468.34 0.00 0.00 0.00% 0.00 0.00 0.00%

135.35 676.75 0.00 0.00 0.00% 0.00 0.00 0.00%

7.15 2,545.40 0.00 0.00 0.00% 0.00 0.00 0.00%

47.85 1,196.25 0.00 0.00 0.00% 0.00 0.00 0.00%

507.16 4,381.86 0.00 0.00 0.00% 0.00 0.00 0.00%

38.5 1,516.52 0.00 0.00 0.00% 0.00 0.00 0.00%

38.5 3,713.71 0.00 0.00 0.00% 0.00 0.00 0.00%

Page 511: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

7.15 1,118.26 156.4 1,118.26 100.00% 0.00 0.00 0.00%

47.85 1,234.53 25.8 1,234.53 100.00% 0.00 0.00 0.00%

507.16 745.53 1.47 745.53 100.00% 0.00 0.00 0.00%

38.5 4,087.68 0.00 0.00 0.00% 0.00 0.00 0.00%

7.15 1,929.07 269.8 1,929.07 100.00% 0.00 0.00 0.00%

47.85 1,160.84 24.26 1,160.84 100.00% 0.00 0.00 0.00%

507.16 1,414.98 2.79 1,414.98 100.00% 0.00 0.00 0.00%

29.34 1,455.26 0.00 0.00 0.00% 0.00 0.00 0.00%

16.28 936.69 0.00 0.00 0.00% 0.00 0.00 0.00%

Page 512: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

135.35 2,165.60 0.00 0.00 0.00% 0.00 0.00 0.00%

7.15 5,090.80 0.00 0.00 0.00% 0.00 0.00 0.00%

47.85 2,392.50 0.00 0.00 0.00% 0.00 0.00 0.00%

507.16 8,763.72 0.00 0.00 0.00% 0.00 0.00 0.00%

Page 513: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

38.5 5,088.78 0.00 0.00 0.00% 0.00 0.00 0.00%

360.23 2,521.61 0.00 0.00 0.00% 0.00 0.00 0.00%

7.15 1,461.46 0.00 0.00 0.00% 0.00 0.00 0.00%

47.85 734.50 0.00 0.00 0.00% 0.00 0.00 0.00%

507.16 1,120.82 0.00 0.00 0.00% 0.00 0.00 0.00%

38.5 8,985.13 233.38 8,985.13 100.00% 0.00 0.00 0.00%

Page 514: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

7.15 8,791.85 1229.63 8,791.85 100.00% 0.00 0.00 0.00%

47.85 6,122.41 127.95 6,122.41 100.00% 0.00 0.00 0.00%

507.16 5,842.48 11.52 5,842.48 100.00% 0.00 0.00 0.00%

72.04 98,752.43 0.00 0.00 0.00% 0.00 0.00 0.00%

4.83 2,143.55 0.00 0.00 0.00% 443.80 2,143.55 100.00%

5.23 247.12 0.00 0.00 0.00% 47.25 247.12 100.00%

Page 515: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

19.81 8,756.02 0.00 0.00 0.00% 0.00 0.00 0.00%

23.5 822.50 0.00 0.00 0.00% 35.00 822.50 100.00%

4.04 4,899.71 0.00 0.00 0.00% 1,212.80 4,899.71 100.00%

72.04 46,847.61 0.00 0.00 0.00% 0.00 0.00 0.00%

4.83 1,792.75 0.00 0.00 0.00% 371.17 1,792.75 100.00%

5.23 169.45 0.00 0.00 0.00% 32.40 169.45 100.00%

Page 516: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

19.81 5,863.76 0.00 0.00 0.00% 0.00 0.00 0.00%

23.5 564.00 24 564.00 100.00% 0.00 0.00 0.00%

4.04 3,059.90 757.4 3,059.90 100.00% 0.00 0.00 0.00%

4.83 1,254.06 0.00 0.00 0.00% 0.00 0.00 0.00%

5.23 115.06 0.00 0.00 0.00% 0.00 0.00 0.00%

23.50 916.50 0.00 0.00 0.00% 0.00 0.00 0.00%4.04 2,809.42 0.00 0.00 0.00% 0.00 0.00 0.00%

Page 517: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

30.89 8,013.48 0.00 0.00 0.00% 0.00 0.00 0.00%

72.04 18,688.62 0.00 0.00 0.00% 0.00 0.00 0.00%

19.81 2,071.14 0.00 0.00 0.00% 0.00 0.00 0.00%

4.83 522.32 0.00 0.00 0.00% 0.00 0.00 0.00%

23.5 446.50 0.00 0.00 0.00% 0.00 0.00 0.00%

4.04 2,747.20 0.00 0.00 0.00% 0.00 0.00 0.00%

Page 518: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

4.83 820.13 0.00 0.00 0.00% 0.00 0.00 0.00%

5.23 120.81 0.00 0.00 0.00% 0.00 0.00 0.00%

23.5 893.00 0.00 0.00 0.00% 0.00 0.00 0.00%

4.04 3,581.94 0.00 0.00 0.00% 0.00 0.00 0.00%

23.5 634.50 0.00 0.00 0.00% 0.00 0.00 0.00%

4.04 1,356.63 0.00 0.00 0.00% 0.00 0.00 0.00%

Page 519: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

4.83 850.51 0.00 0.00 0.00% 0.00 0.00 0.00%

4.04 48.88 0.00 0.00 0.00% 0.00 0.00 0.00%

23.5 470.00 0.00 0.00 0.00% 0.00 0.00 0.00%

4.04 2,022.83 0.00 0.00 0.00% 0.00 0.00 0.00%

4.83 107.46 0.00 0.00 0.00% 0.00 0.00 0.00%

23.5 540.50 0.00 0.00 0.00% 0.00 0.00 0.00%

4.04 1,379.26 0.00 0.00 0.00% 0.00 0.00 0.00%

Page 520: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

4.83 1,329.70 275.3 1,329.70 100.00% 0.00 0.00 0.00%

5.23 160.61 30.71 160.61 100.00% 0.00 0.00 0.00%

23.5 634.50 27 634.50 100.00% 0.00 0.00 0.00%

4.04 4,169.28 1032 4,169.28 100.00% 0.00 0.00 0.00%

8,276,948.93 440,713.32 5.32% 62,852.86 0.76%920,060.23 48,989.40 6,986.68

Page 521: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

6/4/2012

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

ParcialValorización Anterior Valorización Actual

Metrado Costo % Metrado Costo % Precio Unitario

420,363.64 22,382.63 3,192.1270,863.00 3,773.16 538.11

183,142.87 9,751.60 1,390.74

9,871,378.67 525,610.11 5.32% 74,960.51 0.76%

Page 522: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

Page 523: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

1.00 12,500.00 100.00% 0.00 0.00 0.00%

9,994.24 87,249.72 100.00% 0.00 0.00 0.00%

9,344.27 54,757.45 74.80% 3,148.53 18,450.36 25.20%

2,940.75 118,806.20 84.02% 559.25 22,593.80 15.98%

Page 524: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

226.00 8,701.00 100.00% 0.00 0.00 0.00%

4.00 3,183.52 100.00% 0.00 0.00 0.00%

1,212.80 75,642.34 100.00% 0.00 0.00 0.00%

879.10 6,285.57 100.00% 0.00 0.00 0.00%

90.86 4,347.65 100.00% 0.00 0.00 0.00%

8.75 4,437.65 100.00% 0.00 0.00 0.00%

186.00 7,161.00 100.00% 0.00 0.00 0.00%

2.00 2,209.56 100.00% 0.00 0.00 0.00%

Page 525: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

757.40 47,239.04 100.00% 0.00 0.00 0.00%

606.52 4,336.62 100.00% 0.00 0.00 0.00%

63.86 3,055.70 100.00% 0.00 0.00 0.00%

6.39 3,240.75 100.00% 0.00 0.00 0.00%

0.00 0.00 0.00% 123.24 4,744.74 100.00%

138.10 987.42 49.46% 141.13 1,009.08 50.54%

28.35 1,356.55 50.00% 28.35 1,356.55 50.00%

1.44 730.31 50.00% 1.44 730.31 50.00%

Page 526: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

0.00 0.00 0.00% 24.80 727.63 100.00%

0.00 0.00 0.00% 28.77 468.34 100.00%

0.00 0.00 0.00% 5.00 676.75 100.00%

0.00 0.00 0.00% 356.00 2,545.40 100.00%

0.00 0.00 0.00% 25.00 1,196.25 100.00%

0.00 0.00 0.00% 8.64 4,381.86 100.00%

0.00 0.00 0.00% 39.39 1,516.52 100.00%

0.00 0.00 0.00% 96.46 3,713.71 100.00%

Page 527: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

156.40 1,118.26 100.00% 0.00 0.00 0.00%

25.80 1,234.53 100.00% 0.00 0.00 0.00%

1.47 745.53 100.00% 0.00 0.00 0.00%

0.00 0.00 0.00% 106.17 4,087.68 100.00%

269.80 1,929.07 100.00% 0.00 0.00 0.00%

24.26 1,160.84 100.00% 0.00 0.00 0.00%

2.79 1,414.98 100.00% 0.00 0.00 0.00%

0.00 0.00 0.00% 49.60 1,455.26 100.00%

0.00 0.00 0.00% 57.54 936.69 100.00%

Page 528: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

0.00 0.00 0.00% 16.00 2,165.60 100.00%

0.00 0.00 0.00% 712.00 5,090.80 100.00%

0.00 0.00 0.00% 50.00 2,392.50 100.00%

0.00 0.00 0.00% 17.28 8,763.72 100.00%

Page 529: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

0.00 0.00 0.00% 132.18 5,088.78 100.00%

0.00 0.00 0.00% 7.00 2,521.61 100.00%

0.00 0.00 0.00% 204.40 1,461.46 100.00%

0.00 0.00 0.00% 15.35 734.50 100.00%

0.00 0.00 0.00% 2.21 1,120.82 100.00%

233.38 8,985.13 100.00% 0.00 0.00 0.00%

Page 530: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

1,229.63 8,791.85 100.00% 0.00 0.00 0.00%

127.95 6,122.41 100.00% 0.00 0.00 0.00%

11.52 5,842.48 100.00% 0.00 0.00 0.00%

0.00 0.00 0.00% 1,370.80 98,752.43 100.00%

443.80 2,143.55 100.00% 0.00 0.00 0.00%

47.25 247.12 100.00% 0.00 0.00 0.00%

Page 531: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

0.00 0.00 0.00% 442.00 8,756.02 100.00%

35.00 822.50 100.00% 0.00 0.00 0.00%

1,212.80 4,899.71 100.00% 0.00 0.00 0.00%

0.00 0.00 0.00% 650.30 46,847.61 100.00%

371.17 1,792.75 100.00% 0.00 0.00 0.00%

32.40 169.45 100.00% 0.00 0.00 0.00%

Page 532: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

0.00 0.00 0.00% 296.00 5,863.76 100.00%

24.00 564.00 100.00% 0.00 0.00 0.00%

757.40 3,059.90 100.00% 0.00 0.00 0.00%

0.00 0.00 0.00% 259.64 1,254.06 100.00%

0.00 0.00 0.00% 22.00 115.06 100.00%

0.00 0.00 0.00% 39.00 916.50 100.00%

0.00 0.00 0.00% 695.40 2,809.42 100.00%

Page 533: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

0.00 0.00 0.00% 259.42 8,013.48 100.00%

0.00 0.00 0.00% 259.42 18,688.62 100.00%

0.00 0.00 0.00% 104.55 2,071.14 100.00%

0.00 0.00 0.00% 108.14 522.32 100.00%

0.00 0.00 0.00% 19.00 446.50 100.00%

0.00 0.00 0.00% 680.00 2,747.20 100.00%

Page 534: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

0.00 0.00 0.00% 169.80 820.13 100.00%

0.00 0.00 0.00% 23.10 120.81 100.00%

0.00 0.00 0.00% 38.00 893.00 100.00%

0.00 0.00 0.00% 886.62 3,581.94 100.00%

0.00 0.00 0.00% 27.00 634.50 100.00%

0.00 0.00 0.00% 335.80 1,356.63 100.00%

Page 535: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

0.00 0.00 0.00% 176.09 850.51 100.00%

0.00 0.00 0.00% 12.10 48.88 100.00%

0.00 0.00 0.00% 20.00 470.00 100.00%

0.00 0.00 0.00% 500.70 2,022.83 100.00%

0.00 0.00 0.00% 22.25 107.46 100.00%

0.00 0.00 0.00% 23.00 540.50 100.00%

0.00 0.00 0.00% 341.40 1,379.26 100.00%

Page 536: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

275.30 1,329.70 100.00% 0.00 0.00 0.00%

30.71 160.61 100.00% 0.00 0.00 0.00%

27.00 634.50 100.00% 0.00 0.00 0.00%

1,032.00 4,169.28 100.00% 0.00 0.00 0.00%

503,566.18 6.08% 310,561.29 3.75%

55,976.09 34,521.79 3.8%

Page 537: f 19 Pio Aza Koribeni

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURAVALORIZACION PARTIDAS NUEVAS

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

EJECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Valorización Acumulada Saldo por Valorizar

Metrado Costo % Metrado Costo %

25,574.75 15,772.56 3.8%

4,311.28 2,658.87 3.8%

11,142.34 6,871.75 3.8%

600,570.63 6.08% 370,386.25 3.75%

Page 538: f 19 Pio Aza Koribeni

FORMATO SNIP 19

FICHA DE SEGUIMIENTO DEL PROYECTO DE INVERSIÓNI.INFORMACIÓN GENERAL

DATOS DEL PIP

SECTOR: GOBIERNO LOCAL

PLIEGO: MUNICIPALIDAD DISTRITAL DE ECHARATI

Nombre del Proyecto: "MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE-LA CONVENCION-CUSCO"

Objetivo del Proyecto: EFICIENTE PRESTACION DE LOS SERVICIOS EDUCATIVOS EN LOS NIVELES PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE CORIBENI

Presenta Plan de Trabajo y/o Término de Referencia: PdT X

Elaboración del Expediente Técnico: PdT X

Código SNIP: 213775

Fecha de la declaración de viabilidad: 5/8/2012

Monto de Inversión:perfil aprobado 9,966,082.00

Modalidad de Ejecución: ADMINISTRACIÓN DIRECTA

Código DNPP (SIAF): 2.157177

Monto de Inversión Modificado:(Expediente Técnico) 9,871,378.67

Porcentaje de modificación: -0.95%

Registro de Formatos: F15: X

Fecha del primer desembolso:

DATOS DE LA UNIDAD EJECUTORA

NOMBRE DE LA UNIDAD EJECUTORA: MUNICIPALIDAD DISTRITAL DE ECHARATI

NOMBRE Y CARGO DEL RESPONSABLE: Ing° Luis Efraín, ALTAMIRANO ROJAS

Page 539: f 19 Pio Aza Koribeni

TIEMPO DE EJECUCIÓN 12 Meses

FECHA DE INICIO DEL PROYECTO (Ejec.): 6/4/2012

PLAZO DE EJECUCIÓN SEGÚN CONTRATO (MESES): 12

FECHA DE CULMINACIÓN PREVISTA SEGÚN CONTRATO: 6/3/2013

AMPLIACIÓN DE PLAZO Y PRESUPUESTO SI

Presentación del Residente y Supervisor de Obra

DESCRIPCIÓN1ra Ampliación

Fecha de present. Cantidad

Ampliación de plazo (días calendario) 6/26/2013 300.00

Ampliación presupuesta (S/.) 0.00 0.00

% Perfil/exped. Modif. 0.00

Aprobación de la Ampliación

DESCRIPCIÓN

1ra Ampliación

Fecha de present. Fecha de Aprobación

Ampliación de plazo (días calendario) 6/26/2013 7/5/2013

Ampliación presupuesta (S/.) 0.00 0.00

% Perfil/exped. Modif. 0.00

II. SEGUIMIENTO DEL PIP (Eficiencia)

2.1. Situación de los Estudios Definitivos (Expedientes Técnicos)

Nota: la segunda ampliacion de plazo y la primera amplaicion de presupuesto aun no se han registrado en el sistema.

Page 540: f 19 Pio Aza Koribeni

Estudio definitivo Fecha Modalidad

Modificacionea de acuerdo a resultado del informe de consistencia y/o haber ocurrido incremento de monto de inversión y/o verificación de viabilidad:

Page 541: f 19 Pio Aza Koribeni

2.2. Si el PIP está a nivel de Expediente Técnico:

Componentes / Actividades

Preinversión

PIP Viable o presentado

Unidad de medida Cantidad (S/.)

EXPEDIENTE TÉCNICO Glb 180,000.00

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA 7,753,077.00

CONSTRUCCION DE AULAS Glb 2,456,330.00

CONSTRUCCION DE DIRECCION CON SSHH. Glb 452,365.00

CONSTRUCCION DE SSHH Glb 42,544.00

CONSTRUCCION DE SALA MULTIUSO Glb 325,436.00

CERCO PERIMETRICO, ATRIO Y PORTADA DE INGRESO Glb 638,884.00

PATIO DE RECREACION Glb 114,524.00

OBRAS COMPLEMENTARIAS Glb 52,436.00

ESTRUCTURAS Glb

ARQUITECTURA Glb 2,272,230.00

Page 542: f 19 Pio Aza Koribeni

PATIO Y CANCHAS POLIDEPORTIVAS Glb 555,992.00

INSTALACIONES SANITARIAS Glb 337,524.00

INSTALACIONES ELECTRICAS Glb 504,812.00

FLETE Glb 281,010.00

COMPONENTE 02; MOBILIARIOS Y EQUIPOS GLB 323,011.00

COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL GLB 7,080.00

COSTO DIRECTO 8,083,168.00

GASTOS GENERALES Glb 770,060.00

GASTOS DE SUPERVISIÓN Glb 418,210.00

LIQUIDACIÓN Glb 83,642.00

FLETE Glb 281,010.00

OTROS Glb 149,992.00

TOTAL 9,966,082.00

Nota: Adjuntar la copia del F15, F16, Resolución y otros documentos incluye contrato de la empresa.

Page 543: f 19 Pio Aza Koribeni

2.3. Avance Físico

Componente/Acciones

PIP Viable

Indicador (sólo el principal)

EXPEDIENTE TÉCNICO Expediente

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

OBRAS PROVISIONALES

BLOQUE VIVIENDAS DOCENTES PRIMARIA Y SECUNDARIA

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

BLOQUE AULAS SECUNDARIA

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

Page 544: f 19 Pio Aza Koribeni

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

INSTALACIONES ELECTRICAS

BLOQUE AULAS PRIMARIA

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

BLOQUE AUDITORIUM

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

BLOQUE BIBLIOTECA

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

BLOQUE TALLERES

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

Page 545: f 19 Pio Aza Koribeni

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

BLOQUE SALA DE CÓMPUTO

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

BLOQUE ADMINISTRACIÓN

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

SERVICIOS HIGIÉNICOS I Y II

INFRAESTRUCTURA

ARQUITECTURA

INSTALACIONES SANITARIAS

Page 546: f 19 Pio Aza Koribeni

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

INSTALACIONES ELECTRICAS

AREAS EXTERIORES Y OBRAS COMPLEMENTARIAS

INFRAESTRUCTURA

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

HUERTOS Y JARDINDES

BLOQUE LOSA DEPORTIVA I Y II, PATIO DE HONOR

CERCO PERIMETRICO

FLETE TERRESTRE

COMPONENTE 02; MOBILIARIOS Y EQUIPOS

CARPETAS UNIPERSONALES NIVEL PRIMARIO

COMPUTADORAS NIVEL PRIMARIO

MESA PEDAGÓGICA MADERA INCLUIDA 8 SILLAS

CARPETAS UNIPERSONALES NIVEL SECUNDARIO

COMPUTADORAS NIVEL SECUNDARIO

Page 547: f 19 Pio Aza Koribeni

OTROS

COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL

COSTO DIRECTO

GASTOS GENERALES GG

GASTOS DE SUPERVISIÓN GS

LIQUIDACIÓN

Proceso de selección para la contratación del consultor

Preliquidación

Liquidación del proyecto y aprobación

Page 548: f 19 Pio Aza Koribeni

2.4. Avance Financiero (**)

Fuente de Financiamiento: CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

Modalidad de Ejecución: ADMINISTRACIÓN DIRECTA

Componente/Acciones

PIP Viable

Indicador (sólo el principal)

EXPEDIENTE TÉCNICO Expediente

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

CONSTRUCCIÓN DE INFRAESTRUCTURA

COMPONENTE 02; MOBILIARIOS Y EQUIPOS

MOBILIARIO Y EQUIPOS

COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL

MITIGACIÓN AMBIENTAL

COSTO DIRECTO

GASTOS GENERALES GG

GASTOS DE SUPERVISIÓN GS

Page 549: f 19 Pio Aza Koribeni

LIQUIDACIÓN Liquidación

FLETE F

OTROS O

TOTAL

Page 550: f 19 Pio Aza Koribeni

(**) Este avance se comparará con el cronograma programado registrado en el SIAF-MPP

2.5.Cuadro resumen de las metas (PIP Viable y Ejecución de la inversión).

Componentes / ActividadesPIP Viable o presentado

Unidad de medida Cantidad (S/)

EXPEDIENTE TÉCNICO Glb 180,000.00

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA 7,753,077.00

CONSTRUCCIÓN DE INFRAESTRUCTURA M2 7,753,077.00

COMPONENTE 02; MOBILIARIOS Y EQUIPOS 323,011.00

MOBILIARIO Y EQUIPOS Glb 323,011.00

COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL 7,080.00

MITIGACIÓN AMBIENTAL Glb 7,080.00

COSTO DIRECTO 8,083,168.00

GASTOS GENERALES Glb 770,060.00

Page 551: f 19 Pio Aza Koribeni

GASTOS DE SUPERVISIÓN Glb 418,210.00

LIQUIDACIÓN Glb 83,642.00

FLETE Glb 281,010.00

OTROS Glb 149,992.00

TOTAL 9,966,082.00

III INFORMACIÓN DE AVANCES, LOGROS Y PROBLEMAS EN LA EJECUCIÓN:

COMPONENTE I

COMPONENTES

META FÍSICA PROGRAMADA ACUMULADA

Unidad de Medida Cantidad (%)

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

OBRAS PROVISIONALES GLB 100%

BLOQUE VIVIENDAS DOCENTES PRIMARIA Y SECUNDARIA M2 100%

BLOQUE AULAS SECUNDARIA M2 100%

Page 552: f 19 Pio Aza Koribeni

BLOQUE AULAS PRIMARIA M2 100%

BLOQUE AUDITORIUM M2 100%

BLOQUE BIBLIOTECA M2 100%

Page 553: f 19 Pio Aza Koribeni

BLOQUE TALLERES M2 100%

BLOQUE SALA DE CÓMPUTO M2 100%

BLOQUE ADMINISTRACIÓN M2 100%

SERVICIOS HIGIÉNICOS I Y II M2 100%

AREAS EXTERIORES Y OBRAS COMPLEMENTARIAS M2 100%

HUERTOS Y JARDINDES M2 100%

BLOQUE LOSA DEPORTIVA I Y II, PATIO DE HONOR M2 100%

CERCO PERIMETRICO ML 100%

FLETE TERRESTRE GLB 100%

Page 554: f 19 Pio Aza Koribeni

Principales logros o hechos positivos de resaltar:

Principales problemas que explican el bajo nivel de avance físico o financiero:

Acciones tomadas para superar los problemas presentados:

Se ha optado por modalidad de servicios de sub contrata por mano de obra. Elaboración del expedientillo del sustento de mayores metrados y nuevas metas para la ampliación presupuestal y ampliación de plazo.

COMPONENTE II

COMPONENTES

META FÍSICA PROGRAMADA ACUMULADA

Unidad de Medida Cantidad (%)

COMPONENTE 02; MOBILIARIOS Y EQUIPOS

_ se realizo el cambio del residente de obra e inspector, a partir del mes de febrero 2014 con quienes se biene reprogramando la ejecucion de la obra.- Se aprecia un considerable avance físico en cuanto a las construcciones de los módulos tanto en aulas Primaria como Secundaria para el mes de abril.- se viene tramitando la segunda ampliacion de plazo y primera amplaicion presupuestal para su registro respectivo.

• falta de personal técnico calificado, operarios, oficiales bajos rendimientos de avance por contar solo con obreros de la zona con baja capacitación técnica en construcción - • Se sigue teniendo problemas como son los bajos rendimientos que existen y estos no estaban contemplados en el expediente técnico y teniéndose esos problemas la obra se sigue ejecutando a un ritmo positivo. -• no se atiende los requerimientos de fierro y materiales eléctricos.

Page 555: f 19 Pio Aza Koribeni

MOBILIARIO Y EQUIPOS Glb 100%

Principales logros o hechos positivos de resaltar:

Aún no se ejecuta

Principales problemas que explican el bajo nivel de avance físico o financiero:

Aún no se ejecuta

Acciones tomadas para superar los problemas presentados:

Aún no se ejecuta

Page 556: f 19 Pio Aza Koribeni

COMPONENTE III

COMPONENTES

META FÍSICA PROGRAMADA ACUMULADA

Unidad de Medida Cantidad (%)

COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL

MITIGACIÓN AMBIENTAL Glb 100%

Principales logros o hechos positivos de resaltar:

Aún no se ejecuta

Principales problemas que explican el bajo nivel de avance físico o financiero:

Aún no se ejecuta

Acciones tomadas para superar los problemas presentados:

Aún no se ejecuta

Nombres y apellidos del informante: Ing. MANUEL CARPIO GANDULIAS

Page 557: f 19 Pio Aza Koribeni

Correo electrónico del informante: [email protected]

Teléfono del informante: 993488932

Nota: Llenar la presente ficha una por cada proyecto de inversión o estudio de preinversión cofinanciado.

Considerar en la meta financiera ejecutada el monto girado.

Agregar los recuadros necesarios según el número de componentes de cada proyecto o estudio de preinversión que se informa.

Residente de Obra Inspector de Obra

Ing Manuel carpio Gandulias Ing. JULIO CARBAJAL COILACIP: 106532 CIP: 29186

Page 558: f 19 Pio Aza Koribeni

FORMATO SNIP 19

FICHA DE SEGUIMIENTO DEL PROYECTO DE INVERSIÓN

GOBIERNO LOCAL

MUNICIPALIDAD DISTRITAL DE ECHARATI

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE-LA CONVENCION-CUSCO"

EFICIENTE PRESTACION DE LOS SERVICIOS EDUCATIVOS EN LOS NIVELES PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE CORIBENI

TdR

TdR

213775

5/8/2012

9,966,082.00

ADMINISTRACIÓN DIRECTA

2.157177

9,871,378.67

-0.95%

F 16: X

MUNICIPALIDAD DISTRITAL DE ECHARATI

Ing° Luis Efraín, ALTAMIRANO ROJAS

Page 559: f 19 Pio Aza Koribeni

12 Meses

6/4/2012

12

6/3/2013

SI

2da Ampliación 3ra Ampliación

Fecha de present. Cantidad Fecha de present. Cantidad

4/20/2014 245.00 0.00 0.00

4/21/2014 1, 885,727.16 0.00 0.00

17.48 0.00

1ra Ampliación 2da Ampliación

Cantidad Fecha de present. Fecha de Aprobación Cantidad

300.00 3/30/2014 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00

II. SEGUIMIENTO DEL PIP (Eficiencia)

Fecha de Culminación

Page 560: f 19 Pio Aza Koribeni

Modalidad Estado Costo S/. Nombre del Responsable

Modificacionea de acuerdo a resultado del informe de consistencia y/o haber ocurrido incremento de monto de inversión y/o verificación de viabilidad:

Page 561: f 19 Pio Aza Koribeni

Inversión

Expediente Técnico / Estudio Definitivo 1/

Unidad de medida Cantidad (S/.)

Glb 183,142.87

-0.95%

7,883,830.73

Glb

Glb

Glb

Glb

Glb

Glb

Glb

Glb 2,494,281.07

Glb 3,484,334.30

Variación % perfil/exped.

Page 562: f 19 Pio Aza Koribeni

Glb -0.95%

Glb 582,317.23

Glb 507,327.64

Glb 815,570.49

GLB 376,476.00

GLB 16,642.20

8,276,948.93

Glb 920,060.23

Glb 420,363.64

Glb 70,863.00

Glb

Glb

9,871,378.67

Nota: Adjuntar la copia del F15, F16, Resolución y otros documentos incluye contrato de la empresa.

Page 563: f 19 Pio Aza Koribeni

PIP Viable

Ejecución del MesIndicador (sólo el principal) Unidad de medida

Expediente Glb 1

-

OBRAS PROVISIONALES GLB 1 0

BLOQUE VIVIENDAS DOCENTES PRIMARIA Y SECUNDARIA M2 408.75 0.00

INFRAESTRUCTURA glb 1.00 0.00

ARQUITECTURA glb 1.00 0.00

INSTALACIONES SANITARIAS glb 1.00 0.00

INSTALACIONES ELECTRICAS glb 1.00 0.00

BLOQUE AULAS SECUNDARIA M2 545.65 18.03

INFRAESTRUCTURA glb 1.00 0.00

ARQUITECTURA glb 1.00 0.09

INSTALACIONES SANITARIAS glb 1.00 0.00

Meta total vigente/Exp. Téc.Meta total vigente/

Perfil Aprobado

Page 564: f 19 Pio Aza Koribeni

INSTALACIONES ELECTRICAS glb 1.00 0.00

BLOQUE AULAS PRIMARIA M2 760.09 35.43

INFRAESTRUCTURA glb 1.00 0.03

ARQUITECTURA glb 1.00 0.09

INSTALACIONES SANITARIAS glb 1.00 0.00

INSTALACIONES ELECTRICAS glb 1.00 0.00

BLOQUE AUDITORIUM M2 265 0

INFRAESTRUCTURA glb 1.00 0.000

ARQUITECTURA glb 1.00 0.000

INSTALACIONES SANITARIAS glb 1.00 0.000

INSTALACIONES ELECTRICAS glb 1.00 0.000

BLOQUE BIBLIOTECA M2 175.75 0

INFRAESTRUCTURA glb 1.00 0.000

ARQUITECTURA glb 1.00 0.000

INSTALACIONES SANITARIAS glb 1.00 0.000

INSTALACIONES ELECTRICAS glb 1.00 0.000

BLOQUE TALLERES M2 201.03 7.55

INFRAESTRUCTURA glb 1.00 0.02

ARQUITECTURA glb 1.00 0.07

INSTALACIONES SANITARIAS glb 1.00 0.00

INSTALACIONES ELECTRICAS glb 1.00 0.00

Page 565: f 19 Pio Aza Koribeni

BLOQUE SALA DE CÓMPUTO M2 223.05 35.74

INFRAESTRUCTURA glb 1.00 0.38

ARQUITECTURA glb 1.00 0.01

INSTALACIONES SANITARIAS glb 1.00 0.00

INSTALACIONES ELECTRICAS glb 1.00 0.00

BLOQUE ADMINISTRACIÓN M2 121.5 4.29

INFRAESTRUCTURA glb 1.00 0.05

ARQUITECTURA glb 1.00 0.02

INSTALACIONES SANITARIAS glb 1.00 0.00

INSTALACIONES ELECTRICAS glb 1.00 0.00

SERVICIOS HIGIÉNICOS I Y II M2 77.84 0

INFRAESTRUCTURA glb 1.00 0.00

ARQUITECTURA glb 1.00 0.00

INSTALACIONES SANITARIAS glb 1.00 0.00

Page 566: f 19 Pio Aza Koribeni

INSTALACIONES ELECTRICAS glb 1.00 0.00

AREAS EXTERIORES Y OBRAS COMPLEMENTARIAS M2 1104 0.311

INFRAESTRUCTURA glb 1.00 0.001

INSTALACIONES SANITARIAS glb 1.00 0.000

INSTALACIONES ELECTRICAS glb 1.00 0.000

HUERTOS Y JARDINDES M2 76772 2594.61

BLOQUE LOSA DEPORTIVA I Y II, PATIO DE HONOR M2 1889 35.05

CERCO PERIMETRICO ML 705 0

FLETE TERRESTRE GLB 1 0.125

Glb 1

CARPETAS UNIPERSONALES NIVEL PRIMARIO Unid. 300 1 0

COMPUTADORAS NIVEL PRIMARIO Unid. 21 1 0

MESA PEDAGÓGICA MADERA INCLUIDA 8 SILLAS Unid. 21 1 0

CARPETAS UNIPERSONALES NIVEL SECUNDARIO Unid. 200 1 0

COMPUTADORAS NIVEL SECUNDARIO Unid. 21 1 0

Page 567: f 19 Pio Aza Koribeni

OTROS Glb 1 1 0

Glb 1 1 0

GG Glb 1

GS Glb 1

Proceso de selección para la contratación del consultor Glb 1

Preliquidación Glb 1

Liquidación del proyecto y aprobación Glb 1

Page 568: f 19 Pio Aza Koribeni

CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

ADMINISTRACIÓN DIRECTA

PIP Viable

Ejecución del MesIndicador (sólo el principal) Unidad de medida

Expediente Glb 180,000.00 183,142.87

7,753,077.00 7,883,830.73 166,869.13

CONSTRUCCIÓN DE INFRAESTRUCTURA Glb 7,753,077.00 7,883,830.73 166,869.13

323,011.00 376,476.00 -

MOBILIARIO Y EQUIPOS Glb 323,011.00 0

7,080.00 16,642.20 -

MITIGACIÓN AMBIENTAL Glb 7,080.00 16,642.20 0

8,083,168.00 8,276,948.93 166,869.13

GG Glb 770,060.00 920,060.23

GS Glb 418,210.00 420,363.64

Meta total vigente/Exp. Téc.Meta total vigente/

Perfil Aprobado

Page 569: f 19 Pio Aza Koribeni

Liquidación Glb 83,642.00 70,863.00 -

F Glb 281,010.00 -

O Glb 149,992.00 -

9,966,082.00 9,871,378.67 166,869.13

Page 570: f 19 Pio Aza Koribeni

0.16 0.8400

Expediente Técnico

Ejecución de la Inversión

% de ModificaciónEjecución del mes

Cantidad (S/) Cantidad (S/) Cantidad (S/) Cantidad (S/) %

183,142.87 -

7,883,830.73 166,869.13 - -

7,883,830.73 166,869.13

- - - -

-

16,642.20 - - -

16,642.20

7,900,472.93 166,869.13 - -

920,060.23 - - -

Ejecución de Mayores Metrados

Ejecución de Nuevas Metas

Page 571: f 19 Pio Aza Koribeni

420,363.64 -

70,863.00 -

- - - -

- -

9,494,902.67 166,869.13 - -

III INFORMACIÓN DE AVANCES, LOGROS Y PROBLEMAS EN LA EJECUCIÓN:

COMPONENTE I

META FÍSICA EJECUTADA ACUMULADA

Unidad de Medida Cantidad (%) Unidad de Medida Cantidad (S/.) Unidad de Medida

GLB 100%

M2 43%

Glb 9,871,378.67 Glb

M2 63%

META FINANCIERA PROGRAMADA ACUMULADA (S/.)

META FINANCIERA EJECUTADA ACUMULADA (S/.)

Page 572: f 19 Pio Aza Koribeni

M2 57%

Glb 9,871,378.67 Glb

M2 0%

M2 0%

Page 573: f 19 Pio Aza Koribeni

M2 23%

Glb 9,871,378.67 Glb

M2 23%

M2 31%

M2 0%

M2 2%

M2 7%

M2 3%

ML 0%

GLB 25%

Page 574: f 19 Pio Aza Koribeni

Principales logros o hechos positivos de resaltar:

Principales problemas que explican el bajo nivel de avance físico o financiero:

Acciones tomadas para superar los problemas presentados:

Se ha optado por modalidad de servicios de sub contrata por mano de obra. Elaboración del expedientillo del sustento de mayores metrados y nuevas metas para la ampliación presupuestal y ampliación de plazo.

COMPONENTE II

META FÍSICA EJECUTADA ACUMULADA

Unidad de Medida Cantidad (%) Unidad de Medida Cantidad (S/.) Unidad de Medida

_ se realizo el cambio del residente de obra e inspector, a partir del mes de febrero 2014 con quienes se biene reprogramando la ejecucion de la obra.- Se aprecia un considerable avance físico en cuanto a las construcciones de los módulos tanto en aulas Primaria como Secundaria para el mes de abril.- se viene tramitando la segunda ampliacion de plazo y primera amplaicion presupuestal para su registro respectivo.

falta de personal técnico calificado, operarios, oficiales bajos rendimientos de avance por contar solo con obreros de la zona con baja capacitación técnica en construcción - • Se sigue teniendo problemas como son los bajos rendimientos que existen y estos no estaban contemplados en el expediente técnico y teniéndose esos problemas la obra se sigue ejecutando a un ritmo positivo. -• no se atiende los requerimientos de fierro y materiales eléctricos.

META FINANCIERA PROGRAMADA ACUMULADA (S/.)

META FINANCIERA EJECUTADA ACUMULADA (S/.)

Page 575: f 19 Pio Aza Koribeni

Glb 0.00% Glb Glb

Principales logros o hechos positivos de resaltar:

Aún no se ejecuta

Principales problemas que explican el bajo nivel de avance físico o financiero:

Aún no se ejecuta

Acciones tomadas para superar los problemas presentados:

Aún no se ejecuta

Page 576: f 19 Pio Aza Koribeni

COMPONENTE III

META FÍSICA EJECUTADA ACUMULADA

Unidad de Medida Cantidad (%) Unidad de Medida Cantidad (S/.) Unidad de Medida

Glb 0.00% Glb 16,642.20 Glb

Principales logros o hechos positivos de resaltar:

Aún no se ejecuta

Principales problemas que explican el bajo nivel de avance físico o financiero:

Aún no se ejecuta

Acciones tomadas para superar los problemas presentados:

Aún no se ejecuta

Nombres y apellidos del informante: Ing. MANUEL CARPIO GANDULIAS

META FINANCIERA PROGRAMADA ACUMULADA (S/.)

META FINANCIERA EJECUTADA ACUMULADA (S/.)

Page 577: f 19 Pio Aza Koribeni

Correo electrónico del informante: [email protected]

Teléfono del informante: 993488932

Agregar los recuadros necesarios según el número de componentes de cada proyecto o estudio de preinversión que se informa.

Gerente de Línea Responsable de OPI

Ing° WILBER LAPA BERROCAL ING. MARCO ANTONIO VELÁSQUEZ PAREDES

Page 578: f 19 Pio Aza Koribeni

FORMATO SNIP 19

FICHA DE SEGUIMIENTO DEL PROYECTO DE INVERSIÓN

GOBIERNO LOCAL

MUNICIPALIDAD DISTRITAL DE ECHARATI

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE-LA CONVENCION-CUSCO"

EFICIENTE PRESTACION DE LOS SERVICIOS EDUCATIVOS EN LOS NIVELES PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE CORIBENI

213775

5/8/2012

9,966,082.00

ADMINISTRACIÓN DIRECTA

2.157177

9,871,378.67

-0.95%

Resolución Nª 667-2013-GM-MDE/LC (16/10/2013) Expediente Técnico

MUNICIPALIDAD DISTRITAL DE ECHARATI

Ing° Luis Efraín, ALTAMIRANO ROJAS

Page 579: f 19 Pio Aza Koribeni

12 Meses

6/4/2012

12

6/3/2013

SI

2da Ampliación

Fecha de Culminación

0.00

0.00

0.00

Page 580: f 19 Pio Aza Koribeni

Nombre del Responsable

Page 581: f 19 Pio Aza Koribeni
Page 582: f 19 Pio Aza Koribeni
Page 583: f 19 Pio Aza Koribeni

Avance acum.

Modificaciones en Ejecución

Avance TotalMayores Metrados Nuevas Metas Deductivos

(a) (b) (c) (d) a+b+c-d

1.00 2.42 3.419

175.46

0.97 1.57 0.17 2.713

0.34 0.01 0.02 0.363

0.19 0.10 0.289

0.06 0.00 0.065

344.02

1.00 0.02 0.15 1.170

0.43 0.06 0.02 0.499

0.08 0.08 0.164

Page 584: f 19 Pio Aza Koribeni

0.14 0.138

430.83

0.75 0.05 0.119 0.917

0.40 0.00 0.02 0.416

0.13 0.36 0.000 0.490

0.15 0.151

0.18

0.001 0.001

0.000 0.000

0.000 0.000

0.000 0.000

0.08

0.001 0.001

0.000 0.000

0.000 0.000

0.000 0.000

46.40

0.52 0.02 0.03 0.570

0.07 0.00 0.00 0.068

0.00 0.000

0.00 0.000

Page 585: f 19 Pio Aza Koribeni

51.95

0.56 0.10 0.02 0.680

0.01 0.014

0.00 0.000

0.00 0.000

38.13

0.60 0.103 0.02 0.720

0.02 0.024

0.00 0.004

0.00 0.000

0.02

0.00 0.001

0.00 0.000

0.00 0.000

Page 586: f 19 Pio Aza Koribeni

0.00 0.000

18.11

0.040 0.040

0.000 0.000

0.000 0.000

5383.12

57.63

0.70

0.25

0

0

0

0

0

Page 587: f 19 Pio Aza Koribeni

0

0

Page 588: f 19 Pio Aza Koribeni

CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

ADMINISTRACIÓN DIRECTA

Avance acum.

Modificaciones en Ejecución

Avance TotalMayores Metrados Nuevas Metas Deductivos

(a) (b) (c) (d) a+b+c-d

183,142.87

6,047,715.59 - - -

6,047,715.59

-

0

-

0

6,047,715.59 - - -

486,266.05

222,168.68

Page 589: f 19 Pio Aza Koribeni

-

-

6,939,293.19 - - -

Page 590: f 19 Pio Aza Koribeni
Page 591: f 19 Pio Aza Koribeni

COMPONENTE I

Cantidad (S/.)

6,939,293.19

META FINANCIERA EJECUTADA ACUMULADA (S/.)

Page 592: f 19 Pio Aza Koribeni

6,939,293.19

Page 593: f 19 Pio Aza Koribeni

6,939,293.19

Page 594: f 19 Pio Aza Koribeni

Principales logros o hechos positivos de resaltar:

Principales problemas que explican el bajo nivel de avance físico o financiero:

Acciones tomadas para superar los problemas presentados:

Se ha optado por modalidad de servicios de sub contrata por mano de obra. Elaboración del expedientillo del sustento de mayores metrados y nuevas metas para la ampliación presupuestal y ampliación de plazo.

COMPONENTE II

Cantidad (S/.)

falta de personal técnico calificado, operarios, oficiales bajos rendimientos de avance por contar solo con obreros de la zona con baja capacitación técnica en construcción - • Se sigue teniendo problemas como son los bajos rendimientos que existen y estos no estaban contemplados

META FINANCIERA EJECUTADA ACUMULADA (S/.)

Page 595: f 19 Pio Aza Koribeni

Principales logros o hechos positivos de resaltar:

Aún no se ejecuta

Principales problemas que explican el bajo nivel de avance físico o financiero:

Aún no se ejecuta

Acciones tomadas para superar los problemas presentados:

Aún no se ejecuta

Page 596: f 19 Pio Aza Koribeni

COMPONENTE III

Cantidad (S/.)

0.00

Principales logros o hechos positivos de resaltar:

Aún no se ejecuta

Principales problemas que explican el bajo nivel de avance físico o financiero:

Aún no se ejecuta

Acciones tomadas para superar los problemas presentados:

Aún no se ejecuta

Nombres y apellidos del informante: Ing. MANUEL CARPIO GANDULIAS

META FINANCIERA EJECUTADA ACUMULADA (S/.)

Page 597: f 19 Pio Aza Koribeni

Correo electrónico del informante: [email protected]

Teléfono del informante: 993488932

ING. MARCO ANTONIO VELÁSQUEZ PAREDES

Page 598: f 19 Pio Aza Koribeni

FORMATO SNIP 19

FICHA DE SEGUIMIENTO DEL PROYECTO DE INVERSIÓN

GOBIERNO LOCAL

MUNICIPALIDAD DISTRITAL DE ECHARATI

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE-LA CONVENCION-CUSCO"

EFICIENTE PRESTACION DE LOS SERVICIOS EDUCATIVOS EN LOS NIVELES PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE CORIBENI

213775

5/8/2012

9,966,082.00

ADMINISTRACIÓN DIRECTA

2.157177

9,871,378.67

-0.95%

X

MUNICIPALIDAD DISTRITAL DE ECHARATI

Ing° Luis Efraín, ALTAMIRANO ROJAS

Page 599: f 19 Pio Aza Koribeni

12 Meses

6/4/2012

12

6/3/2013

SI

Page 600: f 19 Pio Aza Koribeni
Page 601: f 19 Pio Aza Koribeni
Page 602: f 19 Pio Aza Koribeni
Page 603: f 19 Pio Aza Koribeni

Variación % Perfil/Modif.

Page 604: f 19 Pio Aza Koribeni
Page 605: f 19 Pio Aza Koribeni
Page 606: f 19 Pio Aza Koribeni
Page 607: f 19 Pio Aza Koribeni
Page 608: f 19 Pio Aza Koribeni

Variación % Perfil/Modif.

Page 609: f 19 Pio Aza Koribeni

-

Page 610: f 19 Pio Aza Koribeni
Page 611: f 19 Pio Aza Koribeni
Page 612: f 19 Pio Aza Koribeni
Page 613: f 19 Pio Aza Koribeni
Page 614: f 19 Pio Aza Koribeni
Page 615: f 19 Pio Aza Koribeni
Page 616: f 19 Pio Aza Koribeni
Page 617: f 19 Pio Aza Koribeni