15
3 0 , 0 0 0 S F T R I A N G L E D A T A C E N T E R F O R S A L E | F O R L E A S E RALEIGH – DURHAM AREA CARY, NORTH CAROLINA Email: [email protected] Phone: 704.651.2210 Online: www.five9sdigital.com

F O R L E A S E - assets.contentful.com€¦ · c o n c e p t u a l l a y o u t 1 staging data center telco / network #1 elec / ups fire / sprklr admin lobby shell tenant space loading

Embed Size (px)

Citation preview

3 0 , 0 0 0 S F T R I A N G L E D A T A C E N T E R

F O R S A L E | F O R L E A S E

RALEIGH – DURHAM AREA CARY, NORTH CAROLINA

Email: [email protected]

Phone: 704.651.2210

Online: www.five9sdigital.com

S P E C I F I C A T I O N S

LOCATION 3300 Regency Parkway

Cary, North Carolina Raleigh-Durham data center market

EQUIPMENT YARD Enclosed and secured equipment area

housing generator and fuel storage 2,000 kW existing, low hour generator Additional pad stubbed and ready for

second generator 12,000 gallon existing fuel tank with on

site fuel scrubberSIZE Approximately 30,000 RSF data center Freestanding, single level building

POWER Duke Energy – scalable power 1.5 MW existing transformer with

expansion capacity Low cost power ranging from $.045 to

$.055 per kwh for high load customers Power can be loop fed from a circuit to

two (2) substations Power incentives available

FIBER Diverse fiber routes into the building 3 – 4” conduits entering the north and

south of the data center AT&T, DukeNet, Verizon, tw telecom,

Time Warner, and others nearby

PARKING 64 parking spaces available Expansion of parking possible on site

WATER | SEWER City water City Sewer

MECHANICAL Two (2) 140 ton air cooled chillers Four (4) 36 ton units feeding ring duct

and VAVs Electrical room and one data center area

equipped with two (2) 15 ton units

ROOF | CEILING Fibertite roof system 2 ply vapor barrier Equalizer valve system 14 ‘ clear height

SECURITY Card access control at all access points Perimeter and interior security cameras High impact concrete bollards surround

the building

FIRE PROTECTION Dual interlock, pre-action fire

suppression system VESDA early warning system Cross zone releasing function Zoned heat and smoke detection

S O U T H C A R O L I N A

N O R T H C A R O L I N A

A S H E V I L L E

C H A R L O T T E

L E N O I R

G R E E N S B O R O

L O C A T I O N

W I N S T O N – S A L E M

R A L E I G H – D U R H A M

TriangleData Center

The existing 30,000 SF Triangle Data Center (below, blue) is located in Cary, North Carolina, within the Southeast's most activedata center cluster. The data center is located approximately 18 miles from the Research Triangle Park in Durham, NC, which is home to numerous corporate data centers such as IBM, Ericsson, Synthon, Fidelity, Cisco, EMC, the Social Security Administration, and is near the Peak 10 and Windstream Hosted Solutions data centers.

Regionally, the data center is ideally located in close proximity to numerous metropolitan markets. It is located within the high demand Raleigh-Durham market, 70 miles from Greensboro, 90 miles from Winston-Salem, and 140 miles from Charlotte, NC.

L O C A T I O N

The Triangle Data Center is located in the high demand Raleigh-Durham, NC data center market, within the highly distinguished Regency Park business park. The business park is prominently located at the interchange of US-1 and US-64,easily accessible to every major travel corridor and just minutes from I-40 and the I-440 beltline.

Triangle Data Center

S I T E M A P

The 30,000 SF Triangle Data Center offers a securely enclosed equipment yard on site. The equipment yard houses a low hour, 2,000 kW enclosed generator with an additional pad stubbed and ready for a second generator. The equipment yard also houses a 12,000 gallon fuel storage tank with fuel scrubber.

C O N C E P T U A L L A Y O U T 1

STAGING

DATA CENTER

TELCO /

NETWORK #1

ELEC / UPS

FIRE /

SPRKLR

ADMIN

LOBBY

SHELL TENANT SPACE

LOADING

DOCK

ENG.

CTRL

33

00

REG

EN

CY

PA

RK

WA

Y

DA

TA C

EN

TER

CO

NC

EP

TC

AR

Y, N

C

GA-3

DATA HALL AREA: ~ 5,550 SF

OFFICE / ADMIN AREA: ~ 4,000 SF

ELEC / SUPPORT AREA: ~ 2,650 SF

Capacity: 120 Racks

Power Density: 150 W/SF (6.9 kW / rack)

Distribution: 10 CRAH’s

12 PDU’sSHELL TENANT SPACE: ~ 14,800 SF

GA-1

GA-1

1 DATA CENTER CONCEPT PLAN

8'

GRAPHIC SCALE

16' 32' 48'

SMALL ENTERPRISE

33

00

REG

EN

CY

PA

RK

WA

Y

DA

TA C

EN

TER

CO

NC

EP

TC

AR

Y, N

C

GA-3

DATA HALL AREA: ~ 13,000 SF

OFFICE / ADMIN AREA: ~ 4,000 SF

ELEC / SUPPORT AREA: ~ 3,750 SF

Capacity: 282 Racks

Power Density: 150 W/SF (6.9 kW / rack)

Distribution: 27 CRAH’s

32 PDU’sSHELL TENANT SPACE: ~ 6,250 SF

LARGE ENTERPRISE

GA-2

1 DATA CENTER CONCEPT PLAN

8'

GRAPHIC SCALE

16' 32' 48'

GA-2

ELEC / UPS

LOADING FIRE /

SPRKLR

ADMIN

STAGING

TELCO /

NETWRK #2

TELCO /

NETWORK #1

SHELL TENANT SPACEDATA HALL #2

DATA HALL #3

DATA HALL #1

C O N C E P T U A L L A Y O U T 2

DATA HALL #2

TELCO /

NETWORK #1

ELEC / UPS #1

FIRE /

SPRKLR

ADMIN

LOADING

DOCK

ELEC / UPS #2

TELCO /

NETWORK #2

STAGING /

STORAGE

DATA HALL #1

33

00

REG

EN

CY

PA

RK

WA

Y

DA

TA C

EN

TER

CO

NC

EP

TC

AR

Y, N

C

GA-3

GA-3

1 CO-LOCATION CONCEPT PLAN

8'

GRAPHIC SCALE

16' 32' 48'

DATA HALL AREA: ~ 20,000 SF

OFFICE / ADMIN AREA: ~ 3,800 SF

ELEC / SUPPORT AREA: ~ 3,200 SF

Capacity: 725 Racks

Power Density: 150 W/SF (4 kW / rack)

Distribution: 30 CRAH’s

30 PDU’s

C O N C E P T U A L L A Y O U T 3

N O R T H C A R O L I N A

D A T A C E N T E R M A P

This map has been compiled courtesy of Five 9s Digital. For display purposes, data center locations are not exact or to scale. This graphic is meant to serve as an overall look at the data center landscape in North Carolina.

The Triangle Data Center is highlighted in yellow above (DC) and in close proximity to the Research Triangle Park, which is home to numerous data centers such as IBM, Ericsson, Synthon, Fidelity, Cisco, EMC, the Social Security Administration.

DC Triangle Data Center

N O R T H C A R O L I N A

Raleigh-Durham

Charlotte

Greensboro

Hickory

1 2 3 4

5

6

7

1117

18

21

2419

Data Center Map1. Facebook 2. Disney3. WiPro4. AT&T5. Time Warner Cable6. Apple iCloud7. Bed Bath & Beyond8. Google9. Centrilogic10. DataChambers

11. Wells Fargo12. Lowes Home Improvement13. TIAA CREF14. Windstream Hosted Solutions15. Peak 1016. Bank of America17. American Express18. Fidelity19. IBM20. Social Security Administration

Winston-Salem

98 12

13

23

10

21. EMC22. Synthon23. Ericsson24. Cisco25. Peak 1026. Windstream Hosted Solutions27. DataChambers

1415

16

22

2526 20

27DC

D U K E E N E R G Y S E R V I C E A R E A M A P

D U K E E N E R G Y

The Data Center is located in the heart of Duke Energy’s service area, with access to abundant, low-cost power.

Electric rates range from $.045 to $0.055 per KWH for high load customers. Power incentives are also available.

45.7% of Duke Energy’s power is generated at Nuclear Generation Plants. Duke energy offers a diverse generation portfolio that ensures rate stability and offers green energy blends.

Triangle Data Center

F L O O R P L A N

Approximately 30,000 RSF

D I S A S T E R A V O I D A N C E

The Triangle Data Center is located in an area designated as a low risk for natural disasters

Cary, North Carolina

Low Natural Disaster RisksCary, North Carolina is located in an area known for its low risk of natural disasters. The area benefits greatly from an equitable climate with moderate year-round temperatures.

Access to High-Tech WorkforceNorth Carolina’s 58-campus community college system is nationally recognized for its customized workforce training programs, particularly for research, development, and technology related jobs. Additionally, the state’s 16-campus renowned university system and extensive private university sector such as nearby UNC Chapel Hill, Duke, Wake Forest, and NC State are integral to North Carolina’s strong research and development infrastructure.

The North Carolina Data Center ClusterOver the past six (6) years, North Carolina has witnessed a flurry of substantial data center investments. Google, Apple, Disney, Wipro, American Express, EMC, AT&T, Bed Bath & Beyond, Time Warner Cable, and IBM among others have all positioned data centers in North Carolina.

Regional GatewayThe Triangle Data Center is located in Wake County, North Carolina within the Regency Park business park. The data center offers access to US-1 and US-64, is easily accessible to every major travel corridor, and is just minutes from I-40 and the I-440 beltline. The location also provides convenient access to the Raleigh-Durham International Airport.

Competitive CaryCary, North Carolina offers a highly-educated workforce, a diverse business landscape, and a competitive cost of doing business, creating an ideal environment for new and expanding companies. Thousands of businesses have responded by establishing offices, headquarters and major facilities in Cary, including Verizon, American Airlines, Kellogg’s, John Deere, LexisNexis, Siemen’s Medical, Deutsche Bank, and Fidelity Investment among others.

Access to Major Metropolitan AreasThe centralized location of the region is an ideal access point to the other major metropolitan areas of North Carolina including Greensboro to the west and Charlotte to the south.

Raleigh, North Carolina

R E G I O N A L P R O F I L E

NC State University – Raleigh, NC

Best Data Sites Certification™The data center site selection process can be a lengthy, costly, and inconsistent science. Best Data Sites Certification™ is a consolidated standards system whereby the strictest industry site selection requirements are used to evaluate potential data center sites and buildings within a weighted scoring matrix.

BDS Alliance™ & the BDS Standards™The BDS Alliance™ is an independent board comprised of data center professionals and companies. The alliance is charged with the creation and continued evaluation and maintenance of the BDS Standards™. These standards are key to creating an efficient, reliable, and cost effective data center site selection evaluation process.

Triangle Data Center is Now BDS Certified™The existing 30,000 SF Triangle Data Center, located in Cary, North Carolina, has been Best Data Sites Certified™. Significant factors include abundant, low cost, reliable power; diverse fiber connectivity; excellent water and sewer infrastructure; and a low risk of natural and man-made threats.

Recent TransactionsTowards the end of 2012, multiple Best Data Sites Certified™data center properties transacted in the marketplace. In November, Bed Bath & Beyond purchased a 50,000 SF BDS Certified™ data center shell in Catawba County, North Carolina. DataChambers also purchased a certified data center in October in the Raleigh-Durham area of North Carolina.

North Carolina data center operator and hosting services provider Dacentec Inc. retained the services of Five 9s Digital to represent them in the sale of their data center and operations. Their Lenoir, NC data center was BDS Certified™in 2012 and, in June of 2013, the data center and operations were acquired in a deal by CentriLogic.

Certification & Economic Development PartnershipsOver the past year, data center recruitment efforts have become increasingly collaborative in nature. The same can be said for Best Data Sites Certification™. Economic development groups, land and building owners, and utilities companies have partnered together throughout the certification process, seeking to improve their region’s competitive advantage as it relates to landing new data center initiatives.

B E S T D A T A S I T E S

F O R M O R E I N F O R M A T I O N :

Doug Hollidge: [email protected] 704.651.2210

F O R S A L E | F O R L E A S E

RALEIGH – DURHAM AREA CARY, NORTH CAROLINA

3 0 , 0 0 0 S F T R I A N G L E D A T A C E N T E R

W E B S I T E :

www.five9sdigital.com