Facts and Tasks

at Fukushima DaiichiAugust 2012

Skilled Veterans Corps for Fukushima

Page 2: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

1  Building of Unit 4 at Fukushima Daiichi

Quote TEPCO

  Facts at Fukushima Daiichi

UNIT 4

Page 3: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

Quote TEPCO

  Facts at Fukushima Daiichi

  Building of Unit 3 at Fukushima Daiichi 2

UNIT 3

Page 4: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

Quote TEPCO

  Facts at Fukushima Daiichi

  Temporary Seawall at Fukushima Daiichi

3

Page 5: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Facts at Fukushima Daiichi

Hoses for Contaminated Cooling Water

Quote TEPCO

4

Page 6: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Facts at Fukushima Daiichi

  Route of Cooling Water Hoses and Leakages

Quote TEPCO

5

Page 7: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

Fuel Debris

Quote TEPCO

  Facts at Fukushima Daiichi

  Present Status of Fuel Debris (Estimated)

6

Quote EPRI

Page 8: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

Spent Fuel Removal

Spent Fuel Removal

Quote TEPCO

  Tasks at Fukushima Daiichi

7

Page 9: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

Steps for Fuel Debris Removal  

Repair of PCV (lower) Fuel Debris Removal

Quote TEPCO

  Tasks at Fukushima Daiichi

8

Page 10: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  TMI-2 Cleanup Experience

11

2019 20202021

Quote TEPCO

1984-1989

Fuel Removal

Quote EPRI

9Annual Doses at TMI-2 and TEPCO’s Estimation of Man Power Requirement

Page 11: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Appeal of SVCF

Statement

SVCF requests:

Skilled Veterans be allowed to work at Fukushima Daiichito reduce doses for

Younger Workers10

Page 12: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Appeal of SVCF

Progress 11

March 11, 2011 Earthquake and Tsunami

April 10, 2011 First Appeal was delivered

May 4, 2011 First negotiation with TEPCO

May 24, 2011 Meeting with Mr. Hosonoand TEPCO

July 12, 2011 SVCF Inspection Team toFukushima Daiichi

August 3, 2011 Proposal to Government and to TEPCO

Page 13: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

Limited Responcibility by TEPCO for Dose Control

  Barrier for Fukushima Daiichi

a c2nd Sub-

Contractors b d

TEPCOFukushima Daiichi

PrimeContractors

Workers

Dose Control forWorkers within

Fukushima Daiichi

e

ASub-

Contractors Dose Controlby Employer not to

Exceed LimitValue

B C D F

3rd Sub-Contractors

Dose Control by Each Worker

400 Contractors

Workers

Workers

Workers

Workers

E

12

Page 14: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Proposal For National Project

Necessity of National Project

1. Independent from TEPCO2. Employ worldwide expertise3. Integrated Project management4. International inspection team

13

FukushimaDaiichi

TEPCO

National Project

Even TEPCO is owned by the government it is still profit oriented private company, as the same case as GM

Page 15: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Proposal For National Project

Necessity of National Project

1.Project Team shall be independent from TEPCO

There are so many issues are not known at Fukushima Daiichi, that a profit oriented company never has capabilities to deal with such a project

Presently the project cannot be open and clear due to TEPCO’s own interest

14

Page 16: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Proposal For National Project

Concentrate Capabilities Worldwidely 18

2.The Project Team shall employ capabilities, knowledge,   experiences from all over the world

Fukushima Daiichi is more complex than Chernobyl, and larger in size than TMI-2

The project cannot be handled only by Nuclear Specialists. It’s much complicated Engineering Project

The Project members shall be from TEPCO, Hitachi, Toshiba; and also experienced engineers from Chernobyl, TMI-2, as well as Bechtel, Fluor, TEC, JGC, Chiyoda and/or other companies

15

Page 17: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Proposal For National Project

Integration of Operation, Clean-up, and R&D

3.Integrated Project Management, including progress, quality, cost, and radiation exposure control shall be applied

Project shall be managed in integrated way and avoid multi-layered contract system

Workers shall be employed directly by the Project Team , unless specially required

Allocation of workers including SVCF’s members shall be optimized considering dose in relation to age, skill, work place, etc.

17

Page 18: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Proposal For National Project

Integrated Project Management 20

4.Inspection Team consisting of international members shall be formed

Independent Inspection Team shall be free to check safety, progress, etc. to minimize risk of accident and minimize the cost and time

17

Page 19: Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

  Proposal For National Project

International Inspection Team

SVCF appeals you: to speak up and to ask your

Government to request Japan Government that:

18

1. Form a National Project Team for Containment and Cleanup of Fukushima Daiichi, which is independent from TEPCO

2. Utilize all of the assets in the world

3. Integrated Project Management shall be the key replacing traditional multi-layered sub-contract structure

4. International Inspection Team be established