Forestville Project
Information Memorandum2014
‘The best investment on earth is Earth!’
Table of Contents
Topic Page
Overview of the Opportunity 3
Overview of the Land 5
Capital Structure and Minimum Investment Size 9
Illustrative Investor Returns 12
FAQ’s 29
Private & Confidential
Forestville Project
2
Overview of Opportunity
Executive Summary
3
Transaction 6.15 Acres of land parcel at Hinjewadi, Pune (“Land”) has been acquired in Pune Premises. It is a
partnership firm owned by Atul M. Lunkad and Sanjay M. Palesha.
Land proposed to be transferred vide Regd. Development Agreement under a Special Purpose Vehicle –
Forestville Premises Pvt. Ltd.
Investors to subscribe to preference shares in the SPV and with “Advance/ Loan”
Business
Model of the
SPV
The SPV shall acquire the land vide Regd. Development Agreement from Pune Premises..
It will hold the land for 7 Years from the date of entering into Regd. Development agreement.
After a period of 7 Years the company will have 3 options i.e :-
i) Sell the Land at prevailing market value
ii) Enter into Joint Venture Agreement with Third Party (Developer);
iii) Develop the Plot by the SPV
iv) TDR (in case of reservation on the land)
Investment
Amount Investment amount is Rs. 5,30,588 Lacs equivalent to 1323.97 Sq. Ft of Land Area
INR. 1000/- Preference Share and INR. 5,29,588 Lacs as “Advance/ Deposit” (Advance/ Deposit to ensure
tax efficient profit extraction)
0.5% ownership as Preference Share
Growth
Potential and
Returns
Significant appreciation in land price expected over the coming years in the Western Corridor of Pune
An investment of INR 4,63,390 Lacs for 0.5% in preference to potentially yield an investment multiple of ~
4x over a 7 year period
The SPV has the option to repay its “Advance/ Loan” facilitating an exit for the investors.
Overview of the Opportunity
Private & Confidential
Forestville Project
4
Overview of the Land
5
Land Details and Attributes
Land area 6.15 acres
Location Hinjewadi, Pune – Western Corridor
Business Model Land & Equity
About
Hinjewadi
Hinjewadi officially is a locality now treated as the IT Village of Pune which is located on the NH4 bypass around the city of Pune.Originally a small village, it is now the location of Rajiv Gandhi InfoTech Park, housing around two hundred software companies
Proximity to Industrial hubs
• The technology park at Hinjawadi houses many software companies. Some of them are: EMERSON Innovation Center Pune, Fulcrum Worldwide, IBM India, Hexaware Technologies, AtoS, Synechron Technologies, Mahindra Engineering (located at the remotest corner of phase 2), Idea Cellular, KPIT Cummins, Tata Technologies, Infosys, Wipro, Credit Suisse (located inside Wipro), Tata Consultancy Services, Geometric Limited, Tech Mahindra,Cognizant Technology Solutions, Persistent Systems, Honeywell, Mindtree, 3DPLM Software Solutions, CECsoft, Compulink, Pesh-Infotech, ANSYS Fluent and Digital Group InfoTech. It also houses product companies such as Compulink and CISCO.
Nearby Townships
developments
• The influx of IT professionals to the Rajiv Gandhi InfoTech Park is causing a rapid growth of townships in Hinjawadi. This has led to the development of integrated townships in Hinjewadi, which have schools, health care facilities, restaurants, shopping areas andentertainment areas on their premises. Most of the developers in Pune are developing integrated townships in Hinjawadi. Some of these townships include Megapolis Pune by Pegasus Properties Ltd, Life Republic by Kolte Patil Developers, Blue Ridge by ParanjapeSchemes (Construction) Limited and Xrbia by Eiffel Group.
Rapidly growingEducation hub
• Two major colleges are also located in Hinjawadi namely International Institute of Information Techonology and Symbiosis Centre for Management and Human Resource Development. These two are located in Phase 1 of the Area.
• Sharad Pawar international school in Megapolis Township.
Private & Confidential
Forestville Project
6
Land Location and Connectivity
Private & Confidential
Forestville Project
7
Land Location and Connectivity
Private & Confidential
Forestville Project
8
Capital Structure &
Investment Size
9
Capital Structure of the SPV
SPV
Land parcel
InvestorsPromoters
100%
49% Preference Share Holders51% Preference Share Holders
Private & Confidential
Forestville Project
10
Investment Size
Investment
(% of Contribution of Total
Capital Raise)
Amt. In. Rs.
(Rate / Sq ft of total land
area per unit of investment
i.e 1323.97 sqft.)
Investment towards:
- Cost of 1 Preference
Share
1000/- -
- Cost of 1 Unit
(Land)
4,63,390/- Rs. 350/-
- Development
Expenses
66,199/- Rs.50/-
TDS (Collected Today) 38,146/- Rs. 29/-
Total 568,734/- Rs 430/-
Private & Confidential
Forestville Project
11
Minimum Investment Number Values (Rs)
- Through
Preference Shares
1 Rs 1000/-
- Through Loan - Rs. 5,29,588/-
Total Rs 5,30,588/-
1 Unit of Investment is equivalent to 1323.97 sqft. of land area and 0.5% ownership in the SPV
Illustrative Investor Returns
12
Assumptions and Product Mix
1. Project Duration
- Option I (Sell the land) - 7 Years
- Option II (Joint Venture with Third Party) – 7 Years + 4 Years = 11 Years
- Option III (Company itself Develops the Plot) – 7 Years + 4 Years = 11 Years
2. The incoming investors will be issued preference shares of Rs. 1000/- each for each unit of investment.
3. Each Investors investment will be linked for arithmetical understanding to an area of 1323.97 Sq. Ft. @ Rs. 350/- per sq.
ft. i.e. Rs.5,29,588/-
4. Investor will have to pay Rs. 50/- per sq. ft. towards development expense i.e. Rs.66,199/-
5. Every Investor will have to pay TDS amount (Rs. 29/Sqft.) in advance on the date of investment as an part of investment
itself.
6. The balance investment will come into the company in the form of Loan / Advance.
7. Loan/ Advance will be entitled to an interest @ 12% p.a.
8. Interest, will be accumulated every year and corresponding TDS (Tax Deducted at Source) will be credited to the
investor (Tax Credit).
9. Investor can exit from the Investment Option at any time and get 12% p.a. interest. Investor will transfer his shares to
promoters, if he desires to exit.
10. Investor will get accumulated interest on Loan/Advance and profits (after taxes) will be distributed in the form of
dividend, which will be a tax free income at the end of the project.
Private & Confidential
Forestville Project
13
Assumptions and Product Mix
1. Income Tax Rate @ 33.99%
2. Dividend Distribution Tax @ 17%
3. TDS on investment collected today does not form part of the cost of investment as the credit of the same can be
claimed by the investor.
4. In case of a reservation on land of any kind, TDR is issued against it. Currently the TDR cost in the market rates are as
below
Zone A – Rs. 4500 / Sqft
Zone B – Rs. 4000 / Sqft
Zone C – Rs. 3500 / Sqft
Zone D – Rs. 2800 / Sqft
The returns for the same have been shown in the presentation ahead.
Private & Confidential
Forestville Project
14
Option 1 : Sale of Land
15
Facts & Assumptions :
1. Total Area of land = 2,64,795 Sqft.
2. Sale Rate of Land is considered @ Rs. 2500/Sqft.
3. Project Duration : 7 Years
Option 1 : (Option 3 for Investor)RETURN ON INVESTMENT TO INVESTORS
SR NO PARTICULARS AMOUNT IN RS.
A AREA IN SQ. FT 1323.97
B COST OF INVESTMENT PER SQ. FT 350
C COST OF INVESTMENT (A*B) 463390
D DEVELOPMENT EXPENSE PER SQ. FT 50
E COST OF DEVELOPMENT (A*D) 66199
F TDS ON INVESTMENT COLLECTED TODAY 38146
G TOTAL COST OF INVESTMENT (C+E) 529588
H INTEREST ON INVESTMENT RECEIVED FOR 7 YEARS 381462
I DIVIDEND ON INVESTMENT 1480072
J TOTAL RETURN ON INVESTMENT (H+I) 1861535
K INVESTMENT VALUE AT THE END OF 7 TH YEAR (G+J) 2391123
L INVESTMENT MULTIPLIER (K/G) 4.52
M % RETURN P.A. [(J/G)/7] 50%
Private & Confidential
Forestville Project
16
Computation Of Tax
Private & Confidential
Forestville Project
17
PARTICULARS (Amount in Rs Lakhs)
Sale Consideration for Land 6620
6620
Less : Revalued Cost of Acquisition 927
Accumulated Interest on Loans 381
Accumulated Development Expenses 65 1373
Profit Before Tax 5247
Income Tax @33.99% 1783
Profit After Tax 3463
Computation of Tax on Distributable Profits
Preference Shareholders
Preference Dividend Payable to PSH 3463
Less : Dividend Distribution Tax @ 17% 503
Preference Dividend Payable 2960
Profitability Statement
Private & Confidential
Forestville Project
18
YEAR
PROJECTIONS (Amt. in Lacs)
1 2 3 4 5 6 7 8
INCOME:
Sale of Land at Sr. No. 451,Godambewadi - - - - - - 6619.85 -
Closing WIP 990.76 1054.52 1118.29 1182.05 1245.81 1309.57 - -
TOTAL (A) 990.76 1054.52 1118.29 1182.05 1245.81 1309.57 6619.85 -
EXPENSES
Opening Work - In - Progress - 990.76 1054.52 1118.29 1182.05 1245.81 1309.57 -
Land at Sr.No. 451,Godambewadi 927.00 - - - - - - -
Estimated Development Expenses each year (For Details Kindly Refer Statement of Development Expenses)
9.27 9.27 9.27 9.27 9.27 9.27 9.27 -
Interest on Unsecured Loan 54.49 54.49 54.49 54.49 54.49 54.49 54.49 -
TOTAL (B) 990.76 1054.52 1118.29 1182.05 1245.81 1309.57 1373.34 -
Net Profit Before Tax - - - - - - 5246.51 -
Preference Dividend - - - - - - 2960.14 -
Income Tax @ 33.99% - - - - - - 1783.36 -
Dividend Distribution Tax @ 17% - - - - - - 503.22 -
Profit After Tax 2286.37 -
Option 2 : Joint Venture
19
Facts & Assumptions :
1. Total Area of land - 2,64,795 Sqft.
2. Joint Venture considered in Ratio 30% (Land Owners) : 70% (Developer)
3. Total Saleable Area – 4,23,974 Sqft.
4. Sale Rate of Flat is considered @ Rs. 7000/Sqft.
5. Project Duration : 7 + 4 Years Years
Option 2 : (Option 2 for Investor)
Private & Confidential
Forestville Project
20
SR NO PARTICULARS AMOUNT IN RS.
A AREA IN SQ. FT 1323.97
B COST OF INVESTMENT PER SQ. FT 350
C COST OF INVESTMENT (A*B) 463390
D DEVELOPMENT EXPENSE PER SQ. FT 50
E COST OF DEVELOPMENT (A*D) 66199
F TDS ON INVESTMENT COLLECTED TODAY 59944
G TOTAL COST OF INVESTMENT (C+E) 529588
H INTEREST ON INVESTMENT RECD. FOR 11 YEARS 599441
I DIVIDEND ON INVESTMENT 2043663
J TOTAL RETURN ON INVESTMENT (H+I) 2643104
K INVESTMENT VALUE AT THE END OF 11th YEAR (G+J) 3172692
L INVESTMENT MULTIPLIER 5.99
M % RETURN P.A. [(J/G)/11] 45%
Computation Of Tax
Private & Confidential
Forestville Project
21
PARTICULARS (Amount in Lacs)
Sale Consideration 8903
8903
Less : Expenses 1659
Profit Before Tax 7245
Income Tax @33.99% 2462
Profit After Tax 4782
Computation of Tax on Distributable Profits
Preference Shareholders
Preference Dividend Payable to PSH 4782
Less : Dividend Distribution Tax @ 17% 695
Preference Dividend Payable 4087
Profitability Statement
Private & Confidential
Forestville Project
22
YEAR
PROJECTIONS
1 2 3 4 5 6 7 8 9 10 11 12
INCOME:
Consideration for JV - - - - - - - - - - 8903.45 -
Closing WIP 1000.41 1073.82 1147.23 1220.63 1294.04 1367.45 1440.86 1495.35 1549.85 1604.34 - -
TOTAL (A) 1000.41 1073.82 1147.23 1220.63 1294.04 1367.45 1440.86 1495.35 1549.85 1604.34 8903.45 -
EXPENSES
Opening Work - In - Progress - 1000.41 1073.82 1147.23 1220.63 1294.04 1367.45 1440.86 1495.35 1549.85 1604.34 -
Land at Sr.No. 451,Godambewadi 927.00 - - - - - - - - - - -
Estimated Development Expenses each year (For Details Kindly Refer Statement of Development Expenses)
18.91 18.91 18.91 18.91 18.91 18.91 18.91 - - - - -
Interest on Unsecured Loan 54.49 54.49 54.49 54.49 54.49 54.49 54.49 54.49 54.49 54.49 54.49 -
TOTAL (B) 1000.41 1073.82 1147.23 1220.63 1294.04 1367.45 1440.86 1495.35 1549.85 1604.34 1658.84 -
Net Profit Before Tax - - - - - - - - - - 7244.62 -
Preference Dividend - - - - - - - - - - 4087.33 -
Income Tax @ 33.99% - - - - - - - - - - 2462.45 -
Dividend Distribution Tax @ 17% - - - - - - - - - - 694.85 -
Profit After Tax - - - - - - - - - - 3157.29 -
Option 3 : Self Development
(7 + 4 Years)
23
Facts & Assumptions :
1. Total Area of land - 2,64,795 Sqft.
2. Total Saleable Area – 4,23,974 Sqft.
3. Sale Rate of Flat is considered @ Rs. 7000/Sqft.
4. Construction Cost considered as Rs. 3500/- Sqft.
5. Project Loan is considered for Rs. 25Cr. @ 14% p.a.
6. Project Duration : 7 + 4 Years Years
Option 3 : Option 1 for Investor
Private & Confidential
Forestville Project
24
SR NO PARTICULARS AMOUNT IN RS.
A AREA IN SQ. FT 1323.97
B COST OF INVESTMENT PER SQ. FT 350
C COST OF INVESTMENT (A*B) 463390
D DEVELOPMENT EXPENSE PER SQ. FT 50
E COST OF DEVELOPMENT (A*D) 66199
F TDS ON INVESTMENT COLLECTED TODAY 59944
G TOTAL COST OF INVESTMENT (C+E) 529588
H INTEREST ON INVESTMENT RECEIVED FOR 11 YEARS 599441
I DIVIDEND ON INVESTMENT 4894769
J TOTAL RETURN ON INVESTMENT (H+I) 5494210
K INVESTMENT VALUE AT THE END OF 11th YEAR (G+J) 6023798
L INVESTMENT MULTIPLIER 11.37
M % RETURN P.A. [(J/G)/11] 94%
Computation Of Tax
Private & Confidential
Forestville Project
25
PARTICULARS
Sale Consideration 29678
29678
Less : Expenses 12327
Profit Before Tax 17352
Income Tax @33.99% 5898
Profit After Tax 11454
Computation of Tax on Distributable Profits
Preference Shareholders
Preference Dividend Payable to PSH 11454
Less : Dividend Distribution Tax @ 17% 1664
Preference Dividend Payable 9790
Profitability Statement
Private & Confidential
Forestville Project
26
YEAR
PROJECTIONS
1 2 3 4 5 6 7 8 9 10 11 12
INCOME:
Sale of Flats - - - - - - - - - - 29678.18 -
Closing WIP 1000.41 1073.82 1147.23 1220.63 1294.04 1367.45 1440.86 4934.62 8428.38 11922.13 - -
TOTAL (A) 1000.41 1073.82 1147.23 1220.63 1294.04 1367.45 1440.86 4934.62 8428.38 11922.13 29678.18 -
EXPENSES
Opening Work - In - Progress - 1000.41 1073.82 1147.23 1220.63 1294.04 1367.45 1440.86 4934.62 8428.38 11922.13 -
Land at Sr.No. 451,Godambewadi 927.00 - - - - - - - - - - -
Estimated Development Expenses each year (For Details Kindly Refer Statement of Development Expenses)
18.91 18.91 18.91 18.91 18.91 18.91 18.91 3089.26 3089.26 3089.26 - -
Interest on Unsecured Loan 54.49 54.49 54.49 54.49 54.49 54.49 54.49 54.49 54.49 54.49 54.49 -
Interest on Bank Finance - - - - - - - 350.00 350.00 350.00 350.00 -
TOTAL (B) 1000.41 1073.82 1147.23 1220.63 1294.04 1367.45 1440.86 4934.62 8428.38 11922.13 12326.63 -
Net Profit Before Tax - - - - - - - - - - 17351.55 -
Preference Dividend - - - - - - - - - -9789.54
-
Income Tax @ 33.99% - - - - - - - - - - 5897.79 -
Dividend Distribution Tax @ 17% - - - - - - - - - - 1664.22 -
Profit After Tax - - - - - - - - - - 7562.01 -
Investor Return
Private & Confidential
Forestville Project
27
Sr. No.
Particulars SALE OF
LANDJV @ 25% JV @30% JV @ 35% DEVELOP SALE OF TDR
A Cost of Investment 5.30 5.30 5.30 5.30 5.30 5.30
Bi Interest on Investment 3.81 5.99 5.99 5.99 5.99 3.81
Bii Dividend on Investment 14.80 16.25 20.44 24.62 48.95 16.85
Total Returns (Post Tax) 18.62 22.25 26.43 30.62 54.94 20.67
C Investment Value 23.91 27.54 31.73 35.91 60.24 25.96
D % Returns per annum 50% 38% 45% 53% 94% 56%
EInvestment Multiplier (times)
4.52 5.20 5.99 6.78 11.37 4.90
Frequently Asked Questions
28
Land FAQ’s
1. What is the location of the land?Land is located at 3 mins. away from Phase 3 in Hinjewadi, Pune.
2. In whose name is the 7/12 Extract on?The land is currently on the name of M/S Pune Premises
3. Then why are the cheques being taken in the name of Forestville Premises Pvt. Ltd.?There has been a development agreement between Pune Premises & Forestville Premises Pvt. Ltd. Thus transferring all the development rights in the name of Forestville Premises Pvt. Ltd. Thus now the land is being held under this SPV
4. What is the status of the land?The land currently is in Proposed Residential zone.
5. What is the existing plot rate in Hinjewadi?Currently agricultural land rates in Hinjewadi is from Rs. 500-700/Sqft.
6. Is the title of the property clear?Yes the title of the property is a 100% clear. You will get to see all the supporting documents at our office. If required, a CD with our legal documents will be provided by our Sales representative.
7. Who will service the land for the next 7 years?The company will service the land for the next 7 years.
Private & Confidential
Forestville Project
29
FAQ’s1. As an investor, after 7 years what is the best option for me?As an investor the highest returns will be in the following order :A. The company itself develops the landB. Give the land in JVC. Sell of the land
2. Why cannot I put all my money as preference share and divide it between preference & loan?Company has framed such a policy considering all the preference shareholders and taxation both in the hands of the company and investor.From Company’s point of view – i) Interest can be claimed as expenditure ii) Tax on Interest saved.From Investors point of view- i) Every year some amount of income is getting accrued of which taxation benefit can be claimed by the investor. ii) At the end of the 7th year tax burden will be less. dividend income received by the investor will be tax free.
3. If want to opt out of the scheme before the 7 year term, who will buy my shares?The investor has the option to exit from the scheme at any given point of time with ROI of 12% Simple interest.
4. What is my security against the investment Scheme?Every Investor investing in our scheme will get a Preference Share Certificate & Share holders Agreement.
5. Are there any additional charges for documentation?No, there are no additional charges for documentation.
6. Why is the TDS amount collected from me today itself?As there would be on transaction in the company for 7 years there would be no funds in the company’s accounts, therefore investors
being the only source of TDS, the same is collected in advance rather than every year. The credit of which can be taken by the investor.
Private & Confidential
Forestville Project
30
FAQ’s7. Can NRI’s invest in this investment scheme?No NRI’s are not eligible for investing in this investment scheme.
8. Who will be deciding the valuation of the land after 7 yearsThe company will have the land valuated from top real estate companies like JLL, CBRE & Knight Frank.
9. What are the facilities being provided for which Rs. 50/Sqft is being charged?Rs. 50/Sqft. Is being charged for the following purposes
A. Fencing / Compound Wall F. Waterline / Drip IrrigationB. Leveling G. Landscaping & Tree PlantationC. Demarcation H. Electric MeterD. Internal Roads I. SecurityE. Staff / Admin Expenses J. Liasoning
10. Key distances from our plot:
Phase 3 3 mins Hotel Lemon Tree 10 minsPhase 2 7 mins Pune – Mumbai Highway 15 minsPhase 1 10 mins Symbiosis Infotech Campus 10 minsPirangut 15 mins Balewadi Stadium 20 mins
Private & Confidential
Forestville Project
31
Disclaimer
• This presentation does not constitute offer to the Public to subscribe to the Securities of the Company. This Investor
Presentation has been prepared for investors, solely for informational purposes.
• The information contained herein has been prepared to assist prospective investors in making their own evaluation
of the Company and does not purport to be all-inclusive or to contain all of the information a prospective or
existing investor may desire. In all cases, interested parties should conduct their own investigation and analysis of
the Company and the Transaction and the data set forth in this information. We makes no representation or
warranty as to the accuracy or completeness of this information and shall not have any liability for any
representations (expressed or implied) regarding information contained in, or for any omissions from, this
information or any other written or oral communications transmitted to the recipient in the course of its evaluation
of the Transaction.
• The Investments is only suitable for sophisticated investors who are able to bear the risk and who have sought
professional advice concerning the possible tax consequences, legal requirements relevant to the investment and
relevant generally to the making of investments in such projects.
• This Information includes certain statements and estimates provided by the Company with respect to the
projected future performance of the Company. Such statements, estimates and projections reflect various
assumptions by promoters concerning possible anticipated results, which assumptions may or may not be correct.
No representations are made as to the accuracy of such statements, estimates or projections. Prospective investors
will be expected to have conducted their own due diligence investigation regarding these and all other matters
pertinent to investment in the Company.
Private & Confidential
Forestville Project
32