1
REKAPITULASI PELAKSANAAN HASIL REVERSE ENGINEERING / NON-OEM UBP ……………… SEMESETER 1 TAHUN 2013 (01 JANUARY - 30 JUNI 2013) Report Date : …………………………………… No. Kode Anggaran** Uraian Material ** Satuan** Keterangan Rp. Tahun Volume Tanggal** Rp.** Volume Tanggal** Rp.** A B C D E F G H I J K L M N O P = N x K Q R S T U = S x K V contoh: PLTU 1 1 c.dd.e.aa.bbb Mechanical Seal 39.003.002.0294 Buah Mitsubishi 100,000,000 1991 914,027,494 PT. XYZ 548,416,496 200,000,00017 Juni 2010 10 23 Mei 2012 5,484,164,963 10 Mei 2014 5 23 Mei 2013 2,742,082,482 dst SUB TOTAL 100,000,000 914,027,494 548,416,496 200,000,000 5,484,164,963 2,742,082,482 PLTG 2 dst SUB TOTAL 100,000,000 914,027,494 548,416,496 200,000,000 5,484,164,963 2,742,082,482 TOTAL 200,000,000 1,828,054,988 1,096,832,993 400,000,000 10,968,329,926 5,484,164,963 Jakarta, …………………. 2013 Note : General Manager ** Mandatory data yang wajib diisi untuk perhitungan penilaian KKU Reverse Engineering dan tidak menjadi point penilaian apabila kosong 1) Untuk memisahkan harga material RE dengan jasa dalam melaksanakan RE tersebut Nama 2) Tanggal Penerimaan Barang yang tertera pada TUG 4 (Bon Pemeriksaan Barang) 3) Tanggal Pengeluaran Barang yang tertera pada TUG 9 (Bon Pengeluaran Barang) 4) Update berdasarkan inflasi dll agar diperoleh kesetaraan harga saat ini Kode Material (Maximo) ** Nama Pabrikan OEM ** Harga Satuan OEM TERAKHIR** Harga Satuan OEM Ter- UPDATE 4) (Rp.)** List Nama Workshop NON-OEM** Harga Satuan Material NON- OEM (Rp.)** Harga Satuan Jasa RE Non-OEM (Rp.) 1) Tanggal Perolehan Non-OEM Pertama Kali Penerimaan Material Non-OEM Terbaru 2) Jumlah PO Non- OEM (kali) Tanggal Rencana Pemasangan Material Non- OEM Realisasi Material Non-OEM Terpasang 3) Tersedia detail drawing, design, spesifikasi material yang berada di UBP

Formulir RE SM 1 - 2013

Embed Size (px)

DESCRIPTION

vcv

Citation preview

Page 1: Formulir RE SM 1 - 2013

REKAPITULASI PELAKSANAAN HASIL REVERSE ENGINEERING / NON-OEMUBP ………………

SEMESETER 1 TAHUN 2013 (01 JANUARY - 30 JUNI 2013)Report Date : ……………………………………

No. Kode Anggaran** Uraian Material ** Satuan** KeteranganRp. Tahun Volume Tanggal** Rp.** Volume Tanggal** Rp.**

A B C D E F G H I J K L M N O P = N x K Q R S T U = S x K Vcontoh:PLTU 1

1 c.dd.e.aa.bbb Mechanical Seal 39.003.002.0294 Buah Mitsubishi 100,000,000 1991 914,027,494 PT. XYZ 548,416,496 200,000,000 17 Juni 2010 10 23 Mei 2012 5,484,164,963 10 Mei 2014 5 23 Mei 2013 2,742,082,482

dstSUB TOTAL 100,000,000 914,027,494 548,416,496 200,000,000 5,484,164,963 2,742,082,482

PLTG 2dstSUB TOTAL 100,000,000 914,027,494 548,416,496 200,000,000 5,484,164,963 2,742,082,482TOTAL 200,000,000 1,828,054,988 1,096,832,993 400,000,000 10,968,329,926 5,484,164,963

Jakarta, …………………. 2013

Note : General Manager

** Mandatory data yang wajib diisi untuk perhitungan penilaian KKU Reverse Engineeringdan tidak menjadi point penilaian apabila kosong

1) Untuk memisahkan harga material RE dengan jasa dalam melaksanakan RE tersebut Nama

2) Tanggal Penerimaan Barang yang tertera pada TUG 4 (Bon Pemeriksaan Barang)3) Tanggal Pengeluaran Barang yang tertera pada TUG 9 (Bon Pengeluaran Barang)4) Update berdasarkan inflasi dll agar diperoleh kesetaraan harga saat ini

Kode Material (Maximo) **

Nama Pabrikan OEM **

Harga Satuan OEM TERAKHIR**

Harga Satuan OEM Ter-UPDATE 4)

(Rp.)** List Nama Workshop

NON-OEM**

Harga Satuan Material NON-

OEM(Rp.)** Harga Satuan

Jasa RE Non-OEM (Rp.) 1)

Tanggal Perolehan Non-OEM

Pertama Kali

Penerimaan Material Non-OEM Terbaru 2) Jumlah

PO Non-OEM (kali)

Tanggal Rencana

Pemasangan Material Non-

OEM

Realisasi Material Non-OEM Terpasang 3)

Tersedia detail drawing, design, spesifikasi material yang berada di UBP