Upload
chihiya-fitria-nurhayati
View
220
Download
0
Embed Size (px)
DESCRIPTION
vcv
Citation preview
REKAPITULASI PELAKSANAAN HASIL REVERSE ENGINEERING / NON-OEMUBP ………………
SEMESETER 1 TAHUN 2013 (01 JANUARY - 30 JUNI 2013)Report Date : ……………………………………
No. Kode Anggaran** Uraian Material ** Satuan** KeteranganRp. Tahun Volume Tanggal** Rp.** Volume Tanggal** Rp.**
A B C D E F G H I J K L M N O P = N x K Q R S T U = S x K Vcontoh:PLTU 1
1 c.dd.e.aa.bbb Mechanical Seal 39.003.002.0294 Buah Mitsubishi 100,000,000 1991 914,027,494 PT. XYZ 548,416,496 200,000,000 17 Juni 2010 10 23 Mei 2012 5,484,164,963 10 Mei 2014 5 23 Mei 2013 2,742,082,482
dstSUB TOTAL 100,000,000 914,027,494 548,416,496 200,000,000 5,484,164,963 2,742,082,482
PLTG 2dstSUB TOTAL 100,000,000 914,027,494 548,416,496 200,000,000 5,484,164,963 2,742,082,482TOTAL 200,000,000 1,828,054,988 1,096,832,993 400,000,000 10,968,329,926 5,484,164,963
Jakarta, …………………. 2013
Note : General Manager
** Mandatory data yang wajib diisi untuk perhitungan penilaian KKU Reverse Engineeringdan tidak menjadi point penilaian apabila kosong
1) Untuk memisahkan harga material RE dengan jasa dalam melaksanakan RE tersebut Nama
2) Tanggal Penerimaan Barang yang tertera pada TUG 4 (Bon Pemeriksaan Barang)3) Tanggal Pengeluaran Barang yang tertera pada TUG 9 (Bon Pengeluaran Barang)4) Update berdasarkan inflasi dll agar diperoleh kesetaraan harga saat ini
Kode Material (Maximo) **
Nama Pabrikan OEM **
Harga Satuan OEM TERAKHIR**
Harga Satuan OEM Ter-UPDATE 4)
(Rp.)** List Nama Workshop
NON-OEM**
Harga Satuan Material NON-
OEM(Rp.)** Harga Satuan
Jasa RE Non-OEM (Rp.) 1)
Tanggal Perolehan Non-OEM
Pertama Kali
Penerimaan Material Non-OEM Terbaru 2) Jumlah
PO Non-OEM (kali)
Tanggal Rencana
Pemasangan Material Non-
OEM
Realisasi Material Non-OEM Terpasang 3)
Tersedia detail drawing, design, spesifikasi material yang berada di UBP