An overview ofFormwork systems
used for High rise
building at L&T
Omkar site
Presented By
Vijay Bhilwade
Roll No : 134047002
8/13/2019 Formwork Presentation
2/19
CONTENT
1. Project Overview.
2. Formwork.
3. Requirements of good Formwork.4. Why ACS and Mivan
4. Mivan 4 days cycle.
5. Automatic Climbing system (ACS) operation.
8/13/2019 Formwork Presentation
3/19
D
72 Floors
C61 Floors
B61 Floors
A53 Floors
8/13/2019 Formwork Presentation
4/19
8/13/2019 Formwork Presentation
5/19
2.FORMWORK
Formwork system is the key factor determining the success of a project in
terms of
Speed
Quality
Safety
Cost
Sustainability
8/13/2019 Formwork Presentation
6/19
Quick , Easy and Precise formwork alignment.
Flawless concrete surface finish.
Maximum adaptation.
Optimum work force.
Integrated safety
Economical
3.REQUIREMENTS OF GOOD FORMWORK
8/13/2019 Formwork Presentation
7/19
4. Why ACS and MIVAN ?
8/13/2019 Formwork Presentation
8/19
5. MIVAN :FOUR DAY CYCLE
Day
: erection of vertical reinforcement bars and oneside of the vertical formwork
Day 2: erection of the second side of the verticalformwork and formwork for the slab
Day 3: fixing reinforcement bars for slabs and casting ofwalls and slabs
Day 4: removal of vertical form work panels after24hours, props after 7 days, floor slab formwork after 2.5
days
February 6, 2014
8
8/13/2019 Formwork Presentation
9/19
February 6, 2014
9
8/13/2019 Formwork Presentation
10/19
February 6, 2014
10
8/13/2019 Formwork Presentation
11/19
February 6, 2014
11
8/13/2019 Formwork Presentation
12/19
February 6, 2014
12
8/13/2019 Formwork Presentation
13/19
8/13/2019 Formwork Presentation
14/19
5. ACS CLIMBING STAGE
8/13/2019 Formwork Presentation
15/19
5.ACS CLIMBING STAGE
8/13/2019 Formwork Presentation
16/19
8/13/2019 Formwork Presentation
17/19
ACS CLIMBING STAGE : CONTD
Stage5
: Climbing the wall panel by hydraulic pump.Fixing all the second level assembly of ACS. Tying of
reinforcement/fixing of cone/wall
shuttering/concreting.
Stage 6: Deshutteing panel/fixing shoes of 3rdlevel.Stage 7: Climbing the wall. Tying thereinforcement/fixing of cone/wall
shuttering/concreting.
February 6, 2014
17
8/13/2019 Formwork Presentation
18/19
References.
1.www.mivan.com
2.www.doka.com
3.www.lntecc.com
8/13/2019 Formwork Presentation