    An overview ofFormwork systems

    used for High rise

    building at L&T

    Omkar site

    Presented By

    Vijay Bhilwade

    Roll No : 134047002

  • 8/13/2019 Formwork Presentation

    2/19

    CONTENT

    1. Project Overview.

    2. Formwork.

    3. Requirements of good Formwork.4. Why ACS and Mivan

    4. Mivan 4 days cycle.

    5. Automatic Climbing system (ACS) operation.

  • 8/13/2019 Formwork Presentation

    3/19

    D

    72 Floors

    C61 Floors

    B61 Floors

    A53 Floors

  • 8/13/2019 Formwork Presentation

    4/19

  • 8/13/2019 Formwork Presentation

    5/19

    2.FORMWORK

    Formwork system is the key factor determining the success of a project in

    terms of

    Speed

    Quality

    Safety

    Cost

    Sustainability

  • 8/13/2019 Formwork Presentation

    6/19

    Quick , Easy and Precise formwork alignment.

    Flawless concrete surface finish.

    Maximum adaptation.

    Optimum work force.

    Integrated safety

    Economical

    3.REQUIREMENTS OF GOOD FORMWORK

  • 8/13/2019 Formwork Presentation

    7/19

    4. Why ACS and MIVAN ?

  • 8/13/2019 Formwork Presentation

    8/19

    5. MIVAN :FOUR DAY CYCLE

    Day

    : erection of vertical reinforcement bars and oneside of the vertical formwork

    Day 2: erection of the second side of the verticalformwork and formwork for the slab

    Day 3: fixing reinforcement bars for slabs and casting ofwalls and slabs

    Day 4: removal of vertical form work panels after24hours, props after 7 days, floor slab formwork after 2.5

    days

    February 6, 2014

    8

  • 8/13/2019 Formwork Presentation

    9/19

    February 6, 2014

    9

  • 8/13/2019 Formwork Presentation

    10/19

    February 6, 2014

    10

  • 8/13/2019 Formwork Presentation

    11/19

    February 6, 2014

    11

  • 8/13/2019 Formwork Presentation

    12/19

    February 6, 2014

    12

  • 8/13/2019 Formwork Presentation

    13/19

  • 8/13/2019 Formwork Presentation

    14/19

    5. ACS CLIMBING STAGE

  • 8/13/2019 Formwork Presentation

    15/19

    5.ACS CLIMBING STAGE

  • 8/13/2019 Formwork Presentation

    16/19

  • 8/13/2019 Formwork Presentation

    17/19

    ACS CLIMBING STAGE : CONTD

    Stage5

    : Climbing the wall panel by hydraulic pump.Fixing all the second level assembly of ACS. Tying of

    reinforcement/fixing of cone/wall

    shuttering/concreting.

    Stage 6: Deshutteing panel/fixing shoes of 3rdlevel.Stage 7: Climbing the wall. Tying thereinforcement/fixing of cone/wall

    shuttering/concreting.

    February 6, 2014

    17

  • 8/13/2019 Formwork Presentation

    18/19

    References.

    1.www.mivan.com

    2.www.doka.com

    3.www.lntecc.com

  • 8/13/2019 Formwork Presentation

    19/19