Fr-tambun Town-nw40059-e7 Koe Ed

  • Upload
    kltower

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    1/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 1 of 49

    Celcom 3G Project

    NodeB Project File

    Site Code: NW 40059

    Site Name: TAMBUN TOWN

    Equipment Type: BTS3812E

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    2/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 2 of 49

    © COPYRIGHT for Huawei

    All rights reserved.

     No part of this document may be copied, distributed, transmitted, transcribed, stored in a retrieval system or translated into any human or

    computer language without the prior written permission of Huawei. The manufacturer will if necessary explain issue which may not be

    covered by the documents. The manufacturer’s liability for any errors in the documents is limited to the correction of errors services.

    The documents have been prepared to be used by professional and properly trained personnel and the customer assumes full responsibilitywhen using them. The manufacturer welcomes customer comments as part of the process of continual development and improvement of the

    documentation in the best way possible from the user’s viewpoint.

    Any trademarks mentioned in the documents are the property of their respective owners.

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    3/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 3 of 49

    Table of Contents

    Chapter 1 Map Reference ..........................................................................................01-01  

    Chapter 2 SDP ............................................................................................................02-01  

    Chapter 3 Project Description

    Project Description .....................................................................................03-01

    Node B cell parameter and data configuration............................................03-02

    Chapter 4 Project Responsibility Interface .............................................................04-01  

    Chapter 5 Equipment Location

    Node B Installed .........................................................................................05-01

     AC/DC Power Tapping Point ......................................................................05-02

    E1 Connection Point ...................................................................................05-03

    Chapter 6 Antenna Location 

     Antenna Location........................................................................................06-01

    Sector Beam width View.............................................................................06-02

    Panoramic View..........................................................................................06-03

    Chapter 7 Feeder Cable Routing

    Feeder Cable Routing.................................................................................07-01

    Earth Point..................................................................................................07-02

    Chapter 8 Engineering Drawing................................................................................08-01

    Chapter 9 Material Request & BOQ .........................................................................09-01

    Chapter 10 Hardware Configuration 

    Cabinet Board Layout.................................................................................10-01

    Board Information .......................................................................................10-02

    Host Version Information List......................................................................10-03

    Chapter 11 External Cable Connection ......................................................................11-01

    Chapter 12 DTF & VSWR Plots....................................................................................12-01

    Chapter 13 Commissioning & Integration Checklist.................................................13-01

    Chapter 14 Equipment Installation Report.................................................................14-01

    Chapter 15 Node B Hardware Installation Acceptance.............................................15-01Chapter 16 User Acceptance Report ..........................................................................16-01

    Chapter 17 Single Site Verification Report ................................................................17-01

    Chapter 18 Punch List ................................................................................................18-01

    Chapter 19 Certification of Acceptance .....................................................................19-01

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    4/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 4 of 49

    1

    MAP REFERENCE

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    5/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 5 of 49

    1. Map Reference

    MAP AND SQUARE 

    MAP REFERENCE: TAMBUN TOWN

    Tambun Town

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    6/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 6 of 49

    2

    SDP

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    7/131

    3G SITE DESIGN PACKAGE

    TAMBUN

    NORTHERN

    NW42948

    N_TAMBUNTOWN

    PERAK

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    8/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    9/131

    SITE ID : NW42948

    SITE NAME :

    SITE CONFIGURATION : 1+1+1

    FREQ. BAND : 3G

    Prepared by ;

    N_TAMBUNTOWN

    CELCOM (M) BHD.

    NORTHERN REGION

    SITE DESIGN PACKAGE

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    10/131

    CELCOM (M) BHD 1 Site InformationNORTHERN REGION

    ( PERAK ) 2 RF Design

    3 Existing 2G Information

    4 New 3G Information

    5 Site Picture

    6 Mobile Checklist / BOQ

    7 Installation Plan

    NW42948 8 Transmission Check List

    N_TAMBUNTOWN 9 CME BOQ

    1+1+1 10 Site Management Unit

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    11/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD.

    NORTHERN REGION

    Site Informations

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    12/131

    Site Informations

    Survey Date : 13 April 2006

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NW42948 N_TAMBUNTOWN

    1.0

    1.1 Site Location and Access

    GPS Position

    Latitude: 04-36-37.7

    Longitude : 101-08-23.6

     Altitude : 90m

    1.2  Address :

    SITE INFORMATIONS

    1(2)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    13/131

    Site Informations

    Survey Date : 13 April 2006

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NW42948 N_TAMBUNTOWN

    1.3 Site Details (Existing)

    Type of Site : Rooftop

    Height of Building : 14.9m

    Equipment Location : Room Reno

    Cabin Dimension : -

     Air Conditioning : 2

    Cable Ladder  : Yes

    Lightning Protection : Yes

    Type of Tower  : Mini StructureTower Height : 8m

    Type of terrain : Flat

     Access road : Tar / Good condition

    Distance to main road : 10m

    Crane needed : No

    Site Access Information : TambunTown

    1.4 Contact Information

    Celcom : Mizazuddin Bin Muhiyuddin

    Telephone No. : 04-3973030 ext 1009

    Fax No. : 04-3974040

    Mobile No. : 019-5713060

    Contractor Name : Zulkiflie Muhamad Zin

    Telephone No. :

    Fax No. :

    Mobile No. : 013-2153575

    2(2)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    14/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD.

    NORTHERN REGION

    RF Design

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    15/131

    Legend : Site Nodes :

    10

    RSCP Coverage Prediction Plots

    RSCP Coverage with G2948

    RSCP Coverage without G2948

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    16/131

    Legend : Site Nodes :

    10

    Single Site RSCP Coverage wit h G2948

    RSCP Coverage Prediction Plots

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    17/131

    Site Name:

    Site ID :

    Existing 2G Site Name:

    Existing 2G Site ID:

    Co-locate Operator: Cluster No:

    Candidate:

    Version:

    Lat (N-WGS 84-Decimal): 4.6104722 4.610472222

    Long (E-WGS 84-Decimal): 101.13989 101.1398889

    Node B room Type: Node B Type:

    Node B Configuration:

    Transmission Type on site:

    Cell Site RF Configur ation

    Cell ID

     Antenna Heigh t (mi d. of an t)

     Antenna Direc tio n (deg )

    Electrical Tilt

    Mech. Tilt

    Cable Length (m)

    Cable Type (inch)

    MHA (Y/N)

    Technical Site Surveyor : Company : Signature

    Contact No:

    RF Planner Deepak Yadav Company : Signature

    Contact No: 0133568089

    TM/Celcom Reviewer :

     Air com Inter nati onal

    019-3160900

    Mohd Nizam

    Others:

     Air com Inter nati onal

    Shoplot, housing area

    Sector 2 :

    Sector 3 :

     Apartment, housing area, shoplot

    Comment/ Problem:

    Sector 1 :

    Housing , village area, Tambun Sunway City

    Mount 3.5

    1

    Boom

    3.5

    Sector 2

    65

    120

    N

    Room Reno

    Phase:

    1,1,1

    N

    1

    Mini Structure

    N

    Boom

    Technical Site Survey Report (Proposed Antenna Location)

    Survey Date:

    Building Height(m):

    N_TambunTown

    NW42948

    13-Apr-2006

    14.9m

     Area:

    Room Reno

    Ipoh

    2

    90

    Indoor 

     Ams l(m):

    Reason for Node B type:

    Structure type

    Model Number 

    Beam width (deg) Antenna Ty pe Single band Single band Single band

    3.5

    Mini Structure

    BoomMini Structure

    34

    40

    2 2

    0

    Height (m)

    No of Pole/ Tripod

    34 34

    22.75

    0

    DMC Pasolink

    Sector 3

    230

    22.75 22.75

    6565

    TambunTown

    G2948

    N/A

    N/A

    Structure Height(m):

    0

    8m

    Proposed antenna direction different from existing due to get a better 3G coverage. Looking at 2G antenna

    direction, the Cell 3 is pointing to less population area.

    7/8" 7/8" 7/8"

    1

    Type

    Sector 1

    2

     Air com Conf iden tial 11/21/2007 Page 1

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    18/131

    Site Name:

    Site ID :

    Existing 2G Site Name:

    Existing 2G Site ID:

    Co-locate Operator: Cluster No:

    Version:

    Lat (N-WGS 84- Decimal): 4.6104722

    Long (E-WGS 84-Decimal): 101.13989

    BTS room Type: BTS Type:

    BTS Configuration:

    Transmission Type on site:

    Cell Site RF Configur ation

    Cell ID

     Antenna Heigh t (mi d. of an t)

     Antenna Direc tio n (deg )

    Electrical Tilt

    Mech. Tilt

    Cable Length (m)

    Cable Type (inch)

    MHA (Y/N)

    Technical Site Surveyor : Company : Signature

    Contact No:

    RF Planner Company : Signature

    Contact No:

    TM/Celcom Reviewer :

    Mohd Nizam

    0133568089

    Comment/ Problem:

    Sector 1 :

    Village, housing area.

    Others:

    Deepak Yadav Aircom International

     Air com Inter nati onal

    019-3160900

    Sector 2 :

    Shoplot, Housing area.

    Sector 3 :

    Village, housing area.

    2

    Mount

    No of Pole/ Tripod 2

    Type

    Height (m) 3.5 , 2 3.5 , 2 3.5 , 2

    2

    7/8" 7/8" 7/8"

    BoomBoom Boom

    Structure type Mini Stucture Mini Stucture Mini Stucture

    0 0 0

    29 29 29

    40 150 330

    N/A N/A N/A

    20.75m 20.75m 20.75m

    65 65

    Kathrein Antenna Ty pe Model Number  Kathrein Kathrein

    Beam width (deg) 65

    Sector 1 Sector 2 Sector 3

    2,2,2

    DMC Pasolink

     Ams l(m): 90

    Room Reno Alcatel Evolium indoor  

    Phase: 2

    G2948  Area: Tambun

    N/A

    NW42948 Building Height(m): 14.9m

    TambunTown Structure Height(m): 8m

    N_TambunTown Survey Date: 13-Apr-2006

    Technical Site Survey Report (Existing Antenna System Locations

     Air com Conf iden tial 11/21/2007 Page 2

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    19/131

    Technical Site Surveyor : Company : Signature

    Contact No:

    RF Planner Company : Signature

    Contact No:

    TM/Celcom Reviewer :

    019-3160900

    Deepak Yadav Aircom International

    0133568089

    Technical Site Survey Drawing

    Mohd Nizam Aircom International

     Air com Conf iden tial 11/21/2007 Page 3

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    20/131

    Technical Site Surveyor : Company : Signature

    Contact No:

    RF Planner Company : Signature

    Contact No:

    TM/Celcom Reviewer :

    0133568089

    019-3160900

    Deepak Yadav

    Technical Site Survey Drawing

    Mohd Nizam Aircom International

     Air com Inter nati onal

     Air com Conf iden tial 11/21/2007 Page 4

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    21/131

    Site Photograph

    Technical Site Survey Photograph

     Air com Conf iden tial 11/21/2007 Page 5

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    22/131

    Sector 1 40 Degree

    Sector 2 120 Degree

    Sector 3 230 Degree

    Technical Site Survey Photograph

    Sectorial RF View

     Air com Conf iden tial 11/21/2007 Page 6

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    23/131

    Panoramic View

    40 degree

    Technical Site Survey Photograph

    0 degree

    80 degree

     Air com Conf iden tial 11/21/2007 Page 7

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    24/131

    120 degree

    160 degree

    200 degree

    Technical Site Survey Photograph

     Air com Conf iden tial 11/21/2007 Page 8

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    25/131

    240 degree

    280 degree

    320 degree

    Technical Site Survey Photograph

     Air com Conf iden tial 11/21/2007 Page 9

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    26/131

     Antenna Location

     Sturcture View

      Proposed 3G antenna location

    Technical Site Survey Photograph

     Air com Conf iden tial 11/21/2007 Page 10

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    27/131

    NodeB Location

    Proposed NodeB location

    Technical Site Survey Photograph

     Air com Conf iden tial 11/21/2007 Page 11

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    28/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    Existing 2G Information

    CELCOM (M) BHD.

    NORTHERN REGION

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    29/131

    Site Requirements

    Survey Date : 13 April 2006

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NW42948 N_TAMBUNTOWN

    2.0

    2.1 Exiting Equipment

    Existing Equipment Type

    No Of Cabinet

    Configuration

    Comments :

    2.2 Existing Antenna Dat a 2G

    Make

    Height AGL (m)

    Gain (dBi)

     Antenna Band

    Polarization

    Comments :

    2.3 Feeder Data 2G

    Total no. of feeders (pcs)

    Type of feeders

    Feeder lengths (m) Tx

    Rx

    TOTAL

    Comments :

    2.4 A ntenna Suppor t Detail

    Type of antenna support : Boom

    No. of H-Boom : N/A

    No. of G.I. Pipe : 6

    Length of G.I. Pipes (m) : 3.5 , 2

    Comments :

     Alcatel Evo Indoor 

    1

    2+2+2

    2

    Cell 1 Cell 2

    2

    no indication

    1800Mhz

    +-45 +-45+-45

    no indication

    29 29

    7/8"

    29 87

    7/8"7/8"

    58 58 58

    29 29 29

    174

    87

    no indication

    20.75

    Cell 3 TOTAL

    2 6

    1800Mhz

    EXISTING 2G

    1800Mhz

    Kathrein

    Cell 3

    20.75

    Kathrein

    Cell 1

    Kathrein

    Cell 2

    20.75

    1(1)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    30/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD.

    NORTHERN REGION

    New 3G Information

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    31/131

    Site Requirements

    Survey Date : 13 April 2006

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NW42948 N_TAMBUNTOWN

    3.0

    3.1 Feeder Data

    Total no. of feeders (pcs)

    Type of feeders

    Feeder lengths (m)

    Comments :

    3.2 CABLING

    Cable required

    DDF free space (ports) : 0

    Comments :

    3.3 A ntenna Suppor t Detail

    Type of antenna support : -

    No. of H-Boom : -

    No. of G.I. Pipe : 3

    Length of G.I. Pipes (m) : 3.5m

    Other Special Bracket : -

    Comments :

    Node B to Breaker Grounding / 35mm Cable Lug / 35mm 9m

    Cable Cab le type / s ize Connec to r t ype / s ize

    Node B E1 to DF Coax / 3C 2.5V -

    NEW SITE REQUIREMENTS

    10m

    DDF to DF Coax / 3C 2.5V - 4m

    Node B to MGB Grounding / 35mm

    102

    Rx 34 102

    34

    34

    Tx

    2 62

    Cell 1

    2

    Cell 3Cell 2 TOTAL

    7/8" 7/8"7/8"

    34

    Cable Lug / 35mm

    Length Needed

    6m

    TOTAL 6868

    34

    34

    68 204

    1(2)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    32/131

    Site Requirements

    Survey Date : 13 April 2006

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NW42948 N_TAMBUNTOWN

    3.4 OTHERS

    Comments :

    3.5 POWER SUPPLY SYSTEM

    Rectifier 

    Make Link Model Vout Iout

    Battery Installed : FIAMM

    Capacity : 2V 300Ah x 24 unit

    Banks : 1

    Type / Model : 2 SLA 300

    Comments :

    -

    Plinth Size -

    -

    Swtichtec

    Cable Gantry

    Cabin Size

    Cable Inlet

     AC Ear th ing Busbar  Yes

    DC Earthing Busbar  Yes

    MGB 1

    - -

    BTS Location Room Reno Room reno

    Existing Required

    Lightning Protection

    Comment

    13.2 100MRCB

    65A54

    Capacity

    Yes No

    2 1-feeder inlet, 1-structure

    1Yes

    Free: 12

    -

    No

    No

    Breaker 

    Used: 4

    Required:

    Used:

    Free:

    Required: 1

    2(2)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    33/131

    Site Approval

    Survey Date : 13 April 2006

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NW42948 N_TAMBUNTOWN

     

    Prepared by (Contractor)

    Name

    Company

     Approved by

    Name

    Department

     Approved by

    Name

    Department

     Approved by

    Name

    Department

    SDP APPROVAL

    Mobile Access Planning, Group Network Date

    Zulkiflie Muhamad Zin

    Ivory East Sdn Bhd Date

    CME, Group Network Date

    Transmission, Group Network Date

    1(1)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    34/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD.

    NORTHERN REGION

    Site Pictures

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    35/131

    Existing Site Pictures

    Survey Date : 13 April 2006

     

    Site: NW42948 N_TAMBUNTOWN

      Photo 1 : Site View

      .

      Photo 2 : Existing BTS

    SITE PICTURES

    1(3)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    36/131

    Existing Site Pictures

    Survey Date : 13 April 2006

     

    Site: NW42948 N_TAMBUNTOWN

    SITE PICTURES

    Photo 3 : Existing feeder route

    Photo 4 : Existing feeder route

    . Photo 5 : Existing feeder route

    Photo 6 : Existing antenna location 2(3)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    37/131

    Existing CME

    Survey Date : 13 April 2006

     

    Site: NW42948 N_TAMBUNTOWN

      Photo 1 : Existing ACPDB

      Photo 2 : Existing Rectifier & Battery

      Photo 3 : Existing MGB for equipment

    Photo 4 : Existing feeder inlet

    SITE PICTURES

    1(3)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    38/131

    Existing CME

    Survey Date : 13 April 2006

     

    Site: NW42948 N_TAMBUNTOWN

    SITE PICTURES

      Photo 5 : To repair and make good the broken copper tape.

      Photo 6 : Ladder to rooftop

    2(3)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    39/131

    Existing Tx

    Survey Date : 13 April 2006

     

    Site: NW42948 N_TAMBUNTOWN

    Photo 1 : Existing microwave

      Photo 2 : Existing TX rack

     SITE PICTURES

    1(1)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    40/131

    New Requirement

    Survey Date : 13 April 2006

     

    Site: NW42948 N_TAMBUNTOWN

      Photo 1 : Proposed NodeB location

      Photo 2 : Proposed NodeB DF location

    Photo 3 : Proposed feeder inlet

      Photo 4 : Proposed MGB at feeder inlet

    SITE PICTURES

    1(2)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    41/131

    New Requirement

    Survey Date : 13 April 2006

     

    Site: NW42948 N_TAMBUNTOWN

    SITE PICTURES

      Photo 5 : Proposed 3G antenna location

    2(2)

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    42/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    NORTHERN REGION

    Mobile Checklist / BOQ

    CELCOM (M) BHD.

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    43/131

    BILL OF QUANTITY SITE NW42948

    NO TYPE ITEMS ART NO. PACKING REQUEST SUPPLY IRON WORK Fill in your requested item(s)

    1 SPECIAL BRACKET SET

    2 6m Tripod NA SET

    3 6m BOOM N/A PC

    4 WALL BRACKET N/A SET

     POWER / RF CABLES & ACCESSORIES

    1 Power Cable METER

    2 METER

    3 AC ARMOURED CABLE, 4CORE, 16mm AC.ARM.4C.16mm METER

    4 PVC/PVC AC CABLE 5 CORE, BLACK, 10mm 5C/10mm METER

    5 CABLE TIE 4" (WHITE) CBL. TIE -W-IND-4" PC

    6 CABLE TIE 8" (WHITE) CBL. TIE -W-IND-8" PC

    7 CABLE TIE 14" (WHITE) CBL. TIE -W-IND-14" PC

    8 CABLE TIE 14" (BLACK) CBL. TIE -W-OUD-14" PC

    9 7/8" COAXIAL CABLE EC5-50 METER

    10 1/2" COAXIAL CABLE LDF4-50A METER

    11 TX JUMPER CABLE (716M - 716M), 2 MTR F4A-PDMDM-2M PC

    12 RX JUMPER CABLE (716M - NM), 2 MTR F4A-PNMDM-2M PC

     EARTHING SYSTEM 

    1 COPPER BARE WIRE, 35MM, MULTI STRAND N/A METER

    2 ANDREW CONNECTOR EARTHING KIT (INDOOR) 244495 PC

    3 ANDREW FEEDER EARTHING KIT (OUTDOOR) SGL5-06B1 PC

    CONNECTORS

    1 RFS ANGLE ADAPTER N-TYPE (MALE TO FEMALE) 15852401 PC

    2 H+S BNC CONN. (JACK FULL), 75 OHM, FOR RG59 21BNC-75-4-4 PC

    3 RFS 7/16 FEMALE CONNECTOR FOR 7/8" CABLE 15570560 PC

    4 H+S N-MALE CONNECTOR FOR 7/8" CABLE 11N-50-23-10 PC

    5 H+S N-MALE CONNECTOR FOR 1/2" CABLE 11N-50-12-10 PC

    6 H+S TNC-MALE TO BNC FEMALE ADAPTOR 33-TNC-BNC50-1 PC

    7 H+S N-MALE TO N-MALE ADAPTOR 32N-50-0-2 PC

    8 RFS FEEDER COUPLING (SPLICER) 155 730 60 PC

     MISCELLANEOUS ITEMS

    1 AC TRUNKING, 2" X 2", ORANGE C/W ACCESS N/A PC

    2 METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS N/A PC

    3 CABLE LUG 35MM N/A PC

    4 CABLE LUG 150MM N/A PC

    5 C-CLAMP (C-TYPE) COMPRESSED FOR 35MM N/A PC

    6 3M COOL SHRINK N/A PC

    7 CABLE GLAND (FEEDER THROUGH) N/A PC

    8 3M ELECTRICAL TAPE, SUPER 33+, 3/4 X 66' 6132 PC

    9 3M ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60" 15140 PC

    10 FEEDER CLAMP (2 IN 1) N/A PC

    11 FEEDER CLAMP (3 IN 1) N/A PC

    12 PVC TRUNKING (GREY), 4" X 2" X 1.8M 7 LENGTH

    13 SYW RAWL PLUG (M6X450MM) PC

    14 SYW RAWL PLUG (M12) with rod PC

    15 SYW RAWL PLUG (M12) w/o rod PC

    TOTAL COST (FOR INSURANCE PURPOSES)

    Requester: _________________________ Checked By: _________________________

    (SIGNED & STAMPED) (SIGNED & STAMPED)

    N_TAMBUNTOWN

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    44/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD.

    NORTHERN REGION

    Transmission Checklist

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    45/131

    A. SITE DETAILS

     N_TambunTown

    1 . X OWN TRANSMISSION SOLUTION

    X  MICROWAVE VSAT FIBER OPTIC

    REMARKS

    REMARKS :

    2 . LEASED LINE

     TM LEASED LINE POI/POP : .  2 E1

     3 E1

    REMARKS :

    C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.

    1 . CME

     TRM/TOC  DC POWER SUPPLY ( Pls specify : )

     TRIPOD  SHELTER ( Pls specify : )

     PLINTH DDF

    REMARKS :

    Prepared by, Verify by,

      (Name, TX Region. HP num)

      TSS TRANSMISSION CHECKLIST FOR 3G

    Zulkiflie Muhamad Zin 013-2153575

    B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.

      REGION

    SURVEY BY

    SURVEY DATE

     Northern

    MOHD NIZAM13/4/2006 NW4xxxx

    E1 SHARING ( MAXIS / DIGI) POI/POP : .

      SITE NAME

    SITE ID

    RNC HOME

    NODE B TYPE

    Reuse link 

    FREEUSED RESERVED

    TambunTown

    SITE A

    3

    SITE B

    TmnPerpaduan 4 1

    INSTALLED

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    46/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD.

    NORTHERN REGION

    CME BOQ

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    47/131

    Proposed installation of 3G Equipment for 

    Telekom 3G at BQ Details

    Item DESCRIPTION UNITRATE

    RMQUANTITY AMOUNT SOR

     A

     A.1.0 L/S

    B

    B.1.0 M

    B.2.0 Nos

    B.3.0 M

    B.4.0 Nos

    B.5.0 Sq.m

    B.6.0 Nos

    B.7.0 Sq.m

    B.8.0 Sq.m

    B.9.0 Nos

    B.10.0 M

    B.11.0 Nos

    B.12.0 Nos

    B.13.0 Nos

    B.14.0 Kg

    B.15.0 Nos

    B.16.0 Nos

    B.17.0 Nos

    B.18.0 Sq.m

    B.19.0 Nos

    Supply and install 450mm width mild steel HDG hollow pipe cat ladder

    c/w m.s flat bar cage as per drawing.

    Supply and install HDG cable ladder support at 2.5m height, buried in

    600mm x 600mm x 600mm concrete foundation G25 as per drawing.

    To dismantle existing roofing sheet, truss, ceiling etcs. and providetemporary opening for RBS Eqpt delivery and close after work finish

    and make good clear all debris from site.

    Supply and insta ll HDG cable ladder of width 300mm using 50mm x

    50mm x 6mm thk. angle iron as steps at 300mm interval.

    Supply and install HDG cable ladder support at 3.0m height, buried in

    900mm x 900mm x 900mm concrete foundation G25 as per drawing.

    Supply and insta ll HDG steel bracket c/w screw and nuts for cable

    ladder.

    Total B

    Supply and install HDG I - Beam size 150mm x 150mm x 30kg/m

    (2000mm x 150mm x 150mm)

    Supply and install aluminium plates 500mm x 500mm

    Concrete plinth for floor mounted BTS

    Supply and lay approved 300mm x 300mm vinyl tiles including

    screeding

    RC Concete Base

    400mm x 200mm x 200mm

    The Contractor shall provide the following:-

    PRELIMINARIES

    Preliminaries inclusive mobilisation,insurance and clearing of site on

    completion of the work.

    To provide opening 300mm x 300mm for wave guide cable entrance

    c/w alumin ium p late wi th 38mm holes (10 nos to covered) and a ll

    necessary and make good all defects

    Total A

    Supply and install 12mm thk gypsum board partition on bothside of

    aluminium frame at 600mm c/c vertically & horizontally .

    Supply and install approved 12mm thick x 1200mm x 600mm cemboard

    (hume or equivalent) ceiling including HW framing and other necessary

    fittings and accessories.

    Supply and install 900mm x 2100mm high 1hr rated single leaf door c/w

    frames incl. ironmongeries

    CIVIL WORKS

    Supply and install HDG expended metal walkaway platform c/w safety

    railing & accessories.

    Supply and install 38mm dia. G.I pipe at ground and clamp at wall as

    earth conductor cover for security purposes.

    To hack apron / brickwall for metal trunking, conduit, cable ladder and

    make good.

    Supply and install door latch and 40mm dia. Pad lock (SOLEX) c/w

    accessories.

    ** To install 2 Nos MGB (1 at inlet, 1 at structure)

    Rank Integrated Associates Sdn. Bhd. - BQ-2 TAMBUNTOWN celcom.xls

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    48/131

    Proposed installation of 3G Equipment for 

    Telekom 3G at BQ Details

    Item DESCRIPTION UNITRATE

    RMQUANTITY AMOUNT SOR

    C

    C.1.0

    a) Wall mounted

    3 meter 3½" diameter steel pipe. Nos

    4 meter 3½" diameter steel pipe. Nos

    5 meter 3½" diameter steel pipe. Nos

    6 meter 3½" diameter steel pipe. Nos

    b) Floor Mounted

    3 meter 3½" diameter steel pipe. Nos

    4 meter 3½" diameter steel pipe. Nos

    5 meter 3½" diameter steel pipe. Nos

    6 meter 3½" diameter steel pipe. Nos

    c) Pole with mounting bracket for Tower, SSM, RMF

    2 meter 3½" diameter steel pipe. Nos

    3 meter 3½" diameter steel pipe. Nos

    4 meter 3½" diameter steel pipe. Nos

    5 meter 3½" diameter steel pipe. Nos

    6 meter 3½" diameter steel pipe. Nos

    C.2.0

    i) Tripod mast including climbing ladder, foundation plate, bolts and

    nuts and brackets for feeder clamps at 1 meter interval as per

    Engineers drawings.

    ii) Antenna triangle mounting brackets consisting of 2 sets of flanges

    with gussets, bolt and nuts as per Engineers drawings.

    iii) Wire rope of length to suit the height condition , complete with

    bulldog clips and turnbuckles.All works to be Hot galvanised to BS

    729:1971.

    a) 3 m height tripod sets L/S

    b) 6 m height tripod sets L/S

    c) 9 m height tripod sets L/S

    d) 12 m height tripod sets L/S

    C.3.0 L/S

    C.4.0

    a) 20 tonne crane L/S

    b) 35 tonne crane L/S

    c) 45 tonne crane L/S

    C.5.0

    a) 2" diameter for 2 meter - 3 meter pole Set

    b) 2 ½" diameter for 4 meter - 5 meter pole Set

    Tripod - HDG:

    Construction of 4 nos. concrete plinth dim. 600mm x 600mm x 600mm

    thk. For tripodbaseand support base with3 nos. HDG T-shapedangle

    iron (600mm x 300mm)

    Supply, fabricate, transport, and erect tripod pole sets consisting of the

    following:

    Supply and install PCN poles -Hot Dipped Galvanised

    POLE & TRIPOD

    To provide crane at site for Tripod installation:

    Total C

    Rank Integrated Associates Sdn. Bhd. - BQ-3 TAMBUNTOWN celcom.xls

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    49/131

    Proposed installation of 3G Equipment for 

    Telekom 3G at BQ Details

    Item DESCRIPTION UNITRATE

    RMQUANTITY AMOUNT SOR

    D

    D.1.0 Set

    D.2.0

    a) 20A Nos

    b) 40A Nos

    D.3.0 Nos

    D.4.0 Nos

    D.5.0 Nos

    D.6.0 M

    D.7.0 M

    D.8.0 Nos

    D.9.0 Nos

    D.10.0 Nos

    D.11.0 Nos

    D.12.0 Nos

    D.13.0 M

    D.14.0 M

    D.15.0 Nos

    D.16.0 Nos

    D.17.0 Nos

    D.18.0 Nos

    Total D

    1 x 36 W flourescent fitting light c/w ballast, starter and other

    accessories.

    2 x 2.5 mm PVC copper cable in surface mounting 13 A switch socket

    outlet, earth wire and accessories

    4 x 16sqmm PVC cooper cable in surface trunking c/w 16sqmm earth

    wire from MDB to CU-REC

    Supply and install auto-on system c/w accessories (indoor)

    Supply and install MCB

    ELECTRICAL WORKS

    8W "KELUAR" sign

    4 x 25mm PVC cable from TNB meter to DB

    2 x 1.5 mm PVC cooper cable in surface conduit for florescent fittings

    c/e earth wire for external

    2 x 1.5sqmm approved PVC cooper cable in surface conduit for l ighting

    point c/w 6A switch and earth wire

    Supply and install 60A TPN MCCB, ELR, ELCB, Ammeter, Volt meter,

    MCB main distribution board c/w arrestor Dehn 100KA, wiring, labelling

    and other accessories

    8W approved emergency light c/w 1 hour backup battery and automatic

    charger 

    30A approved TPN isolator metal clad 4 x 10mmsq PVC in trunking to

    equipment distribution board unit

    60A TPN KWH meter 

    Supply and install 1 x 4C x 16mmsq PVC cable underground inclusive

    digging and refill.

    Supply and install auto-on system c/w accessories (outdoor)

    Supply and install MS 20 metal trunking size 50mm x 50mm c/w

    accessories.

    Supply and install Surge Voltage Arrester 40 kA Brand: OBO / Novaris

    or equivalent

    2 x 2.5mm PVC cooper cable in surface conduit for "KELUAR" sign and

    emergency light c/w earth wire

    Rank Integrated Associates Sdn. Bhd. - BQ-4 TAMBUNTOWN celcom.xls

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    50/131

    Proposed installation of 3G Equipment for 

    Telekom 3G at BQ Details

    Item DESCRIPTION UNITRATE

    RMQUANTITY AMOUNT SOR

    E

    E.1.0 Nos

    E.2.0 Nos

    E.3.0 Nos

    E.4.0 Nos

    E.5.0 M

    E.6.0 M

    E.7.0 Nos

    E.8.0 M

    E.9.0 Nos

    F

    F.1.0 Nos

    F.2.0 Lot

    a) PYROGEN agent SP30

    b) Zone Control Panel (Weatherproof) c/w ARM Module 2 Zone

    c) Discharge warning Light c/w wiring

    d) Manual key switch c/w wiring

    e) Smoke Detector c/w accessories

    f) Heat Detector c/w accessories

    g) Alarm Bell c/w accessories

    h) 12V SLA dry fit battery

    PVC pipe

    To provide cadweld connection

    FIRE SUPPRESSION SYSTEM

    Supply of complete set of portable Fire Extinguisher, 9kg Dry Powder 

    Supply and install 300mm (L) x 25mm (W) x 6.3mm Thk. Main Ground

    Bar (chrome) with 10 holes c/w M5 copper bolt and nut and 2 nos of 

    porcelin

     Air Terminal

    Copper Tapered pointed air rod 1m x 15mm diameter - RA225

    LIGHTNING PROTECTION AND EARTHING SYSTEM

    Earth Pit (PT 006)

    Concrete inspection pit 320mm x 320mm x 210mm

     Air Terminal Base

    Copper SD 105

    Earth Rod (RC010)

    Solid Copper Rod 1.2m x 15mm dia. RC

    Supply and install 3mm thk x 25mm wide copper tape

    Total F

    Supply and install 50mm green cable

    Supply and install Total Flooding Suppression System c/w piping and

    accessories:

    Total E

    Rank Integrated Associates Sdn. Bhd. - BQ-5 TAMBUNTOWN celcom.xls

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    51/131

    Proposed installation of 3G Equipment for 

    Telekom 3G at BQ Details

    Item DESCRIPTION UNITRATE

    RMQUANTITY AMOUNT SOR

    G

    G.1.0

    a) 1 HP Nos

    b) 1.5 HP Nos

    c) 2.0 HP Nos

    d) 3.0 HP Nos

    e) 4.0 HP Nos

    G.2.0 Nos

    H

    I

    I.1.0 Sq.m

    I.2.0 Sq.m

    I.3.0 M

    I.4.0 M

    I.5.0 Nos

    I.6.0 L/S

    I.7.0 Lot

    I.8.0 Nos

    I.9.0 Lot

    I.10.0 L/S

    Prepare by Contractor Name Verify By (CME REGION)

    Name : Name :

    Mobile No Mobile No

    Liason submission with TNB.

    Supply DC Power System c/w accersories

    Supply and install 1 x 4C x 25mmsq. PVC/PVC cable in trunking / tray

    c/w earth wire.

     Air conditioning grill and bracket c/w pad lock for compressor.

     AIR CONDITIONING SYSTEM

    Total I

     ADDITIONAL WORKS

    To dismantle existing sliding glass window including grill and all

    necessary hinges, lock and etcs (1000mm x 1000mm)

    Supply and install switch socket outlet (13A)

    Supply and install 1000mm x 1000mm single leaf door to access the

    roof top.

    To dismantle existing wiring point for lighting, fan, SSO and air

    conditioning inclusive of all fittings.

    To dismantle existing sliding glass window including grill and all

    necessary hinges, lock and etcs.(1000mm x 1200mm)

    Supply and install 1000mm x 2000mm double leaf door to access for

    equipment delivery

    2 X 36 flourescent fitting surface wall mounted c/w diffuser 

    Supply and install air cond control panel

    Supply and install air conditioning for split unit system c/w change over

    auto-timer, filter dryer, sight glass, refrigerants, piping, brackets

    insulation wiring in conduit, condensate piping and opening through wall

    as specified.

    Rank Integrated Associates Sdn. Bhd. - BQ-6 TAMBUNTOWN celcom.xls

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    52/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD.

    NORTHERN REGION

    Installation Plan

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    53/131

    SITE ID : NW42948

    SITE NAME : N_TAMBUNTOWN

    SITE CONFIGURATION : 1+1+1

    Site Management Unit

    CELCOM (M) BHD.

    NORTHERN REGION

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    54/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    55/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    56/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    57/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 7 of 49

    3

    PROJECT DESCRIPTION

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    58/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 8 of 49

    3.1 Project Description

    General introduction:

    NodeB name Tambun Town Address 50C, Jalan Besar Tambun, 31400 Ipoh, Perak

    Project type 3G macro

    NodeB type S1/1/1

    Equipment type NodeB 3812E

    Diversity mode 2×antenna diversity

    Coordinate scale N 04º 36’ 37.7” E 101º 08’ 23.6”

    Antenna system Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6

     Antenna typePOWERWAVE

    POWERWAVE

    POWERWAVE

    Number of antennas 1 1 1

     Antenna gain (dBi) 18.3 18.3 18.3

     Antenna polarization modeDual

    polarization

    Dualpolarizat

    ion

    Dualpolarizat

    ion

     Antenna semi-wave angle 65 65 65

     Azimuth 40˚  120˚  230˚ 

     Antenna weight (kg) 7.2 7.2 7.2

     Antenna Height 22.75 22.75 22.75

    TTA presented or not N/A N/A N/A

    Feeder type 7/8” 7/8” 7/8”

    Length of a single feeder 18 18 18

    E. Tilt 2 2 2

    M. Tilt 0 0 0

    Corollary equipment:Power supply(V) -48V DC

    Battery capacity(Ah) 160

    Transmission mode E1

    No. of E1 2

    Transmission Vendor Existing MW

    No. of Battery Bank 1

    DC power supply Existing ACPDB

    User information

    Person in charge

    Celcom

    Jason Stephen Nayagam Email  [email protected]

    Telephone Fax

    Participants of the projectTelephone

    Survey personnel CelcomEmail

    TelephoneDesign personnel Celcom

    Email

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    59/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 9 of 49

    3.2 NodeB Cell parameter and data configuration

    Cell information Cell 1 Cell 2 Cell 3

    Cell Name NW400591_1_1 NW400592_1_2 NW400593_1_3

    Cell ID 11171 11172 11173

    Max Transmit Power (dBm) 44 44 44

    DL primary scrambling code 252 260 268

    Time offset 256 512 768

    UL Frequency 9812 9812 9812

    DL Frequency 10762 10762 10762

    LAC 3022 3022 3022

    SAC 34059 34059 34059

    RAC 1 1 1

    URA 3022 3022 3022

    CPICH (dBm) 33 33 33

    Neighboring Cell

    Neighboring Cell 1

    Neighboring Cell 2

    Neighboring Cell 3

    NodeB Data Configuration Info

    Version No. BTS3812E&3812A V100R006C01B061

    Local IP Address 17.21.2.15

    Local Cell ID 0, 1, 2

    IMA Link No. 0, 1

    UNI Link No. -

    Note: Please input the cell parameter.

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    60/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 10 of 49

    4

    PROJECT RESPONSIBILITY INTERFACE

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    61/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 11 of 49

    4. Project Responsibility Interface

    R&A TELECOMMUNICATION

    SDN BHD

    PROJECT RESPONSIBILITY INTERFACE

     

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    62/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 12 of 49

    5

    EQUIPMENT LOCATION

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    63/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 13 of 49

    5. Equipment Location

    5.1 Node B Installed

    5.2 AC/DC Power Tapping Point

    DC Tapping

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    64/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 14 of 49

    5.3 E1 Connection Point

    E1 Connection

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    65/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 15 of 49

    6

    ANTENNA LOCATION

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    66/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 16 of 49

    6.1 Antenna Location

    Sector 1 Sector 2

    Sector 3

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    67/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 17 of 49

    6.2 Sector Beam width View

    a. Sector 1

    b. Sector 2

    c. Sector 3

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    68/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 18 of 49

    6.3 Panoramic View

    a. 0 degree

    b. 40 degree

    c. 80 degree

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    69/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 19 of 49

    d. 120 degree

    e. 160 degree

    f. 200 degree

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    70/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 20 of 49

    g. 240 degree

    h. 280 degree

    i. 320 degree

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    71/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 21 of 49

    7

    FEEDER CABLE ROUTING

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    72/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 22 of 49

    7.1 Feeder Cable Routing

    3G Feeder Cable3G Feeder Cable

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    73/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 23 of 49

    7.2 Earth Point

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    74/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 24 of 49

    8

    ENGINEERING DRAWING

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    75/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    76/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    77/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 25 of 49

    9

    MATERIAL REQUEST&

    BOQ

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    78/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    79/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    80/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    81/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    82/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    83/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 26 of 49

    9. BTS 3812E BOQ

    BOM NO. DESCRIPTION QTY UOM

    02313078 Multicarrier Antenna Filter Unit 1 PCS

    02313078 Multicarrier Antenna Filter Unit 1 PCS

    02313078 Multicarrier Antenna Filter Unit 1 PCS

    02312783NodeB band 1 Multi-Carrier Transceiver Unit

    (38W,Band1,RX1920-1980/TX2110-2170MHz)1 PCS

    02312783NodeB band 1 Multi-Carrier Transceiver Unit

    (38W,Band1,RX1920-1980/TX2110-2170MHz)1 PCS

    02312783NodeB band 1 Multi-Carrier Transceiver Unit

    (38W,Band1,RX1920-1980/TX2110-2170MHz)1 PCS

    03039105 HSDPA supported baseband processing and interface unit 1 PCS

    03039105 HSDPA supported baseband processing and interface unit 1 PCS

    03030ATX NodeB Digital Trunk Interface unit 1 PCS

    03030CPM NodeB Main Processing & Timing unit without GPS 1 PCS

    31070026 Huawei License Certificate 1 PCS

    02111993 Indoor WCDMA Macrocell BTS Assembly Cabinet 1 PCS

    28010159Insulating Material, Fire Retarded PVC Wiring Trough,

    100*40,2m/PCS3 PCS

    28010210 Insulating material, Fire resistant PVC trough, 39*18mm,2m/pcs 4 M

    27010236Directional antenna,1710~2170M,18dBi,65deg,dual

    polarization,250W,2deg,,DIN/Female,With downtilts1 PCS

    27010236Directional antenna,1710~2170M,18dBi,65deg,dual

    polarization,250W,2deg,,DIN/Female,With downtilts1 PCS

    27010236Directional antenna,1710~2170M,18dBi,65deg,dual

    polarization,250W,2deg,,DIN/Female,With downtilts1 PCS

    02210177 Conductive Material-ESD Glove, With Chinese/English Manual 1 PCS

    04040300External Power Cable, PGND For Welded Rack,10.00m,25mm^2,Yellow

    Green,OT25-8,227IEC02-25^2Y&G,OT25-8!,C&C08B1 PCS

    04040653 Trunk Cable,20m,75ohm,4E1,3.9mm,D25M,SYVP75-2/0.34*8(S),BTS3612 1 PCS

    04060211External Power Cable, Assembled Cabinet -48V Power

    Cable,10.00m,25mm^2,Blue,T25^2BR,227IEC02-25^2BL,OT25-8,C&C08B

    1 PCS

    04060217External Power Cable, Assembled Cabinet GND Power

    Cable,10.00m,25mm^2,Black,T25^2BR,227IEC02-25^2B,OT25-8,C&C08B1 PCS

    14040137Coaxial Connector,7/16 DIN,50ohm,Plug/Straight,

    Male, Matching Superflexible 1/2" Cable12 PCS

    14040166Coaxial Connector, SMB Connector,

    75ohm/Straight/Female,Matching SYV-75-2-2 Cable16 PCS

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    84/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 27 of 49

    14170060Naked Crimping Terminal,OT,25mm^2,M8,

    Tin Plating, Naked Ring Terminal10 PCS

    21100015 Wire Clip,GT-150I,150*3.6mm,Strength 18.2kg 200 PCS

    21100144Nonmetallic parts-GT-300I-cable fastener-300*3.6mm-

    strength 18.2kg200 PCS

    21101245 Score Template 1 PCS

    21101259 Cable Tie-GT-300IUV£¨3.6*300£© 100 PCS

    21120291 Grounding Hardware Combination 2 SET

    21150457 Mount Base 1 PCS

    21200708 Label Type Harness 12 PCS

    26010226Cross Recess Head Self-Threading Screw (GB9074.19-88)

    ST4.2*32,Pointed End, C Type50 PCS

    27150036 Feeder-hermetic-window,13/8" feeder, 9 holes,500mm*500mm 1 PCS

    28010033 Insulating Material, Fire Retarded PVC Terminal,39*18 3 PCS

    28010038 Insulating material - fire-resistance PVC connector 4 PCS

    28010061 Insulating material - fire-resistance PVC elbow 2 PCS

    28010104 Plastic Expansion Tube,D6*26,For Wood Screw Fixed On Wall 50 PCS

    28010160 Fire Retarded PVC Wiring Trough Angle Joint,100*40 3 PCS

    28010161 Fire Retarded PVC Wiring Trough Joint,100*40 3 PCS

    28010168 Insulating Material, Fire Retarded PVC Terminal,100*40 4 PCS

    28040013 Heat Shrink Tube/D18/Radial Shrink Rate>50%/Black 50 CM

    28040015 Heat-Shrink Tube,D25,Radial Shrinkage Ratio>50%,Black 50 CM

    28040017 Heat-Shrink Tube,D30,Radial Shrinkage Ratio>50%,Black 50 CM

    28040023 Heat-Shrink Tube/D8.0/Radial Shrinkage Ratio %>50%/Black 50 CM

    28050001 Wrist Strap 1 PCS

    29040316Blank Label,DB0699,Huawei D Blank Cable Label,40 Groups 40Pcs,4

    Columns*10 Rows, Height 17.8 Width 48.0,1Pcs Each Group, White1 PCS

    29041038 Outdoor Label 4 PCS

    29041060 Signal Cable label 1 PCS

    29041061 Power Cable label 1 PCS

    63200065 DKBA0.480.0238,Cable Tie,GT-300HDUV,7.6X300,Anti-Ultraviolet And Anti-Freeze, Black, For BTS3001C

    150 PCS

     

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    85/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 28 of 49

    10

    HARDWARE CONFIGURATION

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    86/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 29 of 49

    10. Hardware Configuration

    10.1 Cabinet Board Layout

    Cabinet Board Layout

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    87/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 30 of 49

    10.2 Board Information List ( BTS3812E)

    Board name Board category Board version Quantity Board serial NO.

    BNMACIndoor 3812ECabinet -48V

    N/A 1 N/A

    QW-FAN FAN Node B Fan Box 1 N/A

    NMPT SCC V100R006 1 030CPM1064000296

    V100R006 1 0391051061000189

    HBBIInterface Processing

    Board HSDPASupported V100R006 1 0391051061000185

    NDTI

    Digital trunk Interface

    board V100R006 1

    030ATX1063000610

    V100R006 1 21023130781064000344

    V100R006 1 21023130781064000338MAFUMulticarrier Antenna

    Filter Unit

    V100R006 1 21023130781064000336

    V100R006 1 21023127831064000304

    V100R006 1 21023127831064000302MTRUMulti-CarrierTransceiver

    V100R006 1 21023127831064000303

    PSM-A10 Monitoring Module N/A 1 N/A

    N/A 1 N/A

    N/A 1 N/AHD4825-3 Rectifier Module

    N/A 1 N/A

    KM-BTS- ALMC

    BTS Environment Alarm Box

    N/A 1 N/A

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    88/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 31 of 49

    10.3 Host Version Information List

    1. BTS3812 Version: 

    Host version  Description 

    Version used by the local BS

    (mark √ in the relevant column) 

    Remarks 

    BTS3812EID of the Node B

    versionV100R006C01B061

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    89/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 32 of 49

    11

    EXTERNAL CABLE CONNECTION

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    90/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 33 of 49

    11. External Cable Connection

    Antenna Connection Table

     Antenna connection table

    NDDLNo.

    N-ports on MAFUpanel

    No. of the ports on the top of thecabinet

    Corresponding sector Remarks

    MAFU_TXM ANT_0A Sector 1MAFU

    MAFU_TXD ANT_0B Sector 1

    MAFU_TXM ANT_1AMAFU

    MAFU_TXD ANT_1B

    MAFU_TXM ANT_2A Sector 2

    MAFU MAFU_TXD ANT_2B Sector 2

    MAFU_TXM ANT_3AMAFU

    MAFU_TXD ANT_3B

    MAFU_TXM ANT_4A Sector 3MAFU

    MAFU_TXD ANT_4B Sector 3

    MAFU_TXM ANT_5AMAFU

    MAFU_TXD ANT_5B

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    91/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 34 of 49

    Trunk Cable Connection Table

    E1 transmission mode E1 port No. Characteristic impedance

    NDTINo.

    No. of DB25 oncabinet top

    E1port

    Characteristicimpedance

    Port No. ofDDF rack

    Used orUnused

    Peerequipment

    Remarks

    0 75 0 Used SYRN1

    1 75 1 Used SYRN1

    2 75E1_0

    3 75

    4

    5

    6

    NDTI0

    E1_1

    7

    89

    10E1_2

    11

    12

    13

    14

    NDTI1

    E1_3

    15

    Optical transmission mode

    NAOINo.

    STM-1 portNo.

    Optical typePort No. ofODF rack

    Used orunused

    Peerequipment

    Remarks

    0NAOI0

    1

    2NAOI1

    3

    NAOINo.

    E1 port No. Characteristic impedancePort No. ofDDF rack

    Used orunused

    Peerequipment

    Remarks

    0

    1

    2NAOI1

    3

    4

    5NAOI1

    6

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    92/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 35 of 49

    12

    DTF & VSWR PLOTS

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    93/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 36 of 49

    1. Sector 1 Tx/RxA – DTF

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    0 5 10 15 20 25 30

    M1 M2 M3 M4

    Distance-to-faultTAMBUN TOWN TX1/RX1A

    Model: S331D Serial #: 00507029 Prop.Vel:0.890Date: 09/23/2006 Time: 10:46:33 Ins.Loss:0.069dB/mStd: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Distance (0.0 - 30.0 Meter)

    M1: 1.05 @2.21 Meter M2: 1.054 @19.77 Meter M3: 1.04 @21.86 Meter M4: 1.07 @23.37 Meter 

     

    2. Sector 1 Tx/RxA – VSWR

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1750 1800 1850 1900 1950 2000 2050 2100 2150

    Limit : 1.5

    M1 M2

    VSWR TAMBUN TOWN TX1/RX1A

    Model: S331D Serial #: 00507029Date : 09/23/2006 Time: 10:47:26Std: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Frequency (1710.0 - 2170.0 MHz)

    M1: 1.224 @1897.20 MHz M2: 1.197 @2080.90 MHz

     

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    94/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 37 of 49

    3. Sector 1 RxB – DTF

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    0 5 10 15 20 25 30

    M1 M2 M3 M4

    Distance-to-faultTAMBUN TOWN RX1B

    Model: S331D Serial #: 00507029 Prop.Vel:0.890Date: 09/23/2006 Time: 10:49:19 Ins.Loss:0.069dB/mStd: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Distance (0.0 - 30.0 Meter)

    M1: 1.058 @2.21 Meter M2 - M1: -.004 , 17.33 Meter  

    M3: 1.054 @21.74 Meter M4: 1.065 @23.26 Meter  

     

    4. Sector 1 RxB – VSWR

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1750 1800 1850 1900 1950 2000 2050 2100 2150

    Limit : 1.5

    M1 M2

    VSWR TAMBUN TOWN RX1B

    Model: S331D Serial #: 00507029Date : 09/23/2006 Time: 10:49:53Std: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Frequency (1710.0 - 2170.0 MHz)

    M1: 1.259 @1902.60 MHz M2: 1.286 @2047.00 MHz

     

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    95/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 38 of 49

    5. Sector 2 Tx/RxA – DTF

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    0 5 10 15 20 25 30

    M1 M2 M3 M4

    Distance-to-faultTAMBUN TOWN TX2/RX2A

    Model: S331D Serial #: 00507029 Prop.Vel:0.890Date: 09/23/2006 Time: 10:53:49 Ins.Loss:0.069dB/mStd: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Distance (0.0 - 30.0 Meter)

    M1: 1.041 @2.09 Meter M2: 1.056 @18.95 Meter M3: 1.04 @21.16 Meter M4: 1.059 @22.67 Meter 

     

    6. Sector 2 Tx/RxA – VSWR

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1750 1800 1850 1900 1950 2000 2050 2100 2150

    Limit : 1.5

    M1 M2

    VSWR TAMBUN TOWN TX2/RX2A

    Model: S331D Serial #: 00507029Date : 09/23/2006 Time: 10:53:18Std: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Frequency (1710.0 - 2170.0 MHz)

    M1: 1.197 @1713.60 MHz M2: 1.161 @2157.50 MHz

     

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    96/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 39 of 49

    7. Sector 2 RxB – DTF

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    0 5 10 15 20 25 30

    M1 M2 M3 M4

    Distance-to-faultTAMBUN TOWN RX2B

    Model: S331D Serial #: 00507029 Prop.Vel:0.890Date: 09/23/2006 Time: 11:13:48 Ins.Loss:0.069dB/mStd: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Distance (0.0 - 30.0 Meter)

    M1: 1.053 @2.21 Meter M2: 1.044 @18.84 Meter M3: 1.055 @20.93 Meter M4: 1.069 @22.44 Meter 

     

    8. Sector 2 RxB – VSWR

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1750 1800 1850 1900 1950 2000 2050 2100 2150

    Limit : 1.5

    M1 M2

    VSWR TAMBUN TOWN RX2B

    Model: S331D Serial #: 00507029Date : 09/23/2006 Time: 11:13:03Std: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Frequency (1710.0 - 2170.0 MHz)

    M1: 1.192 @1713.60 MHz M2: 1.227 @2162.90 MHz

     

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    97/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 40 of 49

    9. Sector 3 Tx/RxA – DTF

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    0 5 10 15 20 25 30

    M1 M2 M3 M4

    Distance-to-faultTAMBUN TOWN TX3/RX3A

    Model: S331D Serial #: 00507029 Prop.Vel:0.890Date: 09/23/2006 Time: 11:15:09 Ins.Loss:0.069dB/mStd: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Distance (0.0 - 30.0 Meter)

    M1: 1.054 @2.21 Meter M2: 1.06 @18.49 Meter M3: 1.036 @20.70 Meter M4: 1.069 @22.21 Meter 

     

    10. Sector 3 Tx/RxA – VSWR

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1750 1800 1850 1900 1950 2000 2050 2100 2150

    Limit : 1.5

    M1 M2

    Distance-to-faultTAMBUN TOWN TX3/RX3A

    Model: S331D Serial #: 00507029Date : 09/23/2006 Time: 11:16:00Std: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Frequency (1710.0 - 2170.0 MHz)

    M1: 1.27 @1710.00 MHz M2: 1.172 @1957.80 MHz

     

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    98/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 41 of 49

    11. Sector 3 RxB – DTF

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    0 5 10 15 20 25 30

    M1 M2 M3 M4

    Distance-to-faultTAMBUN TOWN RX3B

    Model: S331D Serial #: 00507029 Prop.Vel:0.890Date: 09/23/2006 Time: 10:58:24 Ins.Loss:0.069dB/mStd: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Distance (0.0 - 30.0 Meter)

    M1: 1.053 @2.21 Meter M2: 1.044 @18.37 Meter M3: 1.037 @20.47 Meter M4: 1.069 @22.09 Meter 

     

    12. Sector 3 RxB – VSWR

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1750 1800 1850 1900 1950 2000 2050 2100 2150

    Limit : 1.5

    M1 M2

    VSWR TAMBUN TOWN RX3B

    Model: S331D Serial #: 00507029Date : 09/23/2006 Time: 10:59:08Std: Channel: 0Resolution: 259 CAL:ON(COAX) CW: ON

        V    S    W    R

    Frequency (1710.0 - 2170.0 MHz)

    M1: 1.241 @1900.80 MHz M2: 1.2 @2082.60 MHz

     

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    99/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 42 of 49

    13 Antenna System Test Result

    Sector 1 Sector 2 Sector 3

    Tx/RxA RxB Tx/RxA RxB Tx/RxA RxB

    VSWR (Peak) 1.224 1.286 1.197 1.227 1.270 1.241

    DTF (Peak) 1.070 1.065 1.059 1.069 1.069 1.069

    DTF at End Jumper 1.054 1.054 1.056 1.044 1.060 1.044

    DTF at Indoor Jumper 1.050 1.058 1.041 1.053 1.054 1.053

    Indoor jumper (m) 2.5 2.5 2.5 2.5 2.5 2.5

    End jumper (m) 2.5 2.5 2.5 2.5 2.5 2.5

    Feeder length (m) 18 18 18 18 18 18

    Total length (m) 23 23 23 23 23 23

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    100/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 43 of 49

    13

    COMMISSIONING & INTEGRATIONCHECKLIST

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    101/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    102/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    103/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    104/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    105/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 44 of 49

    14

    EQUIPMENT INSTALLATION REPORT

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    106/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    107/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    108/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    109/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 45 of 49

    15

    NODE B HARDWARE INSTALLATIONACCEPTANCE

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    110/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    111/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    112/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    113/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    114/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    115/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    116/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    117/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    118/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 46 of 49

    16

    NODE B USER ACCEPTANCE REPORT

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    119/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    120/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    121/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    122/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    123/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    124/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    125/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    126/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 47 of 49

    17

    SINGLE SITE VERIFICATION REPORT

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    127/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    128/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 48 of 49

    18

    PUNCH LIST

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    129/131

  • 8/19/2019 Fr-tambun Town-nw40059-e7 Koe Ed

    130/131

     

    Celcom 3G ProjectNodeB Project File

    Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

    Ver1.0 Confidential 06/11/2007 Page 49 of 49

    19

    CERTIFICATE OF ACCEPTANCE