Fracasos de Obras Falsas en Puentes

Embed Size (px)

Citation preview

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    1/54

    Bridge Falsework Forum-

    Welcome & Introduction

    Dolores Valls, P.E.

    Deputy Division Chief

    Offices of Structure Construction

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    2/54

    Welcome & Introduction

    Introduction of Key Participants Purpose of Forum

    Notes & Action Items

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    3/54

    Introductions- Key Participants

    Facilitator Mike Halverson Falsework Manager John Babcock

    OSC F/W Senior Engineers: North = John Walters

    South = Ken Burkle

    OSC F/W Technical Team

    CT/Industry Joint F/W Advisory Team

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    4/54

    Falsework Forum - Purpose

    High Risk F/W Operation: Contractors, OSC, public

    Joint Responsibility for public safety

    High profile incident new definition

    Time to discuss:

    Best Management Practices

    Revised Specifications?

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    5/54

    Falsework Forum Notes

    Action Items will be captured All notes will be posted on Internet

    http://www.dot.ca.gov/hq/esc/construction/construc.htm

    Division of Engineering Services

    Structure Construction

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    6/54

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    7/54

    PROGRESSION OF MEETINGS

    RELATED TO FALSEWORK

    STABILITY

    (John Babcock)

    INTERNAL FALSEWORK TEAM

    JOINT CALTRANS/INDUSTRY

    FALSEWORK ADVISORY TEAM

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    8/54

    Bridge Falsework Forum

    Series of three meetings to addressfalsework stability

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    9/54

    Bridge Falsework Forum

    Offices of Structure Construction TechnicalTeam, Falsework

    Issues Identified

    Solutions suggested

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    10/54

    Bridge Falsework Forum

    Joint Caltrans / Industry FalseworkAdvisory Team Issues Identified

    Solutions recommended

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    11/54

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    12/54

    INTRODUCTIONS

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    13/54

    Agenda REGISTRATION

    FORUM INTRODUCTION (Dolores Valls)

    INTRODUCTIONS

    PROGRESSION OF MEETINGS (John Babcock)

    BACKGROUND

    ADVISORY TEAM RECOMMENDATIONS

    FALSEWORK STABILITY TRAFFIC OPENING REQUIREMENTS

    COMMUNICATION/PARTNERING/FALSEWORK DESIGN

    PLANS

    FALSEWORK ENGINEER PRESENCES AND APPROVALS BEST PRACTICES (Internal by Contractor)

    REWRITE FALSEWORK MANUAL, BRIDGE

    CONSTRUCTION MEMOS, SPECIFICATIONS

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    14/54

    Agenda

    ADVISORY TEAM RECOMMENDATIONSWINCHES FOR FALSEWORK REMOVAL

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    15/54

    FALSEWORK SUBMITTALS3 0 4

    1 0 5

    1 7 4

    9 5

    4 2

    9 41 0 4

    4 4

    1 0 8

    1 2 6

    6 0

    0

    5 0

    1 0 0

    1 5 0

    2 0 0

    2 5 0

    3 0 0

    3 5 0

    1 9 9 7 1 9 9 8 1 9 9 9 2 0 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7

    Year

    Submittals

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    16/54

    MAJOR FALSEWORKINCIDENTS

    1 1

    2

    3

    0 0

    3

    1

    0

    3

    1

    0

    2

    4

    1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007

    Year

    MajorIncident

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    17/54

    FALSEWORK STABILITY

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    18/54

    FALSEWORK STABILITY

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    19/54

    FALSEWORK STABILITY

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    20/54

    FALSEWORK STABILITY

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    21/54

    CASE 1

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    22/54

    Falsework Elevation View

    121 123122

    Not attached

    per plan

    Contractor grading Bent at time of incident.Contractor grading Bent at time of incident.

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    23/54

    Falsework Bent Elevation

    W24 X 131

    CenterlineBent 123

    Cable Bracing

    Cripple Cap

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    24/54

    CASE 1

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    25/54

    CASE 2

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    26/54

    CASE 2

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    27/54

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    28/54

    CASE 2

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    29/54

    CASE 3

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    30/54

    CASE 3

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    31/54

    CASE 3

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    32/54

    CASE 3

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    33/54

    CASE 3

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    34/54

    LESSONS LEARNED

    Stability measures must be in place at all times Multi-tiered systems require special attention Dont adjust falsework over or adjacent to

    traffic

    34

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    35/54

    DONT ADJUST

    FALSEWORK OVER OR

    ADJACENT TO TRAFFIC

    Contract Special Provisions Maintaining Traffic

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    36/54

    HOW DO WE MAINTAIN FALSEWORKSTABILITY?

    Or

    WHAT IS IT THAT CAUSESFALSEWORK TO BECOME UNSTABLE?

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    37/54

    ADVISORY TEAM

    RECOMMENDATIONS -

    STABILITY

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    38/54

    1. Traffic Opening requirements

    1.1 Independently stable/ stand aloneframes

    1.2 Connection criteria

    1.3 Customary to increase load withincreased risk

    1.4 Continuity between structure columns

    1.5 Implementation:

    1.5.1 Falsework Manual

    1.5.2 Specifications

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    39/54

    2. Communication/Partnering/Falsework Design Plans

    2.1 Require meetings at criticalbenchmarks

    2.1.1 Erection

    2.1.2 Grading

    2.1.3 Removal

    2.1.4 Prior to opening to traffic (forfalsework over traffic)

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    40/54

    2. Communication/Partnering/Falsework Design Plans

    2.2 Erection and Removal Plans2.2.1 General at time of falsework plan

    submittal

    2.2.2 Detailed at pre-activity meeting

    2.3 Implementation

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    41/54

    3. Falsework Engineer of RecordPresence and Approvals

    3.1 At Critical benchmarks3.1.1 Certify prior to traffic opening (for

    falsework over traffic)

    3.1.2 Onsite during grading operations

    3.1.3 Progressive stages of construction

    3.2 Implementation

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    42/54

    4. Best Practices(Internal by Contractor)

    4.1 Training4.2 Company Certification

    4.3 Implementation

    5 R i F l k M l

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    43/54

    5. Rewrite Falsework Manual,

    Bridge Construction Memos,Specifications

    5.1 Longitudinal Stability Analysis

    5.2 Friction Transfer Capacity (FTC)

    Allowance

    5.3 Testing and use of clamps

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    44/54

    WINCHES FOR

    FALSEWORK

    REMOVAL

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    45/54

    WINCHES FOR FALSEWORK REMOVAL

    Traffic window limitations

    Operation cannot be reasonably doneotherwise

    Does not encroach upon the vertical

    and horizontal traffic clearances

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    46/54

    WINCHES FOR FALSEWORK REMOVAL

    Will not cause a traffic disruptionWork is performed at night with a

    closure

    Load is static to structure soffit

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    47/54

    ADVISORY TEAM RECOMMENDATIONS

    Winches for Falsework Removal

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    48/54

    ADVISORY TEAM RECOMMENDATIONS

    1. Redundant systems are used

    1.1 Use High Strength rods or strands

    and winches

    1.2 High strength rods or strands1.2.1 Requires redundant system

    1.2.2 Requires use of new strand

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    49/54

    ADVISORY TEAM RECOMMENDATIONS

    1.3 Winches only

    1.3.1 Safety factor (5:1)

    1.3.2 Certification

    1.4 Inspection of critical elements (NDT)

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    50/54

    ADVISORY TEAM RECOMMENDATIONS

    2. Implementation

    2.1 Provide additional direction

    2.2 Update Falsework Manual

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    51/54

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    52/54

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    53/54

    Discussion

  • 7/24/2019 Fracasos de Obras Falsas en Puentes

    54/54

    Adjourn