Gebruik kennis & ervaring procesindustrie voor datacenters
Trinseo – Joop Peeters, Program Manager
ABB – Robin Koeken, Account Manager
ABB in de datacenterindustrie een portfolio geschikt voor industrialisatie
- Low-voltage switchboards / switchgear - Circuit breakers - Active filters - Power factor correction
- Substation - Transformer - Medium-voltage switchboards / switches - Power quality assessments - MV UPS
- Intelligent power - Distribution units - Remote power panels - Branch circuit monitoring
- Smart grid connectivity - Microgrid solutions - Strategic partner to leading wind and photovoltaic OEMs
- HVAC solutions - High-efficiency motors - Low-harmonic variable frequency drives / inverters - Circuit breakers - Cooling - Automation and control - Energy efficiency audits - Instrumentation
- Data center automation and power optimization - Remote monitoring and diagnostics
- Wide range of gensets
- Rectifiers - UPS - Power transformer
Trinseo een wereldleider in de productie van plastics, binders en rubber
Agenda
• Introductie
• De uitdaging van de DC industrie
• Vergelijking met de Procesindustrie
• De Uitdaging en Aanpak van Trinseo
• De Uitkomst en Lessons Learned
• Hoe kan de DC industrie hiervan profiteren
IT consumerization drijft enorme vraag IoE, M2M zal de groei alleen maar verder versnellen
Image credit: Qmee
Data center trends
Toenemende groei aan eisen
Hyper-scale infrastructuur
Moore’s Law voor alles
Supersnelle DevOps
Snelle standaardisatie
Onverbiddelijke commoditisering
Image credit: Google
Datacenter challenges zijn universeel risico, efficiëntie & capaciteit zijn (traditioneel) moeilijk te
bereiken
Beschikbaarheid & performance management zijn taai over-design & over-uitgaven zijn standaard strategieën
Troubleshooting & root cause analyses zijn complex over-provisioning & over-staffing is normaal
Capacity planning & management zijn foutgevoelig handmatige processen en het 'buikgevoel' zijn aanvaardbaar
Datacentersystemen zijn onnodig complex ‘islands of automation’ verhoogd risico, kosten & inefficiëntie
Power Cooling Whitespace IT HW, SW, NW
Facilities Engineering, Operations & Planning IT DevOps, Planning
Power Meters
Substation
Utility Meter
PDU
BCM
UPS
Generators
Switchgear
Economisers
VFDs
Temp & RH
Airflow
Pressure Chillers
CRACs
Plug in Strips
Network Mon.
Hotspots
Server Mon.
App. Mon.
FMS BMS CMS EMS PMS
VESDA
Fire Control
Security
‘Islands of automation’ is geschiedenis in ander kritische industrieën
Non-DC industrie uitdagingen
Kapitaal & cash intensief
Energie intensief
Long Return-on-Capital cycles
Overvolle & competitieve markt
Kosten & prijs commoditisering
Toenemende consolidatie
Zijn datacenters echt uniek in hun uitdagingen?
Apparaten
Systemen Personen
Uitdagingen in de Industrie
Een Control Room reality check
Samenwerking van Personen, Systemen & Apparaten
Single view voor alle Systemen en Apparatuur
Agenda Agenda
Licentie Obsolete hardware Kennis Informatie (KPI’s) Verbetering (kwaliteit / kosten) Veiligheid
Waarom migreren?
14
Area of
Technology
Description CURRENT FUTURE
ARCHITECTURE MOD V Common Platform Standard Platform
STANDARDS Conventions Business Driven Corporate & Business
S88, S95, S106, etc.
CONTROL CODE
(Structured Text)
Q&A Templates
Business libraries
Object Oriented
Reuse across business envelopes
Version controlled & Heavily used
Level of
Standardization
75 – 80 % 95 % ++
Modularization Medium - High Very Very High
MODEL Physical Model By Unit (Equipment) Full Model (PC, UN, EM, CM)
Fixed Procedures One per Unit / Sequence Multiple Procedures per Level
Batch Procedures Not Available Some Flexible Procedures
Heavy use on Formulations
ENGINEERING
TOOLS
ASCII Based
Central VAX
C tools on Vax
Fortran
Client/ Server
Open architecture
Workstation, 'Cloud’
Forward Engineering Tools
Integrated data & Systems
Integreren en omzetten van nieuwe en bestaande functionaliteiten
15
Area of
Technology
Description CURRENT FUTURE
ENGINEERING
SUPPORT
Unconnected data Empowered Technology Associates
Global Support
Data and history all in context
Engineering Data available to plant
MAINTENANCE
SYSTEMS
Islands of data
Inaccurate data
Maintenance History in context
Seamless operations, maintenance work
processes and data flow
OPERATIONS
Many unconnected programs Empowered Operators
PRODUCT &
RECIPE
MANAGEMENT
SAP R2, Excel, Custom
databases, Manual workflow
Global recipe management, S88, Cross
functional, Integrated Compliance Mgmt,
MES Links to SAP Production Orders Only in a
couple businesses
All transactions
Business data
and KPI’s
Custom databases, poor
integration, variation in biz
“Real time” roll up of KPI data, Business
dashboards, production and cost and
cash flow integrated
Workflow
automation
All Manual
White Spaces
Standard driven
Automated – Interactive
Cross Functional - Integrated
Criteria voor Success
• Triple ZERO (geen gewonden, lekkages of proces veiligheids -incidenten)
• Voldoen aan de tijdlijn en hebben van een ZERO negatieve business impact
• Voldoen aan total cost of ownership targets
• Klaar zijn voor het Plant 2020 initiatief
Steering Committee Program
Management
Core Team Project Teams
Project Managers Engineers
Technicians Global Resources
Uplift Activities Services
Programma Overzicht
Core Team
Migration Tools
Subject Matter Experts
Coaching FEED
Studies
Cloud Development
System
Samenwerking met de leverancier
First Project
20
Before
After
Heeft een brede (management) ondersteuning nodig om te slagen Korte down-time is mogelijk (keep business running) Cyber security heeft aandacht nodig
You don’t know what you don’t know (vermijd denken van de oude manier) – sta open voor suggesties
Geïntegreerd, maar ook complex – testen is belangrijk!
Multi-system engineering staat betrokkendheid van engineers uit de hele wereld toe – is tevens een uitdaging
Lessons Learned
Voorbereiding is key! Migratie is niet makkelijk!
• De Industrie heeft een uitdaging – Wij laten fabrieken langer en langer draaien, maar het upgraden van de “hersenen” van de plant wordt beschouwd als een hoog risico en gaat gepaard met hoge projectkosten!
• Migreren naar een nieuw en modern systeem creëert nieuwe kansen –
• Verdere verbetering van plant operations
• Wereldwijde standaardisatie van plants dat ons in staat stelt om onderhoud en ondersteuning op een efficiëntere manier in te zetten
• Het trekt en behoudt mensen in een "nieuwe" werkomgeving
“A well thought through planning of
your migration is your key to success.”
-Joop Peeters-
In het kort…
Leren van andere sectoren is een kans voorkom het opnieuw uitvinden van het wiel
Food & Beverage
Semiconductors
Oil & Gas
Pharmaceuticals
Chemicals
Automotive
Datacenters gaan over procesautomatisering true end-to-end automatisering is niet erg complex
Power Meters
Substation
Utility Meter
PDU
BCM
UPS
Generators
Switchgear
Economisers
VFDs
Temp & RH
Airflow
Pressure Chillers
CRACs
Plug in Strips
Network Mon.
Hotspots
Server Mon.
App. Mon.
2 Mogelijk maken van beheer van IT space, energie en koeling
1 Integreer alle fysieke
infrastructuurmonitoring, besturing & automatisering
Converged DevOps & Management
3 Opzetten van volledige IT workflow management
Alle fysieke en virtuele infrastructuur als één
DCIM wat het doet – sneller, beter, goedkoper
1 truth – één gegevensbron, één operationele omgeving
“Real” real-time monitoring om overzicht en controle mogelijk te maken
Uniforme IT & Facility alarm management
Operator vriendelijke uitgebreide NOC omgevingen
Condition-based monitoring en prognose geïntegreerd met verschillende systemen
Contactgegevens
• Bedrijfsnaam: ABB
• Adres: Mon Plaisir 40, Etten-Leur
• Telefoonnummer: 06-53144797
• E-mailadres: [email protected]
• Standnummer: 24