48
社區服務建築業百家講壇 2016 Seminar Series on Remodeling, Addition, New Construction, and Commercial Property Development 2016灣區房屋裝修加建改建新建及商業地產開發系列講座

GreenBuilding

Embed Size (px)

Citation preview

Page 1: GreenBuilding

“社區服務” 建築業百家講壇2016 Seminar Series on Remodeling, Addition, New

Construction, and Commercial Property Development2016灣區房屋裝修、加建、改建、新建、

及商業地產開發系列講座

“社區服務” 建築業百家講壇

Page 2: GreenBuilding

綠色建築趨勢怎樣影響我們的生活

Presented by Allen Chen

http://www.nccaba.org 1-844-565-9688

Page 3: GreenBuilding

Topics of the Day 什麼是 CALGreen? 什麼是 Title 24? 什麼是 Green point rated? 設計師 、承包商應該注意哪些事項? 屋主應考慮哪些方面? 各个城市City的法規有何不同? 各个城市City的法規有何不同? 誰有資格做 professional rater? 綠色認證的要求和過程? 綠色建築有什麼 Benefits? 屋主新建加建申請 permit時如何填寫 check list mandatory

items(必要規定)? 我家的房子需不需要安裝太陽能?太陽能熱水器?使用一次付款還是分期攤還?

August 22, 2016 www.jofforts.com 3

Page 4: GreenBuilding

Climate ChangeU.S. Energy Consumption by Sector

Building:48%, Transportation: 27%, Industrial: 25%

August 22, 2016 www.jofforts.com 4

Page 5: GreenBuilding

The Built EnvironmentIn the United States, Buildings: 1. Consume 65% of electricity 2. Create 30% of total greenhouse gas emissions 3. Create 136 million tons of C&D waste each year 3. Create 136 million tons of C&D waste each year 4. Consume 10% of potable water 5. Use 40% of raw material globally

August 22, 2016 www.jofforts.com 5

Page 6: GreenBuilding

Environmental Impacts of Traditional Buildings

83 million buildings in the US as of 2013Continue to be used for many yearsLots of land, energy, water, material….

August 22, 2016 www.jofforts.com 6

Lots of land, energy, water, material….Lots GHG & harmful air pollutant >40% world energy and 25% of CO2 75% account for electricity (EPA 2008) Energy 2025 19%↑. 2X Germany, 3X Japan

Page 7: GreenBuilding

Quality of life 15% of homeowners in the U.S. may be allergic to

elements in their own homes 40% of children born today will develop some

form of respiratory diseaseform of respiratory diseaseOf all the chemicals that the EPA monitors, only 2

(ozone & sluphur dioxide ) are more prevalent outdoors than indoors

August 22, 2016 www.jofforts.com 7

Page 8: GreenBuilding

什麼是 CALGreen CALGreen is California Green Building Standards Code The purpose of CALGreen is to improve public health, safety

and general welfare by enhancing the design and construction of buildings through the use of building concepts having a reduced negative impact or positive environmental impact and encouraging sustainable construction practices in the following encouraging sustainable construction practices in the following categories: Planning and design Energy efficiencyWater efficiency and conservationMaterial conservation and resource efficiency Environmental quality

August 22, 2016 www.jofforts.com 8

Page 9: GreenBuilding

什麼是 Title 24?Local energy ordinancesThermal massCool roof, window & skylightRadiant barrier & Vapor barrierRadiant barrier & Vapor barrier Insulation and lightingWater heater & HVACMust be 15% beyond original T24.

August 22, 2016 www.jofforts.com 9

Page 10: GreenBuilding

什麼是 Green point rated?LEED 加州縮影有LEED 精神, 但簡單便宜 to promote healthy, energy- and resource-efficient to promote healthy, energy- and resource-efficient

buildings in California.

August 22, 2016 www.jofforts.com 10

Page 11: GreenBuilding

2013 Building Energy Efficiency Standards

The 2013 Standards improve upon the 2008 Standards The 2013 Standards went into effect July 1, 2014. http://www.energy.ca.gov/title24/2013standards/ http://www.energy.ca.gov/title24/2013standards/

August 22, 2016 www.jofforts.com 11

Page 12: GreenBuilding

Environmental CategoriesCommunity DesignEnergy EfficiencyWater EfficiencyWater EfficiencyResource Conservation Indoor Environmental Quality

August 22, 2016 www.jofforts.com 12

Page 13: GreenBuilding

CA Green History 1995 USGBC established 2006 GPR & LEEDH Pilot launched 2006 ~2011 70 LGO adapted, 38 M/Req

August 22, 2016 www.jofforts.com 13

2009 CALGreen finalized 2011 CALGreen goes into effect 2013 Building code goes into effect

Page 14: GreenBuilding

CA Policy Trends & Decisions AB32 – Reduce GHG by 2020 to 1990 CPUC Strategic Plan New Homes – NZE by 2020 Existing Homes – 40% ↑by 2020 Existing Homes – 40% ↑by 2020 GB ordinances - ↑100 cities adapted Incentive, Rebate & Stimulation programs

August 22, 2016 www.jofforts.com 14

Page 15: GreenBuilding

設計師 Architect應該注意哪些事項? Passive solar orientation (more windows on south side) Designed and installed HVAC system via ACCA manual

J/heat load, D/ ducts, S/equip Fan on living/family/dining room or ventilation for nature

cooling (low/in high/out)cooling (low/in high/out) Overhang & landscape shading Pre-plumb for grey water and rain water harvesting Pre-wiring for solar PV system Crawlspaces, free of moisture and air tight

August 22, 2016 www.jofforts.com 15

Page 16: GreenBuilding

Advanced framing or OVE (optimal value engineering) Smart design (2x6 instead 2x4, 16 on center or 24 on

center ?) Headers are sized for load (4x6 instead 4x12 ?) Use only cripple & jack studs where needed (save

設計師Architect應該注意哪些事項?

Use only cripple & jack studs where needed (save material)

2-3 stud corners & T-walls (with clips and/or blocking) Insulated exterior Engineered lumber Use SIPS, OSB (panels) ICFs, AAC

(concrete) FSC wood or steelAugust 22, 2016 www.jofforts.com 16

Page 17: GreenBuilding

Radiant barrier on attic, Vapor barrier on craw space. Whole house fan (solar powered) on top of roof or attic Hot water insulation up to faucet Energy star ceiling fan

設計師 Architect應該注意哪些事項?

Sealed combustion direct vent or power vented gas furnace & water heater (on-demand circulation pump) Or tank less water heater

Blow door test to get minimum leakage ACH Heat Recover Ventilation system

August 22, 2016 www.jofforts.com 17

Page 18: GreenBuilding

承包商應該注意哪些事項?Material selection System performance

August 22, 2016 www.jofforts.com 18

System performanceDecreasing construction waste Improving indoor air quality

Page 19: GreenBuilding

屋主應考慮哪些方面?如何能用最理想的投入達到州政府的要求並為屋主獲得更大的回報?

為順利取得建築許可(permit),屋主應該注意哪為順利取得建築許可(permit),屋主應該注意哪些事項?

屋主怎樣與設計師,承包商溝通,達成協議並順利開工?

August 22, 2016 www.jofforts.com 19

Page 20: GreenBuilding

誰有資格做 professional rater?A Green Rater is a specific type of Home

Energy Rater, qualified to conduct home energy ratings on residential and small commercial buildings.

August 22, 2016 www.jofforts.com 20

commercial buildings. Leadership for Energy and Environmental

Design (LEED) for Homes Program. Launched by the U.S. Green Building Council (USGBC)

Page 21: GreenBuilding

綠色認證的要求和過程(1)HIRE A RATER.

Find a list of Raters through BIG online Certified Professionals Directory.Certified Professionals Directory.

IDENTIFY MEASURES.Review the checklist and create a customized list of design features and construction practices for your project.

August 22, 2016 www.jofforts.com 21

Page 22: GreenBuilding

SUBMIT INITIAL APPLICATION.The Rater submits a project planning score sheet to the City.

綠色認證的要求和過程(2)

to the City. VERIFY MEASURES.

Coordinates with the construction team to provide documentation and site verification of measures and construction practices achieved.

August 22, 2016 www.jofforts.com 22

Page 23: GreenBuilding

APPLY FOR FINAL CERTIFICATION.The Rater calculates scores, and submits all necessary documentation to the City or Build It Green for certification review processing.

綠色認證的要求和過程(3)

Green for certification review processing.GET YOUR CERTIFICATE!

City will issue a final completion permit

August 22, 2016 www.jofforts.com 23

Page 24: GreenBuilding

綠色建築有什麼 Benefits? Saves energy & waterMore durable, less maintenanceQuality constructionHealthier livingHealthier living Improved resale value It’s the right thing to do

August 22, 2016 www.jofforts.com 24

Page 25: GreenBuilding

Green Point Basic PointsCommunity --- 3/28 points Energy --- 26/133 points IAQ/Health --- 7/56 points Resources --- 7/85 points Resources --- 7/85 points Water --- 7/50 points 50/352

*** Less than 50 points, no permit ***

August 22, 2016 www.jofforts.com 25

Page 26: GreenBuilding

各個城市City的法規有何不同?Every city has different requirement, some cities require to have

minimum of 50 points(Campbell, Cupertino…) , while some need to have 70 points (Mountain View) or 80 points(Sunnyvale…). However, most cities in Bay Area adapt 2013 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS which is

CALGREEN RESIDENTIAL MANDATORY MEASURES CALGREEN RESIDENTIAL MANDATORY MEASURES Effective January 1, 2014 all residential buildings undergoing permit alteration, additions or improvements shall replace noncompliant plumbing fixtures with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of final completion, certificate of occupancy or final permit approval by the local building department.

August 22, 2016 www.jofforts.com 26

Page 27: GreenBuilding

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(1)

2013 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS - Version 8.16.16 COMMUNITY

The 2013 CALGreen Code applies to all newly constructed hotels, motels, lodging houses, dwellings, dormitories, condominiums, shelters, congregate residences, employee housing, factory-built housing and other types of dwellings with sleeping accommodations and new accessory buildings associated with such uses.

This section also applies to additions and alterations where there is an increase in conditioned space and specifies that these requirements only apply to the specific area of the addition or alteration. Existing site and landscaping improvements that are not otherwise disturbed are not subject to the requirements of CALgreen.

**If your project totals 300 sq. ft. or less of addition and/or structural remodeled area combined you will NOT be required to obtain a third-party rater. You will still be responsible to follow all Residential Mandatory Measures as applicable to your project. Please incorporate all pages of this checklist except the CALGreen Signature Declaration page into your plans**. August 22, 2016 www.jofforts.com 27

Page 28: GreenBuilding

1. The owner or owner’s agent shall employ a licensed qualified green-point rater (www.builditgreen.org) experienced with the 2013 California Green Building Standards Codes to verify and assure that all required work described herein is properly planned and implemented in the project.

2. The green-point rater, in collaboration with the owner and the design

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(2)

2. The green-point rater, in collaboration with the owner and the design professional shall review Column 2 of this checklist, and initial all applicable measures, sign and date

3. Section 1 –Design Verification at the end of this checklist., prior to submittal. Applicant to include these pages into the construction plans as well as provide (2) separate 8-1/2” x 11” signed copies. .

4. PRIOR TO FINAL INSPECTION BY THE BUILDING DEPARTMENT, the green-point rater shall complete Column 3 and sign and Date Section 2 – Implementation Verification at the end of this checklist and submit the completed form to the Building Department.

August 22, 2016 www.jofforts.com 28

Page 29: GreenBuilding

Project Name: _______________________________________________________________Project Address: _____________________________________________________________Project Description: __________________________________________________________

Instructions (for projects of 300 sq. ft. or more): 1. The owner or owner’s agent shall employ a licensed qualified green-point rater

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(3)

1. The owner or owner’s agent shall employ a licensed qualified green-point rater (www.builditgreen.org) experienced with the 2013 California Green Building Standards Codes to verify and assure that all required work described herein is properly planned and implemented in the project.

2. The green-point rater, in collaboration with the owner and the design professional shall review Column 2 of this checklist, and initial all applicable measures, sign and date

Section 1 –Design Verification at the end of this checklist., prior to submittal. Applicant to include these pages into the construction plans as well as provide (2) separate 8-1/2” x 11” signed copies. .

August 22, 2016 www.jofforts.com 29

Page 30: GreenBuilding

PRIOR TO FINAL INSPECTION BY THE BUILDING DEPARTMENT, the green-point rater shall complete Column 3 and sign and Date Section 2 –Implementation Verification at the end of this checklist and submit the completed form to the Building Department.

MANDATORY FEATURE OR MEASURE COLUMN 2 :Project Requirements Rater to initial applicable measures prior to

submitting forms

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(4)

submitting formsCOLUMN 3 :Verification Rater to verify during construction as applicable to project Planning and Design Site Development 4.106.2 A plan is developed and implemented to manage storm water drainage

during construction. 4.106.3 Construction plans shall indicate how site grading or a drainage system will

manage all surface water flows to keep water from entering buildings.4.106.4 Provide capability for electric vehicle charging in one- and two-family

dwellings and in townhouses with attached private garages; and 3 percent of total parking spaces, as specified, for multifamily dwellings.

August 22, 2016 www.jofforts.com 30

Page 31: GreenBuilding

Energy Efficiency General 4.201.1 Building meets or exceeds the requirements of the California

Building Energy Efficiency Standards3 .Water Efficiency and Conservation Indoor Water Use 4.303.1. Plumbing fixtures (water closets and urinals) and fittings

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(5)

4.303.1. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) installed in residential buildings shall comply with the prescriptive requirements of Sections , 4.303.1.1 through 4.303.1.4.4.

4.303.2 Plumbing fixtures and fittings required in Section 4.303.1 shall be installed in accordance with the California Plumbing Code, and shall meet the applicable referenced standards.

August 22, 2016 www.jofforts.com 31

Page 32: GreenBuilding

Outdoor Water Use 4.304.1 After December 1, 2015, new residential developments with an

aggregate landscape area equal to or greater than 500 square feet shall comply with one of the following options: 1. A local water efficient landscape ordinance or the current California Department of Water Resources’ Model Water Efficient Landscape Ordinance (MWELO),

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(6)

whichever is more stringent; or 2. Projects with aggregate landscape areas less than 2,500 square feet may comply with the MWELO’s Appendix D Prescriptive Compliance Option.

Material Conservation and Resource Efficiency Enhanced Durability and Reduced Maintenance 4.406.1 Annular spaces around pipes, electric cables, conduits or other

openings in plates at exterior walls shall be protected against the passage of rodents by closing such openings with cement mortar, concrete masonry or similar method acceptable to the enforcing agency.

August 22, 2016 www.jofforts.com 32

Page 33: GreenBuilding

Construction Waste Reduction, Disposal and Recycling4.408.1 Recycle and/or salvage for reuse a minimum of 50 percent of the

nonhazardous construction and demolition waste in accordance with one of the following: 1. Comply with a more stringent local construction and demolition waste management ordinance; or 2. A construction waste management plan per Section 4.408.2; or 3. A waste management company per Section 4.408.3; or 4. The waste stream reduction alternative per Section 4.408.4.

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(7)

Building Maintenance and Operation4.410.1 An operation and maintenance manual shall be provided to the building

occupant or owner. ENVIRONMENTAL QUALITYFireplaces 4.503.1 Any installed gas fireplace shall be a direct-vent sealed combustion type.

Any installed woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. Woodstoves, pellet stoves, fireplaces shall also comply with applicable local ordinances.

August 22, 2016 www.jofforts.com 33

Page 34: GreenBuilding

Pollutant Control4.504.1 Duct openings and other related air distribution component openings shall

be covered during construction.4.504.2.1 Adhesives, sealants and caulks shall be compliant with VOC and other

toxic compound limits.4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits.4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(8)

4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for ROC and other toxic compounds.

4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials have been used.

4.504.3 Carpet and carpet systems shall be compliant with VOC limits. 4.504.4 80 percent of floor area receiving resilient flooring shall comply with

specified VOC criteria. 4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood

used in interior finish systems shall comply with low formaldehyde emission standards.

August 22, 2016 www.jofforts.com 34

Page 35: GreenBuilding

Interior Moisture Control4.505.2 Vapor retarder and capillary break is installed at slab on grade

foundations.4.505.3 Moisture content of building materials used in wall and floor

framing is checked before enclosure.

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(9)

Environmental Comfort4.507.2 Duct systems are sized, designed, and equipment is selected

using the following methods:1. Establish heat loss and heat gain values according to ANSI/ACCA 2

Manual J-2004 or equivalent. 2. Size duct systems according to ANSI/ACCA 1Manual D-2009 or

equivalent. 3. Select heating and cooling equipment according to ANSI/ACCA 3

Manual S-2004 or equivalent. August 22, 2016 www.jofforts.com 35

Page 36: GreenBuilding

Installer and Special Inspector Qualifications702.1 HVAC system installers are trained and certified in the proper installation of

HVAC systems.702.2 Special inspectors employed by the enforcing agency must be qualified and

able to demonstrate competence in the discipline they are inspecting.

Verifications

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(10)

Verifications703.1 Verification of compliance with this code may include construction documents,

plans, specifications builder or installer certification, inspection reports, or other methods acceptable to the enforcing agency which show substantial conformance

1. Green building measures listed in this table may be mandatory if adopted by a city, county, or city and county as specified in Section 101.7

2. Required prerequisite for this Tier. 3. These measures are currently required elsewhere in statute or in regulation

CALGREEN SIGNATURE DECLARATIONS August 22, 2016 www.jofforts.com 36

Page 37: GreenBuilding

DECLARATIONS Project Name: _____________________________________________Project Address: ___________________________________________ Project Description: _____________________________________________

SECTION 1 – DESIGN VERIFICATION Complete all lines of Section 1 – “Design

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(11)

SECTION 1 – DESIGN VERIFICATION Complete all lines of Section 1 – “Design Verification” and SUBMIT THE ENTIRE CHECKLIST (COLUMNS 2 AND 3) WITH THE PLANS AND BUILDING PERMIT APPLICATION TO THE BUILDING DEPARTMENT. The owner and design professional responsible for compliance with CalGreen Standards have reviewed the plans and certify that the items checked above are hereby incorporated into the project plans and will be implemented into the project in accordance with the requirements set forth in the 2013 California Green Building Standards Code as adopted by the City of ________(any city)

August 22, 2016 www.jofforts.com 37

Page 38: GreenBuilding

Owner’s Signature Date __________________________________________Owner’s Name (Please Print) ______________________________________Design Professional’s Signature Date _______________________________Design Professional’s Name (Please Print) ___________________________Signature of Green Point Rater Date ________________________________Name of Green Point Rater (Please Print) Phone No. ___________________Email Address for Green Point Rater License No. _____________________

屋主新建加建申請permit,如何填寫check list mandatory items(必要規定)(12)

SECTION 2 – IMPLEMENTATION VERIFICATION Complete, sign and submit the completed checklist, including column 3, together with all original

signatures on Section 2 to the Building Department PRIOR TO BUILDING DEPARTMENT FINAL INSPECTION.

I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2013 California Green Building Standards Code as adopted by the City of (any city)

Signature of Licensed Green Point Rater Date _________________________________ Name of Licensed Green Point Rater (Please Print) Phone No. ____________________ Email address for Licensed Green Point Rate___________________________________August 22, 2016 www.jofforts.com 38

Page 39: GreenBuilding

我家的房子需不需要安裝太陽能?使

用一次付款還是分期攤還?

August 22, 2016 www.jofforts.com 39

Page 40: GreenBuilding

安裝太陽能注意事項

South-facing orientation朝南方向Minimal Shading陰影越小越好Minimal Obstructions & Surface Area盡量不要有

August 22, 2016 www.jofforts.com 40

Minimal Obstructions & Surface Area盡量不要有受到阻礙的東西

Life of roof material屋頂材料的壽命Minimum of utility bill電費能夠降到最低

Page 41: GreenBuilding

What Makes Buildings Green ?

↑ Efficient use of Energy ↓GHG emissions & indoor air pollution ↓Building water use ↓Land use, C & D material

August 22, 2016 www.jofforts.com 41

Page 42: GreenBuilding

Illustration of a Green Building

August 22, 2016 www.jofforts.com 42

Page 43: GreenBuilding

City Green Building

August 22, 2016 www.jofforts.com 43

Page 44: GreenBuilding

Country Green Building

August 22, 2016 www.jofforts.com 44

Page 45: GreenBuilding

Typical N Euro Green Building

August 22, 2016 www.jofforts.com 45

Page 46: GreenBuilding

Business Opportunities Suitable for all kinds of engineering Passive house design Solar Thermal retrofit Solar Thermal retrofit DC lighting and appliances Organic waste turns to energy Grey water on site treatment Battery & Solar booming ?

August 22, 2016 www.jofforts.com 46

Page 47: GreenBuilding

ConclusionLSA and 3RReduce

August 22, 2016 www.jofforts.com 47

ReduceReuseRecycle

Page 48: GreenBuilding

See You Next Time!Thank You !!!

August 22, 2016 www.jofforts.com 48

See You Next Time!