44

GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Embed Size (px)

Citation preview

Page 1: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL
Page 2: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

GSN Station Operator Technical Training Program (TTP 2005)

Albuquerque Seismological Laboratory

ASL

Page 3: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL
Page 4: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Training

• Installation, maintenance and operation training are conducted during the initial installation of the station.

• Refreshed during any maintenance visit.

Page 5: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Glossary• ASL – Albuquerque Seismological Laboratory

• Comm-link – Remote system connection from DAU to DPU • DA or DAU – Data Acquisition (Unit) of a Remote system.

• DAU/DPU – Combined Data Acquisition Unit and Data Processing Unit (Local System)

• DCC – Data Collection Center

• DP or DPU – Data Processing Unit. The recording portion of a Remote system.

• GPS – Global Positioning Satellite

Page 6: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Glossary Continued

• GSNMAINT –Technical personnel at ASL that handle Global Seismograph Network Maintenance

• I/O – Input or Output to a module or device

• IRIS – Incorporated Research Institutions for Seismology

• LISS – Live Internet Seismic Server

• QC – Quality Control

• UPS – Uninterruptible Power System

Page 7: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Training Agenda

• Effective communication with ASL• System hardware descriptions• Software operation• Maintenance procedures• Trouble shooting • Data analysis• Grounding and lightning protection• Shipping hardware to ASL

Page 8: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Contacting ASL By E-mail

• Send all station specific messages to: [email protected]

• This is a mail list of all technical persons at Albuquerque Seismological Laboratory

• Use the format below to help us sort mail and quickly respond to your station problems.

Subject: CODE Problem description

Page 9: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Why Do We Use Mail Lists?

• More than one person is aware of the problem. Multiple points of contact.

• Maintenance priority is assigned.

• Actions taken.

• Data quality is verified.

• Mail List is notified when the problem is solved.

Page 10: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

3025002

Order orFabricate

ShipPart

ShipSoftware

SendInstructions

ProblemSource

CanOperator

Fix?

Spareon Site?

CommAvailable?

Spare@ ASL?

Yes

Yes

Failed

Passed

YesNo

No

QCVerification

HW SW

No Repair Necessary

Shop Response Required

Database Entry(Trouble Ticket Closed)

No

RepairRequired?

Problem Communication to ASL Data Flow to ASL DCCData UsersE-Mail

Real Time DataQIC TapeFax Voice

Data QualityControl

Problem TrackingDatabase Entry

(Trouble Ticket Opened)

Problem TrackingDatabase Entry

(Trouble Ticket Opened)

NetworkOperations

FE

Fix Problem ViaLong Haul Link

Respond and Verify

Problem Handling Flowchart

Page 11: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Data Flow from SAML to ASL

SAML

ASL

Internet

Page 12: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

GSN System

D AU /D PU

G PS R eceiver

Tape D rives

H ard D isk

D ia l-up M odem

VBB Seism om eter

VSPSeism om eter

Accelerom eter

Page 13: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

QNETQNET

Serial

GPSPWR

SensorA

SensorB

Q330 PB14F

Serial 2

Serial 1FreeWave FGR115

110929A Q330-

STS-2

110997 Q330,

hub, power

110999 Q330

Baler InterfaceDB9 Null Modem

110401 Q330

Dual Serial

Q330 Recording System Example

Page 14: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Detailed System Hardware Descriptions and Training

• Conducted by Field Engineers on hardware systems matching the specific configuration for each participating station.

Page 15: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Local Power System

SO LA C O N STAN T VO LTAG E TR AN SFO R M ER

STABLIN E VO LTAG E R EG U LATOR

W H ITE - N EU TR AL

TO C O M M ER C IAL AC PO W ER

G R EEN - G N D

BLAC K - AC H O T

EXID E BATTER Y C H AR G ER (D C U PS)

D C O U T

+ -

+ - + -

24 VD C TO IR ISSYSTEM

T2(N EU T)

L2 (N EU T)

L1

T1

+ - + -

G N D

L1 G N DL2

TYPIC AL LO C AL PO W ER SYSTEM

Page 16: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Power System Component Descriptions

• Voltage Regulator

– Used to regulate AC voltage.

– Corrects for low or high commercial power.

• Constant Voltage Transformer

– Conditions the input AC voltage to the DC UPS (battery charger).

Page 17: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Power System Component Descriptions

• DC UPS (Battery Charger)

– Converts commercial AC power to 24 VDC to the operate the DA and charge the stationary batteries.

• Stationary Batteries

– Power for the DA and seismometers during a commercial AC power outage.

Page 18: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Power System Component Descriptions

• Battery Preventive Maintenance

– Keep the battery terminals clean and dry.

– Check for proper voltage in “loaded” and “unloaded” conditions.

• Battery Replacement

– Report any abnormal conditions to GSN Maintenance for replacement instructions.

Page 19: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Photo Voltaic (PV)Power System and VSAT

Page 20: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

GSN Q680 System

CO

NN

EC

TO

RC

ON

NE

CT

OR

CH

AN

1 - 3

CH

AN

4 - 6

114

13

25

25

13

14 1

Q A TAQ A P 4 1 0 0Q A P 4 1 0 0

Q U A N T E R R A

Q D PQ D P

CO

NN

EC

TO

RC

ON

NE

CT

OR

CH

AN

7 - 9

CH

AN

10

- 12

114

13

25

25

13

14 1

Q A TAQ A P 4 1 0 0 M RQ A P 4 1 0 0 M RQ D PQ D P

Q U A N T E R R A G P S 2R E S E T D IS P L A Y 1 9 9 7 /0 6 /2 3 1 6 :3 9 :4 7 U T C

5 9 .6 4 9 1 N 9 .5 9 8 2 E m

1 G B

/H 0 /M T 0

TO

24

PIN

EX

TE

RN

AL

CO

NN

EC

TO

R

CO

NN

EC

TO

R

TO

24

PIN

EX

TE

RN

AL

Q V 1 Q V 1M

/X 3

/X 2

Q S T A

96

51

96

51

1

14

M O T O R O L A

15

69

14 1

15

69

15

69

Q S T A

/S 2 B

/S 1 B

8 3 0 0 Q P W R

/T 1

15

69

96

51

132

5

/T E R M

M V M E

F AIL

S T ATU S

R U N

S C O N

R M T R S T

A B O R T

/M T 51 4 7 S B -1

15

8

9

1

PO

WE

R IN

PU

T

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1 24

68

1012

1416

1820

2224

2628

3032

3436

3840

4244

4648

50 4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1 24

68

1012

1416

1820

2224

2628

3032

3436

3840

4244

4648

50

/S 2 A

25

13

15

69

96

51

/S 1 A

R E S E T

Page 21: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Q330 and Packet Baler

Page 22: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Equipment Installed in TA Vault

Page 23: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

VSAT Antenna and PV Array Examples

Page 24: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Seismometers

• Borehole Installations– KS54000i– CMG3-TB

• Surface Installations– STS-1/VBB– STS-2– CMG-3T– FBA-23 (Accelerometer)– Episensor (Accelerometer)

Page 25: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Seismometers• Basic Information

– NEVER move a seismometer without locking the mass.

– Prevent temperature changes to seismometer and inside vault.

– Eliminate seismic noise near seismometers.

Page 26: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Seismometers

• Operator Maintenance Requirements– Depends on the type of seismometer– Monitor the data quality– Check the mass positions (if data is available)– Center the masses (not possible on all

seismometers)– Align the seismometer if it has been replaced

(surface instruments only)– Troubleshoot problems

Page 27: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Seismometers

• STS-2– Monitor the data for problems– Check mass positions on status screen

• Center all masses if any mass is more than + or- 5 volts from zero. Use the current procedure provided by GSN Maintenance

– Center the masses whenever power is lost to the seismometer

– Troubleshooting• If data is noisy or spiking, check for moisture problems

and re-level the instrument • If there is no seismic or mass position data, this is most

likely due to a faulty Host Box• Request help from ASL

Page 28: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

S T S -1 H O R IZ O N T AL S E IS M O M E T E R O R IE N T ATIO N

E X P L A N A TIO N

E Q U A L S E A R TH M O T IO N N O R TH

E Q U A L S E A R TH M O T IO N E A S T

B O O M A C T IO N

B L O W T O W AR D S O U T H

B L O W T O W AR D W E S TE /W

N /S

S E IS

W E S T E A S T

S

O R IE N T ATIO NE /W S E IS

P L U GV AC U U M

S IG N A LN

C A B L E

R E S U L T

S IG N A L G O E S P O S IT IV E

S IG N A L G O E S P O S IT IV E

V AC U U MP L U G

SS E IS -P O S0 7 /0 9 /9 6

N

N /S S E ISO R IE N T ATIO N

W E S T E A S T

C A B L ES IG N A L

Page 29: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL
Page 30: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Grounding

• Grounding is for protection of personnel and reliable equipment operation.

• Lightning or equipment failures can cause voltage transients that can damage equipment or kill you.

• All equipment is grounded to one place: Single Point Ground

• Maintain the integrity of the grounding system installed with the GSN equipment.

Page 31: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Grounding

• The importance of correctly installing and maintaining a reliable grounding system is explained.

• Exothermic welding connections are demonstrated.

Page 32: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

System Software

• Training conducted by Software Engineers and Field Engineers.

• On hardware systems configured for the specific stations.

• Running the station operational software.

Page 33: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Quality Control

• Quality Control analysts explain how they verify seismic content of the data.

• Field Engineers and Quality Control analysts demonstrate and explain the capabilities of data analysis software.

Page 34: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

System Maintenance

• Training is conducted by Field Engineers on hardware configurations for each specific station.

• Test systems are setup for any unique hardware configurations.

Page 35: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Trouble Shooting

• Conducted by Field Engineers to locate common problems.

• Present solutions for possible temporary repairs to keep the station operational.

Page 36: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

PRIMARY PROBLEM TROUBLESHOOTING POINTS

Before contacting ASL for technical assistance with a station problem please insure the following troubleshooting procedures have been completed.

Page 37: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

1. Is power available at all equipment locations? Has there been a commercial power outage?

2. If power is available but a component is not functioning, are fuses blown?

3. Verify normal operation of all LED’s on the system and make notes to inform GSN Maintenance if they are ON or OFF or FLASHING.

Page 38: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

4. Note status of Radio or Modem comm- link LED’s if you have this hardware.

5. Inform GSN Maintenance of any electrical storms that may have been in the area when the problem started.

6. If you are not familiar with the above actions ask for guidance from GSN Maintenance.

Page 39: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL
Page 40: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

LIGHTS ON THE QUANTERRA SYSTEM(Example of a Troubleshooting Checklist)

CPU Central Processing Unit Board– FAIL (red) OFF = Normal Operation.– STATUS (yellow) FLASHING = Normal operation.– RUN (green) FLASHING = Normal operation.– SCON (green) ON = Normal operation.

• MVME 712/M Interface Module– Visible through a hole in the front panel are two lights (yellow and green) ON = Normal operation.– The light in the terminator connector on the front panel (green) ON = Normal operation

• QPWR Quanterra Power Module– The top light (yellow) OFF = Normal operation.– The top light is a blown fuse indicator for the incoming power and will also illuminate when the top power switch is turned off.– The center light (yellow) OFF = Normal operation.– The center light is also a blown fuse indicator. ON = 24 VDC power is lost to the QAP modules.– The bottom light (green) ON = Normal operation. – If the bottom light is not illuminated, there is less than 20 VDC available at the input connector.

• QDP Quanterra Digital Processor Modules– All 3 (red) lights Flashing brightly each second = Normal operation.– All 3 lights on continuous = CPU has Reset.– Lights flashing rapidly = Memory failure.– Any light flashing dimly indicates that the Digital Processor is trying to send data but the CPU is not accepting the channel. This

could also mean a QAP module failure.• QVI Quanterra VME Bus Interface Modules

– The top light (green) ON For 1 second duration at each minute = Normal operation.– This occurs when the 1 PPM (1 Pulse Per Minute) signal is received from the GPS receiver. – Note: The GPS receiver will not output signals until it has locked onto a satellite.– Middle light (yellow) Flashing brightly and rapidly once each second = Normal operation.– The bottom light (red) Flashing brightly and rapidly once each second = Normal operation.

Page 41: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL
Page 42: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Operator Responsibilites

• Tasks to monitor station operational

• Daily

• Weekly

• Periodic

• These general tasks are tailored for each station.

Page 43: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Contacting ASL By E-mail

• Send all station specific messages to: [email protected]

• This is a mail list of all technical persons at Albuquerque Seismological Laboratory

• Use the format below to help us sort mail and quickly respond to your station problems.

Subject: CODE Problem description

Page 44: GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL