HSSE Challenges and Planin OMV Petrom
Romania Upstream Conference
&
First Eastern Europe HSE Forum
Sustainability: HSSE
Hans Zepic
Business Partner HSSE for E&P
OMV Petrom
7/27/2019 Hans Zepic
2/13
2 OMV Petrom HSSE Challenges and Plan
Clear statement of OMV Petrom management
Before Modernization
After Modernization
7/27/2019 Hans Zepic
3/13
3 OMV Petrom HSSE Challenges and Plan
Steps were taken to manage the major HSSE
challenges facing the E&P activities in Romania
Major challenges 2011 measures
1. Process Safety/ Asset
Integrity
Process safety management walk-arounds
Process safety champions nominated
Safety-critical equipment identified
Fire detection and fighting study, review of fire fighting capabilities
2. Contractor Management High Risk Contractors identified
CARE Card (Start Card) System implemented in projects
Number of Hazard and Near Miss reports from Contractorsincreased by 50%
3. Workover focus Comprehensive program focused on LTIR reduction, training ofworkforce, recognition & reward for HSSE performance, preventivemaintenance system launched
4. Theft w ith 3rd party
injury/fatality
Anti-Theft campaign rolled out
5. Reduction of LTIs Stepping, handling and lifting training for 7.000 persons
HSSE leadership training program for managers First Aid Training Program
6. Spill s Identification of focus areas and pipelines with majority of spills
7. Road Safety Defensive Driving campaign including courses for 5.700 lightvehicle drivers and 1.600 heavy vehicle drivers
7/27/2019 Hans Zepic
4/13
4 OMV Petrom HSSE Challenges and Plan
Prevention and reduction of risks ofaccidents and professional illnessesby:
Informing
increasing awareness related tobehaviors
theoretical & practical training ofprofessional categories involved inactivities of stepping, lifting & manual
handling, working at heights
Aims
Transmitting best practices toemployees involved
Decreasing the number ofaccidents and incidentscompared to the 2009 - 2010period
Objectives
Construction of 3 simulators thatmimic real working conditions easyto be mounted, dismantled andtransported.
Train-the-trainers for 36 E&P &HSSE employees
Training of7.000 employees in allOMV Petrom E&P locations
Action Lines
Stepping, handling and lift ing & Working at heights
Training Campaign 2011
7/27/2019 Hans Zepic
5/13
HSSE plan for 2012-2015
7/27/2019 Hans Zepic
6/13
6 OMV Petrom HSSE Challenges and Plan
A challenging environment, multiple risks and new
priorities in OMV Petrom into 2015
HSSE Strategy 2015
Identification ofsecurity risks insites and implementation ofmeasures at future projects/sites
Process safety (PS) organization inoperational sites and auditing of PSplans
Reporting; HSSE performanceof contractors; Execution ofhealthprograms, ability to work
HSSE involvement in projectdecisions; safety; community andstakeholder engagement
Quantification and reduction ofenvironmental liabilities
People
Planet
Profit
Shift inprioritieswithin thebusinessmodel:Profitable
Growth
Growth
Integration
Change
Performance
Society, shareholders,and other stakeholderswill have increasingexpectations towardstechnical standards andhow we work in future
HSSE-relevant
challenges
Increasing opera-tional risks (less easyhydrocarbons)
Morecontractorinvolvement
Safety and socio-economic challengeswith divestments
Increasing personaland corporateliabilities
7/27/2019 Hans Zepic
7/13
7 OMV Petrom HSSE Challenges and Plan
Process Safety Management Activity Plan 2012
OR
GroupPSMTeam
OperatingSites
Assets
PSPI reportingin CARE
PSPI Results
Analysis
Annual PS Status Report
Risk Reduction Plan PrioritisationConsolidated
Issues Registers
SubstandardBarriersApply Barrier
Checklist
Barrier Checklist PrioritisationApproach
PSPI AnalysisApproach
Guidance
Check
Mentor
OMV Group level initiatives
7/27/2019 Hans Zepic
8/13
8 OMV Petrom HSSE Challenges and Plan
The OMV Golden Rules are the product of a
three year industry wide study of the cause of
fatalities which identified the critical controls
that shall be in place prior to starting work.
Overview
Roll out Plan
HSSE Golden Rules
OMV Group level initiatives
7/27/2019 Hans Zepic
9/13
9 OMV Petrom HSSE Challenges and Plan
IVMS (In vehicle monitoring system)
System overview
IVMS is an integrated and secured systemdesigned to monitor, record, alert, analyzeand improve driver and vehicleperformance.
Location (via GPS)
Speed / RPMs
Hard dip bumps, unsafe turns,
acceleration or brakes Impact / crash data
Seatbelt use and headlight use
Trip duration / mileage
Expected benefits
Safety Benefits Increase in stolen vehicle recovery Increase in personnel security and safetyReduction of accidentsReduction in insurance costs
Fuel Consumption Benefits
Reduction of excessive idleReduction of harsh accelerationReduction of unauthorized use
Vehicle Maintenance Benefits
Reduction in brake and tire wearReduction in drive train wearAccurate Maintenance Scheduling
Productivity Benefits
Real-time tracking and dispatchingReduction in paperwork Increased driver performanceDecrease in unnecessary overtimeDecrease in disputes
OMV Group level initiatives
7/27/2019 Hans Zepic
10/13
10 OMV Petrom HSSE Challenges and Plan
Seatbelt Programme. Focus areas and objectives
Programme focus areas and
key objectives
Increase knowledge and awareness of the benefitsof seat belt use, through a communication campaign,in order to maximize the impact of the seatbeltprogramme.
Communicate management commitment, throughEB decision and Internal Note, supported by internalregulation applicable at company level
Increase accountability of employees, byintroducing actions for non-compliance, as regulatedby labor legislation and internal rules of OMV Petrom
Monitor programme performance through randomchecks involving line management, on a regular basis
Communication campaign -
Key activi ties
Post-crash bus caravan, depicting interior aftercollision with dummies and informative labels withinjuries. Bus caravan to start in Petrom City HQ andcirculate in the main operational locations.
Other Materials:
OMV Petrom level initiatives
7/27/2019 Hans Zepic
11/13
11 OMV Petrom HSSE Challenges and Plan
Preventive and health promotion plans for 2012
OMV Petrom level initiatives
NEW SCREENING PROGRAMS addressing other
important causes of sick leave days:
Liver diseases
Respiratory diseases
Both screenings will be offered to office and field workers.
NEW HEALTH PROMOTION CAMPAIGNS addressing
risk factors for spine & joint diseases and cardiovascular
diseases: Ergonomic assessment of the workstations (for office
workers)
Healthy eating campaign (for office and field workers)
Develop new programs and campaigns
The cardio-vascular diseases screening and the
vaccinations campaigns (flu, TBE and hepatitis) will
continue in 2012.
Continue on-going initiatives
7/27/2019 Hans Zepic
12/13
12 OMV Petrom HSSE Challenges and Plan
Petrom EP HSSE Roadshow 2012
Increasing the level ofunderstanding andawareness regarding theimportance of HSSE in ourdaily activity and in ourlives.
Aims
Show HSSE leadership andcommitment by topmanagement
Create the possibility for theparticipants to discuss HSSEtopics
Field visits, get in contact with
blue collar to show HSSE isour first priority
Objectives
1 day in each Petrom EP Asset,consisting of field visit andmeetings with the localmanagement by the ExecutiveBoard member and the HSSEsupport function
Create Safety awareness
through movies and break-outsessions
Roll-out the HSSE plan 2012
Approach
A li ve message coming from top management has an important impact ; as
a result behaviors will change
The participants perception of safety will change both from a professional
and personal point of view
OMV Petrom EP level ini tiatives
7/27/2019 Hans Zepic
13/13
13 OMV Petrom HSSE Challenges and Plan
Contractor Management concept in Petrom E&P
Clearly define
accountability and
responsibilities
Establish individuals (CO/ CH) in charge of monitoring performance, forensuring a proper management of the contract
Hold line managers accountable for contractor HSSE performance Clearly define the responsibilities of all involved departments and train
accordingly Update and (re)define standardized HSSE contractual T&C: generic and
specific according to activities
Improve contractor
capabili ty and
performance assessment
Increase site level engagement through increased accountability andcommunication
Workshops, HSSE Forums, open dialog, better coverage of work sites
Constant effort to share learnings, educate and raise performance
Increase monitoring of sub-contractors and ensure that contractors
request same standards from their sub-contractors
Increase awareness and
monitoring at
operational/ site level
Simplify and improve pre-award capability assessment, for both existingand new contractors, with the purpose of ensuring the alignment withPetrom standards
Monitor performance and take into account when awarding futu re works
Reporting HSSE KPIs as well as technical performance indicators
Systematic approach, with clear systems in place
Increase awareness and
monitoring at
management level
Senior management leadership for driving culture change in both Petrom andContractor organization
Quarterly senior management meetings with contractors
Greater involvement at site level, for setting examples and reinforce monitoring
Training for ensuring a better understanding of HSSE matters
OMV Petrom EP level ini tiatives