    HSSE Challenges and Planin OMV Petrom

    Romania Upstream Conference

    &

    First Eastern Europe HSE Forum

    Sustainability: HSSE

    Hans Zepic

    Business Partner HSSE for E&P

    OMV Petrom

  • 7/27/2019 Hans Zepic

    2/13

    2 OMV Petrom HSSE Challenges and Plan

    Clear statement of OMV Petrom management

    Before Modernization

    After Modernization

  • 7/27/2019 Hans Zepic

    3/13

    3 OMV Petrom HSSE Challenges and Plan

    Steps were taken to manage the major HSSE

    challenges facing the E&P activities in Romania

    Major challenges 2011 measures

    1. Process Safety/ Asset

    Integrity

    Process safety management walk-arounds

    Process safety champions nominated

    Safety-critical equipment identified

    Fire detection and fighting study, review of fire fighting capabilities

    2. Contractor Management High Risk Contractors identified

    CARE Card (Start Card) System implemented in projects

    Number of Hazard and Near Miss reports from Contractorsincreased by 50%

    3. Workover focus Comprehensive program focused on LTIR reduction, training ofworkforce, recognition & reward for HSSE performance, preventivemaintenance system launched

    4. Theft w ith 3rd party

    injury/fatality

    Anti-Theft campaign rolled out

    5. Reduction of LTIs Stepping, handling and lifting training for 7.000 persons

    HSSE leadership training program for managers First Aid Training Program

    6. Spill s Identification of focus areas and pipelines with majority of spills

    7. Road Safety Defensive Driving campaign including courses for 5.700 lightvehicle drivers and 1.600 heavy vehicle drivers

  • 7/27/2019 Hans Zepic

    4/13

    4 OMV Petrom HSSE Challenges and Plan

    Prevention and reduction of risks ofaccidents and professional illnessesby:

    Informing

    increasing awareness related tobehaviors

    theoretical & practical training ofprofessional categories involved inactivities of stepping, lifting & manual

    handling, working at heights

    Aims

    Transmitting best practices toemployees involved

    Decreasing the number ofaccidents and incidentscompared to the 2009 - 2010period

    Objectives

    Construction of 3 simulators thatmimic real working conditions easyto be mounted, dismantled andtransported.

    Train-the-trainers for 36 E&P &HSSE employees

    Training of7.000 employees in allOMV Petrom E&P locations

    Action Lines

    Stepping, handling and lift ing & Working at heights

    Training Campaign 2011

  • 7/27/2019 Hans Zepic

    5/13

    HSSE plan for 2012-2015

  • 7/27/2019 Hans Zepic

    6/13

    6 OMV Petrom HSSE Challenges and Plan

    A challenging environment, multiple risks and new

    priorities in OMV Petrom into 2015

    HSSE Strategy 2015

    Identification ofsecurity risks insites and implementation ofmeasures at future projects/sites

    Process safety (PS) organization inoperational sites and auditing of PSplans

    Reporting; HSSE performanceof contractors; Execution ofhealthprograms, ability to work

    HSSE involvement in projectdecisions; safety; community andstakeholder engagement

    Quantification and reduction ofenvironmental liabilities

    People

    Planet

    Profit

    Shift inprioritieswithin thebusinessmodel:Profitable

    Growth

    Growth

    Integration

    Change

    Performance

    Society, shareholders,and other stakeholderswill have increasingexpectations towardstechnical standards andhow we work in future

    HSSE-relevant

    challenges

    Increasing opera-tional risks (less easyhydrocarbons)

    Morecontractorinvolvement

    Safety and socio-economic challengeswith divestments

    Increasing personaland corporateliabilities

  • 7/27/2019 Hans Zepic

    7/13

    7 OMV Petrom HSSE Challenges and Plan

    Process Safety Management Activity Plan 2012

    OR

    GroupPSMTeam

    OperatingSites

    Assets

    PSPI reportingin CARE

    PSPI Results

    Analysis

    Annual PS Status Report

    Risk Reduction Plan PrioritisationConsolidated

    Issues Registers

    SubstandardBarriersApply Barrier

    Checklist

    Barrier Checklist PrioritisationApproach

    PSPI AnalysisApproach

    Guidance

    Check

    Mentor

    OMV Group level initiatives

  • 7/27/2019 Hans Zepic

    8/13

    8 OMV Petrom HSSE Challenges and Plan

    The OMV Golden Rules are the product of a

    three year industry wide study of the cause of

    fatalities which identified the critical controls

    that shall be in place prior to starting work.

    Overview

    Roll out Plan

    HSSE Golden Rules

    OMV Group level initiatives

  • 7/27/2019 Hans Zepic

    9/13

    9 OMV Petrom HSSE Challenges and Plan

    IVMS (In vehicle monitoring system)

    System overview

    IVMS is an integrated and secured systemdesigned to monitor, record, alert, analyzeand improve driver and vehicleperformance.

    Location (via GPS)

    Speed / RPMs

    Hard dip bumps, unsafe turns,

    acceleration or brakes Impact / crash data

    Seatbelt use and headlight use

    Trip duration / mileage

    Expected benefits

    Safety Benefits Increase in stolen vehicle recovery Increase in personnel security and safetyReduction of accidentsReduction in insurance costs

    Fuel Consumption Benefits

    Reduction of excessive idleReduction of harsh accelerationReduction of unauthorized use

    Vehicle Maintenance Benefits

    Reduction in brake and tire wearReduction in drive train wearAccurate Maintenance Scheduling

    Productivity Benefits

    Real-time tracking and dispatchingReduction in paperwork Increased driver performanceDecrease in unnecessary overtimeDecrease in disputes

    OMV Group level initiatives

  • 7/27/2019 Hans Zepic

    10/13

    10 OMV Petrom HSSE Challenges and Plan

    Seatbelt Programme. Focus areas and objectives

    Programme focus areas and

    key objectives

    Increase knowledge and awareness of the benefitsof seat belt use, through a communication campaign,in order to maximize the impact of the seatbeltprogramme.

    Communicate management commitment, throughEB decision and Internal Note, supported by internalregulation applicable at company level

    Increase accountability of employees, byintroducing actions for non-compliance, as regulatedby labor legislation and internal rules of OMV Petrom

    Monitor programme performance through randomchecks involving line management, on a regular basis

    Communication campaign -

    Key activi ties

    Post-crash bus caravan, depicting interior aftercollision with dummies and informative labels withinjuries. Bus caravan to start in Petrom City HQ andcirculate in the main operational locations.

    Other Materials:

    OMV Petrom level initiatives

  • 7/27/2019 Hans Zepic

    11/13

    11 OMV Petrom HSSE Challenges and Plan

    Preventive and health promotion plans for 2012

    OMV Petrom level initiatives

    NEW SCREENING PROGRAMS addressing other

    important causes of sick leave days:

    Liver diseases

    Respiratory diseases

    Both screenings will be offered to office and field workers.

    NEW HEALTH PROMOTION CAMPAIGNS addressing

    risk factors for spine & joint diseases and cardiovascular

    diseases: Ergonomic assessment of the workstations (for office

    workers)

    Healthy eating campaign (for office and field workers)

    Develop new programs and campaigns

    The cardio-vascular diseases screening and the

    vaccinations campaigns (flu, TBE and hepatitis) will

    continue in 2012.

    Continue on-going initiatives

  • 7/27/2019 Hans Zepic

    12/13

    12 OMV Petrom HSSE Challenges and Plan

    Petrom EP HSSE Roadshow 2012

    Increasing the level ofunderstanding andawareness regarding theimportance of HSSE in ourdaily activity and in ourlives.

    Aims

    Show HSSE leadership andcommitment by topmanagement

    Create the possibility for theparticipants to discuss HSSEtopics

    Field visits, get in contact with

    blue collar to show HSSE isour first priority

    Objectives

    1 day in each Petrom EP Asset,consisting of field visit andmeetings with the localmanagement by the ExecutiveBoard member and the HSSEsupport function

    Create Safety awareness

    through movies and break-outsessions

    Roll-out the HSSE plan 2012

    Approach

    A li ve message coming from top management has an important impact ; as

    a result behaviors will change

    The participants perception of safety will change both from a professional

    and personal point of view

    OMV Petrom EP level ini tiatives

  • 7/27/2019 Hans Zepic

    13/13

    13 OMV Petrom HSSE Challenges and Plan

    Contractor Management concept in Petrom E&P

    Clearly define

    accountability and

    responsibilities

    Establish individuals (CO/ CH) in charge of monitoring performance, forensuring a proper management of the contract

    Hold line managers accountable for contractor HSSE performance Clearly define the responsibilities of all involved departments and train

    accordingly Update and (re)define standardized HSSE contractual T&C: generic and

    specific according to activities

    Improve contractor

    capabili ty and

    performance assessment

    Increase site level engagement through increased accountability andcommunication

    Workshops, HSSE Forums, open dialog, better coverage of work sites

    Constant effort to share learnings, educate and raise performance

    Increase monitoring of sub-contractors and ensure that contractors

    request same standards from their sub-contractors

    Increase awareness and

    monitoring at

    operational/ site level

    Simplify and improve pre-award capability assessment, for both existingand new contractors, with the purpose of ensuring the alignment withPetrom standards

    Monitor performance and take into account when awarding futu re works

    Reporting HSSE KPIs as well as technical performance indicators

    Systematic approach, with clear systems in place

    Increase awareness and

    monitoring at

    management level

    Senior management leadership for driving culture change in both Petrom andContractor organization

    Quarterly senior management meetings with contractors

    Greater involvement at site level, for setting examples and reinforce monitoring

    Training for ensuring a better understanding of HSSE matters

    OMV Petrom EP level ini tiatives