Hardware Commissioning of the RIKEN Superconducting Ring Cyclotron H. Okuno, K. Yamada, J. Ohnishi, N. Fukunishi, N. Sakamoto, O. Kamigaito, M. Fujimaki, H. Hasebe, K. Kumagai, T. Maie, M. Nagase, S. Yokouchi, K. Ikegami, M. Kase, A. Goto and Y. Yano, RIKEN Nishina Center MOXCR01 Akira Goto Commissioning of the RIBF at RIKEN WEPPRA02 Kazunari Yamada Details of Beam Diagnostic System for RIKEN Superconducting Ring Cyclotron TUPPRA16 Jun'ichi Ohnishi The Magnetic Field of the Superconducting Ring Cyclotron TUPPRA17 Nobuhisa Fukunishi (Yamada) Present Performance and Commissioning Details of RIBF Accelerator Complex TUPPRA15 Naruhiko Sakamoto RF System for the RIBF Superconducting Ring Cyclotron

Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

Hardware Commissioning of the RIKEN Superconducting Ring Cyclotron

H. Okuno, K. Yamada, J. Ohnishi, N. Fukunishi, N. Sakamoto, O. Kamigaito, M. Fujimaki,

H. Hasebe, K. Kumagai, T. Maie, M. Nagase, S. Yokouchi, K. Ikegami, M. Kase,

A. Goto and Y. Yano, RIKEN Nishina Center

MOXCR01 Akira Goto Commissioning of the RIBF at RIKEN

WEPPRA02 Kazunari Yamada Details of Beam Diagnostic System for RIKEN Superconducting Ring Cyclotron

TUPPRA16 Jun'ichi OhnishiThe Magnetic Field of the Superconducting Ring Cyclotron

TUPPRA17 Nobuhisa Fukunishi (Yamada)Present Performance and Commissioning Details of RIBF Accelerator Complex

TUPPRA15 Naruhiko SakamotoRF System for the RIBF Superconducting Ring Cyclotron

Page 2: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

K = 2,600 MeVMax. Field: 3.8T (235 MJ)RF frequency: 18-38 MHzWeight: 8,300 tonDiameter: 19m Height: 8m

Superconducting

Bending Magnet

Control DewarSide Shield

(Open for maintenance)

SC Main Coil

SC Trim CoilLower Shield

RF-Cavity

Upper Shield

Upper Yoke

Side Yoke

Lower Yoke

SRC: the World’s First Superconducting Ring Cyclotron

Self Magnetic ShieldSelf Radiation Shield

Sector Magnets :6RF Resonator :4Injection elements.Extraction elements.

Page 3: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

Assembling of SRC in the vault

Cyclotrons2004

Page 4: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

Cold mass assemblySuperconducting Trim Coil

Connecting Plate

Pole 1

Main Coil

Lower Plate

Pole 2

Connecting Plate#Four sets of coils

# I max = 3000 A

# The same conductor as that for the main coil

S.C. Trim CoilMain Coil

Solenoid winding with 396 turn

Circumference : 10m

Maximum Current : 5000 A

Bath cooling

15mm

8mm

Stabilizer (AL-alloy with 1000ppm Ni)

Rutherford type Nb-Ti SC Cable

ConductorUpper Cold mass unit

Lower Cold mass unit

Page 5: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

The history of the commissioning

The first Uranium beam!07/03/23Fast shutdown test from full excitation06/6/14

The first beam from SRC!06/12/28Magnetic field measurements06/4/17-06/6/14

New isotope search07/05/~

Full excitation again

Trouble due to a He leak

Excitation test (Imain = 5000 A, Itrim = 3000 A)

All the main coils transited to superconducting state.

The 1st Cool-down startedPhase I (Test of the S.C. Magnets)

06/12/17

06/11/~

06/10/18

06/6/24Date

Beam injection to SRC

RF conditioning Started.

Vaccuum for the beam < 10 -5 Pa

RF, Beam diagnostics, Vacuum pumping system were installed

Arrival of RF resonatorsPhase II (toward the first beam)

06/4/15

05/11/8

05/11/7

05/10/13 1:00AM

05/9/19Date

Page 6: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

The First Cool-down and Excitation

0

50

100

150

200

250

300

350

H17.9.15 H17.9.20 H17.9.25 H17.9.30 H17.10.5 H17.10.10 H17.10.15

Day

Temp (K)

TI_A1P01

TI_A1P02

TI_A1P03

TI_A1P04

TI_A1P05A

TI_A1P05B

TI_A2P01

TI_A2P02

Calc.

T(Sup.)

T (Cold Mass, Ret.)

Calculation

23 Days

DT< 50KAll the coils were fully excited on ‘05/11/07.

They have never quenched so far.

Cold Mass :142 ton

Page 7: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

Forces on the upper coil

(TOSCA calculation) The Support system for the coils

Fz ŽxŽ –_Ti ‡‹à

FƒÆŽxŽ –_Ti ‡‹à

Fr ŽxŽ –_SUS Ü‚è•Ô‚µŠÇ

In the excitations, we continuously measured the forces using the strain gauges attached to all the supports, checking whether ourcalculations are correct or not.

Magnetic forces in excitation

Huge magnetic forces on the coils

Mechanical supports for the cold mass

Expansion forceVertical force

Shifting force

Big Errors?

-10

0

10

20

30

40

50

0 1000 2000 3000 4000 5000 6000Current (A)

Fr (t

on)

Meas.

Calc.

Radial Shifting Force.Fr support can sustain the forces up to 90 ton.

Page 8: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

Main PS for Main Coil (5200 A)

0.015

Aux. PS x 6 (100 A)

2 2 2 2 2 2

SM1 SM2 SM3 SM4 SM5 SM6

Switch for Slow shut-down (1206 s)

Switch for Fast shut-down (63 s)0.15 0.15

0.05 0.05 0.05 0.05

Switch Switch Switch Switch

Aux. PS x 2 (400 A) Aux. PS x 2 (100 A) Aux. PS x 2 (100 A) Aux. PS x 2 (100 A)

0.1 0.1 0.3 0.3 0.3 0.3 0.3 0.3

SM6&1 SM2&3 SM4&5 SM6&1 SM2&3 SM4&5 SM6&1 SM2&3 SM4&5 SM6&1 SM2&3 SM4&5

1:Quench characteristic

Current decay:

Temp. rise:

Volt. Development:

63 s

140 K

1.5 kV/2

Main PS for SC Trim

Coil #1 (3200 A)

Main PS for SC Trim

Coil #2 (3200 A)

Main PS for SC Trim

Coil #3 (3200 A)

Main PS for SC Trim

Coil #4 (3200 A)

Power supplies and coil protection

2: The main coils and S.C. Trim coils are strongly coupled together due to their relative positions.

Page 9: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

All the coils were safely shut down even in emergency.

Coil voltages in a fast shut-down test from full excitation

-500

0

500

1000

1500

2000

-50 0 50 100 150 200 250 300

Time (s)

Voltage (V)

maintrim1 x 10trim2 x 10trim3 x 10trim4 x 10

Tim constant~60s

Induced current by the main coil

Fast components due to self-inductances

Page 10: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

Field mapping over the acceleration region

Mapper

Mapper

Mapper

5 Hall Probes

Motors for control

C-FRP pipe

60deg.

Page 11: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

0.0

1.0

2.0

3.0

4.0

3.5 4.0 4.5 5.0 5.5R (m)

B (T

)

main 4500A

main4500A + trim1-4 3000A

Measured field profiles along the hill axis

Main Coil: Bending power over the acceleration region.

Trim Coil: Isochronous field

-0.03

-0.02

-0.01

0.00

3.5 4.0 4.5 5.0 5.5R (m)

Bmea

s-Bca

l(T)

sm1 sm2 sm3sm4 sm5 sm6

Page 12: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

’06/06/24 Installation of the RF resonators

Beam chamber in the

sector magnetBeam chamber in the RF resonator

Connection with the beam chambers

SBM

EBM

Phase Probe

Installation of the parts for the SRC

MDP (Main Differential Probe)

SBM

Injected Beam

EIC (Electric Inflection Channel)

EDC (Electric Deflection Channel)

2.3m, Septum (Ground)

Ti-alloy (cathode)

Page 13: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

l12/17 18:20 Al beams were injected to SRC.

l12/21 16:00 Acceleration Tuning started. (currents of Imain, Itrim, Injection orbits and phase of RF)

l12/23 21:00 Acceleration up to 10cm from rinj.

l12/24 02:00 Acceleration up to 100cm from rinj.

l12/25 23:45 Something @100cm from rinj.

l12/26 daytime Removal of Q-mass

l12/28 6:00 Beam injection re-started.

l12/28 6:08 Acceleration up to the final turns

l12:28 16:00 The first beam extracted!

SRC Beam commissioning 27Al10+ 345MeV/u (pilot beam for 238U88+

Failure

Successful

Beam

Q mass spectrometer

First Beam profile at the exit of SRC

Page 14: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

After the first beam

Improvement • RF resonators• EIC/EDC (high voltage device)

To the next stage2007/3/11 86Kr26+ 345MeV/u

(pilot for238U86+ )

2007/3/23 The first Uranium beam (TOP priority)

2007/5/ ~ New isotope search

0

1000

2000

3000

4000

5000

6000

0 5 10 15 20

Days (d)

Main Coil Current (A)

Jan.-Feb.2007

Jun-2007

Iron Yoke starts to saturate.

RF input OK? (pulse mode)

Imain ++

Wait for hours

No

YesImproved!

EDC’07/5 EDC’07/6

EIC/EDC

Specification:

120kV 12mm gap

In the first beam

2mA @90kV

Cleaning:

Supersonic cleaning

Buff polishing

Voltage (kV)

Dar

k C

urre

nt (m

A)

Dar

k C

urre

nt (m

A)

Voltage (kV)

Before After

Improved!

Page 15: Hardware Commissioning of the RIKEN Superconducting Ring ...epaper.kek.jp/c07/TALKS/TUZCR06.pdf · S.C. Trim Coil Main Coil Solenoid winding with 396 turn Circumference : 10m Maximum

Summary

1. The SRC sector magnets were successfully cooled down and excitedwithout quench.

2. Supports against magnetic forces, quench protection, cooling system, etc worked well as designed.

3. The field measurement:

a. Field disturbances can be corrected.

b. Data base to create isochronous fields for acceleration.

4. RF system, vacuum system and beam diagnostic system were successfully installed and tested under the stray fields arising from the sector magnets.

5. The SRC started working as an accelerator from the end of 2006.