DAFTAR BAHAN DAN UPAH
KEGIATAN
PEKERJAAN
LOKASI
TAHUN
HARGA SATUAN
NO J E N I S B A H A N SATUAN BAHAN KETERANGAN
( Rp )
A. AGREGAT KASAR, BAHAN PEREKAT DAN
BAHAN JADINYA
1 Tanah urug m3 120.120,00 DIPROYEK
2 Pasir Mahakam m3 219.000,00 DIPROYEK
3 Pasir Tenggarong m3 300.000,00 DIPROYEK
4 Pasir Palu m3 445.000,00 DIPROYEK
5 Batu pecah 2/3 m3 550.000,00 DIPROYEK
6 Batu gunung m3 497.000,00 DIPROYEK
7 Bata merah Bh 1.650,00 DIPROYEK
8 Paving block lokal (warna) Bh 5.030,00 DIPROYEK
Segi Empat, 10,5x21x6 cm ( 43 bh/m2)
9 Semen PC 50 kg/zak Zak 113.750,00 DIPROYEK
10 Semen PC Kg 2.275,00 DIPROYEK
11 Semen warna Zak 131.250,00 DIPROYEK
12 Semen warna Kg 2.625,00 DIPROYEK
13 Air Bersih (PDAM) M 11.500,00 DIPROYEK
14 Kansteen Beton Ukuran 10 x 20 x 50 Bh 32.500,00 DIPROYEK
15 Buis Beton U-30 Bh 75.000,00 DIPROYEK
Hal 1 - 2
HARGA SATUAN
NO J E N I S B A H A N SATUAN BAHAN KETERANGAN
( Rp )
B. BAHAN KAYU BERIKUT BAHAN JADINYA
1 Papan Bengkirai m3 8.043.750,00 DIPROYEK
2 Papan Meranti m3 4.772.620,00 DIPROYEK
3 Papan Kapur m3 7.239.370,00 DIPROYEK
4 Balok Meranti m3 3.700.120,00 DIPROYEK
5 Balok Bengkirai m3 7.239.370,00 DIPROYEK
6 Balok Ulin m3 5.280.000,00 DIPROYEK
7 Balok Kapur m3 5.630.620,00 DIPROYEK
Papan Bouwplank m3 3.539.250,00 DIPROYEK
C. BAHAN LOGAM DAN PAKU
1 Paku kayu 2"-6" kg 20.125,00 DIPROYEK
D. UPAH KERJA
1 Pekerja JE 8.000,00
2 Mandor JE 12.250,00
3 Pekerja biasa Hari 80.000,00 PERORANG
4 Mandor Hari 145.000,00 PERORANG
5 Tukang batu Hari 125.000,00 PERORANG
6 Kepala Tukang batu Hari 135.000,00 PERORANG
7 Tukang kayu Hari 125.000,00 PERORANG
8 Kepala Tukang kayu Hari 135.000,00 PERORANG
9 Tukang Cat Hari 125.000,00 PERORANG
10 Kepala Tukang Cat Hari 135.000,00 PERORANG
11 Tukang Besi Hari 125.000,00 PERORANG
12 Kepala Tukang Besi Hari 135.000,00 PERORANG