28
High Power Test A N f Areas: Nextef CLIC08 CLIC08, Oct. 14-17, 2008 Sh ji M Shuji Matsumoto Accelerator Lab., KEK 10/16/2008 CLIC08 Workshop

High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Embed Size (px)

Citation preview

Page 1: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

High Power Test A N fAreas: Nextef

CLIC08CLIC08, Oct. 14-17, 2008,

Sh ji MShuji MatsumotoAccelerator Lab., KEK,

10/16/2008 CLIC08 Workshop

Page 2: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Introduction

Mission of Nextef

•Nextef was proposed in 2006 as a reassembled facility of old

Nextef stands for NEw X-band TEst Facility.

Nextef was proposed in 2006 as a reassembled facility of old XTF. Its construction was done in 2007. •A 100MW high power station for the X-band accelerator structure tests.

•Use of Nextef for collaboration work on developing high gradient p g g gaccelerator structures (of 100MV/m or beyond) by 2011.•T18 structure test (first test) has just started at Nextef.

•For small size fundamental studies on high gradient and RF breakdown tests such as narrow waveguides are done at KT-1 50MW station.

10/16/2008 CLIC08 Workshop

Page 3: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

LocationIntroduction

Both Nextef and X-band Klystron Test station (We now call it KT-1) are located upper stream end of KEKB/PF Injector.) pp j

Nextef (100MW)

KEKB/PF InjectorGLCTA/XTF

KEKB/PF Injector

X-band Klystron Test Station (50MW)

Plan view of KEKB Injector HallNextef (2007~),KLY Test Station(2006~)

Plan view of KEKB Injector Hall10/16/2008 CLIC08 Workshop

Page 4: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

X-band high power stations we are operating..Introduction

KT-1 (50MW)Nextef (100MW) KT 1 (50MW)Nextef (100MW)

Klystron Test,Modulator and twin klystrons

Small experiments (in Lead shield box)

Test area in the bunker10/16/2008 CLIC08 Workshop

Page 5: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Nextef Configuration

Introduction

Nextef Configuration

Frequency 11 424GHzFrequency 11.424GHz

Max power d ti

100MWproductionMax power for test*

75MW

Pulse width 400ns

Repetition rate 50pps

A: Modulator B: Klystrons C: CircularWaveguide D: Accelerator Structure in the

Repetition rate 50pps

* 25% power loss in the waveguideg

Bunker. The control hut is not shownexplicitly in the figure.

waveguide.

10/16/2008 CLIC08 Workshop

Page 6: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

F tIntroduction

Features· 11 424GHz 100MW(50MW x2) 400ns 50pps11.424GHz, 100MW(50MW x2), 400ns, 50pps.· Linked with KEKB Injector operation. 24Hr operation is possible when theinjector is in operation.j p· 50cm-thick concrete wall bunker.· Local control PC linked with KEKB Injector control system. Remote accessi iblis possible.· Acquisition and store the (log) data by LINUX and EPICS.· DPO Oscilloscopes are prepared to record pulse to pulse (typically last ten· DPO Oscilloscopes are prepared to record pulse-to-pulse (typically last tenpulses) waveforms when a BD event happens.· Monitor and analyze dark current by Faraday cups, CT and analyzer magnet.· Acoustic sensors and X-ray detectors and Q-mass monitor are prepared.

10/16/2008 CLIC08 Workshop

Page 7: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Commissioning of NextefCommissioning of Nextefyear Month Nextef Comment

2007 5 Nextef construction starts.6

71st HG Structure CollaboratrionMeeting at CERN.

8 Major construction work done.9

1011 St t RF ti11 Starts RF operation.12 Injector Shutdown.

2008 1234

52nd HG Structure CollaborationMeeting at KEK.

90MW RF Prodution / w 210ns, 25pps.(65MW power feed to the structure. Itsuffices for T18 series structure tests. ).

6 Install KX03.

7 Established 60MW feed, 300ns / w KX03. Injector shutdown Jul 4- Sep 11.8

9 T18 2 4 Di k #2 i t ll d T t t t d9 T18 vg2.4 Disk #2 installed. Test started.

10 CILC WS

We have no serious failure during the commissioning.g g10/16/2008 CLIC08 Workshop

Page 8: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Nextef Commissioning Run with KX03 S O h hi l f hStructure: One-month history plots of the

power to the structure and pulse width

Injector scheduled

Jul. 4

shutdown

10/16/2008 CLIC08 Workshop

Page 9: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Example of observed waveform with KX03p

Faraday cupsAccelerator StructurePower combinationKlystron Output

Commission detectors with these BD events.10/16/2008 CLIC08 Workshop

Page 10: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Current Status of NextefThe test of T18_vg2.4_Disk#2 started on Sep 29.

T18_vg2.4_Disk#2 Acoustic sensors 10/16/2008 CLIC08 Workshop

Page 11: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Future Plans for Facility Improvement and Other Related

A i iActivity•C-band test•X-band Pulse compressionX b d kl•X-band klystron

10/16/2008 CLIC08 Workshop

Page 12: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Test Schedule: Nextef and KT 1Future Plans

Test Schedule: Nextef and KT-1

10/16/2008 CLIC08 Workshop

Page 13: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Future Plans

C-band test•C-band R&D project is for upgrading the positron injectionC band R&D project is for upgrading the positron injection energy in Super KEKB project.

•Four 1m long Acc structures work in Injector. Additional two are to be installed in 2009 and 2010 (one per each year).

•It is necessary to test them in late spring 2009. The duration of the test will be 2 monthsthe test will be 2 months.

The bunker of Nextef will be occupied by the processing of these structures.

10/16/2008 CLIC08 Workshop

Page 14: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Future Plans

C-band test planC-band power is provided from the power stand located in next door through circular waveguide.g gInstallation of the waveguide will be done around Dec. or Jan. 2009.

The bunker can be expanded (additional 2m x 4m area )after C band modulator and C band klystron in Nextefafter C-band modulator and C-band klystron in Nextefhall being removed. It may be done in 2009.The expansion is preferable (or necessary) to do both X-p p ( y)band and C-band tests in an efficient way. The plan is now under examination.

10/16/2008 CLIC08 Workshop

Page 15: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Layout of the circular waveguideKT-1

C-band station

C-band Mod. and Kly.yArea will be cleared.Additional bunker ?

Circular waveguideNextef Modulator

10/16/2008 CLIC08 Workshop

Page 16: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

X b d P l C i lFuture Plans

X-band Pulse Compression plan•Each of C-band structure test is to be completed in 2months.p

•If Φ80 circular waveguide for the C-band test can be used for the pulse compression system in our X-band system, it sounds pretty nice.

•Realize peak power of 150MW with 150ns pulse width.Each klystron produces 30 MW output,y p p ,

→ 60MW (combined) ×gain 3 = 180MW→ looks like 150MW available.

h ibl i•There are some possible options…(A single High-Q cavity option was proposed for us).It looks feasible to employ the single circular waveguide scheme

10/16/2008 CLIC08 Workshop

It looks feasible to employ the single circular waveguide scheme.

Page 17: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

SLED-II Traveling WaveP l C

Traveling WaveSi l D l Li

Consideration about Delay Line Type M.Yoshida

KlystronAccelerator

Pulse Compressor Single Delay LinePulse Compressor

KlystronAccelerator

3-dB

Iris

43m ×2 43m×1

TE11R

20 1 00 ( 1)

2( 2) 1 0 0 0

k jkV a

V b k jk

⎛ ⎞−⎜ ⎟⎛ ⎞ ⎛ ⎞⎜ ⎟⎜ ⎟ ⎜ ⎟⎜ ⎟⎜ ⎟ ⎜ ⎟

TE11L

( 2) 1 0 0 0( 3) 020 0 10 ( 4)

2

V b k jkV b

jk kV a

−⎜ ⎟⎜ ⎟ ⎜ ⎟=⎜ ⎟⎜ ⎟ ⎜ ⎟⎜ ⎟−⎜ ⎟ ⎜ ⎟⎜ ⎟⎝ ⎠ ⎝ ⎠⎜ ⎟

・Easy Phase Flip・Only One Phase Shifter.

11L20 1 0jk k⎝ ⎠ ⎝ ⎠

⎜ ⎟−⎝ ⎠

Only One Phase Shifter.・Utilizing C-band Low Loss Line (φ80).・Avoiding to adjust phase difference of different mode.

10/16/2008 CLIC08 Workshop

Page 18: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Mode ConverterWR90 Rectangular TE10 → Circular TE11(R)

S.Kazakov10/16/2008 CLIC08 Workshop

Page 19: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Ideal Gain of Traveling Wave Delay Line Pulse Compressor

( ) d /22m×(TE11R+TE11L+TE12R+TE12L)

86 (TE ) 0 24dB/t 43m×(TE01+TE11)= -0.44dB/turn11R 11L 12R 12L

= 43m× (TE11R+TE11L ) = -0.6dB/turn

3.5

3.6

3.3

3.4

86m×(TE01)= -0.24dB/turn

3.7

3.8

3 1

3.2

3.3

3.4

gain

3

3.1

3.2

gain

3.3

3.4

3.5

3.6

gain

3-dB3

3.1

0.6 0.7 0.8 0.9k

4

2.8

2.9

0.6 0.7 0.8 0.9k

44

3.1

3.2

0.6 0.7 0.8 0.9t (ns)

1 5

2

2.5

3

3.5ga

in

1 5

2

2.5

3

3.5

gain

1 5

2

2.5

3

3.5

gain

0

0.5

1

1.5

0 200 400 600 800 1000 1200 1400 1600t (ns)

0

0.5

1

1.5

0 200 400 600 800 1000 1200 1400 1600t (ns)

0

0.5

1

1.5

0 200 400 600 800 1000 1200 1400 1600t (ns)

Gain=3.74 Gain=3.53 Gain=3.35(Gain=3.29 @ 3-dB Hybrid)

Page 20: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Strategy for Nextef22m - One Channel 30MW×2 Klyston

M.Yoshida

Kly

stro

nTE11L

×gain=3→ 180MW

750ns → 150nsGain = 3.6 @ 3dB

Acc

eler

ator

TE11RTE M d3dB A

TE

TE11 ModeConverter Upgrade using higher mode

3dBHybrid

Kly

stro

n

1500ns → 300nsG i 3 3 @ 3d

TE11L

TE

ccel

erat

or

Gain = 3.3 @ 3dBTE12LTE12R

Ac TE11R TE11-TE12

Reflector10/16/2008 CLIC08 Workshop

Page 21: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

X-band klystronsFuture Plans

yWe have two(Nextef)+one(KT-1) klystrons in operation and one spare.p(The spare klystron needs to be conditioned: done in the end of this FY at KT-1.)

The performance of our X-band ppm focus klystron has a limit in p pp yavailable peak power and pulse width by the RF pulse tearing events.

Multi-Beam Klystron: The design study has been doing at KEK. We have no definite plan to construct it.

An idea was proposed recently to use our solenoid klystrons with SC magnet. Our solenoid focus klystron have not shown (severe) pulse g y ( ) ptearing events. These klystrons can be our spare. Design work has not started yet.

10/16/2008 CLIC08 Workshop

Page 22: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Additional two topics

•Solid state Amplifier with GaN HEMT•Solid-state Amplifier with GaN HEMT

•Waveguide valve

10/16/2008 CLIC08 Workshop

Page 23: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

P ibl l t f TWTGaN HEMT

Possible replacement of TWT power amplifier by GaN HEMT*power amplifier by GaN HEMTGaN HEMT is a promising device for producing severalGaN HEMT is a promising device for producing several 10W CW power in C, X and Ku band. It is believed as a successor of GaAs FETs.successor of GaAs FETs.

Toshiba demonstrated 81W(CW) at 9.5GHz, also 65W at 14 5GH14.5GHz.

*Hi h El t M bilit T i t*High Electron Mobility Transistor10/16/2008 CLIC08 Workshop

Page 24: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Technical SpecificationsGaN HEMT

Product Ch t i ti

TGI1414-50L TGI0910-50CharacteristicsFrequency 14.0 - 14.5GHz 9.5-10.5GHz

Output Power 47.0dBm 47.0dBmLinear Gain 8 0dB 9 0dBLinear Gain GL(typ.)

8.0dB 9.0dB

Drain Current +24V/5.0A +24V/4.5ADrain Current VDS/IDS(typ.)

24V/5.0A 24V/4.5A

Efficiency 29% 35%yPackage 7- AA04A 7- AA04A

10/16/2008 CLIC08 Workshop

Page 25: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Our Target is 11.4GHz 50MWFrequency/PowerGaN HEMT

Our Target is 11.4GHz 50MWq y8GHz 2W 10W 50W

16GHz10/16/2008 CLIC08 Workshop

Page 26: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Proposed spec for 11424MHzGaN HEMT

We have asked the manufacturer to make the devices for us.We are going to check the performance of the device and if it i OK i t k lifi ith th

10/16/2008 CLIC08 Workshop

if it is OK, we are going to make an amplifier with them.

Page 27: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Compact waveguide valve designedTE11 mode to make the device compactUsing VAT existing GV with some modification such as

Edge rounding, vacuum seal device far from pipe, etc.

Now under mechanical designgTo be made in this fiscal yearTo be tested somewhere soon

Sergey Kazakov10/16/2008 CLIC08 Workshop

Page 28: High Power Test Areas: NfNextef - CLIC Workshop 2008... · •A 100MW high power station for the X-band accelerator ... power amplifier bypower amplifier by GaN HEMT* ... Toshiba

Summary1. Nextef produced combined power of 100MW. 75MWpower

available for tests.2. Test of T18_vg2.4_Disk #2 has been started (Toshi Higo’s talk).3. Nextef will run for few years for the tests of the structures of

collaboration among KEK, CERN and SLAC.4. KT-1 50MW X-Band Klystron Station is running. Tests of

Narrow Waveguides continues Conditioning of a spare klystronNarrow Waveguides continues. Conditioning of a spare klystron is done in this FY.

5. Future plans such as Pulse Compression has been started. p p6. Collaboration in the structure tests as well as the future projects

are welcome.

10/16/2008 CLIC08 Workshop