DIVISI PEMBAYARAN DIV. 6 PERKERASAN ASPAL NO. ITEM PEMBAYARAN 6.1.1(a) Lapis Resap Pengikat ( Aspal Cair ) No Uraian Pekerjaan Sketsa/ Gambar Lokasi 0+500 Ka dan Ki 0+525 Ka dan Ki Pelebaran 1 m Pelebaran 1 m 0+550 Ka dan Ki Laston Lapis Pondasi (AC-Base) (gradasi halus/kasar) 0+575 Ka dan Ki 50.24 m3 / 0.08 m x 1 liter/ meter 2 Existing Jalan 7 m 0+600 Ka dan Ki Laston Lapis Pondasi (AC-Base) (gradasi halus/kasar) 12.04 m3 / 0.07 m x 1 liter/ meter ( utk Peaching ) Lapis Resap Pengikat ( Aspal Cair ) Station / Kilometer

Hitungan Aspal

Embed Size (px)

DESCRIPTION

Sample Perhitungan Aspal

Citation preview

resap pengikatDIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL1NO. ITEM PEMBAYARAN6.1.1(a)Lapis Resap Pengikat ( Aspal Cair )NoUraian PekerjaanSketsa/ GambarStation / KilometerLokasiVolumeKeterangan( liter )

0+500Ka dan Ki

0+525Ka dan KiPelebaran 1 mPelebaran 1 m0+550Ka dan KiLaston Lapis Pondasi (AC-Base) (gradasi halus/kasar)0+575Ka dan Ki50.24m3 / 0.08 m x 1 liter/ meter 2628.00Existing Jalan 7 m0+600Ka dan KiLaston Lapis Pondasi (AC-Base) (gradasi halus/kasar)12.04m3 / 0.07 m x 1 liter/ meter 2( utk Peaching )172.01

Lapis Resap Pengikat ( Aspal Cair )800.01literkontrak328.7

perekatDIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL1NO. ITEM PEMBAYARAN6.1(2)aLapis Perekat - Aspal CairNoUraian PekerjaanSketsa/ GambarStation / KilometerLokasiVolumeKeterangan( liter )

0+000Laston Lapis Aus (AC-WC), ( gradasi halus/kasar )652.30m3 / 0,04 m x 0,15 liter/meter22,446.13s/d

Laston Lapis Antara (AC-BC) (gradasi halus/kasar)47.10m3 / 0,075 m x 0,15 liter/meter294.201+780Laston Lapis Antara Perata ( AC-BC(L) ) ( gradasi halus/kasar )1,100.300.07 m 3x 0,35 liter/meter25,501.50

Lapis Perekat - Aspal Cair8,041.83literkontrak6,315.19

ac-wcDIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL3NO. ITEM PEMBAYARAN6.3(5a)Laston Lapis Aus (AC-WC), ( gradasi halus/kasar )NoDimensiSketsa/ GambarStation / KilometerLokasiTebalLebarLuasLuas rata2PanjangVolumeKeterangan(m)(m)(m2)(m2)(m)(m3)

0+0000.0410.000.400.4025.0010.000+0250.0410.000.40Badan Jalan0.4025.0010.000+0500.0410.000.400.4025.0010.000+0750.0410.000.400.4025.0010.000+1000.0410.000.400.4025.0010.000+1250.0410.000.400.4025.0010.000+1500.0410.000.400.4025.0010.000+1750.0410.000.400.4025.0010.000+2000.0410.000.400.4025.0010.000+2250.0410.000.400.4025.0010.000+2500.0410.000.400.4025.0010.000+2750.0410.000.400.4025.0010.000+3000.0410.000.400.4025.0010.000+3250.0410.000.400.4025.0010.000+3500.0410.000.400.4025.0010.000+3750.0410.000.400.4025.0010.000+4000.0410.000.400.4025.0010.000+4250.0410.000.400.427.002.940+4320.0411.000.440.4418.007.920+4500.0411.000.440.4425.0011.000+4750.0411.000.440.4425.0011.000+5000.0411.000.440.4425.0011.000+5250.0411.000.440.4413.005.720+5380.0411.000.440.4412.005.281,753.700+5500.0411.000.44Badan Jalan0.4425.0011.001,753.700+5750.0411.000.440.4414.006.160+5890.0411.000.44179.240.4411.004.8430+6000.0411.000.440.4425.0011.000+6250.0411.000.440.4425.0011.000+6500.0411.000.440.4425.0011.000+6750.0411.000.440.4425.0011.000+7000.0411.000.440.4425.0011.000+7250.0411.000.440.4425.0011.000+7500.0411.000.440.4425.0011.000+7750.0411.000.440.4425.0011.000+8000.0411.000.440.4425.0011.000+8250.0411.000.440.4425.0011.000+8500.0411.000.440.4425.0011.000+8750.0411.000.440.4425.0011.000+9000.0411.000.440.4425.0011.000+9250.0411.000.440.4425.0011.000+9500.0411.000.440.4425.0011.000+9750.0411.000.440.4425.0011.001+0000.0411.000.440.4425.0011.001+0250.0411.000.440.4425.0011.001+0500.0411.000.440.4425.0011.001+0750.0411.000.440.3825.009.601+1000.048.200.330.3325.008.201+1250.048.200.33Jembatan panjang 26,30 m1+151,30.048.800.350.3523.708.3423.71+1750.048.800.350.3225.007.901+2000.047.000.280.2825.007.001+2250.047.000.280.2825.007.001+2500.047.000.280.2825.007.001+2750.047.000.280.2825.007.001+3000.047.000.280.2825.007.001+3250.047.000.280.2825.007.001+3500.047.000.280.2825.007.001+3750.047.000.280.2825.007.001+4000.047.000.280.2825.007.001+4250.047.000.280.2825.007.001+4500.047.000.280.2825.007.001+4750.047.000.280.2825.007.001+5000.047.000.280.2825.007.001+5250.047.000.280.2825.007.001+5500.047.000.280.2825.007.001+5750.047.000.280.2825.007.001+6000.047.000.280.2825.007.001+6250.047.000.280.2825.007.001+6500.047.000.280.2825.007.001+6750.047.000.280.2825.007.001+7000.047.000.280.2825.007.001+7250.047.000.280.2825.007.00Bahu JalanBahu Jalan1+7500.047.000.280.2825.007.001+7750.047.000.28Badan Jalan0.285.001.401+7800.047.000.28hotmixASPAL+ANTI STRIPING1,521,169.200.05685,185.48ANTI STRIPING0.003255.56AGREGAT+SEMEN1,521,169.200.9441,435,983.72ASPAL84.93AGREGAT1,407.26Jumlah652.30m3646.84SEMEN0.0228,719.67Jumlah dalam TON ( 2.332 )(Q)1,521.17TONJumlah dalam KG ( Qx1000 )(A)1,521,169.20KGAspal Keras +Aditif Anti Pengelupasan (5.6%xA)(b)85,185.48KGLaston Lapis Aus (AC-WC) ( gradasi halus/kasar ) + Bahan Pengisi ( Filler ) Tambahan (94.4%*A)( c )1,435,983.72KGAspal Keras (99.7% x b)/100084.93TONAditif Anti Pengelupasan ( 0.3% x b )255.56KGreal lapangan s/d 4 juni 2012Bahan Pengisi ( Filler ) Tambahan ( 2% x c )28,719.67KG382.23tonLaston Lapis Aus (AC-WC) ( gradasi halus/kasar ) (98% x c )/10001,407.26TON382,230.00aspal + aditif21,404.88sta 1175-1780p605395.04395.04p200205.22205.22ERROR:#REF!

ac-bcDIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL1NO. ITEM PEMBAYARAN6.3(6a)Laston Lapis Antara (AC-BC) (gradasi halus/kasar)NoDimensiSketsa/ GambarStation / KilometerLokasiTebalLebarLuasLuas rata2PanjangVolumeKeterangan(m)(m)(m2)(m2)(m)(m3)

0+432KI0.0754.000.300.3018.005.40catatan penting0+450KI0.0754.000.30Pelebaran 1 mPelebaran 1 m0.3025.007.50%ANTI STRIPING0.30.1620+475KI0.0754.000.30HOTMIXASPAL+ANTI STRIPING10005.4054.00ASPAL53.840.3025.007.50AGREGAT+SEMEN100094.6946.00AGREGAT98927.080+500KI0.0754.000.30100.00SEMEN218.92Existing Jalan 7 m0.3025.007.50%%0+525KI0.0754.000.30OKEASPAL+ANTI STRIPING70,140.000.0543,787.56ANTI STRIPING0.00311.360.3013.003.900+538KI0.0754.000.300.3012.003.60AGREGAT+SEMEN70,140.000.94666,352.44ASPAL3.780+550KI0.0754.000.30AGREGAT65.030.3025.007.50SEMEN0.021,327.050+575KI0.0754.000.300.3014.004.200+589KI0.0754.000.30

Jumlah47.10m3Jumlah dalam TON ( 2.338 )(Q)110.12TONJumlah dalam KG ( Qx1000 )(A)110,119.80KGAspal Keras +Aditif Anti Pengelupasan (5.4%xA)(b)5,946.47KGLaston Lapis Aus (AC-BC) ( gradasi halus/kasar ) + Bahan Pengisi ( Filler ) Tambahan (94.6%*A)( c )104,173.33KGAspal Keras (99.7% x b)/10005.93TONAditif Anti Pengelupasan ( 0.3% x b )17.84KGBahan Pengisi ( Filler ) Tambahan ( 2% x c )2,083.47KGLaston Lapis Antara (AC-BC) ( gradasi halus/kasar ) (98% x c )/1000102.09TON

ac-bc(L)DIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL3NO. ITEM PEMBAYARAN6.3.6(c)Laston Lapis Antara Perata (AC-BC L), ( gradasi halus/ kasar )NoDimensiSketsa/ GambarStation / KilometerLokasiTebalLebarLuasLuas rata2PanjangVolumeKeterangan(m)(m)(m2)(m2)(m)(m3)

0+0000.0710.000.700.7025.0017.500+0250.0710.000.700.7025.0017.500+0500.0710.000.700.7025.0017.500+0750.0710.000.700.7025.0017.500+1000.0710.000.700.7025.0017.500+1250.0710.000.700.7025.0017.500+1500.0710.000.700.7025.0017.500+1750.0710.000.700.7025.0017.500+2000.0710.000.700.7025.0017.500+2250.0710.000.700.7025.0017.500+2500.0710.000.700.7025.0017.500+2750.0710.000.700.7025.0017.500+3000.0710.000.700.7025.0017.500+3250.0710.000.700.7025.0017.500+3500.0710.000.700.7025.0017.500+3750.0710.000.700.7025.0017.500+4000.0710.000.700.7025.0017.500+4250.0710.000.700.707.004.900+4320.0710.000.700.6018.0010.710+4500.077.000.490.4925.0012.250+4750.077.000.490.4925.0012.250+5000.077.000.490.4925.0012.250+5250.077.000.490.4913.006.370+5380.077.000.490.4912.005.880+5500.077.000.490.4925.0012.250+5750.077.000.490.6014.008.330+5890.0710.000.700.7411.008.090+6000.0711.000.770.7725.0019.250+6250.0711.000.770.7725.0019.250+6500.0711.000.770.7725.0019.25258.990+6750.0711.000.77438.230.7725.0019.250+7000.0711.000.770.7725.0019.250+7250.0711.000.770.7725.0019.250+7500.0711.000.770.7725.0019.250+7750.0711.000.770.7725.0019.250+8000.0711.000.770.7725.0019.250+8250.0711.000.770.7725.0019.250+8500.0711.000.770.7725.0019.250+8750.0711.000.770.7725.0019.250+9000.0711.000.770.7725.0019.250+9250.0711.000.770.7725.0019.250+9500.0711.000.770.7725.0019.250+9750.0711.000.77Bahu JalanBahu Jalan0.7725.0019.251+0000.0711.000.770.7725.0019.25Badan Jalan1+0250.0711.000.770.7725.0019.251+0500.0711.000.770.7725.0019.251+0750.0711.000.770.6725.0016.801+1000.078.200.570.5725.0014.351+1250.078.200.57Jembatan panjang 26,30 m1+151,30.078.800.620.6223.7014.601+1750.078.800.620.5525.0013.831+2000.077.000.490.4925.0012.251+2250.077.000.490.4925.0012.251+2500.077.000.490.4925.0012.251+2750.077.000.490.4925.0012.251+3000.077.000.490.4925.0012.251+3250.077.000.490.4925.0012.251+3500.077.000.490.4925.0012.251+3750.077.000.490.4925.0012.251+4000.077.000.490.4925.0012.251+4250.077.000.490.4925.0012.251+4500.077.000.490.4925.0012.251+4750.077.000.490.4925.0012.251+5000.077.000.490.4925.0012.251+5250.077.000.490.4925.0012.251+5500.077.000.490.4925.0012.251+5750.077.000.490.4925.0012.251+6000.077.000.490.4925.0012.251+6250.077.000.490.4925.0012.251+6500.077.000.490.4925.0012.251+6750.077.000.490.4925.0012.251+7000.077.000.49Bahu JalanBahu Jalan0.4925.0012.251+7250.077.000.490.4925.0012.25Badan Jalan1+7500.077.000.490.4925.0012.25OKEASPAL+ANTI STRIPING2,572,499.530.054138,914.97ANTI STRIPING0.003416.741+7750.077.000.49AGREGAT+SEMEN2,572,499.530.9462,433,584.56ASPAL138.500.495.002.45AGREGAT2,384.911+7800.077.000.49SEMEN0.0248,671.69

Jumlah1,100.30m3Jumlah dalam TON ( 2.338 )(Q)2,572.50TONJumlah dalam KG ( Qx1000 )(A)2,572,499.53KG1126.22Aspal Keras +Aditif Anti Pengelupasan (5.4%xA)(b)138,914.97KGrel lapanganLaston Lapis Aus (AC-BC(L)) ( gradasi halus/kasar ) + Bahan Pengisi ( Filler ) Tambahan (94.6%*A)( c )2,433,584.56KG2051.76tonAspal Keras (99.7% x b)/1000138.50TON2051760Aditif Anti Pengelupasan ( 0.3% x b )416.74KGaditif+aspal keras110,795.04Bahan Pengisi ( Filler ) Tambahan ( 2% x c )48,671.69KGbc L + filler1,940,964.96Laston Lapis Antara Perata (AC-BC (L)) ( gradasi halus/kasar ) (98% x c )/10002,384.91TONaditif 332.39aspal110.46

ac-baseDIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL1NO. ITEM PEMBAYARAN6.3.7(a)Laston Lapis Pondasi (AC-Base) (gradasi halus/kasar)NoDimensiSketsa/ GambarStation / KilometerLokasiTebalLebarLuasLuas rata2PanjangVolumeKeterangan(m)(m)(m2)(m2)(m)(m3)

0+432KI0.084.000.320.3218.005.764000+450KI0.084.000.32Pelebaran 1 mPelebaran 1 m0.3225.008.000+475KI0.084.000.320.3225.008.000+500KI0.084.000.32Existing Jalan 7 m0.3225.008.000+525KI0.084.000.320.3213.004.160+538KI0.084.000.320.3212.003.840+550KI0.084.000.320.3225.008.00OKEASPAL+ANTI STRIPING117,662.080.0516,000.77ANTI STRIPING0.00318.000+575KI0.084.000.320.3214.004.480+589KI0.084.000.32AGREGAT+SEMEN117,662.080.949111,661.31ASPAL5.98AGREGAT109.43SEMEN0.022,233.23Jumlah50.24m3Jumlah dalam TON ( 2.342 )(Q)117.66TONJumlah dalam KG ( Qx1000 )(A)117,662.08KGAspal Keras +Aditif Anti Pengelupasan (5.1%xA)(b)6,000.77KGLaston Lapis Aus (AC-Base) ( gradasi halus/kasar ) + Bahan Pengisi ( Filler ) Tambahan (94.9%*A)( c )111,661.31KGAspal Keras (99.7% x b)/10005.98TONAditif Anti Pengelupasan ( 0.3% x b )18.00KGBahan Pengisi ( Filler ) Tambahan ( 2% x c )2,233.23KGLaston Lapis Pondasi ( AC-Base ) ( gradasi halus/kasar ) (98% x c )/1000109.43TON

aspalDIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL1NO. ITEM PEMBAYARAN6.3.(8a)Aspal kerasNoUraian PekerjaanSketsa/ GambarStation / KilometerLokasiVolumeKeterangan( TON )

0+000Laston Lapis Aus ( AC-WC ) ( gradasi halus/kasar )84.93

Laston Lapis Antara ( AC-BC ) ( gradasi halus/kasar )5.93s/dLaston Lapis Antara Perata ( AC-BC(L) ) ( gradasi halus/kasar )138.50

Laston Lapis Pondasi ( AC-Base ) ( gradasi halus/kasar )5.981+780Laston Lapis Pondasi ( AC-Base ) ( gradasi halus/kasar )1.43( utk Peaching )

Aspal Keras236.77TONkontrak271.20

aditifDIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL1NO. ITEM PEMBAYARAN6.3.9Aditif anti pengelupasanNoUraian PekerjaanSketsa/ GambarStation / KilometerLokasiVolumeKeterangan( Kg )

0+000Laston Lapis Aus ( AC-WC ) ( gradasi halus/kasar )255.56

Laston Lapis Antara ( AC-BC ) ( gradasi halus/kasar )17.84s/dLaston Lapis Antara Perata ( AC-BC(L) ) ( gradasi halus/kasar )416.74

Laston Lapis Pondasi ( AC-Base ) ( gradasi halus/kasar )18.001+780Laston Lapis Pondasi ( AC-Base ) ( gradasi halus/kasar )4.31( utk peaching )

Aditif anti pengelupasan712.46Kgkontrak542.38

fillerDIVISI PEMBAYARANDIV. 6PERKERASAN ASPAL1NO. ITEM PEMBAYARAN6.3.10Bahan Pengisi ( Filler ) TambahanNoUraian PekerjaanSketsa/ GambarStation / KilometerLokasiVolumeKeterangan( Kg )

0+000Laston Lapis Aus ( AC-WC ) ( gradasi halus/kasar )28,719.67

Laston Lapis Antara ( AC-BC ) ( gradasi halus/kasar )2,083.47s/dLaston Lapis Antara Perata ( AC-BC(L) ) ( gradasi halus/kasar )48,671.69

Laston Lapis Pondasi ( AC-Base ) ( gradasi halus/kasar )2,233.231+780Laston Lapis Pondasi ( AC-Base ) ( gradasi halus/kasar )( utk peaching )535.21

Bahan Pengisi ( Filler ) Tambahan82,243.27Kgkontrak96,262.57