Page 1: Horváth Szabolcs Technical & Project Manager

scapackaging.hu

SCA PACKAGING HUNGARYCONSUMER PACKAGING / DISPLAY PLANT GYŐR

Gyakorlati oldalról megközelített Lean projekt(ek) bemutatása

Page 2: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 2

35

Horváth SzabolcsTechnical & Project Manager

Bemutatkozás

Tímea, Máté és Benedek

1997 – 1999 Kisalföld Kidaó Kft.

1999 – 2004 Széchenyi Nyomda Kft.

2004 – SCA Packaging Hungary Kft.

Page 3: Horváth Szabolcs Technical & Project Manager

scapackaging.hu

Vízió

TO BECOME A FULL-SERVICE PACKAGING PROVIDERBY GROWING AND DIFFERENTIATING OUR CORE BUSINESS

TO OFFER OUR CUSTOMERS INCREASING VALUE

High-performing

culture

World-classSales &

MarketingExecution

Innovative Culture Lean Appropriate

assets

VISION STATEMENT

TO

A European market and

customer driven full service

packaging provider operating

an integrated corrugated core

business supported by

relevant adjacent business

streams

FROM

An

undifferentiated,

cyclical raw

material pusher

Page 4: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 4

LEAN Kezdetek

Köszönjük a figyelmet, a nyitottságot és a közreműködést!

Az ok amiért ide jöttünk: •megteremteni az ideális Lean gondolkodásmódot a győri gyárban • és feltárni annak lehetőségeit.

Fontos megjegyezni, hogy kizárólag a lehetőségeket keressük és nem a gyengeségeket, hiányosságokat szeretnénk felnagyítani.

Előre is …

Page 5: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 5

LEAN – Jelen állapot felmérés

Page 6: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 6

LEAN – Jelen állapot felmérés

Page 7: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 7

LEAN – Anyag és Információ Folyam Analízis

MIFA

Page 8: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 8

LEAN – Anyag és Információ Folyam Analízis

Jelen állapot visszajelzése…

Page 9: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 9

LEAN – Anyag és Információ Folyam Analízis

•Túl sok a felesleges mozgatás / kézi művelet(szállítás, anyagmozgatás, átforgatás, válogatás, fóliázás, ellenőrzés, rakatolás)

=>emlékeztetőül a 8 fő veszteségre

• Magas készletek az alapanyag és készáruraktárban (30 / 20 nap)

•A termelési folyamat „Hozzáadott értéket” tartalmazó lépéseinek időaránya 0,015% (1db termék átlagos legyártására vonatkoztatva. (12,5 perc gyártás ↔ 55 nap tárolás)

Page 10: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 10

LEAN – Gyártáskapacitás „cső-modell”

Tényleges gyártási sebesség 2.700 ív (2.900 m2 ) /óra

Page 11: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 11

LEAN – OEE potenciálok vizsgálata

22%

11%16%

11%16%

11% 8% 6%

15%

Bobst 1600

Wook 21K1

KBA Diana Small

Diana Wide

100%

TanabeLaminátor Bobst 142E

Wook 24K1

126%

137%

142% 141%

129%

125%

144% 144%

132%

Legeslegjobb

Legjobb hónap

Jelen állapot

Page 12: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 12

LEAN – Mini projektek alakulása

•Tervezés • Tervezés I. • Tervezés II.

• Átfutási idő •Supply Chain folyamat-optimalizálás

• Supply Chain költség-hatékonyság

•Customer profitability / Vevői profitabilitás

•Laminátor hatékonyág I.•Bobst 142E (SMED)

•Laminátor hatékonyág II.•Bobst 142 ER (OEE)

• KBA hatékonyság növelés I.

• KBA hatékonyság növelés II.

• Ragasztás hatékonyság növelés

•Laminátor hatékonyság növelés

•Minőség és selejt - Laminátor

• Minőség és selejt – Nyomda, Előkészítés

• RCPS kultúra I.

• RCPS kultúra II.

• Hulladék-csökkentés

• Anyag-felhasználás optimalizálás.

• Anyag-felhasználás, optimalizálás

• 5S bevezetés I.

•5S bevezetés II.•TPM Laminátor

•TPM bevezetés Nyomda (Laminátor felkövetés)

• TPM Bevezetés III.

•TPM Bevezetés IV.

•Gondolkodásmód és viselkedés I.

• Gondolkodásmód és viselkedés II.

•Gondolkodásmód és viselkedés III.

•Gondolkodásmód és viselkedés IV.

• Teljesítmény-követés I.

• Teljesítmény-követés II.

•Bérmunka költség-optimalizálás

• Élőmunka hatékonyság optimalizálás

• CBS Costing I.

• CBS Costing II.

1. hullám 2. hullám 3. hullám 4. hullám 5. hullám 6. hullám

Tervezés & anyagáram

Hatékonyság

Minőség

5S/TPM

Teljesítmény-követés

Támogató folyamatok

Szervezet

Gond. mód & Viselkedés

7. hullám2009 2010 2011 2012

Page 13: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 13

„Nokia” Mini projekt

•Túl sok a felesleges mozgatás / kézi művelet(szállítás, anyagmozgatás, átforgatás, válogatás, fóliázás, ellenőrzés, rakatolás)

=>emlékeztetőül a 8 fő veszteségre

?

Page 14: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 14

„Nokia” Mini projekt

WIP

Waste & rework area

Ver. 1.

Page 15: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 15

„Nokia” Mini projekt

Ver. 2.

Page 16: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 16

„Nokia” Mini projekt

Page 17: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 17

„Nokia” Mini projekt

Page 18: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 18

Teljesítmény-követés

Repülőgép a napi életben

Mi történik akkor, ha a pilóták nem értékelik ki az adatokat és ha ezek alapján nem hoznak intézkedést?

Nincs sok mindent tenni… A megelőzés a fontos!

Egy repülőgépen folyamatosan értékelik a teljesítményt, miért nem tesszük mi is ezt a vállalatunknál?

Page 19: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 19

Teljesítmény-követés

Túl késő! Sok pénzbe fog kerülni…

Page 20: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 20

Teljesítmény-követés

Nem vakon vezetünk, hanem van az autóban kormány és részletes kiterjedő műszerfal!

Beavatkozás

Beavatkozás

Pillanatnyi érték

Teljesítmény mutató

Célérték

Page 21: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 21

Teljesítmény-követés

Corporate Vision/Direction

MSGOTier One

MSGO MSGOTier Two

MSGO MSGO MSGO

Tier Three

Objectives are “givens”, but creativity is

needed for strategies & measures

Team

CharterIndividual

ActionPlan

Individual

Action

Plan

Team & individuals can see their work linking back to company’s objectives Review

(Quarterly)

Review (Monthly)

Review (Weekly)

Bench Marking

Bench MarkingBench Marking

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

......

....…….…

Page 22: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 22

TIER 1 - PLANT OBJECTIVES (Resp: Auke)Objectives Goals Strategy MeasuresContinually improve our Health & Safety, Hygiene and Environment Performance

0 Accident Frequency Rate Continue focus on safety performance

0 LTA

AIB>800 Use FAM audit systems effectively

FAM score < 80

Comply with legislation Comply with ’document 601’

100% compliant

KlanttevredenheidImprove our Quality Performance

<170 klachten/jaar Reduce our Quality Complaints by following procedures and reducing our biggest issues

<170 klachten/jaar

Follow ISO 9001 System Successful Audit

Improve our Delivery Performance

OTIF >85% Reduce Lates and earlies <2% Late<2% Early

Reduce Unders and Overs <5% Under<5% Over

Make a Profit EBITDA >6.1% Lower our Conversion Cost <39,5% operational income

Reduce Total Waste Total Waste <12,8%

Reduce Inventory Turns <5,9 days

Create a motivated team of skilled people

Lean Assessment Score > 90%

Train and motivate our staff Training Matrix Achieved

>97% Attendance Rate

Internal Communication 4x Meetings8x Internal Newsletter

Coaching 3 Coaching and 1 Appraisal Review per year for each employee

Achieve Reliable Capacity Weekly Despatches > 1.4 Msqm

Stablise Reliable Capacity 1960 M Boxes sold per week

Page 23: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 23

Teljesítmény-követés

TIP Projekt Csapat - A Szerepek

ModerátorCsapatvezetőCsapattagok

PROJEKT Csapat

Szponzor

Page 24: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 24

Teljesítmény-követés

28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

09

-Ju

l-0

7

16

-Ju

l-0

7

23

-Ju

l-0

7

30

-Ju

l-0

7

06

-Au

g-0

7

13

-Au

g-0

7

20

-Au

g-0

7

27

-Au

g-0

7

03

-Se

p-0

7

10

-Se

p-0

7

17

-Se

p-0

7

24

-Se

p-0

7

01

-Oct

-07

08

-Oct

-07

15

-Oct

-07

22

-Oct

-07

29

-Oct

-07

Wh

en

?

Wh

o?

Start up presentation with whole Maintenance crew

Initial presentatation

Presenatation of TIP

Initial 5s workshop in Enginering dept Sort, Sign post and order, sweep shie and scan, standardise, sustain

Acivity and peformance bord installed as focal point. Initial current state OEE for key machines on display in work shop and link to maitenance department

Use dice game with Maintenance department to highlight importance of there role (reduce variation)

Develop daily work plans for non planned maintenance days.

Start standard working methods for 8hr planned maitenance , whilst assets care plan are being developed.

Responsibility for spare parts and necessary tools equipement for planeed maitenanace.

Analyse Breakdon trends for 2006 - 2007, for Corrugator, Oee Lines

Quantify Losses from Major stops and minor stops related to MDCollect data for MTTR, and MTBF for corrugator, Press, OEE pilot linesCollet any historical data that can be use in Time and utilisation based maintenanace fo rOEE lines Corrugator press

Analyse, display OEE data from Dianostic. Go through OEE with teams (Shopfloor and MD departement) OEE trainingAssess major causes of losses to focus improvement activity - Use fishbone and CTQ tree to diagnose issues

Carry out criticality assessment in potential problem areas

Perform condition appraisal of critical equipement start with cleaning to inspect to make appraisalProduce refurb planDevelop Assest care plan for area worked on - (Apple a day, joint condition monitoring, Technical procedures)

Analyse and improve daily meeting make a structure and agenda around improvements to be made include review of last 16hrs production and losses

Install weekly review (KPI meeting) - Inc team barometer

Install Bi weekly meeting with Dedicated engineers and shopfloor teams

Make T card system form Lines part of daily review and resulting actions

Use Information developed in asset care plan to design Time based and Utilisation based PM schedules for critical arease on pilot Lines (Technical procedures PPM)

Build on Standard work document and data collected to schedule in critical maitenance points changes etc. for pilot lines (bearings, olil changes, any other strip downs etc)

Include help for Predictive Maitenance programme.

100%Key meetings held

Develop asset care (Joint Condition monitoring) and technical specilast input for oee pilot lines

????? Hrs per week

SCA Packaging Zaandam

Create standard methods for work

Improve data Collection system for key KPI's MTTR, MTBF

Methods in place and followed

End of JULY

Date and status: 13/03/07

Workstream owner: Auke Keuning

High level idea / objective

Project leader: Richard Gilhuys

Workstream support: Rob van de Geer

KPI Target Sub-idea Key activities

Tactical Implementation Plan - Level 1

Maintenance TIP

Weekly Schedule

Su

pp

ort

Re

sou

rce

Progress review

Team barometer

4 Improve minsets and behaviours within MD, by creating one team and developing team coordination

Re

spo

nsi

bili

ty

Build initial case for /Themal, Vibration oil analysis expenditure to move to Predictive Maintenance

Reduce Technical down

time by 50% within 15 weeks

on pilot OEE improvement

lines. Create a clear structure and within 12

months integrated TPM

programme.

MTTR/MTBF

Breakdowns in OEE

Move from breakdown repair to Time and utilisation based prevenative maitenance on pilot lines, Inc corrugator.

????? Hrs per weekBreakdowns in OEE

Improve management infrastructure for MD. Reporting, Meetings KPIS, frequency of reviews etc

Mikor: Minden tevékenységnek van világos

kezdő és végpontja (Max időtartam 2 hét.)

Miért: A fő cél, amelyet el akarunk

érni

Mit 1: A fő kezdeményezések – hogy a

Jövőkép megvalósuljon

Hogyan: A kezdeményezések konkrét leírása, hogy az mindenki számára érthető legyen,

hogyan is lesz megvalósítva

Ki: Minden tevékenységének van

felelőse, aki az eredményt is nyomon követi

Mit 2: A kezdeményezések

eredménye

Page 25: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 25

Teljesítmény-követés

A TIP TELJESÍTMÉNY-KÖVETŐ TÁBLÁJAA TIP TELJESÍTMÉNY-KÖVETŐ TÁBLÁJAA célokA célok TagokTagok StátusStátus

zzTeljesítmény-értékelő megbeszélések Ferenczy,

Norbert

felállítása, teljesítmény-követő táblák Ferecskó, Anita használatával. (8 tábla készült.) Bombicz,

György

Gyári szintű OGSM meghatározása és Madarász, Ottó kommunikálása a szervezetben Fadgyas, Zsolt Adminisztráció csökkentése a gépeken Szegi, Renáta Az RCPS támogatása Udvardi, Tibor

Page 26: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 26

Teljesítmény-követés

A TIP TELJESÍTMÉNY-KÖVETŐ TÁBLÁJAA TIP TELJESÍTMÉNY-KÖVETŐ TÁBLÁJAElért eredményekElért eredmények StátuszStátusz 8 db Teljesítmény-követő táblát elkészítettünk A felmerülő problémákra akciókat hozunk, megoldjuk Elkészítettük a gyári OGSM-et és lebontottuk tovább területekre

Elkészítettük az egyes területek adminisztrációs térképét, javaslatot tettünk az adminisztrációs feladatok csökkentésére

Page 27: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 27

Teljesítmény-követés

A TIP TELJESÍTMÉNY-KÖVETŐ TÁBLÁJAA TIP TELJESÍTMÉNY-KÖVETŐ TÁBLÁJAHaszonHaszon StátuszStátusz Megalapoztuk a teljesítmény-követő kultúrát a gyárban Vizualizáltuk a gyár leterheltségét Vizualizáltuk a gyár néhány jelentősebb problémáját A teljesítmény napi áttekintésével és az akciók végrehajtásával javult a dolgozók motivációja

Az OGSM célok lebontásával egyértelmű lett a cél, a stratégia és a feladat

Page 28: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 28

Teljesítmény-követés

Page 29: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 29

Teljesítmény-követés

A laminátor táblájának terve

A KBA táblája majdnem kész

Meghatározzuk a tartalmat

Fiúk akcióban!

Jaj, Istenem!

Page 30: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 30

Teljesítmény-követés

Page 31: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 31

Teljesítmény-követés

Page 32: Horváth Szabolcs Technical & Project Manager

scapackaging.hu

TPM Bevezetés

LEAN

TPMMachine reliability

Lean

TPM

Kaizen

Tools:Poka-Yoke, 5S, T-Cards, SMED, One Piece Flow, Pull, RCPS, Kanban, Vizualizálás, RCM analysis ...

Complete systemwith logistics

Page 33: Horváth Szabolcs Technical & Project Manager

scapackaging.hu

Karbantartás csapatépítés

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Szükséges/szükségtelen dolgok szétválasztása

Tárolóhely kialakítása

Szükségtelen dolgok elvitele

Szükséges dolgok elrendezése

Azonosítás, feliratozás

Nagytakarítás

Takarítási, tiszítási módszerek, tervek

Fényképezés

Szemle / audit (J.A., Sze.R.)

Értékelés (J.A., Sze.R.)

Ismertetők (fényképek)kihelyezése

Folyamatos tökéletesítés

Szükséges/szükségtelen dolgok szétválasztása(ablak melletti két polcsor és a lépcső alatti terület)Tárolóhely kialakítása(ablak melletti két polcsor és a lépcső alatti terület)Szükségtelen dolgok elvitele(ablak melletti két polcsor és a lépcső alatti terület)Szükséges/szükségtelen dolgok szétválasztása(másik két polcsor, a szekrények és a maradék terület)Tárolóhely kialakítása(másik két polcsor, a szekrények és a maradék terület)Szükségtelen dolgok elvitele(másik két polcsor, a szekrények és a maradék terület)Szükséges dolgok elrendezése(ablak melletti két polcsor és a lépcső alatti terület)Szükséges dolgok elrendezése(másik két polcsor, a szekrények és a maradék terület)

Azonosítás, feliratozás

Nagytakarítás

Takarítási, tiszítási módszerek, tervek

Fényképezés

Szemle / audit (J.A., Sze.R.)

Értékelés (J.A., Sze.R.)

Ismertetők (fényképek)kihelyezése

Folyamatos tökéletesítés

SEIKETSU

SHITSUKE

Műhely

SEIRI

Április

Műhely melletti 6x6 m-es tárolóhelyiség

SEITON

SHITSUKE

SEIRI

Időterv

Feladatok

SEISO

SEITON

SEISO

SEIKETSU

Page 34: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 34

TPM program

TODAY

2010. 21. week

Preparation phase /

2010. 44. week

TPM Intro. Laminátor /

4. Wawe of th

e LEAN Transformation

Weekly follow up

2011.16. week

TPM Intro. Printing & Lam. fo

llow up /

5. Wawe of th

e LEAN Transformation

Weekly follow up

TPM Intro. Die Cut &

Lam. Follow up /

6. Wawe of th

e LEAN Transformation

Weekly follow up

2011.36. week

TPM Intro. Gluing & Die Cut fo

llow up /

7. Wawe of th

e LEAN Tranfsf.

Weekly follow up

2012.02. week

TPM Intro. Sustain & extend

to the not prod areas /

8. Wawe of th

e LEAN Trasf.

Weekly follow up

2012.18. week

Page 35: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 35

TPM program

TPM alapokon felül két fő gondolat:

1. Egyszerűsíts, amennyire csak lehet2. Szakmaiság a karbantartásban magas szinten

MÚLT:1. Bonyolult karbantartási utasítások2. Karbantartások gépkönyvekben, nem a gép

mellett3. Karbantartást külön csoport végzi

JELEN:1. 3 db TV lap2. Tapasztalatokból felépített utasítások3. Jól vizualizált és a gépen elhelyezett

utasítás4. Gépkezelők bevonásával5. Egypontos leckékkel6. Mérőeszközök határértékeinek

vizualizálásaival

1.

6.

5.

Page 36: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 36

TPM program

TPM alapokon felül két fő gondolat:

1. Egyszerűsíts, amennyire csak lehet2. Szakmaiság a karbantartásban magas szinten

MÚLT:1. Bonyolult karbantartási utasítások2. Gépkönyvi ajánlás szerint3. A karbantartás nagyobb részben probléma

elhárítására és gépjavításra összpontosít, megelőzéssel nem foglalkozik

JELEN:1. Berendezés-elemekre bontjuk a teljes gépet2. Berendezés-elemeken állapot-értékeléseket

végzünk3. Berendezés-elemek kritikusság-becsléseit

elvégezzük4. ERCM elemzésekkel választjuk ki a

karbantartandó gép-elemeket5. Diagnosztika alapú vizsgálatok megjelenése

(pl. TV-lapok)6. Gépkezelők bevonásával7. A karbantartás nagyobb részben gép-

fejlesztéssel, probléma megelőzéssel foglalkozik

2.

3.

4.

7.

Page 37: Horváth Szabolcs Technical & Project Manager

scapackaging.hu

Eredmények

OEE 3%-kal növelése az Agnati és CI laminátor gépsoron

0431_Laminátor_OEE_módosított_design_speedHullámtípusok %-os megoszlása

20,00

25,00

30,00

35,00

40,00

45,00

50,00

55,00

48 49 1 2 3 4 5 6 7 8 9 10 11

Hónapok/Hetek

OE

E [

%]

0,00

20,00

40,00

60,00

80,00

100,00

120,00

OEE cél 48. héttől OEEEB hullám % OEE átlag 2010.05.31-2010.12.05.B hullám % BC hullám %E hullám % F hullám %N hullám % Linear (OEE)

Nem tervezett műszaki állásidők alakulása a tervezett futás %-ában

0,000,501,001,502,002,503,003,504,004,505,005,506,006,507,007,508,008,509,009,50

10,00

6 7 8 9 10 11 12 13 14 15 16 17 18

48 49 1 2 3 4 5 6 7 8 9 10 11

Időszak/Hetek

[%]

Nem tervezett műszaki állásidők a rendelkezésre állás %-ábanCélNem tervezett műszaki állásidők átlaga 2010.05.31.-2010.12.05.Linear (Nem tervezett műszaki állásidők a rendelkezésre állás %-ában)

• A TIP időtervéhez viszonyított 5-20. héten a nem tervezett műszaki állásidő 1%-kal csökkentése az Agnati és CI laminátor gépsoron

Page 38: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 38

LEAN Haszna

Lean haszna 2010 január – 2011 nov.Cél: 550 000 EUR megtakarítás 2011-ben

Lean benefits 2010 January – YTD 2011Goal: 550 000 EUR savings in 2011

Page 39: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 39

Túra során

Csapatok vezetői:

Farkas Rita menetrend: Gyek, CTP, Nyomda, Laminátor, Kimetszés, Ragasztás

Kálmán Gyula menetrend: Nyomda, Laminátor, Kimetszés, Ragasztás, Gyek, CTP

Dobra Péter menetrend: Laminátor, Kimetszés, Ragasztás, Gyek, CTP, Nyomda

Kondor Zoltánmenetrend: Kimetszés, Ragasztás, Gyek, CTP, Nyomda, Laminátor

Turcsányi András (5-7 perces eltolt indulással)menetrend: Gyek, CTP, Nyomda, Laminátor, Kimetszés, Ragasztás

Page 40: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 40

Túra során

Page 41: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 41

Túra során

General principles:

1. Smoking is forbidden in the whole plant.

2. It is forbidden to wear rings, watch, naklaces or viewable body piercing during phisical work, machinery and during repair.

3. Use mobile phone or any private electronic equipment only in marked area.

4. Eating is only alowed in marked area. It is forbidden to take and store food at the shopfloor.

5. Use earplugs near every machine.

6. On the shopfloor please wear a reflective jacket and steel toe safety shoes.

Page 42: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 42

Túra során

Reflective jacket

Steel toe safety shoes

Earplugs

Page 43: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 43

Túra során

Page 44: Horváth Szabolcs Technical & Project Manager

scapackaging.hu 44

Mert termékeink az Ön számára és a világ különböző helyein élő sokmillió ember

számára könnyebbé teszik az életet. Mert mind erőforrásaink, mind az a mód, ahogyan dolgozunk, a globális életciklus természetes részét képezi. És, mert törődünk egymással.