7/30/2019 HR26archNBC Irr(Ju05)
1/26
Republic of the Philippines
Department of Public Works and Highways (DPWH)Office of the SecretaryNational Building Code Review Committee (NBCRC) and the Board of Consultants (BoC)
New Architectural Rules under the
2005 Revised IRR ofPD 1096(The National Building Code)
July 2005Metropolitan Manila
by Archt. Armando Dominador N. ALL, fuap, piep, aaifMember, DPWH Board of Consultants (2002-2005)
(Resource Person)
IAPOA
7/30/2019 HR26archNBC Irr(Ju05)
2/26
DPWH Office of the Secretary BOC & NBCRC IAPOA
1. What is generally considered by Architects as the most
important architectural provision of the 2005Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Under Sec. 302.3 (Application for Permits) of the 2005 Revised IRR, thesigning and sealing of architectural documents shall be limited toArchitects*, a provision fully harmonized with stipulations of RA9266:
SEC. 302. Application for Permits.
1. Any person desiring to obtain a building permit XXX . . . XXX shall file applications therefore on
the prescribed application forms
2. XXX . . . XXX
3. Five (5) sets of survey plans, design plans and specifications and other documents prepared, signed
and sealed over the printed names of the duly licensed and registered professionals:
a. XXX . . . XXX;
b. Architect, in case of architectural documents; in case of architectural interior/ interior design
documents, either an architect or interior designer may sign;
c. Civil Engineer, in case of civil/ structural documents;d. XXX . . . XXX
*Important Notes: 1) Temporary Restraining Order (TRO) replaced by Writ of Preliminary
Injunction (WPI) dated 24 May 2005 issued by Manila RTC Branch 22 with NO final decision to
date; and 2) the QC RTC Branch 219 in its order dated 23 May 2005 dismissed claims by Civil
Engineers (CEs) that they can sign and seal architectural documents.
7/30/2019 HR26archNBC Irr(Ju05)
3/26
DPWH Office of the Secretary BOC & NBCRC IAPOA2.
What is RA 9266 and its relation to
Sec.302.3 of the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
1) Republic Act or RA 9266 is The Architecture Act of 2004 which took effect10 April 2004, while its IRR took effect 01 December 2004;2) Section 302.3 of the 2005 Revised IRR of the NBC (PD1096) is already fully
harmonized with RA9266 and its provisions limiting the preparation,signing and sealing of architectural documents only to RegisteredArchitects;
3) Civil Engineers (CEs) who shall continue to sign and seal architecturalplans, specifications and documents shall still be subject to the applicationof the severe penalties under RA 9266 & its IRR (reference Sec. 29 of RA 9266);
4) The DPWH can still legally bar CEs from signing and sealing architecturalplans, specifications and documents by invoking multiple provisions under
RA 9266 (Sections 20, 29, 31, 32, 34, etc.) and its IRR, specifically Sec. 20.2of RA 9266 which prohibits acting Building Officials/ Building Officials (orany other officer or employee of the republic) from accepting or approvingany architectural plans or specifications not prepared in accordance withRA9266 and Sec. 44 which mandates all public officials to enforce RA9266.
7/30/2019 HR26archNBC Irr(Ju05)
4/26
DPWH Office of the Secretary BOC & NBCRC IAPOA3.
What are the Architectural (A) Documents
under the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Following is a list of architectural documents appearing under Sec. 302.4 of theRevised IRR of PD 1096 which took effect 02 May 2005. The definitions are omittedfor brevity.
a. Architectural Plans/ Drawingsi. Vicinity Map/ Location Plan . . .XXX.
ii. Site Development Plan . . .XXX.iii. Perspective . . .XXX.iv. Floor Plans . . .XXX.v. Elevations, at least four (4) . . .XXX.vi. Sections, at least two (2) . . .XXX.vii. Reflected Ceiling Plan . . .XXX.
viii.Details, in the form of plans, elevations/ sections:(a) accessible ramps . . .XXX(p) all types of partitions.
ix. Schedule of Doors and Windows . . .XXX.x. Schedule of Finishes . . .XXX.xi. Details of Other Major Architectural Elements.
7/30/2019 HR26archNBC Irr(Ju05)
5/26
DPWH Office of the Secretary BOC & NBCRC IAPOA4.
What are the Architectural Interior (AI)
Documents under the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Following is a list of architectural interior/ interior design documents appearing underSec. 302.4 of the Revised IRR of PD 1096 which took effect 02 May 2005. The definitionsare omitted for brevity.
b. Architectural Interiors/ Interior Designi. Space Plan/s or layout/s of architectural interiors.ii. Architectural interior perspective/s.iii. Furniture/ furnishing/ equipment/ process layout/s.iv. Access plan/s, parking plan/s and the likev. Detail design of major architectural interior elements.vi. Plan and layout of interior, wall partitions, furnishing, furniture, equipment/
appliances . . .XXX.vii. Interior wall elevations . . .XXX.viii.Floor/ ceiling/ wall patterns and finishing details . . .XXX.ix. List of materials used.x. Cost estimates.
7/30/2019 HR26archNBC Irr(Ju05)
6/26
DPWH Office of the Secretary BOC & NBCRC IAPOA5.
What are the Other Architectural (OA)
Documents under the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Following is a list of other architectural documents appearing under Sec. 302.4 of theRevised IRR of PD 1096 which took effect 02 May 2005. The definitions are omitted forbrevity.
c. Plans and specific locations of all accessibility facilities . . .XXX.d. Detailed design of all such accessibility facilities outside and
around buildings/ structures including parking areas, and their
safety requirements . . .XXX.
e. Fire Safety Documentsi. XXX
ii. XXXiii.XXX
iv.XXX
v. XXX
f. Other related documents
7/30/2019 HR26archNBC Irr(Ju05)
7/26
DPWH Office of the Secretary BOC & NBCRC IAPOA6.What do the termscarrying capacity, development
control and development potentialactually mean (under
the 2005 Revised IRR of the NBC/ PD 1096)?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Carrying Capacity of Lot the optimized extent of physical development that may beintroduced into the lot without causing undue damage, effects or hardship on the end-usersof the proposed development or on neighboring occupants, entities, properties, lands,developments or the environment (whether man-made or natural) and with the proposedbuilding/structure capable of being supported by existing utility, transportation and servicesystems or by proposed expansions/upgrading of such systems within the immediate future;
Development Control (for Lots and Buildings/ Structures) a set of inter-actingregulations concerning the physical utilization of a lot and likewise governing theplanning/design of spaces and/or the use/occupancy of a building/structure to be introduced(or already existing) on a lot; development controls help determine in detail the development
potential and/or the carrying capacity of all lots and/or of proposed developments on lots;and
Development Potential of Lotthe maximum extent of physical development that may beintroduced into the lot, i.e., the erection of the proposed buildings/ structures, after fullcompliance with the applicable regulations that need to be satisfied, specifically those foundin the Code, i.e., the PNBC.
7
7/30/2019 HR26archNBC Irr(Ju05)
8/26
DPWH Office of the Secretary BOC & NBCRC IAPOA7.
What are the new architectural features
under Rule VIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
1. Under Rule VII (Classification & Requirements of Buildings by Use andOccupancy), a schedule of principal, accessory and conditional uses/ occupanciesfor buildings was prepared and matched with specific zoning classifications;
2. Rule VII, Sec. 704 : firewalls relative to foot-printing of buildings/ structuresshall be strictly implemented; for instance, firewalls are explicitly prohibited forlow density residential uses (R-1); allowed lengths of firewalls in relation to lotperimeter dimensions are prescribed for all other uses, specifically for residentialcondominium uses (R-5);
3. Rule VII, Sec. 705 - 707 : prescribes Allowable Maximum Total Gross FloorAreas (TGFAs), which is the product of the Building Height Limit (BHL), i.e.,defined in both number of storeys and height in meters, and the Allowable
Maximum Building Footprint (AMBF) for each type of building use/ occupancy;4. Rule VII, Sec. 707, Subsection 4 : prescribes more detailed parking
requirements for each type of building use/ occupancy; parking must be integralparts of building projects and all parking located outside shall be consideredbuffer parking;
7/30/2019 HR26archNBC Irr(Ju05)
9/26
DPWH Office of the Secretary BOC & NBCRC IAPOA
8a.What are the new architectural features
under Rule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
1. Rule VIII (Light and Ventilation), Section 803 : maximum Percentage ofSite Occupancy (PSO) is discussed at length; the identifiable Total Open Spacewithin a Lot (TOSL) are sub-classified and limits prescribed for all buildinguses and occupancies, e.g., the Maximum Allowable Impervious Surface Area(ISA), the Minimum Unpaved Surface Area (USA);
2. Rule VIII, Section 804 :a) prescribes a minimum front setback of only 4.50 meters for a low
density residential (R-1) structure on a minimum lot size of 301 sq.m.(14.0 m frontage x 21.5 m depth);
b) prescribes a minimum front setback of 8.00 meters at the ground floor
level only for medium and high density residential (R-2 and R-3)buildings/ structures that are more than 3 storeys/ 9.0 m in height; andc) prescribes front setbacks of from 5.0 to 8.0 meters for all types of
commercial, industrial, institutional and recreational developments plusincremental side and rear setbacks for such buildings/ structures.
7/30/2019 HR26archNBC Irr(Ju05)
10/26
DPWH Office of the Secretary BOC & NBCRC IAPOA
8b.What are the new architectural features
under Rule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
7/30/2019 HR26archNBC Irr(Ju05)
11/26
DPWH Office of the Secretary BOC & NBCRC IAPOA
8c.What are the new architectural features
under Rule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
8d
7/30/2019 HR26archNBC Irr(Ju05)
12/26
DPWH Office of the Secretary BOC & NBCRC IAPOA8d.
What are the new architectural features
under Rule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
9
7/30/2019 HR26archNBC Irr(Ju05)
13/26
DPWH Office of the Secretary BOC & NBCRC IAPOA9.
What are the new architectural features
under Rule XXof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Rule XX (Signs), Section 2004, Subsection1.c.ii : Ground sign structures shall belocated within the property line and under nocircumstances shall these occupy the RROW/street or sidewalk/ arcade or similar access-
ways.Rule XX (Signs), Section 2004, Subsection1.d.i : On non-arcaded RROW/ streets, signsshall not extend more than 1.20 meters overthe sidewalk measured horizontally from the wall
line or building line. On arcaded RROW/ streets,the signs shall not project more than 0.60meters from the outermost portion of thewall line of the allowed structure over thearcade.
7/30/2019 HR26archNBC Irr(Ju05)
14/26
DPWH Office of the Secretary BOC & NBCRC IAPOA
10a.What are the new architectural features
of the GuidelinesunderRule VIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
1. Under Rule VII Guidelines, building bulk limitations are suggested through theinteraction of Floor-Lot Area Ratios (FLAR), the Allowable Maximum Building Foot-print (AMBF), the Outermost Faces of the Building (OFB), the width of the road right-of-way (RROW) and all other applicable provisions for natural light and ventilation;
2. Under Rule VII Guidelines, examples are shown as to the manner of sizingbuildings or establishing the development potentials of a lot/ property with the proper
interactive application of the foregoing development controls; and3. Under Rule VII Guidelines, the following are also included:
a) floor to lot area (FLAR) designations for all major building occupancies;b) factors are also suggested to convert Gross Floor Areas (GFA) to Total Gross Floor Area
(TGFA);c) determination of the outermost face of building (OFB) and outermost limit of building
projection (OLBP) using angles drawn from the centerline of the road right-of-way(RROW);d) establishing the OFB through the interactive use of the allowed maximum building
footprint (AMBF), the building height limit (BHL), the allowable maximum volume ofbuilding (AMVB) and the angular plane along the RROW; and
e) buildings and accessory structures within cemeteries & memorial parks.
10b
7/30/2019 HR26archNBC Irr(Ju05)
15/26
DPWH Office of the Secretary BOC & NBCRC IAPOA10b.
What are the new architectural features
of the GuidelinesunderRule VIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
10
7/30/2019 HR26archNBC Irr(Ju05)
16/26
DPWH Office of the Secretary BOC & NBCRC IAPOA10c.
What are the new architectural features
of the GuidelinesunderRule VIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
11
7/30/2019 HR26archNBC Irr(Ju05)
17/26
DPWH Office of the Secretary BOC & NBCRC IAPOA11a.
What are the new architectural features
of the GuidelinesunderRule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Under Rule VIII Guidelines, the following are included:a) suggested treatments for easements/ waterside rights-of-way (ROW),e.g., esplanades and promenades and stipulations on structuresallowed/ disallowed along or within designated easement areas ;
b) view corridors/ sight lines along road rights-of-way (RROWs);
c) suggested median and lane widths within RROWs;d) suggested minimum RROW provisions for developments withmultiple dwelling units;
e) access to interior lots;f) suggested development components within RROWs at all its levels;g) use, treatment and development of arcades, sidewalks, curbs and
driveways;h) incremental front setbacks for tall structures using RROW widths;i) detailed open space requirements for all building types/ occupancies;j) basement configurations for tall buildings; andk) design of public buildings and structures.
11b
7/30/2019 HR26archNBC Irr(Ju05)
18/26
DPWH Office of the Secretary BOC & NBCRC IAPOA11b.
What are the new architectural features
of the GuidelinesunderRule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
11
7/30/2019 HR26archNBC Irr(Ju05)
19/26
DPWH Office of the Secretary BOC & NBCRC IAPOA11c.
What are the new architectural features
of the GuidelinesunderRule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
11d
7/30/2019 HR26archNBC Irr(Ju05)
20/26
DPWH Office of the Secretary BOC & NBCRC IAPOA11d.
What are the new architectural features
of the GuidelinesunderRule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
11e
7/30/2019 HR26archNBC Irr(Ju05)
21/26
DPWH Office of the Secretary BOC & NBCRC IAPOA11e.
What are the new architectural features
of the GuidelinesunderRule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
11f
7/30/2019 HR26archNBC Irr(Ju05)
22/26
DPWH Office of the Secretary BOC & NBCRC IAPOA11f.
What are the new architectural features
of the GuidelinesunderRule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
11g
7/30/2019 HR26archNBC Irr(Ju05)
23/26
DPWH Office of the Secretary BOC & NBCRC IAPOA11g.
What are the new architectural features
of the GuidelinesunderRule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Rule VIII
Rule VIII
Guidelines
11h
7/30/2019 HR26archNBC Irr(Ju05)
24/26
DPWH Office of the Secretary BOC & NBCRC IAPOA11h.
Whatare some of the new architectural
of the GuidelinesunderRule VIIIof the 2005 Revised IRR?
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
Rule VII
DPWH Office of the Secretary BOC & NBCRC IAPOA
7/30/2019 HR26archNBC Irr(Ju05)
25/26
DPWH Office of the Secretary BOC & NBCRC IAPOA
12.Caveat
__________________________________________________________________________________________________________________________________
New Architectural Rules under the 2005 Revised IRR of PD 1096 (The National Building Code) b y Archt. Armando Dominador .N. ALLI,fuap, piep, aaif
July 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)
To prevent illegal rule insertions in the printed version of
the 2005 Revised IRR (which happened so many times in the past toprevious editions of the NBC IRR), the following steps should betaken:
a) the DPWH must be the only and solely designated
copyright holder to the 2005 Revised IRR;b) the only official source of the document (in either hard or
soft versions) should be the DPWH; and
c) the only official publisher should be the National PrintingOffice (NPO) located along EDSA in Quezon City (between East Ave.& Quezon Blvd.), i.e., not the National Bookstore!
DPWH Office of the Secretary BOC & NBCRC IAPOA
7/30/2019 HR26archNBC Irr(Ju05)
26/26
DPWH Office of the Secretary BOC & NBCRC IAPOA
Thank Youand
a Pleasant Morning
to You All!
__________________________________________________________________________________________________________________________________New Architectural Rules under the 2005
Revised IRRof PD 1096 (The National Building Code) b y
Archt. Armando Dominador
.N. ALLI, fuap, piep, aaif
July 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)