Welcome to HOPEFUL
8/16/2019 HWE-un Exemplu Foarte Bun
2/49
8/16/2019 HWE-un Exemplu Foarte Bun
3/49
www.hopefulenergy.com
Main wind turbines manufactured by HOPEFULAirforce 4.1-5 KW grid-tied wind turbine system (available)Airforce 4.1-5 KW(48V) off grid wind turbine system (available)Airforce 2.0-1 KW(24V) off grid wind turbine system (will beavailable at the end of 2010)Airforce 9.8-30 KW grid-tied wind turbine system (will be availablein 2011)
8/16/2019 HWE-un Exemplu Foarte Bun
4/49
www.hopefulenergy.com
The typical characteristic of Airforce 4.1One style with two models-5 KW(48V) off grid windturbine and 5 KW grid-tied wind turbine, the two models
are the same in looks, but different inner design ofgenerator, different controllers and different inverters.
8/16/2019 HWE-un Exemplu Foarte Bun
5/49
8/16/2019 HWE-un Exemplu Foarte Bun
6/49
www.hopefulenergy.com
Detailed information about Airforce 4.1-5KW wind turbine system
1. 12m Free Standing Tower1.1 Installation Sketch Map of Tower
8/16/2019 HWE-un Exemplu Foarte Bun
7/49www.hopefulenergy.com
1. 12m Free Standing Tower1.2 Tower Material and Design Characteristics
Tower material: Hot galvanized iron with Fluor-Carbon Painting.
Design Characteristics: Tubular design of top
section of the tower can reduce tower shadoweffect.
Tubular design with eight sides of the two lowersections of the tower can ensure the strength of thetower.
8/16/2019 HWE-un Exemplu Foarte Bun
8/49www.hopefulenergy.com
2. GeneratorGearless and NdFeB permanent-magnet three phases generator
(weight: 68 kg)
8/16/2019 HWE-un Exemplu Foarte Bun
9/49www.hopefulenergy.com
2. Generator2.1 Bearing-type and brand
SKF-6208, made in Sweden.
8/16/2019 HWE-un Exemplu Foarte Bun
10/49www.hopefulenergy.com
2. Generator2.2 Main shaft of the generator
It is made in two kinds of steel. Inner part is made of carbon steel which canensure the high machining precision of the shaft. Outer part is made ofstainless steel which has a strongly corrosion resistance. The two kinds ofsteel are joined by Friction Welding.
2.3 Nacelle of the generator
Combined with aeronautical coating technology,it is made of A360 anticorrosive aluminum alloythrough vacuum casting processed by a 900 tonsmold.
8/16/2019 HWE-un Exemplu Foarte Bun
11/49www.hopefulenergy.com
3. Blades and Hub3.1 Blades material
Outer layer is made of GFRP (Glass Fiber Reinforced Plastics) and carbonfiber; inner part is filled with an insert and Epoxy Vinyl Ester Resin whichcan ensure the strength of the blades and also reduce the weight of the
blades, each blade is 7.8 kg.
insert
8/16/2019 HWE-un Exemplu Foarte Bun
12/49www.hopefulenergy.com
3. Blades and Hub3.2 Blades Design Characteristics
Efficient aero-dynamic design: start-up wind speed-1.8m/s,survival wind speed-60m/s, TSR value-8, Cp value-about 0.43.
◆ The design of wing shape meets U.S. NACA2412 standard.◆ Round blade root; tick mark on the blade root; adjustable blade angles to
achieve maximum efficiency.
8/16/2019 HWE-un Exemplu Foarte Bun
13/49www.hopefulenergy.com
3. Blades and Hub3.3 Hub
It is made of steel by precision forging but not casting.The strength of the hub processed by precision forging istwice as much as that processed by casting.
8/16/2019 HWE-un Exemplu Foarte Bun
14/49www.hopefulenergy.com
4. Braking SystemThe wind turbine has two braking systems, short circuit
braking system and electromagnetic brakingsystem which can ensure the wind turbine can stop turning athigh wind speed.
8/16/2019 HWE-un Exemplu Foarte Bun
15/49
www.hopefulenergy.com
5. Airforce 4.1-5 KW(48V) off grid wind turbine system5.1 Controller of Airforce 4.1-5 KW(48V) off grid WT5.1.1 Main Functions of the controller:
It adopts an embedded microprocessor as its core controlling unit with PWM function.
It possesses a tracking system of the max power.Battery charging under a wide range of wind speed.Automatic discharging for the wind generator which is experiencing an overvoltage.A dual protection — automatic braking of wind turbine over-loading (over-loading ofvoltage and current) and emergency stop.Protection against over-charging of battery and warning for over-discharging.Protection against the reverse connection of battery.Protection against electrical shock and voltage surges.Optional output voltage and power according todifferent battery capacity.
8/16/2019 HWE-un Exemplu Foarte Bun
16/49
www.hopefulenergy.com
5. Airforce 4.1-5 KW(48V) off grid wind turbine system5.1 Controller of Airforce 4.1-5 KW(48V) off grid WT5.1.2 Main technical parameters of the controller
8/16/2019 HWE-un Exemplu Foarte Bun
17/49
www.hopefulenergy.com
5. Airforce 4.1-5 KW(48V) off grid wind turbine system5.2 Technical Specifications
8/16/2019 HWE-un Exemplu Foarte Bun
18/49
www.hopefulenergy.com
5. Airforce 4.1-5 KW(48V) off grid wind turbine system5.3 Curves of performance-- Airforce 4.1-5 KW(48V) off grid system
8/16/2019 HWE-un Exemplu Foarte Bun
19/49
www.hopefulenergy.com
5. Airforce 4.1-5 KW(48V) off grid wind turbine system5.4 sketch map of Airforce 4.1-5 KW(48V) off grid wind turbine system
8/16/2019 HWE-un Exemplu Foarte Bun
20/49
www.hopefulenergy.com
5. Airforce 4.1-5 KW(48V) off grid wind turbine system5.5 Airforce 4.1 wind-solar hybrid off grid system
8/16/2019 HWE-un Exemplu Foarte Bun
21/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system6.1 Controller of Airforce 4.1-5 KW grid-tied WT6.1.1 Main Functions of the controller
It adopts an embedded microprocessor as its core control unit with PWM function.It possesses a dual protection function — automatic braking of wind turbine over-loading (over-loading of voltage and current) and emergency stop.Protection against over-charging of battery.Protection against reverse connection of battery.Protection against electrical shock and voltage surges.
8/16/2019 HWE-un Exemplu Foarte Bun
22/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system6.1 Controller of Airforce 4.1-5 KW grid-tied WT6.1.2 Main technical parameters of the controller
8/16/2019 HWE-un Exemplu Foarte Bun
23/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system6.2 Technical Specifications
8/16/2019 HWE-un Exemplu Foarte Bun
24/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system6.3 Curves of performance-- Airforce 4.1-5 KW grid-tied system
8/16/2019 HWE-un Exemplu Foarte Bun
25/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system6.4 Grid-Tied Inverter for Airforce 4.1-5 KW grid-tied system6.4.1 GINLONG GCI-5K grid-tied inverter & protection box & unloader boxes (two Resistor boxes, unloading power of each one is 4
KW, in all, it’s 8 KW).
GCI-5K grid-tied inverter
Protection box
unloader boxes
8/16/2019 HWE-un Exemplu Foarte Bun
26/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system6.4 Grid-Tied Inverter for Airforce 4.1-5 KW grid-tied system6.4.2 Germany SMA Windy Boy 6000A(grid-tied inverter) &Windy Boy Protection
Box 600&Resistor box (unloading power-6 KW)
Windy Boy 6000A
Windy Boy Protection Box 600
Resistor box
8/16/2019 HWE-un Exemplu Foarte Bun
27/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system6.5 Airforce 4.1-5 KW single phase grid-tied system
8/16/2019 HWE-un Exemplu Foarte Bun
28/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system
6.6 Airforce 4.1-5 KW three phases grid-tied system
In some islands or villages where are abundant wind resources but common solar resources, because of the small capacity oflocal public grid (for example, small three phases(380V/400V)grid), it needs three phases grid-tied wind turbine systems to
balance such a limited local grid.
8/16/2019 HWE-un Exemplu Foarte Bun
29/49
www.hopefulenergy.com
6. Airforce 4.1-5 KW grid-tied wind turbine system6.6 Airforce 4.1-5 KW three phases grid-tied systemInstallation Example
Installation site: Dong’ao Island, Zhuhai, ChinaLocal grid: small three phases(380V) gridConfigurations: one unit of Airforce 4.1-5kw grid-tied wind turbine (including acontroller), one unit of protection box (including an unloader box), three units ofGINLONG GCI-2K gird-tied inverter.
8/16/2019 HWE-un Exemplu Foarte Bun
30/49
www.hopefulenergy.com
Installation site:Dong’ao Island, Zhuhai, China
6. Airforce 4.1-5 KW grid-tied wind turbine system6.6 Airforce 4.1-5 KW three phases grid-tied systemInstallation Example
8/16/2019 HWE-un Exemplu Foarte Bun
31/49
www.hopefulenergy.com
7. Tests before the delivery of our products7.1 Vibration testing
7.1.1 testing equipment
7.1.2 testing purpose
Used to test the anti-vibration capabilityof the wind turbine and its maincomponents during the processes of assembly,transport and installation.
7.1.3 testing conditions and operations
conditions---the products are fully packed; time of testing---half an hour;speed of rotation---270 rpm; amplitude of vibration ---22 cm.
Simulative transport table vibrator
8/16/2019 HWE-un Exemplu Foarte Bun
32/49
www.hopefulenergy.com
7. Tests before the delivery of our products
7.2 Temperature and humidity testing
7.2.1 testing equipment
7.2.2 testing purpose
Used to check out the controller ’
s performanceunder a certain simulative temperature andhumidity.
7.2.3 testing conditions and operations
temperature---(+42℃
), humidity—
60%, time---8 hours,then connect the controller with “ testing platform of wind turbine ” to check out its working state;temperature---(-25 ℃ ), humidity — 0, time---15 minutes,then connect the controller with “ testing platform of wind turbine ” to check out its working state.
Programmable temperature andhumidity chamber
Testing platform of wind turbine
8/16/2019 HWE-un Exemplu Foarte Bun
33/49
www.hopefulenergy.com
7. Tests before the delivery of our products7.3 salt spray testing
7.3.1 testing equipment
7.3.2 testing purpose
Used to test the anti-corrosion performance ofmetal parts and their surface coating (there aredifferent testing conditions and standards ondifferent metal parts and coating).
7.3.3 testing conditions and operations
Temperature---35 ℃ , NaCl (sodium chloride) solution with a concentration of 10%aluminum alloy parts: 48 hours;aluminum alloy parts with coating: 600 hours;forging parts with electrophoresis: 400 hours.
Salt spray tester
8/16/2019 HWE-un Exemplu Foarte Bun
34/49
www.hopefulenergy.com
7. Tests before the delivery of our products7.4 Fatigue testing
7.4.1 testing equipment
7.4.2 testing purpose
Used to test the blade ’s anti-fatigue capabilityduring normal operation.
7.4.3 testing conditions and operations
Under the condition of room temperature,amplitude of vibration--15 cm,frequency of vibration--9 Hz,times of vibration--200,000 times per day for 8 hours,testing time--100 days, total 800 hours, 20,000,000 times.
8/16/2019 HWE-un Exemplu Foarte Bun
35/49
www.hopefulenergy.com
7. Tests before the delivery of our products7.5 X-ray testing
7.5.1 testing equipment
7.5.2 testing purpose
Used to mainly test for nacelle of the generator.
7.5.3 testing conditions and operations
The inner air holes in the nacelle can generatenegative influence on the strength of the nacelle,via the testing, the inner air holes can be fully eliminated.
X-ray detector
8/16/2019 HWE-un Exemplu Foarte Bun
36/49
www.hopefulenergy.com
7. Tests before the delivery of our products7.6 Drop testing
7.6.1 testing equipment
7.6.2 testing purpose
Used to mainly test for 1 kw off grid wind turbine system.
7.6.3 testing conditions and operations
Haven ’t yet been confirmed.
Drop test machine
8/16/2019 HWE-un Exemplu Foarte Bun
37/49
www.hopefulenergy.com
8. Certification8.1 CE certification
8/16/2019 HWE-un Exemplu Foarte Bun
38/49
8/16/2019 HWE-un Exemplu Foarte Bun
39/49
www.hopefulenergy.com
8. Certification8.3 Noise Test Report
8/16/2019 HWE-un Exemplu Foarte Bun
40/49
www.hopefulenergy.com
9. Hopeful Wind Energy & Exh ibitionsFull name of Exhibition:
WIND POWER 2009 CONFERENCE + EXHIBITION (AWEA2009)
Date: 4-7 May 2009
Address: 2301 S. Lake Shore Drive, Chicago, Illinois, USA
8/16/2019 HWE-un Exemplu Foarte Bun
41/49
www.hopefulenergy.com
9. Hopeful Wind Energy & ExhibitionsFull name of Exhibition: new energy husum 2010
Date: 18-21 March 2010
Address: Am Messeplatz 16 – 18, 25813 Husum, Germany
8/16/2019 HWE-un Exemplu Foarte Bun
42/49
www.hopefulenergy.com
9. Hopeful Wind Energy & ExhibitionsFull name of Exhibition:
The 4th China (shanghai) International Wind Energy Exhibition And ConferenceDate: 27-29 April 2010
Address: Shanghai New International Expo Center, Shanghai, China
8/16/2019 HWE-un Exemplu Foarte Bun
43/49
www.hopefulenergy.com
9. Hopeful Wind Energy & ExhibitionsFull name of Exhibition: WINDPOWER 2010 Conference&Exhibition
Date: 23-26 May 2010
Address: Dallas Convention Center, Dallas, Texas, USA
8/16/2019 HWE-un Exemplu Foarte Bun
44/49
www.hopefulenergy.com
10. Sales introduction of Airforce 4.1
The engineers of Hopeful Wind Energy began to design and developAirforce 4.1 since 2007, after a long-term development, innovation andtesting, we started to sell it since the September of 2009.
Airforce 4.1 has been sold and installed in China, Germany, Italy,Russia, Lithuania, France, Bulgaria, Denmark, New Zealand, Australia,
USA, Canada, Mexico, and so on.
8/16/2019 HWE-un Exemplu Foarte Bun
45/49
www.hopefulenergy.com
Installation site: Swan Hill, Australia
Installation photos of Airforce 4.1
8/16/2019 HWE-un Exemplu Foarte Bun
46/49
www.hopefulenergy.com
Installation site: Mildura, Australia
Installation photos of Airforce 4.1
8/16/2019 HWE-un Exemplu Foarte Bun
47/49
www.hopefulenergy.com
Installation site: Wyoming, USA
Installation photos of Airforce 4.1
8/16/2019 HWE-un Exemplu Foarte Bun
48/49
8/16/2019 HWE-un Exemplu Foarte Bun
49/49
Hopeful Wind Energy
In China,
We too care about the world's future!