21
ILC e+ 源源源源 29-June-2015, ADI-J meeting T. Omori

ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

Embed Size (px)

Citation preview

Page 1: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

ILC e+ 源の現状 2

29-June-2015, ADI-J meetingT. Omori

Page 2: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

  前回 (6/22) の復習

Page 3: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

Strategy of e-Driven Scheme

K. Yokoya2015.6.8 ILC-CLIC

2015/6/8 ILC-CLIC, Yokoya 3

Page 4: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

Positron Source Status• Undulator source• Design is mature except the rotating target• Various possibilities are being pursued• Little hope of R&D completion before ILC approval• Probability of success when budget becomes ready is

not 100% (and not zero either)• Need backup scheme

• e-Driven source• Conceptual design exists• But design detail must be worked out to be a true

backup• CFS-related issues are urgent

2015/6/8 ILC-CLIC, Yokoya 4

Page 5: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

Survey on Technical Feasibility of ILC (unofficial translation of 国際リニアコライダー( ILC)計画に関する技術的実現可能性及び加速器製作における技術的課題等に関する調査分析 )

• MEXT asked for commissioned survey of the technical feasibility of ILC• Hearing at domestic/foreign labs and industries• Report deadline Feb.1.2016

• Tender of NRI (Nomura Research Institute) was accepted• First meeting will be in July

• Need documents from ILC side• Lyn Evans is preparing an outline document (ILC Progress

Report)• Supplementary document needed on positron source• Summary on e-Driven source (not described in TDR) by the

end of June• Slides ~10 pages (the speaker in the meeting will compress them)• Urgent but not in detail2015/6/8 ILC-CLIC, Yokoya 5

Page 6: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

Detailed Report on e-Driven Source

• System design of e-driven source• Simulation• Electron driver linac• Target• Flux concentrator• Capture section• Booster linac• Energy compressor• Tunnel, Radiation safety• Cost

• Least advanced is the booster linac

2015/6/8 ILC-CLIC, Yokoya 6

Page 7: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

Change Request• At this moment

• It is obviously premature to change the baseline• But it is necessary to make the backup design ready• CFS design is the most urgent

• Possible contents of the change request• Make the CFS design compatible with both undulator source

and e-driven source• For the tunnel design a system design of the e-driven source

to somewhat detail is necessary

• Deadline• There is no rigorous deadline• But hopefully before November workshop• Tentatively, deadline for detailed design should be the end of

September2015/6/8 ILC-CLIC, Yokoya 7

Page 8: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

Who are Working?

Incomplete list• Simulation: Seimiya• Target: T.Omori, T.Takahashi1), P.Sievers4),

M.Yamanaka, RIGAKU5), J.Gao2), S.Jin2)

• Flux concentrator: P.Martyshkin3), T.Kamitani, G.Pei2), X.Sun2) , Akemoto(大森追記 )

• Linac: S.Fukuda, S.Michizono, J.Urakawa• CFS: M.Miyahara• General: M.Kuriki, T.Okugi, K.Yokoya

2015/6/8 ILC-CLIC, Yokoya 8

1) Hiroshima Univ. 2) IHEP 3) BINP 4) CERN 5) company, other are KEK

Page 9: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

  今回 (6/29) のお話

Page 10: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

   ILC Conventional e+ Source

Page 11: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

   Why Conventional e+ Source? 6.2 Positron productionIn the TDR, polarized positrons are produced by converting photons produced in a long undulator by the electron beam. The cooling for the converter target still needs substantial R&D. In addition, for very low-energy operation, the positron flux may not be sufficient. A backup scheme for positron production is under study using a conventional source, from which the positrons will not be polarised. This must be made compatible with the TDR accelerator tunnel layout so that both options could be installed in the same tunnel.

A part of ILC Progress Report

Page 12: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

20 triplets, rep. = 300 Hz • triplet = 3 mini-trains with gaps • 44 bunches/mini-train, Tb_to_b = 6.15 n sec

DRTb_to_b = 6.15 n sec (3.07)

2640 bunches/train, rep. = 5 Hz • Tb_to_b = 369 n sec

e+ creation go to main linac

Time remaining for damping = 137 m secWe create 2640 bunches in 63 m sec

Booster Linac5 GeV NC300 Hz

Drive LinacSeveral GeV NC300 Hz

TargetAmorphous Tungsten

Pendulum or Slow Rotation

Conventional e+ Source for ILCNormal Conducting Drive and Booster Linacs in 300 Hz operation

2640 bunches60 mini-trains

Page 13: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

20 triplets, rep. = 300 Hz • triplet = 3 mini-trains with gaps • 44 bunches/mini-train, Tb_to_b = 6.15 n sec

DR

2640 bunches/train, rep. = 5 Hz • Tb_to_b = 369 n sec

e+ creation go to main linac

Time remaining for damping = 137 m secWe create 2640 bunches in 63 m sec

Booster Linac5 GeV NC300 Hz

Drive LinacSeveral GeV NC300 Hz

TargetAmorphous Tungsten

Pendulum or Slow Rotation 2640 bunches60 mini-trains

Stretching

Conventional e+ Source for ILCNormal Conducting Drive and Booster Linacs in 300 Hz operation

Tb_to_b = 6.15 n sec (3.07)

Page 14: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori
Page 15: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori
Page 16: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori
Page 17: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori
Page 18: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

4.7

Page 19: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori
Page 20: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori
Page 21: ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori

   Backup Slides