TVA -SNP 1 Sequoyah SGRP / U2R18 Outage Sequoyah Nuclear Plant D. Alan Day Radiation Protection Manager

INPO Presentation - Sequoyah SGRP

Embed Size (px)

Citation preview

Page 1: INPO Presentation - Sequoyah SGRP

TVA -SNP1

Sequoyah SGRP / U2R18 Outage

Sequoyah Nuclear PlantD. Alan DayRadiation Protection Manager

Page 2: INPO Presentation - Sequoyah SGRP

TVA -SNP

Sequoyah Nuclear, TVA

2

Page 3: INPO Presentation - Sequoyah SGRP

TVA -SNP3

SQN Overview• Two Units (1200 MWe each) • Westinghouse 4 loop Ice Condenser PWR• Unit 1 began commercial operation 7/1/81, licensed

through 2020• Unit 2 began commercial operation 6/1/82, licensed

through 2021• NRC license extension under review for 2040 and 2041

SQN/WBN Typical Non Ice CondenserPrimary Containment Volume 1.2M ft3 vs. 2.0 M ft3

Page 4: INPO Presentation - Sequoyah SGRP

TVA -SNP4

SGRP Project Overview• Manufacturer – Doosan (South Korea)• Designer – Westinghouse (Chattanooga, TN)• Installer - SGT• SGs delivered to TVA in November 2010• U2R18 Outage duration = 93.3 days• Passage through the Containment roof• Large Mammoet crane• 24 heavy lifts• Construct OSGSF• Demob and restoration

SQN/WBN Typical Non Ice CondenserPrimary Containment Volume 1.2M ft3 vs. 2.0 M ft3

Page 5: INPO Presentation - Sequoyah SGRP

TVA -SNP

Page 6: INPO Presentation - Sequoyah SGRP

TVA -SNP

Page 7: INPO Presentation - Sequoyah SGRP

TVA -SNP7

Construction of SG Storage Facility

Page 8: INPO Presentation - Sequoyah SGRP

TVA -SNP8

OSGSF

Page 9: INPO Presentation - Sequoyah SGRP

TVA -SNP9

Annulus Work

Page 10: INPO Presentation - Sequoyah SGRP

TVA -SNP10

Erection of PTC Mammoet Crane

Page 11: INPO Presentation - Sequoyah SGRP

TVA -SNP11

Building Containment Super Structure

Page 12: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN12

Dome Concrete Cutting by Hydro-Demolition

Page 13: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN

Dome concrete removal 20’ x 45’ section

Page 14: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN

Steel Containment Vessel (SCV) liner removal

Page 15: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN

Enclosure Plug removal

Page 16: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN16

Old Steam Generator Removal

Page 17: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN17

Old Steam Generator Transport to OSGSF Storage Facility

Page 18: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN18

New Generator readied for heavy lift installation

Page 19: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN19

New SG heavy lift into Containment

Page 20: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN20

Enclosure Plug re-installation

Page 21: INPO Presentation - Sequoyah SGRP

TVA -SNP

Top of Containment - looking in

21

Page 22: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN22

Steel Containment Vessel (SCV) liner re-installation

Page 23: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN23

Ready for Dome Concrete

Mechanical rebar splices

Page 24: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN

DomeConcrete complete

Page 25: INPO Presentation - Sequoyah SGRP

Dept. NameTVA-SQN

Last Steam Generator being placed in OSGSF storage facility

Page 26: INPO Presentation - Sequoyah SGRP

TVA -SNP26

New Decon Building

Page 27: INPO Presentation - Sequoyah SGRP

TVA -SNP27

SGRP Stats and Lessons Learned

• Dose: 156.569 Rem Goal: 158 Rem BOP: 64.661 Rem Goal: 66 Rem Total: 221.230 Rem Goal: 224 Rem• PCEs: 5 Goal: 65 BOP: 17 Total: 22 (0.24 PCEs/day)• No HRA/LHRA Violations• Lessons Learned or Concerns

– RP resources (staffing, experience, training)– Open Containment (environment challenges)– Radiography (inefficiency and SCV liner event)– RAM Control

Page 28: INPO Presentation - Sequoyah SGRP

TVA -SNP

Dose Reduction Initiatives

• Sufficient number of staff-augmented RP personnel to coach and monitor

• Extensive mockup training• Pipe End Decon (decon of RCS piping cuts to

lower dose and contamination levels)• Temporary shielding (tons)• Integrated water plan • Lighted ropes• Remote cameras, temp, fire protection, etc. • Station ALARA Committee involvement

28

Page 29: INPO Presentation - Sequoyah SGRP

TVA -SNP

PCE Reduction Initiatives

• Sufficient number of staff-augmented RP personnel to coach and monitor

• Use of OREX disposables• Down draft SOPs• HEPA Vac usage• Pipe End Decon• Equipment surveyed prior to shipment to SQN• Aggressive mop/vacuum regimen• Aggressive trash removal

29

Page 30: INPO Presentation - Sequoyah SGRP

TVA -SNP

RP Business Plan Initiatives

• Remove high source term old SGs• Install permanent SG Primary Platforms• Install Refuel Bridge shielded mats• Raise Zinc Injection rate to 10 ppb (2 cycles)• Ultrasonic Fuel Cleaning (next 2 cycles)• Decon and vacuum Fuel Transfer Canal

30

Page 31: INPO Presentation - Sequoyah SGRP

TVA -SNP

The End… Questions?